Sunteți pe pagina 1din 5

ROADS UNDER PACKAGE REWA 1 & 2 (As per Agreement)

Sr. No.

MDR. No.

Name of Road

MP-MDR-43-02 Kyonti Katra Lalgaon Road

MP-MDR-43-04 Mauganj Katra Road

District

Length
26.00
38.20

REWA

95.40

MP-MDR-43-11 Bahera Dabar Piprahi Jadkud Road

15.00

MP-MDR-43-12 Naigarhi Devtalab Road

16.20

MP-MDR-44-14 Jigna Bahri Road via New Ramnagar

24.40

MP-MDR-44-16 Kharamseda Kirhai Ramgarh Road

44.00
SATNA

MP-MDR-44-19 Jharkua Raigaon Karsara

MP-MDR-44-23

MP-MDR-45-02 Sidhi Tikri Road

105.00
24.20

Bhatura Bhadpur Barrakhurd Road (19.40 - 7.00


PMGSY = 12.90 Kms)

Nakjhar Jauar Road (15.80 Handed Over to


PMGSY)

12.40
33.60
SIDHI

42.60

10

MP-MDR-45-14

11

MP-MDR-46-03 Parsona-Mada Road

24.40

12

MP-MDR-46-04 Ramgarh Mada Road

22.60

13

MP-MDR-46-08

14

Harphari Khaira Misirgawan via Shivpurva Road


(29.40 Kms Handed over to PMGSY)

MP-MDR-46-01 Beohari Manpur Karkedi Road (Km 26/10 to 46)

16

MP-MDR-47-02 Anooppur Jaitpur Road

17

MP-MDR-47-05 Rajendragram Jethari Kotma Road

18
19

9.00

SINGRAULI

113.49
27.00

Karthua-Chitrangi Road

15

39.49
UMARIA

20.20

ANOOPPUR

Jaithari Rajendragram via Dharamdas Road

55.00

15.60
47.60

20

MP-MDR-48-07 Bataudh to Shahpura Road (Km 1 to 32/10)

32.00

21

MP-MDR-49-04 Anooppur Jaitpur Road (Km 17 to 42)

26.00

22

MP-MDR-49-08 Gohparu Rasmohni Budhar (via Bathiya) Road

33.17
SHAHDOL

111.57

23

MP-MDR-49-02 Beohari Manpur Road

28.00

24

MP-MDR-49-07 Pasgarhi Devri Janakpur Road

24.40

Total Length

Total Length

90.70

29.50

MP-MDR-48-06 Sakka to Amarpur Road (Km 1 to 16/6)

Patna- Sarai Road (To be extended Upto Badi


Tummi)

20.20

6.20

DINDORI

25

District
Total
Length

626.56
UMARIA &
Annuppur

39.40

665.96

39.40

Madhya Pradesh Road Development Corporation Ltd.


45-A, Arera Hills, Bhopal

Proposed list of Roads under ADB-IV Scheme


Sr. no

Name of Road

MDR No.

District

Agreement
Length (In Km)

Prposed Length
(In Km)

Forest
(In Km.)

Traffic in
PCU

Category

Remark

Pkg-7 Rewa I & II Divsion


1

MP-MDR-43-04/16,45-09

Naigarhi (Lalganj Mod)-Mauganj(NH-7)-Baheradabar-Patpara-Sidhi(NH-75) Road

Sidhi

38.2

51.60

Nil

766.00

Road is proposed to extended upto Sidhi better


Conectivity

MP-MDR-43-02/10/04/12

Baikunthpur-Keoti-Lalgaon-Katra Ghuma(NH-27)-Lalganj-Naigarhi-Devtalab
Road(NH-7)

Rewa

42.2

75.00

Nil

582.00

Road is proposed to extended upto Baikunthpur


better Connectivity

Raipur Karchuliyan(NH-7) Manikwar-Sitapur-Panni(NH-7)Road

Rewa

55.70

Nil

1821.00

Hon'ble Minister, Shri Rajendra Shukla,


(New Proposed Road Reccomended by Public
Representative)

Gurh(Badwar)-Sitapur-Mauganj (NH-7) Road

Rewa

40.00

Nil

1456.00

Hon'ble Minister,
Shri Rajendra Shukla,
(New Proposed Road Reccomended by Public
Representative)

Annupur

37.00

5.55

1311.00

New Proposed Road Reccomended by Public


Representativen& Loacal Administration

Satna / Katni

12.4

37.50

Nil

2668.00

Road is proposed to extended upto


Vijayraghavgarh for proper connectivity

MP-MDR-47-06

MP-MDR-44-23/39-13

Anuppur-Jaithari-Venkatnagar Road
Bhadanpur Vijayraghavgarh Road
Patna- Sarai Road (To be extended Upto Badi Tummi)

Annupur

Total A

39.4

84.90

132.20

381.70

Shri Nand Kumar Collector Annupur

MP-MDR-44-14

Jigna-Gorsari-Road via New Ramnagar

Satna

24.4

24.2

1.12

945.00

MP-MDR-44-19

Jharkua Raigaon Karsara

Satna

24.2

24.2

0.00

514.00

10

MP-MDR-45-02

Sidhi Tikri Road

Sidhi

33.6

33.6

0.00

1047.00

11

MP-MDR-47-02/49-04

Anuppur-Jaitpur(Bathiya) Road

Anuppur

32.2

38.74

0.38

592.00

12

MP-MDR-47-05

Rajendragram Jethari Kotma Road

Anooppur

55

55

13

Kuandhyuliya-Naudhiya-Opadokhar-Hardi Mukundpur-Amilki Road

Rewa

15.8

14

Rewa-Duari Nowbasta Bela Road

Rewa

20.2

169.40

211.74

15

MP-MDR-44-16

Kharamseda Kirhai Ramgarh Road

Total B
Satna

44.00

34.50

16

MP-MDR-45-14

Nakjhar Jauar Road Length 15.80 Handev Over to PMGSY

Sidhi

17

MP-MDR-43-11

Baheradabar (Ramnagar)-Piprahi-Jadkud Road

Rewa

15

54.3

18

MP-MDR-46-03

Parsona(Rajmilan)-Mada Road

Singrauli

24.4

24.4

19

MP-MDR-46-04

Ramgarh Mada Road

Singrauli

22.6

22.6

20

MP-MDR-46-08

Harphari -Dhani-Khaira (Upto SH-49 Road)

Singrauli

21
22

Karthua-Chitrangi Road
MP-MDR-46-01

23

Singrauli

B
Proposed
Sanctuary

262

Hon'ble Minister,
Shri Rajendra Shukla,
(New Proposed Road Reccomended by Public
Representative)

Hon'ble Minister,
Shri Rajendra Shukla,
(New Proposed Road Reccomended by Public
Representative)

C
C

May be deleted as Nakjhar & Lauar both are well


connected with PMGSY Road, Nakjhar to Lauar
is fully new Alignment

644.00

Road is proposed to extented upto Ramnagar and


Jadkud for Interstate Connectivity (MP/UP),
15KM does not server the purpose

1512.00

C
C

27

27

39.49

39.49

C
C

Beohari Manpur Karkedi Road Km 26/10 to 46

Umariya

20.2

20.2

Jaithari Rajendragram via Dharamdas Road

13.50

224.00

Anooppur

29.5

29.5

24

MP-MDR-48-06

Sakka-Amarpur-Samnapur Road

Dindori

15.6

30.8

1.54

503

25

MP-MDR-48-07

Shahpura -Bataudh upto Pali Road

Dindori

32

56.3

16.89

1065

26

MP-MDR-49-08

Gohparu(Rasmohni)-Budhar (via Bathiya) Road

Shahdol

33.17

39.17

3.14

9.43

27

MP-MDR-49-02

Beohari Manpur Road

Shahdol

28

28

28

MP-MDR-49-07

Pasgarhi-Deori-Budwa upto SH-9 Road

Shahdol

24.4

23

4.6

1136

364.36
665.96

438.26
979.90

Total C
Suggested Road Length
Page 2 of 5

No clear ROW available along the Road hence


may be deleted.

C
C

Road falls in buffer zone of Bandhawgarh wild


life Sanctuary hence may be deleted from the list

Annexure-'E'

UP-GRADATION OF MDR's IN MADHYA PRADESH UNDER M.P. ROAD DEVELOPMENT PROGRAMME - IV


ROADS UNDER PACKAGE REWA 1 & 2
Length

Road
Inventory

Pavement
Condition
Survey

CD Inventory &
Condition
Survey

BBD
Survey

Pavement
Investigatio
n

Roughness
Survey

Geometric
Design

BOQ

Feasibility

Kyonti Katra Lalgaon Road

26.00

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Completed

Ongoing

Ongoing

Mauganj Katra Road

38.20

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Completed

Ongoing

Ongoing

Bahera Dabar Piprahi Jadkud Road

15.00

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

To be done

To be done

To be done

Naigarhi Devtalab Road

16.20

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Ongoing

Ongoing

Ongoing

Jigna Bahri Road via New Ramnagar

24.40

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Ongoing

Ongoing

Ongoing

Kharamseda Kirhai Ramgarh Road

44.00

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Ongoing

Ongoing

Ongoing

Jharkua Raigaon Karsara

24.20

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Ongoing

Ongoing

Ongoing

Bhatura Bhadpur Barrakhurd Road (19.40 - 7.00


PMGSY = 12.90 Kms)

12.40

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Ongoing

Ongoing

Ongoing

Sidhi Tikri Road

33.60

Completed

Completed

Completed

Completed

Completed

NA

Completed

Completed

Completed

Ongoing

Ongoing

10

Nakjhar Jauar Road (15.80 Handed Over to PMGSY)

9.00

11

Parsona-Mada Road

24.40

To be done

To be done

To be done

Completed

On going

NA

On going

On going

To be done

To be done

To be done

Ramgarh Mada Road

22.60

13

Harphari Khaira Misirgawan via Shivpurva Road


(29.40 Kms Handed over to PMGSY)

27.00

To be done

To be done

To be done

Completed

On going

NA

On going

On going

Ongoing

Ongoing

Ongoing

14

Karthua-Chitrangi Road

39.49

Beohari Manpur Karkedi Road (Km 26/10 to 46)

20.20

Anooppur Jaitpur Road

6.20

Completed

Completed

Completed

Completed

On going

NA

On going

On going

To be done

To be done

To be done

Rajendragram Jethari Kotma Road

55.00

Completed

Completed

Completed

Completed

On going

NA

On going

On going

To be done

To be done

To be done

Jaithari Rajendragram via Dharamdas Road

29.50

Sakka to Amarpur Road (Km 1 to 16/6)

15.60

Completed

Completed

Completed

Completed

On going

NA

On going

On going

Ongoing

Ongoing

Ongoing

20

Bataudh to Shahpura Road (Km 1 to 32/10)

32.00

Completed

Completed

Completed

Completed

On going

NA

On going

On going

Ongoing

Ongoing

Ongoing

21

Anooppur Jaitpur Road

26.00

Completed

Completed

Completed

Completed

On going

NA

On going

On going

To be done

To be done

To be done

Gohparu Rasmohni Budhar (via Bathiya) Road

33.17

Completed

Completed

Completed

Completed

On going

NA

On going

On going

To be done

To be done

To be done

23

Beohari Manpur Road

28.00

24

Pasgarhi Devri Janakpur Road

24.40

Completed

Completed

Completed

Completed

On going

NA

On going

On going

To be done

To be done

To be done

Patna-Sarai-Tumbi (badi) (SH-9 to NH-78 {Via SH-9A})


Road

39.40

Completed

Completed

Completed

Completed

On going

NA

Completed

Completed

On going

On going

On going

Sl.
No.

District

1
2

Name of Road

Traffic Surveys
Topographica
(VC/OD/Axle/TMC)
l Survey

REWA

6
SATNA

9
SIDHI

12
SINGRAULI

15

UMARIA

16
17

ANOOPPUR

18
19
DINDORI

22
SHAHDOL

25

Umariya &
Annuppur

ROADS UNDER PACKAGE REWA 1 & 2 (As per Agreement)


Sr. No.

MDR. No.

Name of Road

District

Length

BORE LOCATIONS & STRUCTURE DETAILS

MP-MDR-43-02 Kyonti Katra Lalgaon Road

MP-MDR-43-04 Mauganj Katra Road

MP-MDR-43-11 Bahera Dabar Piprahi Jadkud Road

MP-MDR-43-12 Naigarhi Devtalab Road

16.20

12.800

Slab 2 x 8.0

14.450

VCW 7 x 1000

MP-MDR-44-14 Jigna Bahri Road via New Ramnagar

24.40

5.00

Arch - 2 x 3.0 m

10.30

Slab - 1 x 5.8 m

MP-MDR-44-16 Kharamseda Kirhai Ramgarh Road

MP-MDR-44-19 Jharkua Raigaon Karsara

Bhatura Bhadpur Barrakhurd Road (19.40 - 7.00


MP-MDR-44-23
PMGSY = 12.90 Kms)

MP-MDR-45-02 Sidhi Tikri Road


Nakjhar Jauar Road (15.80 Handed Over to
PMGSY)

REWA

26.00

6.70 Slab Culvert-1 x 7.0

38.20

4.35

15.00

44.00
SATNA

SIDHI

16.3

SLAB - 7 x 3.0 m

12.40

5.3

Slab - 3 x 4.0 m

14.5

vcw 10 x 1000 m

33.60

7.1

vcw 10 x 1000 m

14.9

vcw 10 x 1000 m 24.725

1.65

SLAB 3 X 5.00 M

15.60

4.9

Vcw - 4 x 900 mm

13.3

32.00

15.6

vcw - 4 x 1000 mm

27.8 Vcw - 20 x 1200 mm

26.00

21.6

Vcw - 10 x 750 mm

33.17

11.00

SLAB 3 X 7.80 M

MP-MDR-46-03 Parsona-Mada Road

24.40

12

MP-MDR-46-04 Ramgarh Mada Road

22.60

13

MP-MDR-46-08

16

MP-MDR-47-02 Anooppur Jaitpur Road

17

MP-MDR-47-05 Rajendragram Jethari Kotma Road

18

27.00
39.49
UMARIA

MP-MDR-48-06 Sakka to Amarpur Road (Km 1 to 16/6)

20

MP-MDR-48-07 Bataudh to Shahpura Road (Km 1 to 32/10)

21

MP-MDR-49-04 Anooppur Jaitpur Road (Km 17 to 42)

22

MP-MDR-49-08 Gohparu Rasmohni Budhar (via Bathiya) Road

23

MP-MDR-49-02 Beohari Manpur Road

24

MP-MDR-49-07 Pasgarhi Devri Janakpur Road

Total Length

20.20
6.20

ANOOPPUR

Jaithari Rajendragram via Dharamdas Road

19

9.00

SINGRAULI

Karthua-Chitrangi Road
MP-MDR-46-01 Beohari Manpur Karkedi Road (Km 26/10 to 46)

17.80 SLAB - 10 x 3.0 m 22.40 SLAB - 1 x 8.40 m

Slab 1 X 5.5 M

11

15

12.90 Vcw - 6 x 600 mm


2.40

MP-MDR-45-14

14

11.80 Vcw - 6 x 1000 mm 12.80 VCW - 3 x 1200 mm

24.20

10

Harphari Khaira Misirgawan via Shivpurva Road


(29.40 Kms Handed over to PMGSY)

Vcw - 2 x 750 mm

55.00
29.50

DINDORI

SHAHDOL

28.00
24.40

626.56

vcw - 4 x 1000 mm

Slab 1 x 6.0

25

Patna- Sarai Road (To be extended Upto Badi


Tummi)

Total Length

UMARIA &
Annuppur

39.40

665.96

S-ar putea să vă placă și