Sunteți pe pagina 1din 19

CASE STUDY 1

Floor Plan

The WBF Complex

by Flad Architects

CASE STUDY 1

Brewing Science Laboratory

CASE STUDY 1

Teaching & Research Winery

CASE STUDY 1

Food Science Laboratory

CASE STUDY 1

Sustainable Highlights

CASE STUDY 2
Pack Line

by Lea Katz Architecture


Location: Industrial Zone Holon, Tel Aviv, Israel.
Project Area: 2,400 sqm (Production Area), 620sqm (Administrative
Area), 2,500 sqm (yard, Parking and Loading Bays)

Floor Plan

CASE STUDY 2

Spatial Arrangement and Flow

CASE STUDY 2

SOUTHEAST FAADE FACTORY BUILDING

STEEL ROOF TYPE AND ARRANGEMENT

SECTION SHOWING DOOR AND DUCT


DETAIL

CASE STUDY 2

A. EXTERIOR VIEW
B. SECTIONS
C. INSULATIN G ALUMINIUM
PANELS
D. INTERIOR HALL

CASE STUDY 4
NESTLE NIG. LTD
AGBARA MANUFACTURING COMPLEX
SONGIUM MALT EXTRACT PLANT AGBARA

EHPM PLANT, AGBARA

ENZYMATIC HYDROLIZED PLANT PROTEIN MIX FACTORY

NESTLE WATER PLANT, AGBARA

FACTORY ROAD CONSTRUCTION

CASE STUDY 4

NESTLE NIG. LTD


AGBARA MANUFACTURING COMPLEX

NESTLE WATER PLANT, AGBARA

INTERIOR- NESTLE WATER PLANT, AGBARA

CASE STUDY 4

NESTLE NIG. LTD


AGBARA MANUFACTURING COMPLEX

INTERIOR- NESTLE WATER PLANT, AGBARA

Jumbo Roller Dryer for All Family Cereals Plant

NESTLE WATER PLANT, AGBARA

CASE STUDY 4
NESTLE WATER PLANT, AGBARA

NESTLE NIG. LTD


AGBARA MANUFACTURING COMPLEX
NESTLE WASTE WATER PLANT, AGBARA

INTERIOR- NESTLE WATER PLANT, AGBARA

Vacuum Band Dryer for


Nestle MILO Production

Ware House for Raw


Material

Wrapping Machine for MAGGI


production

CASE STUDY 4

NESTLE NIG. LTD


AGBARA MANUFACTURING COMPLEX
TRI GENERATOR PLANT, AGBARA

Walk
Way

Agbara Factory Generator


Plant

Agbara Factory Clinic

Agbara Factory Canteen

Agbara Factory Fuel and


Diesel Dump

CASE STUDY 5
NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

SITE FEATURES
The site is located
close to Shagamu in
Ogun State. It sits
on a 36 Hectare Plot
and has facilities
that are separated
by different
structures spread
across the site. The
site is connected by
roads, rails and
walkways that
connects humans
and vehicles
through the various
facilities
on the site
SITE
FEATURES
The factory has a start up staff strength of 180 staffs but the number has
consistently increased over time. A huge parking space and greenery are
strong features of the site

CASE STUDY 5
NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

RAW MATERIAL STORAGE

CASE STUDY 5
NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

Cooling Towers at Watergate


Factory

MAGGI PRESSING AND


WRAPPING

CASE STUDY 5
NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

INDUSTRIAL SERVICE BUILDING


MIXING TOWER

CASE STUDY 5
NESTLE NIG. LTD
FLOWERGATE FACTORY, NEAR SHAGAMU IN OGUN STATE

Cooling Towers at Watergate


Factory

Chillers at Watergate Factory

S-ar putea să vă placă și