METHOD OF WORK
LIFTING and LAUNCHING TRAVELER
BAGIAN DARI PEKERJAAN MODIFIKASI TRAVELER
EX. PADAMARAN
SUB-SUPERVISI DAN LIFTING TRAVELER
jack.sunyoto
jack.sunyoto
FT terpasang / masih
memerlukan
penyempurnaan
Batang
Kelapa
jack.sunyoto
FT masih harus
maju 15 m
Batang Kelapa
Karena Roller Batang Kelapa kemungkinan Launching unit
Traveler under control ( Zig-Zag)
jack.sunyoto
jack.sunyoto
Gantry
Lift
PT
Bar
Front
Chair
Front
Hollow
Jack 50 TUni
Chair
Static
Roller
jack.sunyoto
jack.sunyoto
jack.sunyoto
KINEMATICS SCHEME OF
FORM TRAVELER UNIVERSAL SATELITTE
jack.sunyoto
10
st
nd
11
PT BAR
Nuts PT
Bar
Washer
Sendi PT
Bar
Hollow
Jack
Chair - HJ
Universal
Satelitte
Static
Roller
jack.sunyoto
12
jack.sunyoto
13
METHOD of INSTALLATION :
LAUNCHING and LIFTING UNIT TRAVELER
------------------------
jack.sunyoto
14
jack.sunyoto
15
jack.sunyoto
16
jack.sunyoto
17
1
0
jack.sunyoto
18
1
1
jack.sunyoto
19
1
2
jack.sunyoto
20
1
3
1
4
jack.sunyoto
22
1
5
METHOD of INSTALLATION :
INSTALL TEMPORARY PRESTRESS CABLE etc -----
jack.sunyoto
23
1
6
jack.sunyoto
24
jack.sunyoto
1
7
25
1
8
METHOD of INSTALLATION : JACKING DOWN of FORM WORK,PREPARE of 1ST LAUNC TRAVELER and ETC -----
jack.sunyoto
26
1
9
METHOD of INSTALLATION : GOING DOWN of CASTING HANGER,PREPARE of 1ST LAUNCH TRAVELER and ETC -----
jack.sunyoto
27
2
0
jack.sunyoto
28
2
1
jack.sunyoto
29
2
2
jack.sunyoto
30
2
3
jack.sunyoto
31
2
4
METHOD of INSTALLATION :
CONCRETING DECK and STRESSING CABLE STAYED ---
jack.sunyoto
32
END STRUCTURE
ATJ - CABLE STAYED BRIDGE
BAGIAN DARI PEKERJAAN MODIFIKASI TRAVELER
EX. PADAMARAN
SUB-SUPERVISI DAN LIFTING TRAVELER
jack.sunyoto
33
TERIMA KASIH
jack.sunyoto
34