PREPARE OF LIFTING AND ERECTION


FORM TRAVELER UNIVERSAL SATELITTE

jack.sunyoto

Existing CHECKING and Supervision July, 10th 2015

FT terpasang / masih
memerlukan
penyempurnaan

Batang
Kelapa

jack.sunyoto

Launching Unit FT c/w COCONUTS TRUNKS --

FT masih harus
maju 15 m

Batang Kelapa
Karena Roller Batang Kelapa kemungkinan Launching unit
Traveler under control ( Zig-Zag)
jack.sunyoto

EQUIPMENT LIST OF LIFTING AND ERECTION


FORM TRAVELER UNIVERSAL SATELITTE

jack.sunyoto

EQUIPMENT LIST TO BE THERE ---Rear


Hollow
Jack 50 T
Rear
Chair
Fixcit

Gantry
Lift
PT
Bar

Front
Chair

Front
Hollow
Jack 50 TUni
Chair

Static
Roller

jack.sunyoto

EQUIPMENT and PARTS UNITS ---COUPLER JOINT SYSTEM


HOLLOW JACK SYSTEM

HANGING LIFT SYSTEM

jack.sunyoto

METHOD of INSTALLATION : LIST of EQUIPMENT ----Equipment :


1.
Power pack system w/ hyd. jack
2 units
2.
Chain block caps 3 ton
6 units
3.
Lever block caps 3 ton
4 units
4.
Thread bar c/w nuts dia 36
4 sets (@21
m)
5.
Launching Roller
4 units
6.
Casting Hanger
4 units
7.
Control panel w/ safety lighting
1 units

jack.sunyoto

KINEMATICS SCHEME OF
FORM TRAVELER UNIVERSAL SATELITTE

jack.sunyoto

10

METHOD of INSTALLATION : KINEMATICS SCHEME of TRAVELER ---

Fixing of Casting Hanger, prepare FW


Stressing 1st Cable Stayed, prepare Concreting,
Jack up and Setting of FW, prepare Concreting,
Concreting of Beam and Cross Beam,
Prepare of Launching LH,
Going Front of LH and Dismantling of CH,
Launching of Main Truss and FT,

st

nd

Fixing of Casting Hanger, prepare FW


Stressing 1st Cable Stayed, prepare Concreting,
Jack up and Setting of FW, prepare Concreting,
Concreting of Beam and Cross Beam,
Prepare of Launching LH,
Going Front of LH and Dismantling of CH,
Launching of Main Truss and FT,
jack.sunyoto

11

PT BAR
Nuts PT
Bar
Washer

Sendi PT
Bar

Hollow
Jack

Chair - HJ
Universal
Satelitte
Static
Roller

jack.sunyoto

12

LIFTING AND ERECTION


FORM TRAVELER UNIVERSAL SATELITTE

jack.sunyoto

13

METHOD of INSTALLATION :
LAUNCHING and LIFTING UNIT TRAVELER
------------------------

1. Install of Gentry Lift,


2. Install and Fixing anchorage of Gentry Lif
3. Install of Rear Hollow Jack Unit,
4. Install of Universal Hollow Jack Universal
5. Install of Front Chair

jack.sunyoto

14

METHOD of INSTALLATION : 1st LAUNCHING UNIT


TRAVELER ------

jack.sunyoto

15

METHOD of INSTALLATION : 2nd LAUNCHING UNIT


TRAVELER ----

jack.sunyoto

16

METHOD of INSTALLATION : 3rd LAUNCHING UNIT


TRAVELER ----

jack.sunyoto

17

1
0

METHOD of INSTALLATION : end LAUNCHING UNIT


TRAVELER --

jack.sunyoto

18

1
1

METHOD of INSTALLATION : PREPARE and INSTALL PT BAR, RELEASE of


TEMPORARY STRESS BAR----

jack.sunyoto

19

1
2

METHOD of INSTALLATION : LIFTING TRAVELER ------

jack.sunyoto

20

METHOD of INSTALLATION : VIEW OF LIFTING TRAVELER


------

1
3

1
4

METHOD of INSTALLATION : FIXING CASHTING HANGER &


ROLLING HANGER DISMANTLING of PT. BAR, HYDRAULIC JACK,
GANTRY etc -

jack.sunyoto

22

1
5

METHOD of INSTALLATION :
INSTALL TEMPORARY PRESTRESS CABLE etc -----

jack.sunyoto

23

1
6

METHOD of INSTALLATION : JACKING UP FORMWORK


PREPARE of CONCRETING -----

jack.sunyoto

24

METHOD of INSTALLATION : CONCRETING of BEAM,


INSTALL ANCHORAGE PRESTRESS and STRESSING -----

jack.sunyoto

1
7

25

1
8

METHOD of INSTALLATION : JACKING DOWN of FORM WORK,PREPARE of 1ST LAUNC TRAVELER and ETC -----

jack.sunyoto

26

1
9

METHOD of INSTALLATION : GOING DOWN of CASTING HANGER,PREPARE of 1ST LAUNCH TRAVELER and ETC -----

jack.sunyoto

27

2
0

METHOD of INSTALLATION : DISMANTILING of PT BAR LAUNBHING


HANGER, MOVING OF ROLL -----

jack.sunyoto

28

2
1

METHOD of INSTALLATION : FIXING and ANCHORING of


ROLL --

jack.sunyoto

29

2
2

METHOD of INSTALLATION : DISMANTLING of FORM PT BAR,FIXING and ANCHORING of LAUNCHING HANGER---

jack.sunyoto

30

2
3

METHOD of INSTALLATION : STRESSING CABLE, JACK UP FORM


WORK and CONCRETING 2nd -----

jack.sunyoto

31

2
4

METHOD of INSTALLATION :
CONCRETING DECK and STRESSING CABLE STAYED ---

jack.sunyoto

32

END STRUCTURE
ATJ - CABLE STAYED BRIDGE
BAGIAN DARI PEKERJAAN MODIFIKASI TRAVELER
EX. PADAMARAN
SUB-SUPERVISI DAN LIFTING TRAVELER
jack.sunyoto

33

TERIMA KASIH
jack.sunyoto

34

S-ar putea să vă placă și