Pilot Plant will be tested in
Palembang Min. 6 Month
Contractor
Intake Ogan
Pilot Plant
Location
Koordinate:
3o0116.66 S
104o4620.00 E
Intake
UF Membrane Skid
Panel Control
Panel Control
Panel Control
Musi River
Prasedimentation
Tank Cover
Prasedimentation
Tank
Pra sedimentation
Tank Rack
Pra Sedimentation
Tank Skid
Tank Material : SS304
Rack Material : Carbon
Steel
Piping : SS 304 S10
Valve : Diaghprapm Valve
and Ball Valve
Membrane Tank
Membrane Tank
Skid
Compressor
Valves
Filtrate Pump
Product Tank
Product and
Chemical Tank
Skid
Product Tank
Chemical Pump
Chemical Tank
Space Required
4,5 meter x 3,2 meter
Thank you