REQUEST FOR INFORMATION NO :

192

- Require feedback within 7 days from RI date.

Request for Information


Project Title:

- Urgent, require feedback by:___27/07/15_____________

KERIAN HYDROELECTRIC PROJECT - GENERAL CONSTRUCTION PACKAGE


(CONTRACT NO: 514300/KHEP/C1)

Subject:

Bintang Power House - Cross Section updated

Attention:

En. K.J Arief Budiawan (Resident Engineer)

PART A
Query:
1)Please update the cross section drawing which is SECTION 4(dwg no. 514300/DST/PH/314
rev.02) & SECTION 15(dwh no. 514300/DST/PH/345 rev.0). This cross section its important to
determine the shape of column & turbine foundation. (see attachment)

Location:
Drawing No:
MOHD KHAIRUL

Bintang Power House


514300/DST/PH/301 REV.03, 514300/DST/PH/314 REV.02,
514300/DST/PH/345REV.00
(name)

mohd khairul

(signature)

24-07-15

(date)

PART B
Reply/Comments:

____________________ (name) _____________________ (signature) __________________ (date)


Acknowledge Received:

( date )
Distribution : 1. SMEC - HQ

Form No: SS01.8

2.

WORK FOR THE NEXT WEEK

WORK FOR THE NEXT 2 WEEKS

OLD CROSS SECTION


DRAWING DIDNT REFLECT
WITH LAYOUT PLAN & OTHERS
CROSS SECTION

PROGRESS ON SITE

FOUNDATION FOR BASE FOR FUTURE


TURBINE DIDNT MATCH WITH SECTION 21
(DWG NO. 514300/DST/PH/349 REV.01)

LEVEL OF TOP FOUNDATION FOR


COLUMN C3 DIDNT MATCH WITH SECTION
8 (DWG NO. 514300/DST/PH/319 REV.03)

LEVEL OF TOP FOUNDATION FOR


COLUMN C3 DIDNT MATCH WITH SECTION
6 (DWG NO. 514300/DST/PH/317 REV.03)

OIL SAPERATOR PIT

FOUNDATION FOR FUTURE


TURBINE DIDNT MATCH WITH
LAYOUT PLAN