Sunteți pe pagina 1din 27

PLANILLA #2

OBRA: REMODELACION IGLESIA SANTISIMO ROSARIO


SECTOR:
CONTRATISTA: LLERENCORP S.A.
FISACALIZADOR: ING. ALFREDO ELIZALDE
VALOR DEL CONTRATO: USD. 199070.38
PLAZO DE EJECUCION: 120 DIAS
CODIGO DEL CONTRATO: MCO-GSXXI-014-2014
COD
DESCRIPCION
DEMOLICIONES, REMOCIONES Y RETIROS
1002 DEMOLICION Y DESALOJO DE PAREDES DE MAMPOSTERIA

PLAZO TRANSCURRIDO: 30 DIAS


ENTREGA DEL ANTICIPO:
PERIODO EJECUCION PLANILLA:DEL 15-DIC AL 13-ENE-2015
FECHA DE PRESENTACION: 15 DE ENERO DEL 2015
UNIDAD

CANT.

PRECIO U.

TOTAL

ANTERIOR
ACTUAL
CANTIDAD
TOTAL
CANTIDAD
TOTAL
879.59
289.50 $
1,149.32
0.00 $

ACUMULADO
CANTIDAD
TOTAL
289.50 $
1,149.32

PORCENTAJE

m2

221.56

3.97

1004 DEMOLICON Y DESALOJO DE HORMIGON ARMADO (RIOSTRAS, PILARES, ETC.)

m3

7.91

53.40

422.39

42.84

2,287.66

0.00 $

42.84

2,287.66

130.66%
541.59%

1006 DEMOLICON Y DESALOJO DE HORMIGON SIMPLE

m3

1.00

32.04

32.04

41.85

1,340.87

0.00 $

41.85

1,340.87

4185.00%

1008 RETIRO Y DESALOJO DE MALLA O REJA DE CERRAMIENTO

m2

34.30

5.36

183.85

22.59

121.08

0.00 $

22.59

121.08

65.86%

1010 RETIRO Y DESALOJO DE DE BALDOSA

m2

173.23

3.46

599.38

229.07

792.58

0.00 $

229.07

792.58

132.23%

1012 RETIRO Y DESALOJO DE CUBIERTA Y ESTRUCTURA

m2

263.45

9.73

2,563.37

204.00

1,984.92

0.00 $

204.00

1,984.92

77.43%

1014 RETIRO Y DESALOJO DE TUMBADO

m2

142.80

2.15

307.02

155.04

333.34

0.00 $

155.04

333.34

108.57%

1016 RETIRO DE RECUBRIMIENTO DE MADERA EN PAREDES

m2

40.65

5.43

220.73

57.01

309.56

0.00 $

57.01

309.56

140.24%

1018 RETIRO Y DESALOJO DE PUERTA DE MADERA

1.00

10.19

10.19

2.00

20.38

0.00 $

2.00

20.38

200.00%

1020 RETIRO Y DESALOJO DE PUERTA METALICA

1.00

15.61

15.61

6.00

93.66

0.00 $

6.00

93.66

600.00%

1022 RETIRO DE ARBOLES < 4 M.

2.00

62.96

125.92

2.00

125.92

0.00 $

2.00

125.92

100.00%

1024 RETIRO Y DESALOJO DE ESPECIES VEGETALES

5.00

17.11

85.55

25.00

427.75

0.00 $

25.00

427.75

500.00%

5,445.64

8,987.04

0.00

8,987.04

MOVIMIENTO DE TIERRA
1026 EXCAVACION A MAQUINA Y DESALOJO

m3

420.13

8.19

3,440.86

403.77

3,306.88

65.07

532.92

468.84

3,839.80

111.59%

1028 RELLENO COMPACTADO

m3

546.41

12.06

6,589.70

270.59

3,263.32

232.12

2,799.37

502.71

6,062.68

92.00%

10,030.57

6,570.20

3,332.29

9,902.49

OBRAS DE HORMIGON
1030 HORMIGON ESTRUCTURAL F'C=280 KG/CM2

m3

75.00

303.89

22,791.75

1032 HORMIGON ESTRUCTURAL F'C=210 KG/CM2 (MUROS, ETC.)

m3

1.12

291.45

326.42

1034 ACERO DE REFUERZO F'Y=4200 KG/CM2

kg

15,125.00

2.20

33,275.00

1036 CONTRAPISO DE HORMIGON SIMPLE FC=210 KG/CM2

m2

344.00

15.86

5,455.84

1038 HORMIGON DE LOSA F'C=280 KG/CM2 H=25 CM

m3

25.20

331.95

8,365.14

12.00

1040 HORMIGON DE LOSA DE CUBIERTA F'C=280 KG/CM2 H=20 CM

m3

7.38

2883.34

6,343.35

56.39

$
$

4273.33

$
$

17,136.36
9,401.33
-

56.39
0.00
7156.67

$ 17,136.36
$

$ 15,744.67
-

0.00

3,983.40

12.00

3,983.40

47.62%

2,675.03

2,675.03

56.77%

13.00

362.47

4,712.11

7.38

2.00

190.68

381.36

0.00

1044 RAMPA PEATONAL F'C=210 KG/C2

m2

9.10

27.14

246.97

0.00

1046 REPLANTILLO E=0,05 M. F'C=50 A 80 KG/CM2

m2

79.00

13.07

1,032.53

95.76

85.58

76,587.13

1,118.53

10.18

0.00%
47.32%

1042 CUPULA DE BASE CUADRADA F'C=280 KG/CM2

75.19%

7,461.88

133.05
33,329.17

1,251.58

0.00%

0.00%
0.00%
121.22%

40,791.04

ALBAILERIA
1048 PAREDES DE MAMPOSTERIA
1050

ENLUCIDO INTERIOR-EXTERIOR, INCLUYE FILOS, CUADRADA DE BOQUETES Y


RAYADO

1052 ENLUCIDO DE TUMBADO (LOSA)


1054 MOLDURAS, TACOS, ETC.

m2

523.00

14.45

7,557.35

0.00

0.00%

m2

1,046.00

7.46

7,803.16

0.00

0.00%

m2

72.00

8.05

579.60

0.00

0.00%

137.00

8.59

1,176.83

0.00

0.00%

17,116.94

0.00

0.00

0.00

PLANILLA #2
OBRA: REMODELACION IGLESIA SANTISIMO ROSARIO
SECTOR:
CONTRATISTA: LLERENCORP S.A.
FISACALIZADOR: ING. ALFREDO ELIZALDE
VALOR DEL CONTRATO: USD. 199070.38
PLAZO DE EJECUCION: 120 DIAS
CODIGO DEL CONTRATO: MCO-GSXXI-014-2014
COD
DESCRIPCION
DEMOLICIONES, REMOCIONES Y RETIROS
RECUBRIMIENTOS

PLAZO TRANSCURRIDO: 30 DIAS


ENTREGA DEL ANTICIPO:
PERIODO EJECUCION PLANILLA:DEL 15-DIC AL 13-ENE-2015
FECHA DE PRESENTACION: 15 DE ENERO DEL 2015
UNIDAD

CANT.

PRECIO U.

TOTAL

ANTERIOR
CANTIDAD
TOTAL

CANTIDAD

ACTUAL
TOTAL

ACUMULADO
CANTIDAD
TOTAL

PORCENTAJE

1056 PISO DE PORCELANATO DE 50X50 CM.

m2

325.00

26.82

8,716.50

0.00

0.00%

1058 PISO DE PORCELANATO DE 30X30 CM.

m2

4.40

26.73

117.61

0.00

0.00%

1060 CERAMICA

m2

13.00

26.17

340.21

0.00

0.00%

1062 FACHALETAS

m2

30.00

12.11

363.30

0.00

0.00%

1064 PINTURA LATEX EN PAREDES INTERIOR-EXTERIORES

m2

673.40

5.52

3,717.17

0.00

0.00%

1066 PINTURA ESMALTE

m2

288.60

4.96

1,431.46

0.00

0.00%

1068 PINTURA LATEX EN TUMBADO

m2

120.72

5.65

682.07

0.00

0.00%

1070 FALDON DE CEMENTO FORRADO DE MADERA

m2

9.30

35.86

333.50

0.00

0.00%

1072 TUMBADO DE DUELAS

m2

293.02

52.35

15,339.60

0.00

0.00%

1074 TUMBADO FALSO TIPO LOSA

m2

18.02

22.50

405.45

0.00

0.00%

1076 PIEDRA TIPO ESPACATO (PARED DEL FONDO DE LA IGLESIA)

m2

31.40

41.69

1,309.07

0.00

0.00%

1078 RECUBRIMIENTO DE GRANITO PULIDO (ESCALONES, ASIENTOS, GUARDA, ETC.)

m2

22.30

85.98

1,917.35

0.00

0.00%

1080 RECUBRIMIENTO CON MURANGLAS (CUPULAS)

m2

6.13

31.95

195.85

0.00

0.00%

1082 SUMINISTRO E INSTALACION DE CUBIERTA TIPO TEJA CUENCANA

m2

20.00

21.98

439.60

0.00

0.00%

1084 SUMINISTRO E INSTALACION DE ETERNIT

m2

230.00

33.99

7,817.70

0.00

0.00%

43,126.43

0.00

0.00

0.00

INSTALACIONES SANITARIAS
1086 INODORO DE TANQUE

2.00

127.52

255.04

0.00

0.00%

1088 LAVAMANOS

2.00

74.16

148.32

0.00

0.00%

1090 SUMINISTRO E INSTALACION DE TUBERIA PVC D=110 MM.

30.00

15.11

453.30

0.00

0.00%

m2

30.00

6.21

186.30

0.00

0.00%

1092 SUMINISTRO E INSTALACION DE TUBERIA PVC UNION ROSCABLE 1/2"


1094 PUNTO DE AA.PP.

4.00

40.32

161.28

0.00

0.00%

1096 PUNTO DE AA.SS.

4.00

40.56

162.24

0.00

0.00%

1098 CAJA DE REGISTRO (80X80X80) CM.

2.00

81.39

162.78

0.00

0.00%

1,529.26

0.00

0.00

0.00

INSTALACIONES ELECTRICAS
1100 ACOMETIDA DE BAJA TENSION

20.00

30.43

608.60

0.00

0.00%

1102 TABLERO DE MEDIDOR

1.00

263.68

263.68

0.00

0.00%

1104 PANEL DE DISYUNTORES (INC. PD1-PD2-PD3)

1.00

1,180.32

1,180.32

0.00

0.00%

1106 PUNTO DE LUZ

50.00

38.17

1,908.50

0.00

0.00%

1108 APLIQUES DE PARED

16.00

24.04

384.64

0.00

0.00%

1110 LAMPARAS COLGANTES HQI 150 W.

4.00

356.18

1,424.72

0.00

0.00%

1112 REFLECTORES

11.00

91.83

1,010.13

0.00

0.00%

1114 LAMPARA EMBUTIDA PISO DE 120V. 75 W.

10.00

102.37

1,023.70

0.00

0.00%

1116 INTERRUPTOR SENCILLO

8.00

26.94

215.52

0.00

0.00%

1118 INTERRUPTOR DOBLE

6.00

32.97

197.82

0.00

0.00%

1120 INTERRUPTOR TRIPLE

5.00

39.42

197.10

0.00

0.00%

1122 PUNTO DE TOMACORRIENTE DOBLES DE 120 V.

23.00

40.66

935.18

0.00

0.00%

1124 PUNTO DE TOMACORRIENTE DE 120 V. ESPECIALES

5.00

43.63

218.15

0.00

0.00%

1126 PUNTO DE TOMACORRIENTE DE 240 V.

7.00

48.01

336.07

0.00

0.00%

1128 PUNTO DE CENTRO DE MUSICA

1.00

387.76

387.76

0.00

0.00%

PLANILLA #2
OBRA: REMODELACION IGLESIA SANTISIMO ROSARIO
SECTOR:
CONTRATISTA: LLERENCORP S.A.
FISACALIZADOR: ING. ALFREDO ELIZALDE
VALOR DEL CONTRATO: USD. 199070.38
PLAZO DE EJECUCION: 120 DIAS
CODIGO DEL CONTRATO: MCO-GSXXI-014-2014
COD
DESCRIPCION
DEMOLICIONES, REMOCIONES Y RETIROS
1130 PUNTO DE MICROFONO
1132 PUNTO DE PARLANTES

PLAZO TRANSCURRIDO: 30 DIAS


ENTREGA DEL ANTICIPO:
PERIODO EJECUCION PLANILLA:DEL 15-DIC AL 13-ENE-2015
FECHA DE PRESENTACION: 15 DE ENERO DEL 2015
UNIDAD

CANT.

PRECIO U.

TOTAL

5.00

34.78

ANTERIOR
CANTIDAD
TOTAL
173.90
$

10.00

31.96

319.60

10,785.39

ACTUAL
TOTAL
$

CANTIDAD

0.00

ACUMULADO
CANTIDAD
TOTAL
0.00 $
0.00

0.00

PORCENTAJE
-

0.00%

0.00%

0.00

TRABAJOS METALMECANICOS
1134 ESCALERA CIRCULAR (DE CARACOL)
1136 PASAMANO SOBRE MURO DE H.A. (MANGON DE ACERO)

u
ml

1.00

1,597.07

1,597.07

0.00

0.00%

12.00

89.03

1,068.36

0.00

0.00%

1138 CRUZ DE ACERO

2.00

103.80

207.60

0.00

0.00%

1140 VENTANA DE ACERO TIPO LOUVER (CHAZAS METALICAS)

2.00

179.34

358.68

0.00

0.00%

1142 ESCALERA DE GATO

1.00

277.76

277.76

0.00

0.00%

6,100.00

2.94

17,934.00

1051.25

1144

ESTRUCTURA DE CUBIERTA (SUMINISTRO, PROVISION E INSTALACION DE


ESTRUCTURA CON PERFILES METALICOS)

KG

21,443.47

1051.25

0.00

3,090.68
3,090.68

3,090.68

17.23%

3,090.68

PUERTAS - MADERA
1146 PUERTA DOBLE (1,00X2,00)(1,00X2,00)

2.00

1,213.76

2,427.52

0.00

0.00%

1148 PUERTA (1,00X2,00)

2.00

727.29

1,454.58

0.00

0.00%

1150 PUERTA DOBLE (0,90X2,00)(0,90X2,00)

1.00

277.32

277.32

0.00

0.00%

1152 PUERTA (0,70X2,00)

7.00

139.97

979.79

0.00

0.00%

1154 PUERTA DOBLE (0,60X2,00)(0,60X2,00)

1.00

243.54

243.54

0.00

0.00%

1156 PUERTA DOBLE (0,50X2,00)(0,50X2,00)

1.00

208.00

208.00

0.00

0.00%

5,590.75

0.00

0.00

0.00

VENTANAS - MADERA
1158 VENTANA (1,00X5,87X0,10)

2.00

1,779.03

3,558.06

0.00

0.00%

1160 VENTANA (1,00X2,70X0,10)

2.00

832.00

1,664.00

0.00

0.00%

1162 VENTANA (2,00X3,87X0,00)

1.00

1,184.50

1,184.50

0.00

0.00%

6,406.56

0.00

0.00

0.00

VARIOS
1164 MESA - ALTAR DE H.A. RECUBIERTO DE GRANITO

1.00

1,008.24

TOTAL

FACT.

PLANILLA

PLANILLA 1
PLANILLA 2

PERIODO
DESDE

HASTA

15-Nov-14 14-Dec-14
15-Dec-14 13-Jan-15

TOTALES

CONTRATISTA
CARLOS LLERENA

TOTAL

$ 23,019.12
$ 39,752.14

$ 62,771.26

COORDINADOR TECNICO
FS XXI

1,008.24

0.00

1,008.24

0.00

0.00

0.00

199,070.38

23,019.12

39,752.14

62,771.25

DESCUENTO
MATERIALES

0.00
0.00

0.00%
31.53%

DESCUENTO
DE ANTICIPO

$ 11,509.56
$ 19,876.07

RUBROS - CONTRATO - CONTRACTUAL


COSTOS DIRECTOS
$

$ 31,385.63

ADMINISTRADOR DEL CONTRATO


FM 2000

FISCALIZADOR
ING ALFREDO ELIZALDE

TOTAL BRUTO DE LA PLANILLA


DESCUENTO DE MATERIALES
SUB-TOTAL
(+) IVA
TOTAL DE FACTURA
DESCUENTO ANTICIPO
RETENCION IVA
IMPUESTO RENTA

39,752.14

$
$
$
$
$
$

39,752.14
0.00
39,752.14
4,770.26
44,522.40
19,876.07
1,431.08
397.52

TOTAL DESCUENTO

21,704.67

A PAGAR

22,817.73

12%
50%
30%
1%

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI


ITEM:

CODIGO:
1144

FISCALIZADOR

LLERENCORP S.A.
DESCRIPCION:
ESTRUCTURA DE CUBIERTA
(SUMINISTRO, PROVISION E
INSTALACION DE ESTRUCTURA CON
PERFILES METALICOS)

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

ALTURA

UBICACIN

PLANILLA:

TECNICA

PESO
KG
OBSERVACIONES
1051.250

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

CONTRACTUAL

1,051.25
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI


ITEM:

CODIGO:

LLERENCORP S.A.
DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON DE LOSA DE CUBIERTA


F'C=280 KG/CM2 H=20 CM

1040

UBICACIN
A1
A2
V11-12-VOL
V25
V26
V27
M1

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

ALTURA

9.63
2.20
9.63
4.00
4.35
3.55
1.40

4.20
1.40
0.40
0.20
0.20
0.20
0.30

0.20
0.20
0.20
0.20
0.20
0.20
0.20

CONTRACTUAL

VOLUMEN
M3
OBSERVACIONES
8.089
PAOS
0.616
PAOS
-0.770
-0.160
-0.174
-0.142
-0.084

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

7.375
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI


ITEM:

CODIGO:

LLERENCORP S.A.
DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON DE LOSA F'C=280


KG/CM2 H=25 CM

1038

UBICACIN
A1
A2
A3
A4
A5
A6
A7
A8
A9

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

ALTURA

5.4
2.80
2.80
2.80
5.25
2.54
5.20
2.15
2.10

3.36
1.14
2.87
1.14
0.81
1.86
0.32
1.13
1.13

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

CONTRACTUAL

VOLUMEN
M3
OBSERVACIONES
4.536
0.798
2.009
0.798
PAOS (LOSA DE
1.063
MEZZANINE
1.181
0.416
0.607
0.593

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

12.001
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

FISCALIZADOR

DESCRIPCION:
REPLANTILLO E=0,05 M. F'C=50 A
80 KG/CM2

1046

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

UBICACIN
CAMPANARIO
V4
V5
V6

ANCHO
2.25
0.50
0.50
0.50

LARGO
1.80
3.98
4.33
3.93

AREA
M2
4.05
1.99
2.17
1.97

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

10.18

OBSERVACIONES
OFICINA
OFICINA
OFICINA

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ITEM:

ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

CODIGO:

DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

1030

UBICACIN
V1-2-3 DESDE C1 A C4
V12-13-14 DESDE C9 A 1
V10-11 DESDE C13 C9
V21-22-23 DESDE C10 A C4
V19-20 DESDE C10 A C18
V7 DESDE C11 A C12
V8 DESDE C13 A V15
V9 DESDE V17 A C18
V15-16 DESDE V7 A C16
V17-18 DESDE V7 A C17
VZ DESDE C14 A C15
VZ DESDE C16 A C17
R1 DESDE C2 A R2
R1 DESDE C3 A R2
R2 DESDE C5 A C6
R2 DESDE C7 A C8
R2 DESDE C9 A C10

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

LARGO

ANCHO

ALTURA

12.55
12.09
8.55
12.60
8.32
12.70
4.55
4.50
6.82
6.79
2.95
2.95
5.30
5.50
12.78
12.78
12.78

0.25
0.25
0.25
0.25
0.25
0.30
0.25
0.25
0.20
0.20
0.25
0.25
0.20
0.20
0.25
0.25
0.25

0.25
0.20
0.40
0.20
0.40
0.40
0.20
0.20
0.40
0.40
0.20
0.20
0.25
0.25
0.40
0.40
0.40

VOLUMEN
M3
OBSERVACIONES
0.784
VIGA DE ZAPATA
0.605
VIGA DE ZAPATA
0.855
VIGA DE ZAPATA
0.630
VIGA DE ZAPATA
0.832
VIGA DE ZAPATA
1.524
VIGA DE ZAPATA
0.228
VIGA DE ZAPATA
0.225
VIGA DE ZAPATA
0.546
VIGA DE ZAPATA
0.543
VIGA DE ZAPATA
0.148
VIGA DE ZAPATA
0.148
VIGA DE ZAPATA
0.265
RIOSTRA
0.275
RIOSTRA
1.278
RIOSTRA
1.278
RIOSTRA
1.278
RIOSTRA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

11.442
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ITEM:

ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

CODIGO:
1030

DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

UBICACIN
V1-2-3 DESDE C1 A C4
V14 DESDE C1 A C5
V10-11-12-13 DESDE C13 A C7
V19-20-21-22-23 DESDE C18 A C4
V7 DESDE C11 A C12
V8 DESDE C13 A V15
V9 DESDE V17 A C18
V15-16 DESDE V7 A C16
V17-18 DESDE V7 A C17
VZ DESDE C14 A C15
VZ DESDE C16 A C17
C5
C6
C7
C8
C9
C10

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

LARGO

ANCHO

ALTURA

12.50
6.90
14.02
21.18
12.50
4.17
4.17
6.80
6.80
2.10
2.10
1.25
1.30
1.16
1.26
1.19
1.20

0.60
0.65
0.80
0.80
0.80
0.80
0.80
0.80
0.80
0.60
0.60
0.33
0.38
0.40
0.36
0.45
0.30

0.15
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.15
0.20
0.25
0.25
0.25
0.25
0.25
0.25

CONTRATADO

VOLUMEN
M3
OBSERVACIONES
1.125
ZAPATAS
0.897
ZAPATAS
2.244
ZAPATAS
3.389
ZAPATAS
2.000
ZAPATAS
0.667
ZAPATAS
0.667
ZAPATAS
1.088
ZAPATAS
1.088
ZAPATAS
0.189
ZAPATAS
0.252
ZAPATAS
0.104
BASE DE COL.
0.124
BASE DE COL.
0.116
BASE DE COL.
0.114
BASE DE COL.
0.134
BASE DE COL.
0.090
BASE DE COL.

75.00

ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

14.288
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

FISCALIZADOR

DESCRIPCION:
HORMIGON ESTRUCTURAL F'C=280
KG/CM2

1030

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

UBICACIN
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
C14
C15
C16
C17
C18

ALTURA

0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.40
0.40
0.30
0.30
0.30
PI = 3.1416
PI = 3.1416
0.30

0.35
0.25
0.25
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.60
0.60
0.30
0.30
0.30
r = 0.175
r = 0.175
0.30

2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94
2.94
3.07
3.07
2.94
2.94
2.94

VOLUMEN
M3
OBSERVACIONES
0.361
PB A MEZZANINE
0.221
PB A MEZZANINE
0.221
PB A MEZZANINE
0.361
PB A MEZZANINE
0.361
PB A MEZZANINE
0.361
PB A MEZZANINE
0.361
PB A MEZZANINE
0.361
PB A MEZZANINE
0.361
PB A MEZZANINE
0.361
PB A MEZZANINE
0.706
PB A MEZZANINE
0.706
PB A MEZZANINE
0.265
PB A MEZZANINE
0.277
PB A MEZZANINE
0.277
PB A MEZZANINE
0.283 PILAR REDONDO D=35
0.283
CM V= PI*r2*h
0.265
PB A MEZZANINE

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

6.392
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

FISCALIZADOR

DESCRIPCION:
HORMIGON ESTRUCTURAL F'C=280
KG/CM2

1030

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

UBICACIN
CAMPANARIO

C22
C23
V11-12-13-14
V20-21-22-23
V1-2-3

ALTURA

2.05
1.20
1.20
1.00
0.25
0.25
PI = 3.1416
PI = 3.1416
0.20
0.20
0.20

1.70
0.20
0.20
0.20
0.25
0.25
r = 0.175
r = 0.175
0.20
0.20
0.20

0.15
0.20
0.20
0.20
3.02
3.02
2.94
2.94
14.35
14.93
12.55

VOLUMEN
M3
OBSERVACIONES
0.523
LOSA
0.048
VIGA
0.048
VIGA
0.040
VIGA
0.189
COL PA
0.189
COL PA
0.283 PILAR REDONDO D=35
0.283
CM V= PI*r2*h
0.574
RIOSTRA
0.598
RIOSTRA
0.502
RIOSTRA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

3.277
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

1030

UBICACIN
V4
V5
V6
V4
V5
V6
R1
R1
R1
R1
C19
C20
C21
C24
C25

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

ALTURA

3.93
4.33
3.98
4.00
4.35
3.56
9.03
2.20
1.20
4.00
0.25
0.25
0.25
0.20
0.10

0.50
0.50
0.50
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.25
0.25
0.25
0.20
0.20

0.15
0.15
0.15
0.15
0.15
0.15
0.25
0.25
0.25
0.25
3.00
3.00
3.00
3.00
3.00

CONTRACTUAL

VOLUMEN
M3
OBSERVACIONES
0.295
ZAPATA
0.325
ZAPATA
0.299
ZAPATA
0.120
VIGA
0.131
VIGA
0.107
VIGA
0.452
RIOSTRA
0.110
RIOSTRA
0.060
RIOSTRA
0.200
RIOSTRA
0.188
COL. OFICINA
0.188
COL. OFICINA
0.188
COL. OFICINA
0.120
COL. OFICINA
0.060
COL. OFICINA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

2.843

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

1030

UBICACIN
V1-2-3
V14-15-16-17
V21-22-23-24

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

LARGO

0.20
0.20
0.20

0.40
0.40
0.40

12.55
14.35
14.93

CONTRACTUAL

VOLUMEN
M3
OBSERVACIONES
1.004
VIGA DE 1P
1.148
VIGA DE 1P
1.194
VIGA DE 1P

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

3.346

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ITEM:

ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

CODIGO:

DESCRIPCION:

FISCALIZADOR

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

1030

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

UBICACIN
V4
V5-6-7
V8-9-10
V11-12-VOL1 Y 2
V13
V18
V19
V20
V25
V26
V27
V28
V29
V30
V31
V32
V33
V34

LARGO

0.30
0.30
0.20
0.40
0.20
0.30
0.30
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.20

0.65
0.25
0.40
0.20
0.45
0.25
0.25
0.45
0.20
0.20
0.20
0.25
0.25
0.25
0.25
0.25
0.25
0.25

13.30
5.55
13.30
9.63
5.40
5.39
5.25
5.20
4.00
4.35
3.55
5.25
5.20
1.86
2.85
2.85
2.15
2.15

VOLUMEN
M3
OBSERVACIONES
2.594
VIGA DE 1P
0.416
VIGA DE 1P
1.064
VIGA DE 1P
0.770
VIGA DE 1P
0.486
VIGA DE 1P
0.404
VIGA DE 1P
0.394
VIGA DE 1P
0.468
VIGA DE 1P
0.160
VIGA DE 1P
0.174
VIGA DE 1P
0.142
VIGA DE 1P
0.263
VIGA DE 1P
0.260
VIGA DE 1P
0.093
VIGA DE 1P
0.143
VIGA DE 1P
0.143
VIGA DE 1P
0.108
VIGA DE 1P
0.108
VIGA DE 1P

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

8.190
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

1030

UBICACIN
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

ALTURA

0.35
0.30
0.30
0.35
0.35
0.35
0.35
0.35
0.35
0.35

0.35
0.25
0.25
0.35
0.35
0.35
0.35
0.35
0.35
0.35

2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65
2.65

CONTRACTUAL

VOLUMEN
M3
0.325
0.199
0.199
0.325
0.325
0.325
0.325
0.325
0.325
0.325

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

2.998
0.00

OBSERVACIONES
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA
MEZZANINE A CUBIERTA

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

1030

UBICACIN
V1-2-3
V15-16-17-18
V22-23-24-25

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

LARGO

0.20
0.20
0.20

0.40
0.40
0.40

12.55
14.35
14.93

CONTRACTUAL

VOLUMEN
M3
OBSERVACIONES
1.004
VIGA DE CUBIERTA
1.148
VIGA DE CUBIERTA
1.194
VIGA DE CUBIERTA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

3.346
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ITEM:

ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

CODIGO:

DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

HORMIGON ESTRUCTURAL F'C=280


KG/CM2

1030

UBICACIN
VA1
VA2
VA3
LOSA DE CAMPANARIO

FISCALIZADOR
UNIDAD:

Jan-15

PLANILLA:

TECNICA

LARGO

0.15
0.15
0.15
0.10

0.25
0.25
0.25
1.00

1.40
1.40
1.00
1.20

CONTRACTUAL

VOLUMEN
M3
OBSERVACIONES
0.053
VIGA DE CUBIERTA
0.053
VIGA DE CUBIERTA
0.038
VIGA DE CUBIERTA
0.120
PLACA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

0.264
0.00

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

1028

RELLENO COMPACTADO

FISCALIZADOR
ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

12.65

cota: +0.33

cota: +033

cota: -0.32 corte 1

cota: -0.32

12.80

DESCRIPCION

R1 DESDE C2 A R2
R1 DESDE C3 A R2
R2 DESDE C5 A C6
R2 DESDE C7 A C8
R2 DESDE C9 A C10
V7 DESDE C11 A C12
V7 DESDE C11 A C13
V15-16
V17-18
VI-2-3
V10-11-12-13 DESDE C13 A C7
V19-20-21-22-23 DESDE C18 A C4

V8 DESDE C13 A V15


V9 DESDE V17 A C18
VZ DESDE C14 A C15
VZ DESDE C14 A C16

cota: +0.33

cota: +033

cota: -0.32 corte 2

cota: -0.32

RECTANGULO
AREA
PROFUNDI
DAD
LARGO
ANCHO
M2
20.505
12.725
260.93
0.65
1.45
2.96
4.29
0.65
5.30
0.20
0.25
5.50
0.20
0.25
12.78
0.25
0.40
12.78
0.25
0.40
12.78
0.25
0.40
12.70
0.30
0.40
12.50
0.80
0.25
5.15
0.20
0.40
5.20
0.20
0.40
12.15
0.40
0.20
20.94
0.275
0.25
21.23
0.275
0.25
4.21
0.275
0.25
4.19
0.275
0.25
2.92
0.250
0.25
2.21
0.600
0.20

VOLUMEN
OBSERVACION
169.60
2.79
- 0.27
RIOSTRA
- 0.28
RIOSTRA
- 1.28
RIOSTRA
- 1.28
RIOSTRA
- 1.28
RIOSTRA
- 1.52
VIGA
- 2.50
ZAPATA
- 0.41
VIGA
- 0.42
VIGA
- 0.97
ZAPATA
- 1.44
ZAPATA
- 1.46
ZAPATA
- 0.29
ZAPATA
- 0.29
ZAPATA
- 0.18
VIGA
- 0.27
ZAPATA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

158.25

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

1028

RELLENO COMPACTADO

3.30

14.10
10.00

FISCALIZADOR
ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

3.30

0.80
1

cota: -1.12 cota: -1.12

TRAMO 1

TRAMO 2

cota: -1.12

TRAMO 3

10.00

cota: -1.12
cota: -1.12

cota: -1.12

cota: -1.28 corte 1

cota: -1.28

6.90

2-1

10.00

2-2

23.07

cota: -1.28

4.10

10.00

cota: -1.12

cota: 0.13

cota: -1.28 corte 2-2


TRAMO 6

cota: -1.12 cota: -1.12


cota: -1.12 cota: -1.12

cota: -1.12
cota: -1.12

cota: -1.12 cota: -1.12

cota: -1.12

4.10

DESCRIPCION CANTIDAD

TRAMO 5

10.00

1
1
1
1
1
1

1
2
3
4
5
6

0.80

cota: -1.12
cota: -1.28

16.17

4.10

10.00

cota: -1.12

cota: 0.13

cota: -1.28 corte 3


4.10

cota: -1.12

RECTANGULO
AREA
PROFUNDI
LARGO
ANCHO
M2
DAD
3.3
6.9
22.77
0.16
10
6.9
69.00
0.16
0.8
6.9
5.52
0.16
4.1
16.17
66.30
0.16
10
16.17
161.70
0.16
0.8
16.17
12.94
0.16

0.80

cota: -1.12
cota: -1.28

10.00

cota: 0.13

cota: -1.28 corte 4

0.80

TRAMO

0.80

cota: -1.12

cota: -1.12
cota: -1.28 corte 2-1

TRAMO 4

CONTRACTUAL

0.80

cota: -1.12

3.30

cota: -1.12 cota: -1.12


cota: -1.12 cota: -1.12

PLANILLA:

TECNICA

0.80

cota: -1.12
cota: -1.28

VOLUMEN
3.64
11.04
0.88
10.61
25.87
2.07

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

54.12

OBSERVACION

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

FISCALIZADOR

DESCRIPCION:

1028

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

RELLENO COMPACTADO

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

3.98

cota: -0.30

cota: -0.30

cota: -1.10 V-4

cota: -1.10

4.33

cota: -0.30

cota: -0.30

cota: -1.10 V-5

cota: -1.10

3.93

DESCRIPCION CANTIDAD

TRAMO
V4
V5
V6

RECTANGULO
LARGO
ANCHO
3.98
4.33
3.93

AREA
M2
0.80
0.80
0.80

PROFUNDI
DAD
3.18
3.46
3.14

0.80
0.80
0.80

cota: -0.30

cota: -0.30

cota: -1.10 V-6

cota: -1.10

VOLUMEN

OBSERVACION
2.55
2.77
2.52

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

7.83

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

1028

RELLENO COMPACTADO

FISCALIZADOR
ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

3.98

cota: +0.06

cota: +0.06

cota: -0.27 V-4

cota: -0.27

4.33

cota: +0.06

cota: +0.06

cota: -0.27 V-5

cota: -0.27

3.93

DESCRIPCION CANTIDAD

TRAMO

V4
V5
V6
V4
V5
V6
R1
R1
R2
R1

RECTANGULO
AREA
PROFUNDI
LARGO
ANCHO
M2
DAD
4.20
9.03
37.93
0.33
2.20
1.20
2.64
0.33
3.93
0.15
0.15
4.33
0.30
0.15
3.98
0.15
0.15
3.93
0.15
0.15
4.33
0.15
0.15
3.98
0.15
0.15
9.03
0.20
0.25
4.00
0.20
0.25
2.20
0.20
0.25
1.20
0.20
0.25

cota: +0.06

cota: +0.06

cota: -0.27 V-6

cota: -0.27

VOLUMEN
OBSERVACION
12.52
0.87
- 0.09
ZAPATA
- 0.19
ZAPATA
- 0.09
ZAPATA
- 0.09
VIGA
- 0.10
VIGA
- 0.09
VIGA
- 0.45
RIOSTRA
- 0.20
RIOSTRA
- 0.11
RIOSTRA
- 0.06
RIOSTRA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

11.92

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI


ITEM:

FISCALIZADOR

LLERENCORP S.A.

CODIGO:

DESCRIPCION:
EXCAVACION A MAQUINA Y
DESALOJO

1026

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

TECNICA

3.30
3.30

14.10
10.00

0.80
1

cota: -1.12 cota: -1.12

TRAMO 1

TRAMO 2

cota: -1.12

TRAMO 3

6.90

PLANILLA:

10.00

cota: -1.12

cota: -1.28 corte 1

cota: -1.28

10.00

cota: -1.12
cota: -1.12

2-1

TRAMO 6

cota: -1.12 cota: -1.12


cota: -1.12 cota: -1.12

cota: -1.12
cota: -1.12

cota: -1.12 cota: -1.12

cota: -1.12

4.10

DESCRIPCIOCANTIDAD
1
1
1
1
1
1

TRAMO 5

10.00

1
2
3
4
5
6

4.10

10.00

cota: -1.12

cota: 0.13

cota: -1.28 corte 2-2

0.80

cota: -1.12
cota: -1.28

16.17

4.10

10.00

cota: -1.12

cota: 0.13

cota: -1.28 corte 3

4.10

cota: -1.12

0.80

cota: -1.12
cota: -1.28

10.00

cota: 0.13

0.80

cota: -1.12

cota: -1.28 corte 4

0.80

TRAMO

cota: -1.28

cota: -1.28 corte 2-1

2-2

23.07

TRAMO 4

0.80

cota: -1.12

cota: -1.12
cota: -1.12 cota: -1.12
cota: -1.12 cota: -1.12

0.80

cota: -1.12

3.30

CONTRACTUAL

RECTANGULO
AREA
PROFUNDI
DAD
LARGO
ANCHO
M2
3.3
6.9
22.77
0.16
10
6.9
69.00
0.16
0.8
6.9
5.52
0.16
4.1
16.17
66.30
0.16
10
16.17
161.70
0.16
0.8
16.17
12.94
0.16

cota: -1.28

VOLUMEN OBSERVACION
3.64
11.04
0.88
10.61
25.87
2.07

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

54.12

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI


1026

LLERENCORP S.A.
DESCRIPCION:

ING. ALFREDO ELIZALDEL PULLEY

FECHA:

EXCAVACION A MAQUINA Y
DESALOJO

Jan-15

UNIDAD:
TECNICA

GRAFICO No 1 IMPLANTACION DEL AREA DE EXCAVACION

3.30

14.10
10.00

TRAMO 1

TRAMO 2

0.80

1
6.90

T
R
A
M
O
3

CODIGO:

2-1
2-2

23.07

TRAMO 4

TRAMO 5

T
R
A
M
O
6

ITEM:

FISCALIZADOR

16.17

3
4
4.10

10.00

0.80

PLANILLA:
CONTRACTUAL

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

FUNDACION SIGLO XXI


ITEM:

CODIGO:

CONTRATISTA:

LLERENCORP S.A.
DESCRIPCION:
EXCAVACION A MAQUINA Y
DESALOJO

1026

FISCALIZADOR
ING. ALFREDO ELIZALDEL PULLEY

FECHA:

UNIDAD:

Jan-15

PLANILLA:

TECNICA

CONTRACTUAL

3.98

cota: +0.02

cota: +0.02

cota: -1.10 V-4

cota: -1.10

4.33

cota: +0.02

cota: +0.02

cota: -1.10 V-5

cota: -1.10

3.93

DESCRIPCIOCANTIDAD

TRAMO
V4
V5
V6

cota: +0.02

cota: +0.02

cota: -1.10 V-6

cota: -1.10

RECTANGULO
AREA
PROFUNDI
DAD
LARGO
ANCHO
M2
3.98
0.80
3.18
1.12
4.33
0.80
3.46
1.12
3.93
0.80
3.14
1.12

VOLUMEN OBSERVACION
3.56
OFICINA
3.88
OFICINA
3.52
OFICINA

CONTRATADO
ADICIONAL
TOTAL EJECUTADO
POR EJECUTAR
contratista

Fiscalizador

10.95

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:
1030

DESCRIPCION:
HORMIGON ESTRUCTURAL F'C=280
KG/CM2

FISCALIZADOR
ING. ALFREDO ELIZALDEL PULLEY

FECHA:
Jan-15

DESCRIPCION
VIGAS DE ZAPATA Y RIOSTRA (IGLESIA)
ZAPATAS Y BASE DE COLUMNAS (IGLESIA)
COLUMNAS PB A MEZZANINE
CAMPANARIO, C22-23, Y RIOSTRAS DE 20x20 ENCIMA DE VIGAS DE ZAPATA
ZAPATAS, VIGAS, RIOSTRAS, COLUMNAS DE OFICINA
VIGAS DE 1P EN IGLESIA
VIGAS DE 1P EN LOSA DE IGLESIA Y OFICINA
COLUMNAS DE MEZZANINE A CUBIERTA
VIGAS DE CUBIERTA
VIGAS Y PLACA EN CAMPANARIO

CONTRATISTA
CARLOS LLERENA

UNIDAD:

PLANILLA:

TECNICA

CONTRACTUAL

UNIDAD
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
TOTAL

CANTIDAD
11.442
14.288
6.392
3.277
2.843
3.346
8.190
2.998
3.346
0.264
56.39

FISCALIZADOR

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:
1026

DESCRIPCION:
EXCAVACION A MAQUINA Y
DESALOJO

DESCRIPCION
EXCAVACION EN IGLESIA
EXCAVACION DE ZANJA PARA ZAPATAS EN OFICINA

CONTRATISTA
CARLOS LLERENA

FISCALIZADOR
ING. ALFREDO ELIZALDEL PULLEY

FECHA:
Jan-15

UNIDAD:

PLANILLA:

TECNICA

CONTRACTUAL

UNIDAD
M3
M3
TOTAL

CANTIDAD
54.12
10.95
65.07

FISCALIZADOR

MEMORIA DE CALCULO

Obra: REMODELACION DE LA IGLESIA SANTISIMO ROSARIO


ENTIDAD CONTRATANTE:

CONTRATISTA:

FUNDACION SIGLO XXI

LLERENCORP S.A.

ITEM:

CODIGO:

DESCRIPCION:

1028

RELLENO COMPACTADO
DESCRIPCION
SEGUNDO TRAMO DE RELLENO EN IGLESIA
PRIMER TRAMO DE RELLENO DESDE LA COTA -1,28 HASTA -1,12
RELLENO DE ZANJAS PARA ZAPATAS EN OFICINA
SEGUNDA CAPA DE RELLENO EN OFICINA

CONTRATISTA
CARLOS LLERENA

FISCALIZADOR
ING. ALFREDO ELIZALDEL PULLEY

FECHA:
Jan-15

UNIDAD:
TECNICA
UNIDAD
M3
M3
M3
M3
TOTAL

FISCALIZADOR

PLANILLA:
CONTRACTUAL
CANTIDAD
158.25
54.12
7.83
11.92
232.12