DOWN TIME STATUS

Press #

Reasons

24/03/2015
Downtime(min)
Responsible
Department
A
B
C

25/03/
Reasons

E-Row
E-01/02
E-03/04
E-05/06
E-07/08
E-09/10
F-Row
F-01/02
F-03/04
F-05/06
F-07/08
F-09/10
F-11/12
F-13/14
F-15/16
F-17/18
F-19/20
F-21/22
F-23/24
F-25/26
G-Row
G-01/02
G-03/04
G-05/06
G-07/08
G-09/10
G-11/12
G-13/14
G-15/16
G-17/18
G-19/20
G-21/22

BC
BC

BC(L), H/W line

IF

390

MF

180

MF

120

100
100
Tread Flash
220+90

480

Gland leak
BC

BOR Leak
BC(L), Shapping
U/L arm
PCI locking

MF
IF
MF,IF
MF
IF

60

Vacuum

MF,IF

U/L, PO, VCL

MF,EF,IF

PCI,BC

IF,BC

360

Shapping

IF

60

180
120+40
75
60
120

30

PCI
U/L arm,PCI
PCI unlocking
PCI, Operating
PCI airpipe leak
BC
C/W tubeleak

30+45+30 60+60

U/L arm

IF
MF

120
120

BC,Shapping

BC,IF

90

J-Row
J-01/02
SF
SF
J-03/04
Sibe bent+RC
RC
J-05/06
IF,PCI unlocking
IF,EF
J-07/08
SF
SF
J-09/10
J-11/12STEAM LEAKAGE,item 5 IF,SF,RC
J-13/14
IF
IF
J-15/16 STEAM LEAKAGE
IF
J-17/18
IF
IF
J-19/20

30

30

PLC
C/W leak,C/M shaft

90+45

BC

120
480

480
60

120

240

120
120
240+60
120
120
480

C/Mshaft
Piping

120

BC(L)
IF,RC
EF
opening prob,PCI
RC
RC,piping

K-Row
K-01
K-02
K-03
K-04
K-05
K-06/07
K-08/09
K-10/11
K-12/13
N-Row
N-01
N-02
N-03
N-04
N-05/06
N-07/08
N-09/10
N-11/12
P-Row
P-09/10
P-11/12
Q-Row
Q-01/02
Q-03/04
Q-05/06
Q-07/08
Q-09/10
Q-11/12
Q-13/14
Q-15/16
Q-17/18
Q-19/20
R-Row
R-01/02
R-03/04
R-05/06
R-07/08
R-09/10
R-11/12
R-13/14
R-15/16
R-17/18

TIME STATUS IN CURING


25/03/2015
Downtime(min)
Responsible
Department
A
B
C

IF
IF
MF

60

IF,MF

180+60

240

IF,IF

180

60

240
90

RC
IF,IF

IF

TOR leak

MF

Steam leakage

IF

60
60
60+60
45

PCI
Steam leakage+T/flash
BOR leak,BC,PCI

MF
IF,BC,EF
IF
MF,BC,IF

120
60+60
300
120

RC, B/clamp loose, vcl L

RC,MF,IF

360

PCI

MF

180

Treadflash

MF

Treadflash,BOR leak
Operating prob
BC

MF,MF
EF
BC

60
60

Vacuum

IF

360

U/L arm,B mark

MF,BC

120

opening prob

IF,EF

short vent

IF

Plunger down+BC+operat

60

300+180

60

120
150+60

240
240

240

90
60+360

BC

BC
IF,RC
EF
IF,IF

Auto opening

60

MF
EF,MF
IF
IF,EF
IF
BC

EF
IF,IF,MF

Downtime(min
A

60

BC

MF,IF/MF
IF,BC
IF
IF

Reasons

26/03/2015
Responsible
Department

60

180
120
60

240
120

300

240
120

60

180

15
Downtime(min)
B
C

Reasons

27/03/2015
Responsibl
Downtime(min)
e
Departmen
A
B
C
t

60

65

120
240
210
120
210

90

60
60

U/L arm
MF

MF
MF

tImer fault
BOR Leak
PCI,Top ring down

IF,EF
MF
MF, EF

Size change,MC,BC
MC,BC
PCI
EF,IF
BC, Bottom leakage,IF BC,MF,IF

35
95

360
180

30
420
180

390
120
120

330

60

120

80

60
240
60
60

60

BC,BC

BC,BC

RC

RC

60

BC

BC

30

Vacuum
INT pipeleak
BC

IF
IF,IF
BC

Bottomleak,BC
422 DEF

MF,BC
MR

300

210
70

Timer fault

EF

60

75
60
180

180
240

85
180

240

60

240
60

Operating prob
Opening prob

EF
IF

60
180

MF

480

C/M, gland pipe leak,BC MF,MF,BC


BC
BC
U/L arm operating
Ef

360

BC
BC

BC
BC

240
180

segment slow

MF

420

vcl finger

IF,MF

240+210

C/M shaft

MF

150

BC

BC

90

240
420
60

180+240

gaskit leak,BC,Plunger raise, sup

Reasons

28/03/2015
Responsible
Department

Auto opening prob


Tread flash, B/C cut mark

EF
MF,BC

BOR leak
PCI unlocking
EF
MF,C/M shaft,BC
MF,PCI

MF
EF,EF
EF
MF,MF,BC
MF,PCI,EF

Reasons

60
90

60

BC, Plunger up,345 Def, Tr BC,IF,RC,MF


PCI,PCI locking
EF,MF
MF,Tyre stcuk u/l arm
MF,MF,EF
BC,MF
BC
VCL

Downtime(min)
A
B
C

60
30
30
480 180+135
300
180

30
30
60

120 60+60
60
120
90
240
120+60

BC,MF
BC
EF

45
60

30
30

BC,Operating prob
RC

BC,EF

120+60

steampipe lea, shapping


Vacuum
vacuum
BC(L)

IF,IF,IF
IF
IF
BC

90+90
120
120

shapping

IF

60

PCI,U/L arm
Off cure,RC

EF,EF
IF,RC

Off cure

IF

Ext drop

IF

60

60

120
60+180

360

60

480

29/03/2015
Downtime(min)
A

C/M shaftdue to blast

IF,MF,MF

gaskit leak,BC,Plunger raise, supply pipe


MF,BC,MF,IF
leak
BC
BC
Opening prob
IF

300+180

120

480

480

60 60+180+180
180
120

29/03/2015
Downtime(min)
B
C
IF

30/03/2015
Responsi
Downtime(min)
ble
Departme
A
B
C
nt
IF
300

BC
BC,EF,MF

BC
BC,EF,MF

BC Mark,RC
PCI unlocking
PCI unlocking

BC,RC
MF
MF

60

Steam line leak


IF
BC 416 Def,PCI
BC,IF
PCI rotation, press lock EF
Shapping line, Plunger ra IF,IF
Off Cure,RC
IF,RC
Side wall clean,BC
RC,BC

375
90

Reasons

Side wall clean

RC

Off Cure,RC
C/M shaft,Top ring raise

IF,RC
MF,EF,MF

B/C cur mark


BC
BC(L), Timer Fault,u/l armBC,EF

External drain

IF

U/L arM
RC,Shapping

EF,MF
RC,IF

OFf Cure
IF
Top ring raise, cylinder L EF,MF
Dome

60
60 210+120

285
90
90

240
60
60+30
150
60
120+90
90
60

PCI air pipe leak,Ve

90

120+60
240 60+120

45
120+180

210

240

60+60
420 360+60

420
120+120

Reasons

31/03/2015
Responsib
le
Departme
nt

Downtime(min)
A
B
C

BC
BOR leak,BC

BC
MF,BC

MF

MF

PCI unlocking
Press opening,BC

EF
EF,BC

PCI,PCI locking
PCI locking,RC,U/L arm
MF

EF,IF
MF,RC,EF
MF

240
260

PCI air pipe leak,Vent block

IF,RC

105+30

Press opening,U/L arm


BC

EF,MF
BC

240+150
180

Vacuum
PCI def
Platen temp high

IF
MF
IF

40

PCI locking

MF

40

BC

BC

External drain

IF

45

90
60
180

160
60+60
90
330
145

180
60

60
240

90

Reasons

24/03/2015
Downtime(min)
A

24/03/2015
Downtime(min)
B
C

Reasons

24/03/2015
Downtime(min)
A
B
C

Reasons

24/03/2015
Downtime(min)
A
B

3/2015
owntime(min)
C

Reasons

24/03/2015
Downtime(min)
A
B
C

DOWN T
Press #
E-Row
E-01/02
E-03/04
E-05/06
E-07/08
E-09/10
F-Row
F-01/02
F-03/04
F-05/06
F-07/08
F-09/10
F-11/12
F-13/14
F-15/16
F-17/18
F-19/20
F-21/22
F-23/24
F-25/26
G-Row
G-01/02
G-03/04
G-05/06
G-07/08
G-09/10
G-11/12
G-13/14
G-15/16
G-17/18
G-19/20
G-21/22
J-Row
J-01/02
J-03/04
J-05/06
J-07/08
J-09/10
J-11/12
J-13/14
J-15/16
J-17/18
J-19/20
K-Row
K-01
K-02

Reasons

4/1/2015
Responsible
Department

Downtime(min)
B

40

30
90+120
60

Top ring leak


BOR leak, Bottom Leak

MF
MF,MF

B/C cut mark,Bead offcure


BC, SR# misplace

BC,MF,IF
BC,RC

60

VCL
PCI beam down

EF
MF

30
30

BC
PCI limit deff
Plunger

BC
EF
IF

60

RC,VCL center
C/W copper tube leak
Sr# screw deff

RC,MF

60

RC

45

PCI deff,EF

MF,EF

30

100

B/C 141 Deff,water in tyre,Item 3,4 leak,BC,RC

BC,IF,BC,RC

90

140

U/L arm return

MF

BC
Vacuum

BC
IF

60

Ext drain prob, water in tyre, Bottom leak,C/M leak

IF,IF,MF,MF

270

U/L arm

MF

BC(leak), Plunger raise


BC

BC,IF
BC

BC,Back pressure

BC,IF

EF, U\L arm

EF,IF

40
75

75

90
120

120
60

120

K-03
K-04
K-05
K-06/07
K-08/09
K-10/11
K-12/13
N-Row
N-01
N-02
N-03
N-04
N-05/06
N-07/08
N-09/10
N-11/12
P-Row
P-09/10
P-11/12
Q-Row
Q-01/02
Q-03/04
Q-05/06
Q-07/08
Q-09/10
Q-11/12
Q-13/14
Q-15/16
Q-17/18
Q-19/20
R-Row
R-01/02
R-03/04
R-05/06
R-07/08
R-09/10
R-11/12
R-13/14
R-15/16
R-17/18

C/W drain, BC,C/M shaft,Top ring


Short vent

IF,BC,MF,IF
IF

270+90

180+180

IF,BC,MF
IF
IF
IF,VCL deff
IF
IF, Tread off register
IF
IF

IF,BC
IF
IF
IF,MF
IF
IF,RC
IF
IF

345
330
330
360
360
360
420
420

165+150

IF
IF

IF
IF

420
420

120
120

K-12MF

90
90
150
150+120
120
150

DOWN TIME STATUS IN CURING


4/3/2015
Responsible
Department

Off cure
Item leak, RC, BOR leak

IF
BC,RC,MF

45+225

BC

BC

30

PCI unlock
PCI Locking

EF,IF
IF

60

120
60

330

VCL operating,RC

IF,EF

85

60+60

90

RC

RC

BC
PCI
Off cure,BC

BC
EF
IF,BC

60
60

U/L arm, VCL finger, Off cure

MF,IF

400

U/L arm

MF

480

RC
Off cure, water in cure tyre

RC
IF

300
480

120

Top ring raise, U/L arm

EF,MF

60+60

60

Press late open, Timer, Auto open

EF,IF

240+120

Top ring leak


Press auto open

MF
IF

300

U/L arm

IF

owntime(min)
C

Reasons

Downtime(min)
B
C

90

120
120

30

180

150

60+60

360

120+60

120

180+240
90

60
60
180

480

90

120

60

60

120

60
240

BH adjust

MF

120

420
60

Int steam gland pipe


C/W line leak, U/L arm

MF
IF,IF

180
420

420

180+60

Shapping Late

IF

240

120

60

VCL down
Auto open prob

EF
IF

180

60
480

U/L arm break


BC

MF
BC

330

C/W line leak


BC pin hole

IF
BC

60

BC

BC

U/L arm
Deff 273

MF
DE

120
480

240

480

Off cure

IF

240

210

480

Internal valve close

IF

BC

BC

60

BC

BC

210

120

180

120
60

60
120

480

4/4/2015
Responsible
Department

Downtime(min)
A
B
C

IF

IF

120

BC

BC

60

B/H adjsut, C/M shaft


IF,IF,Off cure,MF,EF

MF,MF
IF,IF,IF,MF,EF

240

EF
EF

EF
EF

120

RC
Sr# misplace,U/L arm return
RC
RC

RC
RC,IF
RC
RC

IF,IF,PCI unlocking
MF
BC,IF

IF,IF,MF
MF
BC,IF

240
30

MF,BC,Shapping

MF,BC,IF

60

BOR leak
IF
IF,Steam pipe leak

MF
IF
IF,IF

90
480

IF

IF

120

IF
BC,MF

IF
BC,MF

480
180

Reasons

5/4/2015

60
180

90
60+60+60

120

120
120

480
60

480
270

180

120

60+120
60+60

60
120
180

180

150

S
U
N
D
A

Dome not coming

IF

60

IF

IF

BC Due to 416

BC

MF

MF

60

B/H adjsut,BC
355 Deff

MF,BC
RC

60

Internal not come, panel tripped,BC

IF,EF,BC,IF

Mold adjusted,355 Deff

RC,RC

60

VCL finger close prob,EF,Deff133


Steam leakage, Tread light deff

MF,EF,BC
IF,DE

150

BC,Shapping

BC,IF

60

Deff 134,162

BC

60

Steam line leak


VCL in/out,C/W pipe leak
Item dented
BC(L)

IF
MF,IF,IF
BC
BC

120
120+60
60

90

60

60
30
30

300

180+60+90
30

120+90
60

90

120

120
240

N
D
A
Y

Reasons
Shapping variation
TOR leak

6/4/2015
Responsi
ble
Departm
ent
IF,IF
MF

Downtime(min)
B

480
120

330

U/L arm deff

MF

MF

MF

PCI unlocking prob,BC


PCI unlocking prob
Size change
BC(L), Plunger down prob,Shapping
PCI locking

EF,IF,BC
IF,EF,MF
MC
BC,EF,IF
MF,EF

60+60
60+120
480
120+60+60
90

240

VCL down, U/L arm, TR down


VCL deff
VCL in prob

IF,IF,MF
EF
IF

60+60+60

90

Off cure,RC, PCI locking


Steam pipe leak,PCI deff
Vacuum

IF,RC,EF
IF,IF
IF

30
450
300

Steam pipe leak

IF

180

BC,PCI deff

BC,EF

Drain prob

IF

120

EF
Auto open prob, Water leakage

EF
IF,IF

120

60
240

BC(L)

BC

120

180

C
60

150

60
90
60

60

60

60
120
180+120
240

60
60

60

120+60

Plunger raise

MF

180

Size change, BC(L)


Size change,MF,IF
VAcuum+Plunger down
Plunger

MC,BC
MC,MF,IF
IF
MF

480
480
240
480

Dome gaskit leak

MF

60

MF,EF

MF,EF

Off cure, Dome gasket leak


Top ring down prob

MFIF,
MF

60
360

360

OFf cure, Vents block


OFf cure, Vents block

IF+RC
IF+RC

45+420
45+420

480
480

U/L arm deff, BC(Pin hole)

MF,BC

Air pipe broken, Brake fail, Operating prob


Off cure,BC(L), Top ring(L), C/W pipe leak
133
VCL finger

IF,MF
IF,BC,MF
BC
MF

210+150
150
210

VCL copper tube


Top ring down prob, steam pipe leak
MF

IF
MF,IF
MF

90
240
180

330

BOR leak
Platen steam pipe leak,VCL
VCL finger

MF
IF,MF
EF

180
120
60

60

120+180
180+120
120
480

60
120
480

60+120
60
60

60

60

60
60

60+35+330

DOWN TIME STATUS IN CURING


Reasons
Shapping

7/4/2015
Responsibl
e
Departme
nt
IF

A
270

Downtime(min)
B
300

Dirty mold

RC

300

DIrty mold,IF

RC,IF

390

Press locking

EF

180

Dirty mold
BC(L)
Plunger early raise
PCI locking problem,MF
PCI locking problem,IF
BC
U/L arm
BC, Dirty mold

RC
BC
EF
MF
EF,IF
BC
EF
BC,RC

420
90
60
60
60

Off cure 2 times, Timer air drop

IF,IF

210

120

Open vacuum, Int not coming


BC(Twice cut mark+ item 3/4 leak)

IF,EF
BC

210

60

VCL down,BC

IF,BC

90

60

BC(L)
Open vacuum,BC, TOR leak

BC
IF,BC,MF

90

60
120

Drain problem,RC

IF,RC

120

90

H/W pipe leaK, Press operating,C/W line leak


Press auto open

IF,EF,IF
IF

240

Auto open

IF

Press opening

EF

360

90
60
60
60
120
60

120

Tread flash
BC

MF
BC

60

Press auto open,BC(cut mark), Auto open

IF,BC,IF

300

180

Housing leak

MF

480

480

u/L arm
Press power off

EF
EF

Brake fail

EF

300

Top ring down

MF+EF

120+120

Press operating

MF

90

BC
BC(L), Side wall clean, U/L arm hold
VCL in/out
Press operating,Side wall,BC(L)

BC
BC,RC,MF
MF
EF,RC,BC

BC(L)
BC(L)

BC
BC

OFF cure

TF

150

Leakage,BC(rough)

IF,RC

60+60

BC,422 Deff(Shapping)

BC,IF

60+150

VCL in, Int steam pipe


BC
BC(mark)

IF,IF
BC
BC

300
120

60

150

120
120+60+120
270+60+60

210

120

RING

ntime(min)
C

75

150

240

35

60+60+60

60

Reasons

8/4/2015
Responsible
Department

Shapping
BOR leak
Press locking
BC

IF
MF
MF
BC

60
60
30

BOR leak

MF

Press auto opening, B/clamp loose


BC,Brake fail

IF,MF
BC,MF

60+60
60

PCI locking
PCI locking

EF,MF,MF
MF

60+60
60

U/L arm(twice), Shapping adjust


Dirty mold
BC,Shapping

,EFEF,IF
RC
BC,IF

60+90
390
60+30

Timer air not come


PCI locking
Open vaccuM
BH adjustment
U/L arm diaphragm line
Offcure,RC

IF
EF
IF
MF
IF
IF,RC

480
60
90
60
60

BC(L)
BC
IF

BC
BC
IF

60

C/W line leak

IF

480

Downtime(min)
B

120
30

90

120

120+300

120

120

MF

MF

120

PLY rating plate


BC(L),auto open,locking,Timer,BC(L),Plunger
Open vaccuM, Gland leak
Housing leak
Top ring raise

RC
BC,IF,MF,MF
IF,MF
MF
MF

60
60+300
60
480

U/L arm holding,Open vaccuM,C/M shaft,416


Press power off
Top ring raise

EF,IF,MF,BC
EF
IF

60+90

Dome gasket leak


U/L arm up

MF
EF

60
60

Press auto open

EF

355 deff

RC

BC(mark)

BC

Mold sibe bent

DE

162 Deff
BC
BOR leak

BC
BC
MF

120
90
45

Dirty mold,BC
BC

RC,BC
BC

390
120

60
60+60
480

60
75

120
480

60

60

60

60
60

120

Downtime(min)
C

Reasons

9/4/2015
Responsible
Department

Downtime(min)
A

Tread flash,BC

MF,BC

30

BOR leak, BC(L)

MF,BC

60+60

BC(L)

BC

PCI locking

EF

60

MF
PCI locking

MF
EF

60

EF,IF
PCI locking,MF
BOR Leak,IF

EF,IF
EF,MF
MF,IF

60
30

Size change
PM

MC
PM

240
PM

416 Deff

BC

U/L arm diaphragm leak,BC(mark)


C/M shaft,Drain prob

IF,BC
MF,IF

Platen temp adjust

IF

C/w leakage

IF

120

BC
Top ring down, supply pipe leak, PLC deff

BC
EF,IF,EF

60+180

U/L arm late in,EF

IF,EF

45

60
30

45

480

180
240

60

Press auto open,BC

EF,IF,BC

60+180

locking problem
Plunger up problem
Bottom gland leak,Off cure
Housing leak
PM

MF
MF
MF,IF
MF
PM

480
360
480
PM

VCL operating
IF

EF,IF
IF

60

IF
MF

IF
MF

120
60

IF

IF

60

Timer fault

EF

VCL finger loosed, 134 deff, C/W pipe LeaK,DraiN


U/L arm

MF,BC,IF,IF
IF,MF

60

C/W leakage/ VCL finger loosed


Top O ring leakBC(pin) Q10

IF,MF
MF,BC

120+30

60

BC(rough), C/M shaft


C/M shaft leak

BC,MF
MF

240+240
150

300

SIbe bent

DE

300

BOR leak
BC R-8

MF
BC

120

BH adjusted,B/clamp loose,BC
BC(mark)
Stopper work

MF,BC,MF
BC
IF

60
120

60+60+60+180
360
120
60
210

60

90

30

DOWN TIME STATUS IN CU


Downtime(min)
B
C

Reasons

10/4/2015
Responsible
Department

120

60

BH adjustment

MF

U/L arm adjustment

MF

MF

MF

PCI locking(4 times)


PCI locking

3MF,EF
MF

BOR leak

MF

BC

BC

U/L arm adjustment

IF

Plunger down
PLC deff, leakage work

IF
EF,MF

60

120+180
60
60

PM

PM

60
15
120

60

60

60
420
120

180+180

60
120
180
480
PM

240
480
PM

60

120+120

60

60+120
150

180
90

90

60

90

60+60
240

BH adjustment,BC, U/L arm up


Shapping slow

MF,BC,IF
IF

Tyre drop from item, U/L arm


Short vent+off cure, Unloading arm broken

EF,IF
IF,MF

Housing leak

PM

STATUS IN CURING

15

11/4/2015
A

Downtime(min)
B

Reasons
Plunger up
c/m shaft leak,BC

30

BOR leaK,U/L arm deff


BOR leaK,BC

60
Brake FaiL

60
PCI deff
30+60+60+120
60
BC
Shapping hold+MF+VCL up,BC
90

BOR leak,BC

PCI deff

60

60
Top ring uP
60
180+60

Press auto open,BC,AutO open

45
45

120

120+120
300

120
300

480

480

60

480

C/m shaft leak,Dome not come


Dome gaskit Leak
U/L arM deff
Housing leak,IF
PM

Q-01 B/Clamp loose

BC
Segment operating,PlateN temP(off cure),Vents block
BH,BOR leak
Q-14 VCL center out,Brake Fail

BC,Plunger down,BC(L)
BC

BC(L)
BC
RC,Plunger up,Gear deff,Timer Air valve

11/4/2015
Responsible
Department
IF
MF,BC
MF,MF
MF,BC

###
A

Downtime(min)
B

120

120

60
180

60

90+120

150

MF

120

EF

240

BC
IF+MF+IF+BC

120+270+60

120
120+120

MF,BC

60

120

MF

120

MF

360

EF,IF,BC,IF

120+60

120

120

S
U
N
D
A

MF,IF
IF
MF
MF,IF
PM

300+180
240
480
360
PM

480
120
PM

MF

60

60

BC
RC,IF,DE
MF
MF

60
240+150
60

BC,MF,BC
BC

BC
BC
RC,IF,MF,IF

60
480
PM

90+90
60
90

150
60

180+150

90
330+90

60
120+120

N
D
A
Y

13/4/2015
Responsible
Department

Plunger up,Vacuum,Plunger up

IF

60

Tread off register, BOR+Gland leak


BC(mark)

MF
BC

60

BC
Brake fail

BC
MF

60
255

BOR, TOR leak,PCI deff


BH adjustment, PCI locking

MF,IF
MF,EF

120+120

VCL up,Ring down height

IF,RC

60

BC

BC

PCI deff
IF,BOR leak

IF,IF,EF,MF
IF,MF

BC
VCL up,mold change

BC
IF,MC

30

BOR leak

MF

60

BC(L)

BC

BC
BC(leak)

BC
BC

IF,PLC deff(3),BC(L)

IF,EF,BC

Reasons

Downtime(min)
B
45

30
240
270

60
60

60

120+60

Shapping
Shapping
Off Cure,RC,U/L arm,Off cure
EF,BC,SteaM pipe leaK
EF,BC,SteaM pipe leaK

IF
IF
MF,IF,RC,EF,IF
EF,BC,IF
PM

120+120+180
180
PM

BC

BC

120

BC(L),Press auto open


BC

BC,IF
BC

Shifting conveyor
Sensor proB,Vents block

MF
EF,RC

Timer deff,BC(L),Off cure,C/M shaft seal change

EF,BC,IF,MF

U/L arm
Vents block

MF
DE

270

VCL center,133,BC(L)

MF,BC

90+60

VCL
133
R15VCL center
BC(L18),BC(mark17)

EF
BC
MF
BC

60+240
60+ 60
PM

60
60

60
60

180

90
120

120
120+90

45+90

60
80
405

DOWN TIME STATUS IN CURING

owntime(min)
C

Reasons

14/4/2015
Responsible
Department

Downtime(min)
A

60

Plunger up,BC(L)

IF,BC

330

120
30

Off cure,Steam pipe leak

IF,IF

300

Steam pipe leak


PF=60
Off cure, Tread

IF
MF

PCI unlocking

MF

BC

BC

MC

240

MC
BC
IF
Shapping,U/L arm

IF
IF,EF

120
180

60+60+60
30

BC
PCI unlocking

BC
MF

120

60+480

G12 Technical follow

Internal line leak,CM Shaft

IF,MF

480

MF+EF,PLC,Steam copper tube

MF+EF

480

30+30

300

30

60

240+240

Operating prob

EF

60

60
60

DS
DS,External temp drop,Gaskit leak
IF

DS
DS,IF,MF
IF

300
240
180

PM

PM

PM

PM

IF

IF

240

IF

IF

300

BC,EF

BC,EF

120+60

Vents block

DE

480

BC(L)
355
BC(L)
C/M shaft seal leak,BC(L)
Piping work,BC(L)
C/W pipe leak
Mold sibe bent,press operating
(power fail 60) SF=85

RC
BC
MF,BC
IF,BC
MF
DE,EF

420

BC

BC

60

Copper tube leak


VCL center

IF
MF

150
480

180

(power fail 60) SF=85

60+60+210

240
90
180
180

120

480

URING
Downtime(min)
B
C
SF=90
150

Reasons

15/4/2015
Responsible
Department

Downtime(min)
A
SF=30

60
60

Steam pipe leak

IF

SeaL change
PCI unlocking

MF
EF

PCI unlocking

MF

PCI Locking
PCI locking

EF
EF

Panel tripped,PCI unlocking

EF,MF

IF,Operating problem,chuck loader


Piping work

IF,EF,MF
IF

300

RC,B/mark
Open vacuum

RC,BC
IF

120

BC

BC

Plunger,Vents block
IF ,BC(L),BC(mark)

MF,RC
IF,BC

150

30
60

480

480

60

60

240+180
120+60

180

300

C/M shaft

MF

360

120+300

IF

IF

480

PM

PM

PM

PM

PM

B/clamp loose
auto opening, u/l arm, shapping

MF
IF,EF,IF

Shapping prob

IF

Vents block
VCL Center out

RC
MF

60

VCL Center out


Steam pipe leak
VCL Center out

MF
IF
MF

180
60

Shapping direct

IF

75

VCL Center out

MF

180

Stopper not working,BC(L)

MF,BC

120

360
60

480
65
65
90
30

35

Downtime(min)
B
C
PF=60

Reasons
Pipe Welding

16/4/2015
Responsible
Department
IF

Downtime(min)
A
40

60
Pipe Welding
Press open problem

IF
EF

75

PM

PM

PM

PCI stopper up

MF,EF

Pipe Welding
TOR leak

IF
MF

120

RC,OFF cure,RC

RC,IF,RC

180

BC(L),C/W line leak

BC,MF

Shapping,BOR leak

IF,MF

U/L arm up problem

IF

60

60

60
60

60

90

60+60
60

150
60
60
60
60

300
60

180

PM

PM

60
60+60+61

PM

PM

PM

BC(L)
auto opening

BC
IF

Plunger deff
Operating prob,Piping
.

MF
EF,IF

120

Plunger Raise, B/Leak, clamp loose


Vacuum,BC(rough)
B/C 133

IF,BC
IF ,BC
BC

60+75
60
90

BC
Bead off cure,BC(L),Press locking
RC
BC(L)
BC(L)
Gear

BC
IF,BC,MF
RC
BC
BC
MF

RC
BC(L),BC(162)
Chuck loader in,VCL,Shapping over

RC
BC
IF,EF,IF

150
60

BC

BC

255

Chuck loader in

IF

120

240

120

60

60

60

120

30
480

150

DOWN TIME STATUS IN CURING


Downtime(min)
B
C

Reasons

17/4/2015
Responsible
Department

Downtime(min)
B

u/l arm copper tube leak


BC(L)
BOR leak,Offcure E5
Dent impression, B out E8

IF
BC
MF,IF
DE

210

BC
PCI unlocking

BC
MF

120

PM

PM

PM

PM

PM

405

90

PCI deff

MF,EF

120

Size change 6.00-16 ND6

SC

Shapping

IF

BOR leak,PCI unlocking

MF,MF

30

RC,G8 4.50-12 PJC8

RC

480

PM

120

25

180+300

480

IF,Piping work

IF

480

90

90

BOR leak

MF

60

MF,Pipng work

MF,IF

120

180

120+30

135

120

300

PM

PM

75
60

120

60
120

150

150

90
120+60
120
120
120

120
120
60+270

420

BC(L)
Plunger raise, U/L arm

BC
IF

60

PM

PM

BC(L),B/clamp loose

BC

150

BC(7)
MF

BC
MF

60

Q2 VCL center out


U/L arm deff
BC(133),BC(L)

MF
EF
BC

60
60

VCL center out,BC(leak 10)


Q12 BC(L)
Steam Pipe leak
BC(L)
BC(133)
Brake fail

MF,BC
BC
IF
BC
BC
MF

120
240
120

BC(1)

BC

Shapping,VCL center
Steam Pipe leak(R10)

IF
IF

BC
R16 133

BC
BC

PM

PM

120

60
120

60
60
90
60

150
120
60
60

CURING

owntime(min)
C
75
60
30+60
360

Reasons

18/4/2015
Responsibl
e
Departme
nt

Downtime(min)
B

120
240

30
120

Press locking,Shaping
Supply Checking,C/W pipe Leak
C/M shaft

MF,IF
IF,MF
MF

BC(162)

BC

PM

PM

PM

PM

EF,PCI plate
PCI deff,PCI unlocking

EF,MF
EF,IF

60

90

Plunger raise

EF

C/M shaft leak,B( leak25) 2 times

MF,BC

PCI deff,PCI unlocking


Platen temp adjust

MF,(MF+IF)
IF

G10BC

BC

BC(L),BOR leak18

BC

BC

BC

120

Auto opening

IF

180

BC

BC

60

Lube line leak

IF

480

60

60
PM

90

180

60

90

60

60
90

480

480

45

180
120

IF, Dome gasket leak

IF,MF

PM

PM

PM

PM

240+150

Dome gasket leak,Tread off register

MF

240

Auto opening

IF

Press operating

EF

BC(L)
u/l arm
BC(L)
Steam pipe leak
Shapping over

BC
IF
BC
IF
IF

RC
BC(mark)

90

240

PM

120

120
90
240
30

60

RC
BC

480

120
90

RC,BC
BC(pin hole 6)

RC,BC
BC

210

60
60

RC
BC(L)

RC
BC

450

120

BC(pin hole 15),vcl finger


R17BC(mark)+(pinhole),Shaping, side wall flash

BC,IF
BC,IF,RC

180+60+180

60
60

120

19/4/2015

wntime(min)

Reasons

BC
BC
locking

180+60

20/4/2015
Responsib
le
Departme
nt
BC
BC
IF

Downtime(min)
B
40
30
30

BC

BC

105

steam pipe leakage

IF

480

180

PM

PCI unit inflation


PM

EF
PM

PM

40
PM

30
240

pci locking

EF

120

PCI unit open

IF

60

IF

IF

120

80+60+105

vcl down

EF

120

60+60

PCI,Off cure,RC
Tread flash
Timer operating

EF,IF,RC
IF

90+120

Platen temp drop

IF

135

RC

RC

240

Auto lubrication,U/L arm(2)

MF,EF

U/L armup

EF

60+60

S
U
N
D
A

30

40

180

75+90
50
160

120+50

Dome gasket leak

MF

PM

PM

60

Ext drain

IF

120

EF

EF

480

Screw missing,B/H adjust


C/M shaft leak
BC
BC(L)
VCL center ouT

DE,MF
MF
BC
BC
MF

120
120

VCL center out

MF

90

VCL center out,BC


SIZE change Q19

MF,BC
MC

60
360

60
480

BOR leak,BC(L),Dirty side wall


BC(pin hole)R4
RC

MF,BC,RC
BC
RC

60+180
120

300

locking,u/L arm
dirty side wall
Shaping,BC(l)
Mold adjust

MF,IF
RC
IF,BC
RC

PM

60
60
60
zxcv

N
D
A
Y

45

PM

PM

105

30

120
120

360

60+30
360
60

120
60

DOWN TIME STATUS IN CURING

owntime(min)
C

Reasons

21/4/2015
Responsible
Department

Downtime(min)
B

BC(L),c/m shaft leak,Bottom Leakage


Shaping,Platen temp drop
Steam leakage,BC(L),MF
c/w pipe leak,IF

BC,MF,MF
IF
IF,BC,MF
IF

455
60
45

Steam pipe leak

IF

60

Tread flash, Platen pipe


PM

MF,IF
PM

30+150
PM

PCI locking

MF

Chuck loader in

EF

MC
Steam line leak,PCI locking,shaping

MC
IF,EF,IF

150+60

480
60

480

RC due to off cure,MF

IF,MF

480

180

120

PM

PM

PM

PM

PM

60+180
120+120
120+60

PM

30

C/W leakage

MF

BC

BC

BC(133),VCL

BC,MF

60

BC(133)
U/L arm,BC
BC
VCL center out
Dirty mold,B/H adjust
TF(Q19 Size),R/D H adjust

BC
MF ,BC
BC
MF
RC
TF,RC

60
60

OFF cure

TF

Platen steam pipe leak

IF

BOR Leak

MF

PM

60

60

420
480

60
60
150+150
150
60

120

30

URING

wntime(min)
C

240
60
60

Reasons

22/4/2015
Responsible
Department

Downtime(min)
B
C

Steam pipe leak,BOR leak


Bead offcure
Press locking,Tread flash,Press locking
BOR leak,vacuum
BC(mark)

IF,MF
MF
EF,MR
MF,iF
BC

45
300
60+120
60
60

RC,BC(162),BC(2)
PCI unlocking,BC,IF
Tread flash,Platen pipe leak,BC
.
PCI locking,Plunger down
PCI plate deff

RC,BC
EF,BC,IF
MF,IF,BC

60+120+60

MF,IF
RC

c/m head leak

60
300
30

120+180
90+60

120
300

210
480

60
90

210

MF

150

180

RC
RC

RC

180

480

MC,B out G1
BOR leak,BC(mark),BOR leak

MC
MF,BC,MF

480
60+60

60

Chuck loader pickup

EF

60

BOR Leak

MF

60

BC(L)

BC

60

PCI locking
Tread flash

EF
MF

120
60

IF
IF

IF
IF

BC ,Shaping over

BC,IF

PM
270

PM

480

480
60

60
60

90

60

Shaping over
Auto opening

IF
IF

60

60

PM

PM

PM

Dome gasket leak

MF

60

u/l arm,Brake

EF

BC(mark)

BC

180

Shapping,BC(mark)

IF,BC

90+75

u/l arm,Plunger raise,vacuum


BC(L)
BC(L)
Press Opening

MF,Mf,IF
BC
BC
EF

30

BC(L)
BC

BC
BC

Chuck loader in
BC,R12 vents block

EF
BC,DE

120
PM

PM

480

480

60

60

120

60+120
90

210
120

150
60

120
60

300

Reasons
H/W line leak

23/4/2015
Responsible
Department
SF

Downtime(min)
A
B
C
300

Shaping,BC(mark)

IF,BC

90+30

Press Operating
PM
Auto open

EF
PM
IF

60
PM
120

Chuck loader in

EF

60

MC
MF

MC
MF

405

G8 gland pipe leak

MF

30

Plunger up poblem,BC
BC(item 2 leak),BC

MF,BC
MF,BC

240+60
60+60

u/l arm
Dome problem

EF
IF

60

BC

BC

60

PM

PM

60

90

60

Pressure light not on

EF

120

u/l arm
Plunger raise
PM

MF
IF
PM

BC(416)

BC

U/l arm
Press Operating,c/w pipe leak, steam pipe leak
Dome gasket leak

MF
EF,MF,IF
MF

165
180+60+240

Brake fail

EF

360

Shaping over
Plunger full raise
Shaping hold,c/m shaft leak
Q16 steam pipe leak

IF
MF
IF,MF
IF

BC

BC

Vents block
Vents block,BC
Dirty mold

RC
RC,BC
RC

PM

120

PM

60
180
PM
120

180
60

300
90
120

30
PM
180

120

240
120
300

60

PM

Reasons

24/4/2015
Responsible
Department

Downtime(min)
B
C

Pipe leakage
Pipe leakage

IF
IF

120
90

Plunger down,IF
PM
PCI locking,PCI,PCI
BC

EF,IF
PM
MF,IF,MF
BC

60
PM
60

BC

BC

RC,BC(L),Shaping
BC

RC,BC,IF
BC

BOR leak,Shaping,BC(mark)

MF,IF,BC

BC

BC

Pluner raise

MF

30
PM
60

60
480
120

60+60
240

30+30+180

60
420

PM
150
60

Late Open

MR

30

Dome gasket leak,Shaping


Auto opening
Pipeing work,Gland leak,BOR leak
PM

MF,IF
MF,IF
IF,MF
PM

60+120
240
240+120+120
PM

BC
Offcure,RC
Piping work,BC(L)
Shaping,BC(mark)
Shaft head leakage

BC
IF,RC
IF,BC
IF,BC
MF

75
420
420
150+60
240

BC(L)
BC(L)

BC
BC

120
120

BC
PM
Shaping hold
BC(15),BC(16 leak)
BC(L)
Internal Pipe leak

BC
PM
IF
BC
BC
IF

VCL center out

MF

PM
240
60

60
PM

PM

120
60

90
PM

PM
120

150
240

120

DOWN
Reasons

25/4/2015
Responsible
Department

Downtime(min)
B
C

Shaping,BOR leak

IF,MF

30+30

Offcure(c/m shaft leak)


BC(mark)

MF
BC

90

c/m shaft,BC(2)
Tread flash

MF,BC
MF

60+60+120

PCI plate 446

MF

480

PCI unlocking,IF

MF

c/w line leak


BC

IF
BC

Tread flash

MF

30

BOR leak
BC
BOR leak

MF
BC
MF

90
60
180

180

30
240

330

65

60

240
30

Press Open,Plunger raise,Ste

120

PM

PM

PM

PM

Dome gasket leak

MF

60

Q3 c/m shaft leak


Side wall clean,BC(mark)

MF
RC,BC

120
120

120

Operating problem,BC(deshape)

EF,MF,BC

60+60

120

BC(L)

BC

90

BC

BC

VCL center out

MF

PM

180

240

DOWN TIME STATUS IN CURING


Reasons

26/4/2015
Responsible
Department

Downtime(min)
B
C

BOR leak

MF

120

BOR leak

MF

PM
PCI locking

PM
MF

PCI unlocking

EF

EF,Offcure

EF,IF

120

IF

IF

60

Press Open,Plunger raise,Steam line(L)

EF,IF,IF

IF Drain problem

IF

60

PM

PM
60

PM

90

120

480

480

180+180

480

480

480

PM

PM

PM

PM

MF

MF

480

BC(leak)
BC(pin hole),Top ring raise
Brake fail

BC
BC,EF
MF

75
75

BC(leak)

BC

Steam line leak

IF

VCL in
Press OPerating

EF
EF

90
180

RC

RC

60

90
120

PM

300
60

RING
Reasons

27/4/2015
Responsible
Department

Downtime(min)
B
C

c/m shaft leak, Shaping

MF,IF

330+120

120

Shaping,c/m shaft deff

IF,MF

240

120+150

Press over travel,Motor problem

EF

PM

PM

PM

PM

Vents Block,PCI
Top ring up
Pitted mold

RC
MF
RC

390

120

BC

BC

Steam pipe leak,BC(L)

IF,BC

180+120

BC(L),Drain

BC,IF

120+360

BOR leak
Top ring down

MF
MF

120

210+60
PM

30
120
120

420

Dome+Drain Problem,u/l arm


Drain

IF,MF
IF

120
60

60

Molding
Dome+Drain Problem
PM

MF
IF
PM

360
PM

BC(L)

BC

60

BC(L),Double molding,Gasket leak

BC,IF,MF

120+180+30

Offcure,Dome not coming,5/9 valve unopeated

IF,EF

120+240

Mold cleaning,Press Opening,Dome temp drop

RC,EF,IF

BC(L)
BC(deshape)

BC
BC

BC(L) ,BC(pinhole)

BC

120

60

BC(L),U/l arm hold

`BC,EF

120

90

BC(L)

BC

120

360
PM

480

PM

120+120

90
60

TF R1

BC(L),Shaping direct,VCL finger adjust

BC,IF,MF

120

BC(mark)
Top ring down

BC
EF

60

480

480

90

30

120

D
Reasons

28/4/2015
Responsible
Department

Downtime(min)
B

Mold cleaning

RC

210

Steam pipe leak

IF

240

BC

BC

Motor burn
Plunger raise
PM
RC
BC,Plunger up
PCI unlocking,BC,PCI air drop

EF
IF
PM
RC
BC,EF
IF,BC,EF

480
90
PM

F20 Shaping
Press Operating
RC
BOR leak

IF
EF
RC
MF

PLC deff
PCI locking,PCI stopper limit,MF

EF
IF,EF,MF

MF

MF

Supply pipe leak,Tread light

IF,MR

60

270

Tread flash,Power off

MF,EF

60

60

Over head leakage

IF

U/l arm roller slip


Tread flash

MF
MF

120
60

Top ring down,CM shaft

MF

480

Dome late apply

IF

150
30

300

480
PM

180

PM
60
240
120

120

180

135
60

30
180
90

60+60

60

300
60

60

360

480

60

300

Oiling and greasing

MF

60

IF

IF

PM

PM

BC(L)

BC

Shapping over
Press open,Rubber remove
Top ring raise
Dome plate leak, TOR leak

IF
EF,RC
IF
RC,MF

300
120+60
420
360+60

Sidewall cleaned,BC,BC(Q2)

RC,BC

90+60

RC

RC

450

Stopper work
Sidewall cleaned
BC(L)
BC(L)
BC(rough),U/l arm
Side wall cleaned

IF
RC
BC
BC
BC,MF
RC

120
60
90
60
300
90

Vacuum,TF

IF,TF

60

BC

BC

120

BC(L),BC(L)
Tyre shifting conveyor

BC
MF

60
90

BC(pinhole),VCL finger,BC(rough),VCL center

BC,IF,BC,MF

120

60
PM

PM

PM

85

120

180

120
420

60

480

30+120+360

120

DOWN TIME STATUS IN CURING


Reasons

29/4/2015
Responsibl
e
Department

Mold cleaning

Rc

330

Press operating

EF

90

PCI deff
Dowel deff,345 deff
PCI,Platen pipe leak
MF
BOR leak
PCI unlocking(3),Plunger down,PCI

EF
DE,MF
MF,IF
MF
MF
IF,EF,MF,EF

360
270
60+120
240
90
120+120+120+60

BC

BC

60

PLC,Press locking,BC,Timer fault,PLC


PCI locking(3)
Tread flash

EF,BC,EF
EF,MF
IF

120+120+30
60+60
300

PLC powe off

EF

60

B/H adjustment

MF

30

MF,PCI

MF

120

IF

IF

120

Top ring down problem

IF

480

BOR leak

MF

60

Downtime(min)
B

90

300
120

480

30

60

405
30

120

300

420

Press locking
Auto opening
Housing broken
PM

MF
IF
MF
PM

PLC

EF

BC,B/clamp

BC,MF

Side wall dirty

RC

60

BC(L),c/m shaft leak


Dirty mold
Q14 vcl center out

BC,MF
RC
MF

180+150
450

u/l arm,BC(rough)
Q20BC(L)

MF,BC
BC

60

R1
BC,Plunger down

TF
BC,MF

480

Shaping
Shaping

IF
IF

R16 vcl work

MF

PM

120
60
180
PM

480
PM

120
60

60

150

420
300

240
60

90
480
90+240

480
480

30
30
180

480

480

Reasons

30/4/2015
Responsible
Department

Downtime(min)
B

BC,BOR leak
c/m shaft leak

BC,MF
MF

30

c/m shaft leak

MF

BC ,IF
Press over travel
PM
PCI deff

BC,IF
EF
PM
MF

60+270

270

PM

PM
60

EF,PCI

EF,IF

120

60

VCL deff
BC

IF
BC

EF,IF,BC
IF,PCI
BC

EF,IF,BC
IF,EF
BC

BC(cut mark)

BC

MF,IF,PCI

MF,IF,MF

240+75

Tread off register


MF,BC
BC

RC
MF,BC
BC

60+270

MF

MF

Double molding
Double molding

IF
IF

120
300
120

450
PM

210
60
180+210+90
120

120
30
120
65

60+60

315

300

120

60
480
120
120

Housing leak
PM

MF
PM

480
PM

PM

IF
IF
Bottom ring leak,BC
BC(pin hole)
BC,Dome gasket leak

IF
IF
MF,BC
BC
BC,MF

150
150
300

60
60
180+60

Offcure(external drop),RC

IF,RC

Stopper work
BC,Vacuum

IF
BC,IF

180 .

Shaping not come,c/m shaft seal change

IF,MF,IF

210

60+210

120

VCL center out


ring down hight adjust
BC,Off cure,BC

MF
RC
BC,IF,BC

210

480

90+90

480
30
60

R1 b/out
R4 c/ shaft change
Press operating

TF
MF
EF

480
480
30

480
390

480

u/l arm

MF

60

120

R16 vcl center out

MF

480

480

PM

60

60
60

420

240

90+90

450

DOWN TIME STATUS IN


Reasons

31/4/2015
Responsible
Department

Downtime(min)
B
C

STATUS IN CURING

DOWN TIME STATUS C


###
Press #
E-Row
E-01/02
E-03/04
E-05/06
E-07/08
E-09/10
F-Row
F-01/02
F-03/04
F-05/06
F-07/08
F-09/10
F-11/12
F-13/14
F-15/16
F-17/18
F-19/20
F-21/22
F-23/24
F-25/26
G-Row
G-01/02
G-03/04
G-05/06
G-07/08
G-09/10
G-11/12
G-13/14
G-15/16
G-17/18
G-19/20
G-21/22
J-Row
J-01/02
J-03/04
J-05/06
J-07/08
J-09/10
J-11/12
J-13/14
J-15/16
J-17/18
J-19/20
K-Row
K-01
K-02
K-03
K-04

Reasons

L
A
B
O
U
R
D

2/5/2015
Responsible
Department

Downtime(min)
A
B

MF,Offcure

MF,IF

150

H/w pipe leak,Press operating

IF,EF

Over travel,PCI locking


PM
PCI locking

EF,MF
PM
MF,EF

240+60
PM
60+60

F12BC(L),Motor deff
PCI locking

BC,EF
MF,IF

60
60+60

BOR leak
Press operating,chuck loader in
U/L arm copper tube,BC(L)
VCL center out

MF
EF,IF
IF,BC
EF

60
60
90
60

c/w line leak


Offcure,Vents block,PLC deff

IF
IF,RC,EF

120+300

240+240

PLC deff

EF

u/l arm, Plunger down,Deff 422

EF,MF,IF

60+120

120+300

Timer deff

EF

480

Shaping late,BC(L)
BC(L),Vacuum

IF,BC
BC,IF

300
120+180

PM

120

60

180
120

K-05
K-06/07
K-08/09
K-10/11
K-12/13
N-Row
N-01
N-02
N-03
N-04
N-05/06
N-07/08
N-09/10
N-11/12
P-Row
P-09/10
P-11/12
Q-Row
Q-01/02
Q-03/04
Q-05/06
Q-07/08
Q-09/10
Q-11/12
Q-13/14
Q-15/16
Q-17/18
Q-19/20
R-Row
R-01/02
R-03/04
R-05/06
R-07/08
R-09/10
R-11/12
R-13/14
R-15/16
R-17/18

U
R
D
A
Y

Dome gasket leak


Housing broken
PM

MF
MF
PM

120
480
PM

Dome gasket leak,Double molding

MF,IF

60+60

Dome gasket leak,Double molding

MF,IF

60+60

BC

BC

105

Q-10 BC(L)

BC

120

Q14-VCL center out


Offcure,c/m shaft seal
VCL center out
BC(L)

MF
IF,MF
MF
BC

420

480
90
60
120

R1
c/w line leak
BC(L)

TF
IF
BC

480
120
120

480
60

BC
c/w line leak,BC

BC
IF,BC

60

90
90

R16 vcl center out

MF

420

30

480
PM

WN TIME STATUS CURING


3/5/2015

owntime(min)

Reasons

Operating
480

4/5/2015
Responsibl
e
Departmen
t
EF

Downtime(min)
A
B
120

60+270

Piping
Plunger down
Operating

IF
IF
EF

480
60
330

480

PM

PCI deff
PM

MF
PM

30
PM

Press auto opening

IF

PCI deff

MF

60

Mold cleaning,PCI deff

RC,EF,IF,MF

420

IF

IF

360

Offcure,PCI unlocking

IF,MF

180

IF

IF

240

Offcure,RC,Housing broken

IF,RC,MF

60

Internal pipe leak


BC,TOR leak

IF
BC,MF

120

PCI deff

MF,IF

180

375

Press opening

EF

Shaping
Vacuum,Internal drain

IF,MF
IF

120+180
480

360

Press operating

EF

PM

480

60
60

60
480

480

150

60
480

S
U
N
D
A
Y
S
U

180+300

480
PM

480
240

480

60

S
U
N
D
A
Y

EF,c/m head leak,Tread flash,shaping over


Housing
PM

EF,MF,IF
MF
PM

180
480
PM

120
480
PM

u/l arm hold


Dome plate leak,VCL deff

IF
MF

240
60

60

c/m shaft seal leak,BC

MF,BC

210

60

Shaping
VCL center out,c/m shaft,R/D adjust
BOR leak
VCL center out(2)Q14 B out
u/l arm hold
VCL center out
Shaping

IF
MF
MF
MF
IF
MF
IF

480
75+210
150
480

120
120

TFR1
TOR leak
VCL

TF
MF
MF

480
150
120

480

u/l arm hold,Steam pipe leak

MF,IF

120

Shaping
Shaping

IF
IF

480
90

480
120
30

30

180

5/5/2015

owntime(min)

Downtime(min)

Reasons

Responsible
Department

Piping work

IF

480

60

IF,Press auto opening

IF

60

60

PCI,c/m head leak


PCI locking

MF
MF

240+360

BOR leak

MF

30

VCL in problem
u/l arm problem

IF
MF

60

IF,MF

IF,MF

120+120

BOR leak

MF

60

480

BC
Mold cleaning,Plunger raise
Housing,Mold fitting,c/m shaft deff B out,Tread flash

BC
RC,IF
MF,RC,MF

60
240
480

120
60

Steam line leak,BOR leak


Plunger down,Bottom O ring leak

IF,MF
IF,MF

240+60
120

120

PCI deff

MF

360

BC
BC(L),B/clamp loose
Shaping+Operating,u/l arm
Lubrication of gearbox,Brake fail
IF,BC,c/m head leak
BC,EF

BC
BC
IF,EF,MF
MF
IF,BC,MF
BC,EF

120+240

IF

IF

120

u/l arm slow work

IF

480

PM

60+60+60

60

60

480

60

360+120
120
60+180
180+60

60+60
480
PM

480

30

120

K-07BC(2)
Double molding,Locking point set,vents block
K-10
PM

BC
IF,EF,RC
MF
PM

120
480
PM

BC

BC

120

Double molding

IF

60

BC

BC

120

Shaping drain,c/m shaft

IF,MF

240

240 steam down


mold cleaning
BC(deshape)

IF
RC
BC

60

Side wall clean


u/l arm problem
PM
BC(L)
BC
BC(L)

RC
MF
PM
BC
BC
BC

R1
R4BC,VCL in

TF
BC,IF

480

Overtravel 448

EF

60

BC(162) ,u/l arm

BC,MF

210
PM
120

DOWN TIME STATUS CURING


Downtime(min)
B
C

Reasons
SF,PF

360

480

360

Piping work

IF

SF
Bead off register,RC

MF,RC

60

PM
PCI unlocking
Steam pipe leak

PM
EF
IF

480
80

c/m shaft deff,PCI unlocking


Steam pipe leak,PCI deff

MF,IF
IF,EF

BH adjust

MF

c/m shaft leak


SF

MF

MF

MF

MC

MC

BC,Plunger up
Shaping,Top O ring leak

BC,IF,EF
IF,MF

Bottom O ring leak


Tire stck top side,Press operating
SF

MF
MF,EF

double molding,Hot water pressure

IF,SF

60

BC

BC

180
240

c/m head leak,Offcure,vents block

MF,IF,RC

SF
Double molding,Hot water pressure

IF,SF

u/l arm slow work

IF

60

180+300

30
480

30

60
60
180

6/5/2015
Responsible
Department
SF,PF

120

60+60
60+360
480
PM

480
480
PM

RC,Locking
K-10,K-11(brake fail)
PM
SF
Double molding,BC(L),Double
Double molding
Double molding

RC,EF
MF
PM

Top ring raise

MF

vcl center out


side wall clean
BC(133),beake fail
422 deff
side wall clean

MF
RC
BC,MF
IF
RC

PM
side wall clean

PM
RC

RC,BH adjust

RC

R1

TF

BC

BC

side wall clean


RC,BC(162)

RC
RC,BC

IF
IF
IF

240+180

120
60

180
PM
60

PM

90
480
60+120

60

480

180

NG
Downtime(min)
A
B
C
60+45

Reasons

7/5/2015
Responsible
Department

210
BOR leak

MF

6.00-16-AT 6
PM
BC
Piping,PCI stopper
BC(L)
PCI deff

SC
PM
BC
IF,MF
BC
MF

60

PCI deff

EF

240

B/clamp loose

MF

BC,c/m shaft deff


Back pressure,Opening problem,BC(rough)
J-11 to J-16

BC,MF
IF,EF,BC
SF

B/clamp loose,PCI locking

BC,EF

12.00-20 HCT

MC

60+300

RC

RC

300

SF
Leakage work

IF

60
120+60
PM

480
480

PM
60

PM
60
480

180
90+60

60
100

60
60
60

60
240

90+60
30
60

60

30
60

60+350
120

300
60
185
300

180
480
PM

120
480
PM
75
75

480
PM
330
90
60

240

480

60
120
120

K-10 Housing
PM

MF
PM

Press open

EF

Press operating

EF

Top ring raise,Vents block

MF,RC

Plunger raise
Side wall cleaned

IF
RC

RC

RC

90

120
120
PM
180

480

PM

PM

300

120

BC(133)
Rubber stck with mold

BC
RC

480

480

TF

TF

VCL problem

MF

60

180
330

60

DOWN TIME
Downtime(min)
A
B
C

Reasons

8/5/2015
Responsible
Department

BOR leak

MF

Internal pipe leak

IF

BC(L)

BC

BC(L),Top ring up(2)

BC,MF

Press opening

EF

PLC defect,BC(L)

EF,BC

Tread light,u/l arm problem

NP,EF

BC

BC

60

PM
60
300

PM

60
PM

60
270

60

60
60

60
300
120

300
60

360

Brake plate,Piping,BC(pin hole),BC(L)

MF,IF,BC

60

60

PCI beam up problem


B/clamp loose,Bottom O ring leak,SyPON

EF
MF,IF

MC
Mold cleaning

MC
MF

480

480

480

240
60

60

480
PM

480

480
PM

300+120

480
PM

k-11 leak
PM

IF
PM

60

shaft down,Sypon

IF

180

Brake fail

EF

480

RC

RC

BC(rough)2

BC

c/w pipe leak,Brake fail


Segment operating
c/w pipe leak,BC(rough)

MF
.
EF
MF,BC

Offcure,c/m shaft
piping work

IF,MF
IF

R1,R2u/l arm problem


RC,Pull vents

TF,MF
RC

Operating

EF

BC(133)
BC(133)

BC
BC

90
180

360

90
120
480

60

DOWN TIME STATUS CURING

15
Downtime(min)
A
B
C

Reasons
SF

9/5/2015
Responsible
Department
SF

180
240

30

90+75

PM
PCI deff
BC,BOR leak

PM
MF
BC,MF

c/m shaft raise


BC,u/l arm problem
BOR leak
Press operating,Gland pipe leak,opeating
Steam leakage
BOR leak,steam line leak

MF
BC,MF
MF
EF,MF,EF
IF
MF,IF

30

RC

RC

Press locking

MF

Ext drain problem,TOR leak,PCI unlocking


BC,TOR leak

IF,MF,EF
BC,MF

u/l arm return


BC

IF
SF

Press opening

EF

90

30

60+45
180

50
120

90+60

330

60

120

60
120

480
60

300
PM

240

480
PM

150

BC
Dome gasket leak,double molding

BC
MF,IF

480
PM

k-10 Housing
PM

MF
PM

120

miss match
Top ring down
Top ring down,u/l arm cylinder

MF
IF
IF,MF

Shaping

IF

c/w pipe leak,u/l arm back

MF,EF

RC,BC

RC,BC

BC(L)
gland leak,BC(pin hole)
cold water pressure,vacuum problem
PM
c/m shaft deff,BC(L)16

BC
MF,BC
IF
Pm
MF,BC

TF
Mold replace

TF
RC

vcl finger
u/l arm tube leak

IF
IF

BC
355 def

BC
RC

120
480

180

60
120
180
150

150

180

90
120

210

150

480+60
180
60

90
120

15

11/5/2015
Downtime(min)
A
B
C
330
480
480

Reasons
SF
Auto opening,Piping,auto open,vacuum

Piping work

PM
60
60

PM
60
60

PM

120

120
30
120+120
480
120

shaping late
PCI locking, c/m shaft deff
PM
BC
Tyre stuck b/w u/l arm
Tyre stuck b/w u/l arm,BC,shaping

180

180
45

45
480

BOR leak
BC(133),vacuum
B/clamp loose,steam pipe leak
Piping work,Press operating
BC(133),vacuum and shaping
TOR leak

G8(Gland leak)
480

150
Plunger up
G17BC,supply pipe leak,vacuum
30

Shaping,internal not,Press opening


BC

240

60
270

60
60

dome gasket leak,steam leakage,RC


Tread flash

150
60

auto opening,internal not come,offcure


u/l arm,short vent
u/l arm

BC
120

60

480
PM

120
60

60

Double molding(3)

480
PM

480
PM

k-10
PM

75
150

External drop
180
150

c/w pipe leak


BC(L)

60

External temperature drop


95+115
Piping work

300

operating,BC,vcl center out


shaping over

180
120

120
120
Pm
390

Pm

90
60
PM
150

Timer
PM
side wall clean
Timer,TOR leak

480
300

480

480

120
30

BC(L)

90
60

vacuum,BC(162),vacuum
shaping over
BC(leak),355
BC(439),vcl center out

DOWN TIME STATUS CURIN


11/5/2015
Responsible
Department
SF
IF

IF

IF
IF,MF
PM
BC
MF
MF,BC,IF

MF
BC,IF
MF,IF
IF,EF
BC,IF

Downtime(min)
A
B
C
75
360
30+180
480

480

480

480

120

PM

150
60+210
PM

60
120

60
60

60+180

60
120+60
480
480
120+240

60
480
480
60

120

MF

45

MF

165

IF

180

BC,IF

135

480

IF,EF

360+75

120

BC

120

MF,IF,RC
MF

PM
120

120+120+180
120

IF,EF,IF

60

300

120

MF,IF
IF

300

240
120

120

BC

330

IF

300

300

240

MF
PM

480
PM

480
PM

480
PM

IF

405

IF
BC

480

IF

60

IF

120

EF,BC,MF
IF

240
90

EF

120

Pm

PM

RC
EF,MF

240
180

BC
IF,BC,IF
IF
BC,PR
BC,MF

150
180

120

55

pM

PM

120

120
120
90
90

120

180

180

60
90

DOWN TIME STATUS CURING


12/5/2015

SF
Vacuum problem,shaping,Plunger raise problem
BC

Responsibl
e
Department
SF
IF
BC

Steam line leak


BC,E-10 c/m head problem

IF
BC,MF

480

300
60

Shaping late,BC,shaping late


PCI locking
PM
BC,Internal pipe leak
PCI deff
Vacuum problem

IF,BC,IF
MF
PM
BC,IF
EF
IF

120+60

270
120
PM
60

PCI unlocking

EF,IF,MF

Steam line leak,ring down height


Press opening
Shaping

IF,RC
EF
IF

480
480
120

BC

BC

150

BC,shaping
BC(L)
BC
BC,shaping

BC,IF
BC
BC
BC,IF

J-02BC(L)
Platform welding
Steam line leak,Vent block,Top ring leak
PCI locking
External temp drain problem,B/clamp loose,Tread flash

BC
MF
IF,RC,MF
EF
IF,MF

120+60

120
360
120
180

Press opening

EF

180

120

u/l arm
Top ring raise

MF
MF

Double molding
Double molding

IF
IF

Reasons

Downtime(min)
A
B
300
480
120+120
60

PM
240
60

120+120+120
120+120
480

60+60
60
60
60

240
480

60
120
260
260

D/M problem,Plunger raise,Dome gasket leak


BC(cut mark)
k-10
PM

IF,MF
BC
MF
PM

Dome gasket leak

MF

shaping

IF

c/w line leak,vcl,Gland pipe leak

300
180
480
PM

180
480
PM

120
180

EF,MF,IF,MF 60+60+240

120

B/clamp loose
Piping work

BC
IF

180

Segment operating problem

IF

BC(133/162)

BC

60

c/w line leak,Q10 BC(L),VCL

MF,BC,MF

30

60

MC,VCL
BC(pin hole)

MC,MF
BC

240+240

210+240
150

R2BC(rough)
BC(mark)
Press operating,BC(L)

BC
BC
EF,MF,BC

120
120

BC(L)
Vacuum problem,BC(mark)

BC
IF,BC

Segment cylinder leak

MF

180

60+90
300
120+90

390

owntime(min)
C

480

PM
300
60

13/5/2015
Responsibl
e
Reasons
Departmen
t
Plunger raise problem,auto open
IF

Downtime(min)
A
B
C
120

60

c/m shaft deff,Press opening,u/l arm

MF,EF,MF

480

120

60

shaping
Bottom shaft leak,offcure,PCI locking
PM

IF
MF,IF,MF
PM

60
90+90
PM

120
PM

PM

auto opening,RC,auto opening

IF,RC,IF

60

300+60

6.50-16 TR10
PCI locking

SC
IF

BOR leak
Opening problem
Shaping,BC

MF
MF
IF,BC

Press operating

EF

60

Press operating,Plunger raise,IF

EF,EF,IF

240+210

480

BC,Shaping

BC,IF

60

180

u/l arm

MF

60

60

PCI locking
PCI locking

MF
EF

60
60

Tread flash,piping work,drain problem


BC

MF,IF
BC

60+420

180+120

480
60

RC,Press opening

RC,EF

480

120

240

BC(L 2 times),B/clamp,BC(L),u/l arm

BC,MF,BC,EF

300

120+180

60

Opening problem

EF

Press operating

EF

240
60

120+120+120

480

60
480
120

120

60

120

120

40

70

480

120
480
PM

60

120

150

55
480

k-10

MF

480

480

Dome gasket leak

MF

120

shaping
Dome gasket leak
U/l arm return,BC,EF
Piping work,Gland pipe leak

IF
MF
IF,BC,EF
IF,MF

360

120
60+60
180

Operating,u/l arm

EF,MF

90+90

PF
Offcure
355
Q-06BC(L)

PF
IF
RC
BC

90

BC(pin hole)
BC(L)
VCL in out,vcl sensor
VcL in out
BC(deshape)
BC(pin hole)

BC
BC
MF,EF
MF,IF,MF
BC
BC

90
150
480
90+90
120
150

Plunger down,offcure

MF,IF

Segment cylinder leak,vcl finger loose

MF

480

360
180
480

300
30
165
90

180

120
165

300

105

100

480

360

90

Reasons

14/5/2015
Responsible
Department

Downtime(min)
A
B

Auto opening
BOR leak

IF
MF

120

60
60

Vacuum

IF

PCI locking
PM
PCI locking
Auto opening,PCI unlocking,auto opening
Mold cleaning,Tread off register

MF
PM
IF
IF,EF,IF
RC

PCI beam

MF

Bottom leak,Fingers operating,BC(deshape)


BC
Chuck loader def
c/m shaft leak

MF,EF,BC
BC
IF
MF

PCI locking
u/l arm copper tube
Press operating,BC(L),press operating,c/m shaft leak
Press opening

MF
IF
EF,BC,EF,MF
EF

120
390+90

BOR leak

MF

60

BC

BC

60

BC

BC

180

Press opening,steam line leak

EF,IF

300+180

Tread flash
BC

MF
BC

60

External drain,TOR leak


Press operating

IF,MF
EF

120

60

PM
180
375

120
PM
120
90+60
60
60

45+40

60
60

150
330

150
90
360+120
60

120

60

420
300

k-10
PM

MF
PM

480
PM

BC(L)Dome gasket leak(2),Drain opening

BC,MF,IF

u/l arm up problem

EF

60

Shaping,BC

IF,BC

180

Plunger up problem
Plunger up problem

EF
EF

120
60

Q2 BC(439),448,c/m shaft seal leak


BC(deshape)

BC,IF,MF
BC

60
60

Q8 Tread offcure

IF

60

Q14 BC(L), Shaping


Q16BC(pin hole),vcl center out,side wall clean,vcl pipe leak
Press operating
Shaping

BC,IF
BC,MF,RC,IF
EF
IF

60+90
60+30

SMO cylinder

MF

90

Press operating

EF

120

c/w pipe leak


RC,Brake fail
BC

IF
RC,MF
BC

VCL finger loose,vcl center out


Total

MF

480
PM
60+60+180

60

390
60

30

120+120
60
60
2565

3480

owntime(min)
C

Reasons
PF
BOR leak,Shaping

PM

120

180

15/5/2015
Responsible
Department
PF
MF,IF

Downtime(min)
A
45

E-6 BC
u/l arm

BC
MF

PF
u/l arm,PM
PCI unlocking
PM, shaping

PF
MF,PM
MF
PM,IF

PCI stopper

MF

Internal pipe leak


RC
u/l arm adjustment
PF

IF
RC
MF
PF

Trip off
BC
c/m shaft,B/H adjustment

EF
BC
MF

345

u/l arm not working

EF

125

Steam leakage from gland

IF

Timer fault,PCI locking,Tread flash,shaping


Timer fault,u/l arm wire loose

EF,IF,MF,IF
EF,MF

65
120

u/l arm,Tread flash


u/l arm

EF,Mf
MF

60

Shaping,BC

IF,BC

60

150+270
PM+60

180
180

480
PM

k-10 maintainance, k-11 top ring raise

MF

480

150

External drain

IF

480

u/l arm out of order


Dome gasket leak
Shaping
Dome plate leak
Plunger raise,BC(Leak 10)

EF
MF
IF
MF
MF,BC

75

9.00-20 HCT 14
PF
c/m shaft seal change,Segment operating,Plunger deff
Gear deff
Dirty mold
195/65 R15ES

MC
PF
MF,IF
MF
RC
MC

480

Segment operating,BC(L)
Operating
vcl up, Offcure,c/m shaft seal change
Vents block

EF,BC
EF
MF,IF,MF
RC

Steam line leak


c/w pipe leak
VCL center out,BC,vcl center out
BC

IF
MF
IF,MF,BC,MF
BC

Shaping ,BC
BC
Total

IF,BC
BC

205+180

345+135

120+360
420

180
120+120

90
120+210
60

90

120
1140

420
150
4015

Downtime(min)
B
C
15
120
60

Reasons

16/5/2015
Responsible
Department

Downtime(min)
A
B

shaping,auto opening,Plunger raise


Plunger deff
BC

IF
MF
BC

480
30
30

120

PF
PM
IF

PF
PM
IF

PM

PCI deff

MF

30

BC

BC

BC(deshape)

BC

Vent block on tread


BC

RC
BC

BC(L)

BC

35

Press operating,Internal pipe leak

EF,IF

45

u/l arm

MF

60

IF,PCI

IF,EF

BC(L),C/W pipe leak

BC,MF

Press late opening

EF

60

BC

BC

60

60
15
PM
60

PM

60

270
60
15

35
PM

60
30

60

60
60
60
180

60

120

240

60+60+120
60
60+120
120

60

60

480

480

k-10
PM

MF
PM

480
PM

Mismatch

MF

75

Vacuum

IF

BC
u/l arm

BC
EF

PF
BC,EF
MF,IF
RC,EF
MF
BC,IF
IF
EF

30+30
60
480
90
480
60

120
150

PF
BC,Timer recycle
Gear deff,copper tubes
Side wall clean,Press opening
Housing,ring down,chuck loader
Q10 BC(pinhole),vacuum
Vacuum
operating

180

Dirty mold

RC

480

Operating

EF

30

vcl height adjust

MF

30

240

480
PM

60

60
240
240

180
30
330
480
480

240
90

90
480
60
480

120

360

360

150
60+90

240

140

4785

2630

30
240
180+105
210
240+240
30
30

owntime(min)
C

Reasons
SF
Plunger raise
Mold cleaning
BOR leak

18/5/2015
Responsible
Department
SF
IF
DE,RC
MF

Downtime(min)
A
B
30
390
120
180+210
210
60

SF
PM
PCI locking, Heavy tread flash

SF
PM
IF,EF,RC

30
PM
390+90

BOR leak
PCI inflation problem

MF
IF,MF

60
300

Supply pipe leak


Shaping
VCL down+u/l arm

IF
IF
IF

420
60
300

240

shaping,c/m shaft deff

IF,MF

300

480

Mold cleaning,BC(L)

RC,BC

180

360

Internal supply pipe leak

IF

480

360

u/l arm

MF

360

Press open problem,

EF,MF,IF

120

240+240

180

BC
Press open problem
U/l arm

BC
EF
IF

60
60
360

240

SF

SF

60

MF

MF

BC

BC

PM
380

180
180

480

PM

30

300

60

480
EF

k-10
u/l arm,Plunger raise

MF
EF,IF,EF

480
60+240+120

480
180

Drain problem
Shaping,Plunger

IF
IF,MF

420
120

120

BC

BC

180

480

Press operating,Vacuum

EF,IF

360

480

opening,brake fail,platen steam pipe,RC


Segment operating
Press operating,BC(L)

240

150

EF,MF,IF,RC 120+120+180+60 480


MF
480
360
EF,BC
30
90

Plunger down,BC(L),448,VCL
u/l arm hold
BC(rough)
BC(rough)

IF,EF
IF
BC
BC

60
150

PM

PM

PM

BOR leak,shaping direct

MF,IF

Shaping over

IF

120+60+60
120

150

PM

90
60

owntime(min)
C

PM
450

480
90

Reasons

19/5/2015
Responsible
Department

Downtime(min)
A

Tread offcure
BC(L)
Operating
BC(L)

IF
BC
EF
BC

210

PM
Supply pipe leak,PCI
BC(L)
Operating

PM
IF
BC
EF

PM
120

shaping,BC(416)

IF,BC

BC(L)

BC

shaping,vcl deff
BC
VCL adjust

IF,MF
BC
MF,IF

90

BC,Plunger down,PCI
c/m shaft, Supply pipe leak,TOR leak,Leakage

BC,IF,EF
MF,IF,MF,IF

60+90+60+120
300+120+120

TOR drop, BC
Offcure
Temperature over
BC
BC

EF,BC
IF
EF
BC
BC

120
60
30

Press operating

EF

30

Pressure switch,PCI
Steam line leak

IF,EF
IF

480

BC

BC

Supply pipe leak,Auto opening

IF

120

VCL deff

MF

480

90

30

60
480

480

120

60

240
480
480

90

PM

375

B/clamp broken,Dome gasket leak

MF

k-10
BC(L),Plunger down,Plunger down,Offcure

MF
BC,EF,IF

480
120+60

c/m shaft bent

MF

480

Shaping

IF

300

BC/Bclamp
BC,Press operating,BC

BC
BC,EF,BC

Vacuum problem(2)
VCL in/out
BC(deshape),Pitted mold
Vacuum problem(2),vcl finger adjust,255,vacuum

IF
MF
BC,RC
IF,MF,RC,IF

Steam line leak


BC

IF
BC

Shaping,Top ring raised


PM
Shaping direct,BC

IF,MF
PM
IF,BC

shaping
BC

IF
BC

90+90
30
90+90+60

PM

480

3630

Downtime(min)
B

Reasons

20/5/2015
Responsible
Department

BC
BC,Operating

BC
BC,EF

BC(2)
MF

BC
MF

PM
PCI deff

PM
EF

30

VCL

MF

90

BC
BC,shaft raise

BC
BC,MF

480

IF,Panel trip
c/m shaft(G5)
u/l arm problem,BC(L)
RC,Offcure
BC

IF,EF
MF
IF,BC
RC,IF
BC

BC

BC

Gear deff
IF steam line leak

MF
IF

Plunger up problem
auto opening
BC

MF
IF
BC

VCL

EF

120
210

PM
60

PM
105

60
60

120
60

60

90
480

60+45
60
120

60
210
50
150

480

480

180

120

480
240

300

k-10
Offcure

MF
EF,IF

RC

RC

Press operating

EF

BC

BC

vacuum

IF

480
60

Dirty mold
vacuum

RC
IF

60

VCL up
Gear deff

EF,IF
MF

240+240
PM

c/m shaft,shaping
134
u/l arm deff

MF,IF
BC
MF

BC
Gear deff
Side wall dirty,VCL center out

BC
MF,PM
RC,MF

300

60

150
120+120
240

240
60+60

120

180
PM
120+60
300
150

4280

3015

Downtime(min)
A
B
C

Reasons

21/5/2015
Responsible
Department

60
150+60
60
60

150

PM

PM
60

PM
vacuum

IF

PCI limit deff

EF

Press open,PCI locking,IF,vents block


G-05 c/m head
u/l arm problem,MF
Shaping
VCL down

EF,IF,RC
MF
IF,MF
IF
IF

Gear deff
Steam pipe leak,PCI deff

MF
IF,MF

Plunger raise
Brake fail

MF
EF

VCL deff

MF

60
60
120

60

210

120

120
240
240
60

120

60
480
120

60

390

480
270

410
240

60
60

120

480
480

k-10

MF

BH/adjustment,Supply pipe leak

MF,IF

Opening

EF

Press locking

EF

180
180

SMO c/w pipe leak,Timer fault


BC,steam leakage,c/w pipe leak
D/mold
Segment operating

IF,EF
BC,IF,MF
RC
EF

120+180
240

BC
VCL sensor, BC,Drain problem
u/l arm hold

BC
EF,BC,IF
IF,MF

BC

BC

BC,BC(mark)
Shaping late,BC(deshape)
BC(pinhole)
c/w pipe leak
155/70 R12EK,BOR leak

BC
IF,BC
BC
IF
MC,MF

Steam flash leak


BC

IF
BC

270

480
120

480

390
180

240

60

330+150

360
75

60

180

300
60

90
480
120

30

4050

3855

2180

Downtime(min)
A
B
C

60

Reasons

22/5/2015
Responsible
Department

c/w copper tube


BOR leak,TOR leak

IF
MF,MF

PM
BC,PCI locking(3)
Timer recycle

PM
BC,MF
EF

BC

BC

BC,shaping regulator,Gland pipe leak


Vacuum,BOR leak,shaping regulator
Vacuum ,chuck loader

BC,IF,MF
IF,MF,IF
IF,EF

vent block
VacuumG5

RC
IF

Press operating,Motor
Offcure

EF
IF

Leakages plunger,Press operating,P/switch leak


Plunger raise

IF,EF,IF
IF

BC

BC

60

30+90
480

120

480

180

60
60

60

480
480

480
120

480
85

MC
Gear deff,Piping work
PCI locking

MC
MF ,IF
EF

480
180

300
480

480

Mold clean
Brake fail

RC
EF

Press auto opening

IF

240

480

480

270+60

120

480

60

60
60+60
60+30

90
60+60
330

120
90
60

60

60
240
90

90
300

90
360

120

90
90

60

135

120

3765

2485

60
60

60
4050

Tread flash,Dome gasket leak

MF

Timer fault
k-10,k-11 mold clean,piping work

EF
MF,RC,IF

Offcure,rubber remove,auto opening

IF,RC,IF

Operating
Press opening,piping work
Piping work
u/l arm

EF
EF,IF
IF
MF

5
Downtime(min)
A
B
C
60
30

60

PM
60+60+60

PM
60

PM
90

Reasons

23/5/2015
Responsible
Department

u/l arm deff

IF

PM
PCI locking,Vacuum
Tread flash

PM
MF,IF
MF

SC

SC

PCI locking

MF,EF

BC(deshape)
BC
BC(deshape)

BC
BC
BC

PCI locking
G5Vacuum

IF,MF
IF

Motor
Offcure,Platen controlling
BOR leak
Pressure switch leak

EF
IF,EF
MF
IF

u/l arm supply leak

MF

120

60+60
60+60+60
90

120
120

150

60

240

480

480

480
180

390

60+90

240
70

480
180
420
180

60

120
180+300

480

Piping work,PCI
PCI

PM,IF,EF
MF

480

480

Mold clean
Brake fail

RC
EF

Tread flash,u/l arm

MF

SF

SF

Press auto opening

IF

120

480

60+300

480

480

60+150

60

60
480

60

Dome gasket leak


Dome gasket leak,auto opening
Piping work
Press operating
SF

MF
MF,IF
PM,RC
EF
SF

BC

BC

Press operating,auto opening

EF,IF

u/l arm

MF

BC(deshape)
Brake fail
BC
vcl finger loosed,vacuum
BC(L),BC(pin hole)

BC
MF
BC
MF,IF
BC

BC
Internal steam pipe leak
BC(L)
255

BC
IF
BC
RC

steam leak+TF

IF,TF

vcl center out,locking,center out

MF

vcl sensor
RC

EF
RC

180+60
60
180

2580

2920

3360

5
Downtime(min)
A
B
C

SF
BC
Offcure,mold tight

60

PM
120+60
60

Reasons

PM
180

PM
60

480

480

25/5/2015
Responsible
Department
SF
BC
IF,RC

Plunger raise

MF

SF
PM
PCI,Tread flash,shaping over tead flash,offcure
Press opening,Motor jam,shaping over tread
Shaping over tread flash
SC

SF
PM
IF,MF
EF,MF,IF
IF
SC

Size change,PCI unlocking

SC,IF

BC

BC

Shaping
RC

IF
RC

SF
PCIunlocking

SF
EF

Press locking
Platen temp drop,Int pipe leak

EF
IF

B/H adjustment

MF

IF
MF
EF,RC
RC
EF

60+60

60
60
120

120+60
480

90
240

480
480
60
210

480
360

480
360

60

PM
60

120
480

120
480

480

480

480
360

c/w pipe leak


PCI beam
Short circuit,PCI locking,OGDC
RC,Tread flash
Power off,press opening

120

Bottom leakage,u/l arm

MF

BC

BC

60
240

480

120

120
60
PM
120
240

60
420

Plunger raise
c/w line leak
auto opening,Press operating
Ext drop problem

MF
IF
IF,EF
IF

back pressure,piping work,dome gasket(2)


piping work,u/l arm,

IF,MF
MF
IF,EF

auto opening
c/w pipe leak
BC
EXt drop problem

IF
MF
BC
IF

355
vacuum,355
sensor change vcl

RC
IF,RC
EF

355
drain

RC
IF

448,b/clmap loose,vcl center,355

IF,MF

120

420

210

60

60

90
60
120
90
120

30
120

60
330
90
60
480

480

480

back pressure

IF

60

465

120

vcl center out

MF

VCL finger

MF

vcl center out


355,offcure
Segment operating

MF
DE,IF
EF

60

5220

330

240

5355

4620

15
Downtime(min)
A
B
C
30
60
180
60+210

30
PM
60

PM
30
120+180

360

BC

75

BC

BC

PM
60+30
90
90

PM
BOR leak,PCI
Press over travel,shaping
Shaping over
BH adjustment
PCI
u/l arm

PM
MF,IF
EF,IF
IF
MF
MF
EF

BOR leak

MF

Press open
EF,chuck loader up,vcl out

EF
EF,MF,IF

leakage

IF

BC,B/clamp loose

BC

BC

BC

MF,IF
PCI
PCI
tread flash
u/l arm
Piping work

MF,IF
MF
IF,EF
MF
EF
IF

PM

PM

gear

MF

60

180

240

c/w line leak


BC

360
240

Reasons

26/5/2015
Responsible
Department
IF

90
300

30
60

240

120
20

60

480
480

360

120
210
360
360
60+60

60
180+60+60
180

120

120

60

60
60
120

300

360
60

Plunger up
IF
BC

MF
IF
BC

dome gasket leak

MF

150+90

Steam pipe leak

IF

180
210

Plunger down,copper tube leak

MF,IF

Locking

EF

c/w pipe leak

MF

55
60

Segment broken
Brake fail
Dirty mold,Plunger raise
vcl center out

DE
MF
RC,EF
MF

55

vcl air pipe


BC(L),Side wall clean

IF
BC,RC

MC,Platen drop
c/w pipe leak,BC

MC,IF
MF,BC

u/l arm return

EF

Top ring raise


BC
R16DE

IF
BC
DE,RC

180
180

120

240

60+60
120

120

55
55

240
240

120

120+60

60

330
480
120
60
480
30

60
330

15
Downtime(min)
A
B
C
120

Respon 26/5/2015
Downtime(min)
sible
Reasons
Depart
A
B
C
ment
u/l arm,BC EF,BC
30+30

150

480

480
90

30
30

BC,TOR leak,u/l BC,MF,EF


arm
255

60

480
PM,vcl in PM,EF,IF,EF
60
30+60
auto opening,u/l arm
IF,MF
60
60
Plunger raise
IF

480

90+30

120+150

120

60

120

240

30

180

60

30
60

MC
VCL in
MC,vcl in

MC
IF
MC,IF

PCI locking

IF

G08 MC

MC

BC(L)

BC

480

120
360

120
30

120

240

90
240

60
60

120+360
120

60

150

BC,Press late open


BC,EF
60+60
EF
EF

150
210

60

60c/w line leak,Brake fail


IF,EF

480

300

480

180
180

120

480

480

480

PM

PM

480

120

480

MF

MF

390

420

60

IF,BC,item 3/4 leakIF,BC


Press operating EF

240

120+60

120

360
480

60

120
75
240+180
Motor brake
EF
BC
BC
BC,Press operating
BC,EF,IF

480
120
240

240+240

60

90

465
480
30
60
120
480
150

480

480
60
180+60

High pressure downSF


steam line leak IF
Brake fail
MF
BC(deshape),Q6 vcl sensor
BC,EF
480Segment operating
DE,EF
120Segment operating EF
120Segment operating
EF,MF

90
180

480
60
180+150

BC(deshape) BC
60 Side wall dirty,BH adjustment,BOR
RC,MF leak 90
SF
SF
45+90
120
145R12cssR1 MC
60

60
180

60

VCL in

IF

85

c/m shaft seal


BOR leak
BC(deshape)

MF
MF
BC

60
480
120
120

60
90
480

60
30

115

300

480

120
180
30
60

Reasons
BC
BC(2)
RC

28/5/2015
Respon
sible
Depart
ment
BC
BC
RC

RC

RC

VCL
PCI

IF
MF,IF,EF

Int drop,u/l arm,PCI beam

IF,EF,MF

RC,vcl problem,c/w line leak

RC,EF,IF

PCI unlocking

MF

Operating

EF

BH adjustment
BC(L)

MF
BC

PCI unlocking,leakage work


Dome plate leak
Brake fail
Leakage work
Top ring raise

IF
MF
EF
IF
EF

PM

PM

Operating

EF

u/l arm,top o ring

EF,MF

Press operating
SF

EF
SF

Brake plate
VCL sensor
Segment slow work

MF
EF
MF,EF

BC(deshape)
Segment operating
Offcure
auto opening

BC
EF
IF
IF

RC,vcl down

RC,EF

vcl in

EF

448

IF

Dirty mold
448 int,Vacuum
Operating,brake fail

RC
IF
EF,MF

2015

30/5/2015 Respon
sible
Depart
ment

Downtime(min)
A
B
C

Reasons

Offcure,Press operating

MF,EF

390

30
190
75

240

90

PCI air
c/m shaft,Timer recycle
PCI beam

IF
MF,EF
MF

BC(L),PCI locking
Press open, TORleak

BC,EF
EF,MF

Bottom leaked,BC
VCL finger

MF,BC
MF

c/m head plate bolt,steam leakage

MF,IF

Bottom o ring leak,TOR leak

Rc,MF

BC
Press opening

BC
IF

Bottom leaked

MF

BC(L)
EXt drain,PCI locking

BC
IF,EF

PCI beam

MF

120
480

u/l arm c/w pipe leak

IF

60

auto opening,Offcure

IF

480

PM

PM

BC

BC

180

60

300

45

30+60

105

120

40

60

90

60

90
120

240

120

240

120
120

480

480

480

480

Motor,Press operating

EF,MF

Shaping

IF

Shaping direct
BC(L),c/m shaft leak,Piping

IF
BC,MF,IF

u/l arm c/w pipe leak,Sypon problem


SF

IF
SF

120

SF

SF

120
60
210

RC
BC(deshape),vcl center out

RC
BC,MF

u/l arm, vcl in out,c/w line leak,RC

MF,IF

dirty mold

RC

MC

MC

VCL finger colaps

IF

60

480

60

60

480

60
120
180
300
90

60
60

120

90

60
3600

180
30
60
2525

150
3270

5
Downtime(min)
A
B
C

480

30+45

65
135

30

480

60
120

160

90

60
210+30

60
60

480

120

240

240

45

120
300

60

35
230

60

45

240

60

60

480

60

240

480

480

480

420

240
120

70
105+105

80
120

120

120
150

90
330
60+150

315

180+180

300

360

120

180

180
4525

2460

2685

DOWN
Press #
E-Row
E-01/02
E-03/04
E-05/06
E-07/08
E-09/10
F-Row
F-01/02
F-03/04
F-05/06
F-07/08
F-09/10
F-11/12
F-13/14
F-15/16
F-17/18
F-19/20
F-21/22
F-23/24
F-25/26
G-Row
G-01/02
G-03/04
G-05/06
G-07/08
G-09/10
G-11/12
G-13/14
G-15/16
G-17/18
G-19/20
G-21/22
J-Row
J-01/02
J-03/04
J-05/06
J-07/08
J-09/10
J-11/12
J-13/14
J-15/16
J-17/18
J-19/20
K-Row
K-01
K-02
K-03

Reasons

1/6/2015
Responsible
Department

Downtime(min)
B

Plate leak,RC,Offcure

MF,RC,MF

240+170

480

Plunger raise

MF

BC
BC
Offcure,TOR leak
Press locking

BC
BC
IF,MF
EF

PCI locking

MF

30

PCI locking

EF,IF

60+120

BC,c/m shaft
BOR leak
BC

BC,MF
MF
BC

c/m shaft

MF

Int drop, shaping


Auto opening

IF
IF

Press operating

EF

Air fluctuation

IF

90

BC(mark)

BC

180

Steam line leak

IF

210

120+60

BC(L)
u/l arm

BC
IF

180
240

420

Offcure

IF

480

60

PM
Press operating,VCL brake fail

PM
EF,MF

480
120

480
120

60
150

60
150
60

60
60

420
300

150+120
180
60

K-04
K-05
K-06/07
K-08/09
BC(mark)
BC
K-10/11
Plunger raise
MF
K-12/13
BC
BC
N-Row
SF
N-01
N-02c/m shaft,BC,double molding,operating,Plunger down MF,BC,EF,MF
N-03
N-04
High pressure down
IF
N-05/06
N-07/08
BC(mark)
BC
N-09/10
N-11/12
P-Row
SF
SF
P-09/10
Offcure,Rubber remove
IF,RC
P-11/12
Q-Row
SF
SF
Q-01/02
Bottom o ring leak
MF
Q-03/04
Q-05/06
Q-07/08
Operating,BC(L),c/w line leak
EF,BC,IF
Q-09/10
BC(L)
BC
Q-11/12
Q-13/14
Q-15/16
VCL in,c/w line,cavity jurking
IF,MF
Q-17/18
Q-19/20
Pressure switch
EF,IF
R-Row
SF
SF
R-01/02
R-03/04
Shaping late
IF
R-05/06
R-07/08
R-09/10
Bottom o ring leak
MF
R-11/12
R-13/14
R-15/16
VCL finger colaps
IF
R-17/18

60
120
180
60
120+120.

60+60
480

240

180
120+300
120

30
60

120+60

180

120+330

120+60
120

120
30

240
4290

3060

DOWN TIME STATUS IN CURING

wntime(min)
C

480

Reasons

2/6/2015 Respon
sible
Depart
ment

Downtime(min)
B
C

Offcure problem
Press open

MF
EF

480

PCI

MF

30

PCI

MF

30

60

Brake fail
c/m shaft deff/leak

EF
MF,IF

180
165+270

480

c/m shaft

MF

240

VCL operating
Offcure problem

EF
IF

210

lube line leak,c/w pipe leak


Piping work,u/larm
TOR leak
BC(L)

MF,IF
IF,EF
MF
BC

60+60
240
60
255

u/l arm
u/l arm

IF
MF

40

PM

PM

480

480
75

120

60

120

480

75

160

140

100

480

480

480

480

195
90

480

135

90

3750

Plunger deff

MF

420

Reasons

4/6/2015
Respon
sible
Depart
ment

Downtime(min)
B
C

448

MF

480

60

Tread off register


BC,c/m shaft

RC
BC,MF

120
30

210
150

c/m shaft,Back pressure,Press open


c/w pipe leak
u/l arm,RC
RC,Gland pipe leak

MF,IF,EF
MF
EF,RC
RC,MF

300
60
90

75+45

PCI stopper

MF

60

Top ring down


VCL in out

IF
EF

120
60

BC(L),c/m shaft

BC ,MF

BC

BC

PM

PM

480

BOR leak,Plunger down

MF,IF

180

leakage work
Shaping overr
TOR leak

MF
IF
MF

120

PM

PM

480

480

300
100+60

240

150

120
480

480

60

60
60
480

480

16.9 SAGT 8,c/m shaft leak

MC,MF

480

480

u/l arm raise

EF,MF

60

300

BC, double molding

BC,IF

270

400

Brake fail

EF

180

480

480

360+120

120

480

Press operating,Ext temp drop,Piping work,Gland pipe


EF,IF,MF
IF

IF

480

MC,bottom o ring leak

MC ,MF

480

BC(deshape)
center out

BC
MF

c/w line leak,Top ring line


Int late

IF,MF
IF

90+90

c/m shaft seal

MF

180

RC

RC

120

Brake fail,vcl in
vacuum
BC

MF
IF
BC

120
240

180
60
120

330

4650

300
360
90
4870

3660

DOWN TIME STATUS IN


Reasons
BC(2)

6/6/2015
Respon
sible
Depart
ment
BC

Downtime(min)
B
C

360

60

100

60

90
120
90

60

PCI air drop


Press open
PCI deff
PCI deff

IF
EF
EF
EF

60
240

PCI deff

MF

150

BOR leak

MF

u/l arm adjust,Opening


offcure,c/m shaft leak,BC
BC

MF,MF
IF,MF,BC
BC

120

PCI unit unlocking,Shaping


Offcure,mold tight,Timer

MF,IF
IF,RC,EF

60
150

Shaping
BC

IF
BC

60

BC(L)

BC

RC,Tread flash

RC,MF

480

PCI deff,Vacuum

MF,IF

360

PCI deff,Vacuum

EF,IF

120

u/l arm

EF

Dome gasket leak,Internal drop,Housing leak MF,IF,MF

PM
BC

PM
BC

120
30

30+60
60

60+30
120+120

90
120

60

90
120
45

120
60

60
60+300

120+300

480

480

480
120

480

auto opening

IF

120

120

Operating problem,u/l arm raise

EF

480

120

Shaping

IF

u/l arm

EF

75

Mold clean,Dome gasket leak

RC ,MF

480

BC(L),Operating

BC,EF

150+270

Line leak

IF

120

BC,Q8 B out

BC

Brake plate broken


VCL adjust
MC
c/m shaft
VCL up c/w pipe leak

MF
MF
MC
MF
MF

c/m shaft

MF

240

u/l arm hold

IF

180

Operaating, jaming

EF,MF

180+180

Plunger slow work

IF

120
120

480

60

120

480
210

60
180

30
240

60

4695

120

2655

60
2680

TIME STATUS IN CURING


Reasons

10/6/2015
Respon
sible
Depart
ment

Downtime(min)
B
C

Shaping problem,Press operating


IF

IF,EF
IF

60

120
120

BC
PCI locking

BC
IF

c/m shaft leak offcure

MF

PM
RC
Top ring slow
Offcure,Opening,u/l arm,opening

PM
RC
IF
IF,EF,MF,EF

480

480

180
240

120
180

Mold clean,BC(L)

RC,BC

300

120

BC,BC(L)

BC

Vacuum,BC(L),PCI

IF,BC,IF

120+60

BOR leak,internal line leak

MF,IF

60+60

PM
SF
Plunger down

PM

480

EF

240

60+60

240
90

240

60

480
300
440
60+240

120

180

480
150

480
345

Mismatch,Vacuum,SF

DE,IF

150+60

90

c/m shaft leak ,offcure,SF

MF,IF

270

120+120

Shaping

IF

300

SF
SF
SF
SF
Vacuum

IF

240

390
390
390
390
240

Motor,Press opening

EF

180

8.25,SF
SF
SF
Offcure,c/m shaft
Copper tube leak

MC
SF
SF
IF,MF
IF

300

VCL finger adjust,segment c/w pipe leak,vcl finger MF,IF,MF


VCL up
IF

30

345

480
480
480
480

60
120+180
180
75
195+150
195

60+90
120

480
480
60

30

VCL up,VCL center out

IF,MF

60

60

Side wall dirty,BC

RC,BC

270

60

R row shaping over

IF

Top ring raise

MF

Vacuum 446

IF

30

15
90

60

3600

5340

5585

Reasons

11/6/2015
Respon
sible
Depart
ment

locking problem

MF

30

Tread flash

MF

30

PCI deff

EF

60

PM
RC,VCL up down
BC,VCL
Opening

PM
RC,IF
BC,MF
EF

480
300+180
30+120
120

PCI deff

IF

150

Plunger rasie

MF

270

c/w line leak

IF

420

PM

PM

480

Downtime(min)
B
C

Vacuum

IF

120

Shaping

IF

420

Leakage

IF

420

Shaping

IF

15

BC
Brake fail

BC
MF

60
105

Press operating,vcl center out

EF,MF

60+60

BOR leak
Steam line leak

MF
IF

90
210

VCL in

EF

90

Side wall dirty

RC

450
4020

DOWN TIME STATUS IN CU


Reasons
Offcure
BC(L)
offcure,c/m shaft leak
Offcure,BC,offcure,EF
BOR leak

13/6/2015
Respon
Downtime(min)
sible
Depart
A
B
C
ment
IF
120
BC
180
IF,MF
90+60
IF,BC,IF 60+60+60
180
480
MF
60

Press locking
PCI locking
BOR leak,Tread flash
PCI limit block

MF
IF
MF
MF

60
90+30
60

60

6.50-16 TR10
BC(L)
PCI deff

SC
BC
EF

270
60
60

u/l arm deff

IF

120

Int pipe leak

IF

480

120

Press auto opening


Low gas

IF
LG

60
480

480

240

PCI conveyor roller

MF

60

Press auto opening


u/l arm return,BC(L)
Press auto opening

IF
IF,BC
IF

480
60+60
60

PM
Low gas
Low gas

PM

480
330
420

480
480

480

Low gas
Low gas
Low gas
Low gas
Low gas
Low gas

480
480
420
420
120
120

c/w line leak

IF

BC(L)
c/w nipple leak

BC
MF

240

Operating

EF

240

Low gas

SF

480

HP steam down

SF

60

BC(L), vents block


VCL center out

BC,DE
MF

Offcure,c/m shaft leak,Offcure,Int offcure

410

480
480

240

120

480

480

150
60

120
300

30

IF,MF,IF

210

195+195

120

BC,Plunger down

BC,MF

60

vcl center out


copper tube leak

MF
IF

360

60
60
7560

3230

3330

TIME STATUS IN CURING


SF

15/6/2015
Responsible
Department
SF

Motor

EF

480

SF
VCL out in

SF
EF

240

Brake loose

MF

90

PCIstopper down
BC

MF
BC

60

PCI unlocking
PCI deff,BOR leak
VCL up
Press opening
BOR leak
Shaft raise
SF
PCI unlocking
PCI deff,Shaping,PCI
Top ring raise

IF
IF,EF,MF
IF,EF
EF
MF
IF
SF
IF
IF,EF,IF,EF
MF

Piping work
SF
Piping work,SF

IF
SF
IF,SF

TOR leak

MF

u/l arm, Plunger raise


Vacuum,u/larm in

MF,EF,IF
IF,EF

60
360

180

120
120

RC,BC(L)

RC,BC

360

480

120+180

SF
PM

SF
PM

60
480

480

BC(L)

BC

Reasons

Downtime(min)
A
B
C
210

480

480

30

60

120
90

90
300

60
60
30
480
120

60
30
300

60+30

420
60

180
120

60
60
60

420

60

120

Top ring raise,piping work

IF

420

auto opening
SF
u/l arm

IF
SF
MF

60
75

SF

SF

120

SF,PF

SF

30

BC
BC
Rc,VCL finger loose
VCLdown
Locking
VCL up air drop
Plunger down

BC
BC
RC,MF
IF
MF
IF
EF

180

150

15
60

90
240

30
30
30
420
60

c/m shaft,c/w down, c/m shaft,BC(deshape


SF,PF

SF,PF

30

Plunger raise
u/l arm,vcl finger,operating
Operating

IF
EF,IF,EF
EF

120
75
45

vcl center out


Shaping over

MF
IF

30
4665

15

30

90

60
3240

2730

Reasons

16/6/2015
Responsible
Department

Downtime(min)
B
C

BC

BC

45

Int Pipe leak


motor

IF
EF,IF

300+120

VCL in out

IF

60

PCI, BH adjustment

MF

VCL deff
Opening problem, Dirty mold
BOR leak,Shaping,BC
Shaping,BC

IF
EF,RC
MF,IF,BC
IF,BC

Plunger up
PCI

MF
MF,IF

Piping work
BC
Vacuum

IF
BC
IF

BC,BOR leak

BC,MF

u/l arm,PCI beam up


BC

MF,IF
BC

PCI deff,BC

60

180

60+60

60
360
120

120
270
45+60
45+60
480

480

120+120

240
60
300

60

30

300

360
360

60

EF,BC

60

240

Vacuum,BC(L)
Vacuum
Operating problem
BOR leak

IF,BC
IF
EF
MF

180
240

Pm

PM

480

Offcure

IF

180
60

480

120
180
300

480
120

Top ring down

IF

BC,Shaping

BC,IF

u/l arm
BC

MF
BC

Plunger up

EF

Plunger raise c/w pipe

MF

MF,BC,Deff 422
Back pressure

MFBC,IF
IF

c/m shaft seal,Q4 offcure

MF,IF

Vacuum,u/l arm,VCL center out


355 load adjusted
Brake plate broken
VCL up

IF,MF
RC
MF
IF

c/m shaft,c/w down, c/m shaft,BC(deshape)MF,IF,MF,BC


BC(deshape)
BC

60
60+60
150
60

480

240
180

120+150
120

195

150+60
60+60
80
120
240

240

120

150+90+30
60

u/l arm

EF

90

Operating problem
BC(L)

EF
BC

240

Steam pipe leak

IF

240

480

Shaft down,Top ring c/w pipe leak,Plunger raise


Steam pipe leak,BC(pin hole)
Q-16 448,c/m shaft deff,BC(L)

60

3230

3810

3540

DOWN TIME STATUS IN CURING


Reasons

17/6/2015
Respon
Downtime(min)
sible
Depart
A
B
C
ment

BC
BC
BH adjust,Offcure

BC
BC
MF,IF

90
60

Supply pipe leak

IF

PCI limit deff


Press over travel

EF
EF

RC

RC

330

Plunger down
BC

MF
BC

390
60

BC(L)

BC

BOR leak

MF

150

18/6/2015
Reasons
PF
RC, Tread flash
Tread flash

180+60

120

Leakage

120
60

Over travel
Supply pipe leak
Open vacuum
Press operating

MC spjc
PCI deff
BH adjusted
150

60
BC

u/l arm broken,BC(L)

MF,BC

PCI locking

180

60

Piping work,BOR leak


Shaping,c/w pipe leak

EF

60

PCI deff,u/l arm deff

u/l arm up and return

EF,MF

60+60

Offcure,RC,Offcure
c/m shaft raise

IF,RC,IF
MF

240
120

480

PM

PM

480

480

120+120

c/w line leak


RC,Offcure,vents block
Piping work

PM

Press operating

Missmatch
u/l arm deff

MF

180

BC
VCLup+u/l arm slow work

BC
IF

60

u/l arm

EF

300

Mold change 16.9

120

B clamp loose

shaping

IF

120

Offcure,C/M shaft deff


IF,MF
480
BC(deshape)
BC
u/l arm, VCL center out,Operating,SteamMF,EF,IF
pipe leak
480
Side wall clean
RC
180
Shaft down,Top ring c/w pipe leak,Plunger
MF,IF
raise
90
Steam pipe leak,BC(pin hole) IF,BC
Q-16 448,c/m shaft deff,BC(L)IF,MF,BC 30+180
Vents block,BC(L)
DE,BC

Vacuum

IF

RC,BC(L)

RC,BC

c/w line leak,shaping

240
60
120+60
120+60
60
120
120

BC(pin hole)

75
60

60
150

BC(leak),Operating
VCL up
BC,side wall dirty, segment cylinder
BC(leak)
BC(leak)
Press operating

Vacuum,BC,BOR leak
BC(leak)

60
VCLin
Shaping

BC,BC(pin hole)

BC

60

120

448,vents block,Offcure

IF,DE,IF

180+180

180

480

4110

2070

1365

offcure

N CURING
18/6/2015
Respon
sible
Depart
ment
PF
RC,MF
MF

Downtime(min)
A
B
C
30
360
270
30
30

IF

270

EF
IF
IF
MF

60

MC
IF,MF

480

30
480
240

Reasons
PF

20/6/2015
Respon
sible
Depart
ment
PF

Downtime(min)
A

Pipe leak
BH adjust

IF
MF

120
120

Operating problem,BH adjust


Operating problem

EF,MF
MF

300+45

MC

MC

480

Bottom leaked,BC(L)

MF,BC

135+90

PCI open

IF

120

C/m shaft open,Offcure,Shaping

MF,IF

360+120

360
180

MF

240
60

BC

180

IF,MF
IF

180

300+60
60

IF,MF

60

150

IF
RC,IF,RC
IF

420
180+300

PM

480

360+120
480

480
480
480

480

480

Brake
Offcure,RC,Ext drop,RC

PM
VCL deff
BC

MF
255
IF,RC,IF,RC 255+180

PM
MF
BC

480

EF

150

RC
MC

MF

300

480

Offcure,RC
u/l arm+open problem

IF,RC
EF

Operating problem

EF

operating,Sypon problem

EF,IF

240

60

MF,IF

360

60+60

150

BC,EF
150
IF
BC,RC,MF 60+60+120
BC
150
BC
EF
60

60
30
60
180

BC(L) 4 times
BC
355
RC
offcure
IF
Platen steam pipe leak
IF
c/m shaft seal change,BC(L),Offcure MF,BC,IF
brake fail

IF,BC,MF
BC

300

240+240

Plunger cylinder leak,c/w pipe leak,seal change


MF,IF,MF
BC

480
480

60+120

420
120
270
480

MF

60
120

EF
IF

60

IF

270
3330

90

480

3270

4440

4125

DOWN TIME STATUS


Downtime(min)
B
C
15

120

60

Reasons
SF

22/6/2015
Respon
sible
Depart
ment
SF

A
45

Downtime(min)
B
C

SF

SF

60

PCI air inflation

IF

120

Vacuum
Operating,Bottom leaked

IF
EF

80
135

Steam tube leakage,Press open


Press locking

IF,EF
MF

110

BC(L)

BC

135

PCI locking

EF,MF

60

100

480

120

90
60

480
360

60

180+300

480

vents block

RC

480

480

480

480
480

VCL deff,BC(L)

IF,BC

195

60+240

180

480

480
480

480
480

390

60

Shaping
IF
vacuum,Plunger raise,Bottom o ring leak IF,MF
vents block
RC
Miss match
RC

195
120
480

120+120
480
360

480

Double molding
VCL c/w pipe leak

IF
MF

120

120

B/clamp open,short circuit,Operating

BC,EF

120+240

480

480

BC(L),Dome temp down

BC,IF

180

480

180+120

210
BC(deshape),TOR leak
BC(L),Shaping,c/m seal change

BC,MF
BC,IF,MF 60+60+120

420

60
150+240
30

2100

Q14 vent block


C/M change,Steam pipe leak

RC
MF,IF

210
480

480
120+120

c/w pipe leak,VCL in

IF,EF

150+60

180

offcure

RC

90

VCL finger loose,VCL up

MF

Offcure,c/m seal change,O

300

3225

3295

Inside offcure, c/m sea

90
3880

420
3240

TIME STATUS IN CURING


Reasons

23/6/2015
Responsible
Department

Downtime(min)
B

Tread flash

MF

180

Brake fail

MF

60

PCI deff

MF

480

Operating problem
Flash
BOR leak

EF
MF
MF

U/l arm drop


Dome valve problem

IF
IF

RC

RC

480

120

PM

PM

480

480

160
60

60
60

120
480

480

RC
Mismatch,Dome plate leak

RC
RC,MF

300
480

Operating problem

MF,EF

240+240

Press operating

EF

240

BC
Top ring leak
VCL center out

BC
BC
MF

60

vents block
DE
Offcure,c/m seal change,Offcure,seal change
IF,MF,IF,MF
15
Plunger up down/c.w leakage
MF,IF
BC
BC

Inside offcure, c/m seal, c/m shaft down MF,IF


Gear deff
MF
BC(deshape)
BC

480

60
60

480

90
60
180+60+120
60+60
60

30

120+60

930

2760

120
60
2590

DOWN TIM
Reasons

24/6/2015
Responsible
Department

Downtime(min)
A
B
C

Bottom leaked

MF

35

Locking problem

MF

60

PCI locking,PCI limit deff

MF,EF

180+60

25/6/2015
Reasons Responsibl

Bottom O riMF
Tread flashMF

Top ring le MF

Operating
BC,Offcure

EF
BC,IF

60
75

210

Offcure

IF

BOR leak MF

c/m shaft d MF
Dome valve deff

IF

180

u/l arm deff

MF

60

PM

PM

480

360

120

u/l arm deffMF


u/l arm deffMF

PM

PM

Dome gaske
MF

u/l arm deffMF


Internal no EF,BC

Shaping IF
Motor,VCL fEF, MF
Timer fault

EF

240
PF
195/65

Q8 VCL center out

MF

Brake fail

MF

465

480

480

150

PF
MC

VCL center MF
BC
BC
BC
BC
c/m shaft d MF
brake fail

MF

Dirty mold, RC,BC,IF


BC
BC
Plunger rai MF
1655

990

810

DOWN TIME STATUS IN CURING


Downtime(min)
A
B

75
75

Respon 26/6/2015
Downtime(min)
sible
Reasons
Depart
A
B
C
ment

27/6/2015
Reasons

Tread flash

E6 Bladder

MF

60

60

PF
RC

45

PF
PCI deff
240
Shaping

240

IF

BOR leak, BC(item leaked)


MF,BC

240

180

180

480

Shaping

IF

BC

BC

270

BC(L)
Shapping,O
VCL operat

300

U/l arm def

75+180

60
u/l arm deff

300

480

PM

PM

BC(L), Operating, BC(L),BC


BC,EF,BC

480

480

480

PM

75+30

60

60

BC

120
VCL operat
Dome gasket
480 u/l arm deff
60+120

MF

480

480

300

u/l arm deff

Dome gaske
180+75

15
330

360

120
60Clamp open

BC

135

BC

15
Seal change

MF

120

SF
BOR leak

BOR leak
MF
240
Q8 VCL center out MF

480

480

270

30

BC(deshape
Q8 VCL cen
BC
Segment cy

60

VCL center
BC,Pitted
c/w pipe le

60 Segment cylinder leak,BOR


MFleak

30
480

60
60
90

BC,C/W pipe leakBC,IF


PF
VCL in
IF

90
45

60

VCL in
BOR leak
BC

360
60

90+90
VCL finger
360

2685

945

BC(L), Va
145/70 R13ET
1695

MC

480
2505

360
2070

2115

DOWN TIME STATUS IN C


Responsibl Downtime(min)
A
B
PF
RC
270
DE

420

PF
MF
BC
IF,EF
IF,BC

Reasons

C
40

480

480

29/6/2015
Respon
sible
Depart
ment

Downtime(min)
A

Tread flash

DE,RC

330

BC

BC

Plunger down poblem


PCI locking
PCI unit deff
SC
Plunger down
Operating
Shaping,Press operating

EF
EF
EF
SC
IF
EF
IF,EF

VCL up press operating


PCI locking

EF
EF

Press open problem

EF

PCI locking, BC(L)


PCI inflaion, PCI unlocking

EF,BC
IF,EF

480

u/l arm

MF

480

480

PM

PM

480

BC, C/M shaft bend

BC,MF

360
180
240

40
175

140

120
180+50
200

MF

90

MF

240

PM

480

BC

180

180

480

EF
MF,IF,RC

120 240+240

400

MF

480

480

VCL motor
MF
Vents block, Dome gasket leak RC,MF
Dome gasket leak, u/l arm up MF,IF,EF
U/l arm
MF
u/l arm early in
EF
VCL in,Press auto opening

EF,IF

240
180
90
480

MF

60

BC

120

BC

BC

180

30
25

SF,PF

SF,PF

60

BC
DS,Pitted mold
VCL center out Q8

BC
DS,De,RC
MF

60
405
180

75

VCL up down,BOR leak

MF

240

60

BC
DS,RC
Vacuum

BC
Ds
IF

300
150

30
30

R3 VCL prob B.out

MF

315

60

DS
BC(L)

DS
BC

120
120

BC(L), Vacuum

BC,IF

120

SF
MF
BC,RC
MF,BC
BC
MF
MF
BC,RC
IF

90

240+75

60 90+90
420
480

60
300
30
90
270

EF
MF
BC

60

MF
BC,IF

50+240
3375

1880

3410

5450

STATUS IN CURING

15
Downtime(min)
B
C

270

Reasons

30/6/2015
Respon
sible
Depart
ment

Downtime(min)
B
C

Tread flash

MF

360

PF

PF

15

Operating

EF

135

PCI deff
Size change 6.50 TR14,BC
Top ring shaft stuck
Plunger down

MF
SC,BC
MF
MR

240
480
95
180

PCI deff
PCI deff

EF
IF

120
240

Bottom leaked
u/l arm deff,Bottom leakage

MF
MF

120
120+70

U/L arm deff

IF

120

360
60
240
480

180

60+120

300

60

60+120
60+120

480

480

300

480

480

PM

PM

480

480

480

180

120+240

c/m shaft bent

IF

480

480

480

270
240
480

60
120
480
60

60

60

Dome gasket leak,Vents block


C/M shaft deff,Safety leakage
U/L arm

MF,RC
MF,IF
MF

Brake fail, u/l arm cylinder,Press open


EF,MF,EF

30

15

60
240
480

480

480
480
480

180+80

60

60

10
30

15

55
30+150

PF
BC(deshape), BOR leak
Side wall dirty

PF
BC,MF

60

VCL center out Q8,BC


355(3)
BOR leak
BC(deshape)

MF,BC
RC
MF
BC

300
60
120
60

120

240+90

120

180+210
480

240
480

30

60

120
480
120

60
420 vacuum, Brake fail,c/m seal change IF,MF

420

Top ring down,134, c/m seal cross IF,MF


BC(L)
BC,IF
BC
BC

300
5100

3315

90+90+60
85
90
3950

2525

3475

Press #
E-Row
E-01/02
E-03/04
E-05/06
E-07/08
E-09/10
F-Row
F-01/02
F-03/04
F-05/06
F-07/08
F-09/10
F-11/12
F-13/14
F-15/16
F-17/18
F-19/20
F-21/22
F-23/24
F-25/26
G-Row
G-01/02
G-03/04
G-05/06
G-07/08
G-09/10
G-11/12
G-13/14
G-15/16
G-17/18
G-19/20
G-21/22
J-Row
J-01/02
J-03/04
J-05/06
J-07/08
J-09/10
J-11/12
J-13/14
J-15/16
J-17/18
J-19/20
K-Row
K-01
K-02
K-03
K-04
K-05
K-06/07

Reasons
PF
Press open

Wednesday, July
01, 2015
Responsib
le
Departme
nt
PF
EF

Downtime(min)
B
C
15
270

PF

PF

15

Press open

MF

360

Press operating, BOR leak

EF,MF

60+30

VCL finger open


Shaping

IF
IF

60
300

Press Open, Shaping over, PCI unlocking


Internal line leak
MC

EF,IF,MF
IF
MC

60+90+60
180
300

PF

PF

15

u/l arm

IF

90

PM

PM

480

BC(L)

BC

480

480

60

Int steam pipe leak

K-08/09
K-10/11
K-12/13
N-Row
N-01
N-02
N-03
N-04
N-05/06
N-07/08
N-09/10
N-11/12
P-Row
P-09/10
P-11/12
Q-Row
Q-01/02
Q-03/04
Q-05/06
Q-07/08
Q-09/10
Q-11/12
Q-13/14
Q-15/16
Q-17/18
Q-19/20
R-Row
R-01/02
R-03/04
R-05/06
R-07/08
R-09/10
R-11/12
R-13/14
R-15/16
R-17/18

Top ring shaft down,C/M shaft


U/L arm
Press auto open

IF,MF
MF
IF

120
480

Press open
U/L arm early in

EF
EF

60
60

Plunger down

MF

60

PF
355

PF
RC

15

BC(L)
355
VCL center out
BC
Q16 448, vents block

BC
RC
MF
BC
IF,De

60
480

BC

BC

BC

BC

60

BC

BC

60

Top ring slow work, c/m shaft deff, BC(L)


Plunger raised

IF,MF,BC
IF

480

480

480
480
60

15
30

30
60
165+75

480
120

240+240

270+90
30

1710

1635

3960

Reasons

Friday,
July 03, 2015
Respon
Downtime(min)
sible
Depart
A
B
C
ment

Mold replace
BC(L)

De
BC

130

Mold cleaning,u/l arm adjust

RC,MF

345

BC

BC

120

u/l arm cold water line leak

IF

480

Shaping

IF

480

PCI unlocking
c/m shaft deff

MF
MF

180

Operating
.

EF

40

u/l arm deff

MF

Internal gland leak

MF

VCL finger open close,Back pressure EF,IF

Top ring raise

IF

Int steam pipe leak, offcure, vents blockIF,RC

120

30

480

300

480

60

75+240

120
240

480
180

60+120

Safety below
u/l arm
Shaping

IF
MF
IF

480
240

Drain

IF

255

PF
VCL center out

PF
MF

BC

BC

Shaping

IF

Bake fail

MF

145/80 R13 ET

MC

240

448
BC
Locking

DS
BC
RC

120
60

480

480
480

480

30
55

90

210
405

480

60
3800

2175

2935

Reasons
IF

Saturday,Respon
July 04, 2015
Downtime(min)
sible
Depart
A
B
C
ment
IF
90

Monday, July 06
Reasons

BOR leak,Plunger up down

Sr# misplace

BC

BC

Bottom leaked,Operating
RC

MF,EF
RC

Operating

EF

240

100
180

270

60

EF,MF

VCL finger open


Shaping+Offcure
PCI unlocking
PCI unlocking

U/L arm

MF

390

IF, Operating

BC(L)

PCI deff

MF

90

BC

BC

90

press locking
BC
C/M shaft cross

BC
MF

90

Offcure, Auto opening

IF

420

120
BC
c/w issue,c/m shaft raise, Top ring leak
60

Internal leakage

u/l arm

MF

Operating
Top ring up

EF
EF

Motor deff
VCL up

EF
EF

480

480

480

120
60
420

480

u/l arm
u/l arm very slow

Dome gasket leak


c/ shaft raise
Motor

60
Plunger raise

PF
PF
Press delay adjust,BC(L), c/m shaft seal change
EF,BC,MF
u/l arm cylinder, Mold sibe bent
MF,DE
c/w leakage work
IF
BC(L)
BC

Top ring up Q16


BC(L)
Brake fail, RC

MF
BC
MF,RC

180
60
90

15
90
60

Shaping
15
SF,PF
VCL
60center out, BC(deshape), center out, BC(L)
BC
120

210
240+240

300
330

Opening
Press operating,BC(L)
B/H adjust, VCL in
VCL in, BC
BC(deshape)
Press operating,BC(deshape)
Press operating, Platen steam pipe,355
BC
BC(134)
u/l arm copper tube

Offcure
c/m shaft seal, 448 deff
Locking problem

IF
MF,IF
EF,MF

60
240

60
60+60

2920

2175

1575

Press locking
BC(deshape),Opening
165/65 R13 EUK

Monday,
July 06, 2015
Respon
Downtime(min)
sible
Depart
A
B
C
ment

Reasons
Mold dent

MF

120

RC

EF,MF

180

210

180+60

EF
IF

60

EF,IF
EF,IF

120+120
120+120

IF,EF

360

BC

IF

BC,MF
MF
BC,IF
EF
DE

120

120

65
280

BC, C/M head leak


F19 VCLdefect
BC, Shaping
Press open
vents block

210+120

480

480

75+280

PCI defect

EF

240

press open

EF

SF

SF

u/l arm slow work

MF

100

180

EF
BC
IF,MF

Tuesday,
July 07, 2015
Respon
Downtime(min)
sible
Depart
A
B
ment
DE
210
480

60
180
480

300

80
480

120

MF
IF

MF
MF
EF

480

480
120

120
480

480

Plunger raise
u/l arm

MF
MF

SF
Plunger raise
c/m shaft bent
Steam leak

SF
EF
MF
IF

210

PF
Offcure(Trap changed)

PF
IF

90

480

480
480

60
240

120

480

IF

480

IF
SF,PF
MF,BC,MF,BC 210+60
BC
60
EF
EF,BC
MF,EF
EF,BC
BC
EF,BC
EF,IF,RC

60
60+120
120+60
60
120
180+90

BC
BC
IF

60
60
30

MF
BC,MF
MC

60
90

60+60
15
60+120

15
120

BC(deshape)
BC
BC(Deshape),VCL center outBC,MF

210

2700

30

60
120+90

60

90

480
3465

RC,VCL in out

RC,MF

Vacuum

IF

145/80 R13 ET

MC

480

270
330

60
30
150

Internal offcure
IF
360
Opening+Jaming
MF
480
165/65
480 R13 EUK, Piping, VCL up,R17
MC,iF,MF
Bout
210+120
2730
3000

360
315
3765

5
wntime(min)
C
480

Wednesday,
July 08, 2015
Respon
Downtime(min)
sible
Reasons
Depart
A
B
C
ment
DE
480
480
480
Mold dented
BOR leak
MF
90
Tread flash
MF
240
120
Timer fault
EF
180

BC(L)
Plant air drop, Press locking

BC
SF,MF

180

120

PCI deff

MF

60

Top ring up

EF

120
430

MF,Press operating

MF,EF

80

Press operating

EF

Operating

EF

SF

SF

C/M shaft raise, Steam leakage

MF

SF

SF

BC(L)

BC

50

120

240+210

180

210

480

100

85

300

420

285

360

330

60

405

480
420

Dome gasket leak, Steam pipe lea

480
480
300
225

60

120

60
480
4180

Plunger raise
u/l arm
u/l arm
SF
BC(L), BC(L)
BC, BC(L), c/m shaft

MF
MF
MF
SF
BC
BC

480
480

480
480
60

c/m shaft bent


Operating, Motor coupling

MF
EF,MF

240

u/l arm
Plunger raise,BC
SF
Safety below

EF
EF,BC
SF
IF

60
120+120
360

SF
VCL center out,c/m shaft leak
BC(pinhole)
c/w leakage
355, BC(L)

SF
MF
BC
IF
RC,BC

BC(pinhole)
BC(pinhole)

BC
BC

90

BOR leak

MF

60

c/m shaft deff, BC


145R12CSS, operating
Offcure
Offcure,Plunger raise
355
VCL up, BC(deshape)

MF,BC
MC,EF
IF
IF,MF
RC
MF,BC

360
120
30

480

240
195
480

85+360

120
480

120
30
90

15
120

15
60

90
30

120

60

330
60
300
420
5040

210+120
60+60
420
120
4755

480
60
120
4410

Thursday,
July 09, 2015
Respon
Downtime(min)
sible
Reasons
Depart
A
B
C
ment
MC,IF
90
MC,auto opening
PM

PM

480

480

BOR leak, c/w pipe leak


Operating, Locking

MF
EF

60
120

120
30

BC(L)

BC

VCL down

MF

BC
Opening
RC, offcure

BC
MF,EF
RC

480

150

Friday, July 10, 201


Reasons

PM

Bottom leakage

70

BOR leak, VCL up, Pluger raise

60
330
240

vents block,Platen drop, Operating


RC,IF,EF

360+120

180+90

RC

115

PLC deff
MC

BC

BC

180

SF
Leakage work
PCI locking
PCI beam

IF
MF

BC(L)

BC

BH adjust

MF

SF

SF

c/m shaft raise

IF

240

480

70
480

300
120

PCI deff, Timer faulty


PCI deff
BC, TOR leak
Dome gasket leak, Brake fail

300
60
c/m shaft raise

Dome gasket leak, Steam pipe leakMF,IF

60+60

Shaping

Plunger rasie
u/l arm
u/l arm

MF
MF
MF

480
480

480
480

c/m shaft def,BC

MF,BC

480

180

brake fail,Overtravel, u/l arm

MF

180+300

480
480
480

u/l arm
MF,IF

75+360

Timer fault
BC

MF
Locking, bottom leak
SF
vcl center out
BC(L)
BC
PLC working, BC(L)

SF
MF
BC
BC
EF,BC

30
120
60

VCL in, side wall dirty

EF,RC

60+180

355

RC

c/w leakage work

IF

30

15
Sidw wall dirty
BC(deshape)
60
90

60

120

90

30

c/w copper tube leak, BC(deshape)


BC

180
Shaping

Gear deff
355, vacuum
center sleave change

MF
RC,IF
MF

240

4170

150+60
90
2970

60
3210

Mold adjusted, Steam leakage, 448


Steam leakage, vcl in

Friday, July
10, 2015
Respon
Downtime(min)
sible
Depart
A
B
C
ment

Reasons
Shaping

PM

MF

480

270

EF
MC

PM

480

IF

IF

210

EF
IF
BOR leak, c/m shaft raise

EF
IF
MF,IF

150
150

PCI plate+VCLup
BOR leak
Operating
BOR leak
DE

MF
MF
EF
MF
DE

60

Top ring raise

EF

300

Mold change, Shaping


BC(L), Shaping

MC,IF
BC,IF

420

BC

BC

60

Steam leakage
PCI deff

MF
IF

480

60

PCI deff

IF

405

40+130

BC, Shaping
C/M shaft leak

BC,IF
IF

180
480

480

Shaping

IF

240

480

480

480

120

120

480

480

420

MF,EF,IF,EF
EF

480
60

60

BC,MF

360

60

480

240

MF

IF

PM

120+120+240

SF
IF

IF

480

180

MF,EF,IF,EF

Rc

480

Monday, July
13, 2015
Respon
Downtime(min)
sible
Depart
A
ment
IF

360
180

MF
MF,iF

480
360+120

EF
360

MF
MF

480
120

RC
BC

210

u/l arm
Double molding

MF
IF

480

BC
IF
EF
EF

BC
IF
EF
EF

vacuum, BOR leak


SF
Press locking

IF,MF
SF
MF

c/w pipe leak, BC(L)


c/w pipe leak
Offcure
VCL up

IF,BC
IF
IF
IF

120

Offcure, c/m shaft seal change

IF,MF

120+60

Offcure, Top ring down, Timer

IF,EF

120

R16 segment flash

RC

60

120
210
480

60

180

240

120+90
180

IF,EF

RC,IF
IF

480
430

60

BC

IF,BC
BC

480
420

120+115

120+120
150
4710

180
120
3540

3670

5685

2015
Downtime(min)
B
C
180

480

480

480

120+360

Reasons
Shaping
BOR leak
PM
MF, BC

Tuesday, July
14, 2015
Respon
Downtime(min)
sible
Depart
A
B
C
ment
IF
315
MF
60
Press operating
PM
PM
PM
PM
MF,BC
180
180

PCI open problem

IF

80

venting work, 145 st

DE,MC

480

BC(416)

BC

90

Press operating

EF

Mold cleaning air pipe


SF
Steam leakage
PCI locking
Pci air

IF
SF
MF
IF
IF

180

448, HMI fixing+Timer, BC(L)

IF,EF,BC

60+90

120

300+100

480

120

120+150
90
120
90
480

155/80, BC, VCL out,Press o


480

480

120

Operating., BC(L), PLC de


120
120+60

480

480
120

120

480
120

Press open
300
480

480
BC(L), PCI unit air
300

120

480

60
480

300

480

u/l arm deff


Top ring shaft raise, shaft fix, Motor deff IF,MF,EF

Mismatch
Shaping

RC
IF

90
360

360

480

480
60

120
30
390

480

Press auto open


u/l arm
Press auto open, BC

IF
MF
EF,BC

240
480
240

60

BC(L), Dome gasket leak, Operating

60

Dome plate steam leak

MF

60

Motor faulty, Gear deff


u/l arm tube leak
Q6 offcure, c/m shaft seal change

MF
IF
IF,MF

480

480
180

BC,MF,EF120+120+90

480

Motor gearbox coupling


u/l arm+PLunger, BC(L), P
Dome plate leak

180
480
90

480

60

480
60
120

120

Shaping, BC(L)

90

100

VCL up
Brake fail
Q-16 item deff

145

4795

60
120
90Vacuum,Internal pipe, BC(leak+bru
Press opening, BC(deshape), O
VCL finger open

Dirty mold, Locking problem,Open+vacuum


RC,MF,EF,IF240+30+60

Dirty mold
Platen temp drop, vents blocked
VCL, Operating
Brake fail
BC(L)
4330

MF
MF
BC

RC
IF,DE
EF
MF
BC

240
210

4445

450

225+240
30
120
240
3420

90
60
BC, locking problem
3900

Wednesday,
July 15, 2015
Respon
Downtime(min)
sible
Reasons
Depart
A
B
C
ment
IF
105
Shaping
Press operating EF
75
PM
PM
PM
PM
PM

RC
RC
155/80, BC, VCL out,Press
MC,BC,IF,EF
open

120
390

Operating., BC(L), PLC


EF,BC,EF
deff

80+80

Press open
EF
SF
SF
Steam leakage housing
MF
BC(L), PCI unit air
BC,IF,EF
PCI deff
IF

BC(L)
u/l arm deff
Motor faulty

BC
EF
EF

Mismatch
MF
Shaping+ dome pressIF

165
480
100+120
135

480
120+180

150

330

180
120
480
60

Reasons
Shaping

Thursday,
July 16, 2015
Respon
Downtime(min
sible
Depart
A
ment
IF
60

PM

PM

PM

Press open problem

EF

60

Plunger down problem, BC

EF,BC

BOR leak
BOR leak
Press open problem
Press open problem

MF
MF
EF
EF

60
50

Press operating
Timer operating

EF
EF

60
180

480
Housing leak
MF
480
BC(L), Dome gasket leak,PCI,c/w pipe
BC,MF,IF,EF,IF100+45
leak
PCI deff
IF
260
PCI deff
IF
405

120
480

480

400
120

60
480

480

Shaping
Motor faulty,Operating

IF,EF
EF

180
240

12.4 PL6

MC

480

Press locking

EF

165

Steam leakage, BC
Plunger raise pipe, Missmatach
u/l arm

IF,BC
IF,RC
EF

285

u/l arm deff


BC

MF
BC

BC
BC
Motor gearbox coupling
MF
u/l arm+PLunger, BC(L),
EF,BC,EF
PLC
Dome plate leak MF

480

480
220+50

480
60

90
480

480
60

u/l arm
BC(L), Press auto open

MF
BC,IF

480
180

u/l arm

EF

gearbox coupling

MF

SF

SF

Segment block loosed


BC(L)

DE
BC

390
60

BC(L)
BC(L)
Vacuum

BC
BC
IF

240

BC(deshape)

BC

480

55

oto faulty, gear deff, copperMF,IF


tube leak 450
Segment block broken
DE

120+90

Shaping, BC(L) IF,BC


BC(L)
BC

90+60

60

60

um,Internal pipe, BC(leak+brust),


IF,BC,IF vacum60
ess opening, BC(deshape),
EF,BC,EF
Operating60+60
VCL finger open EF
120
Press open+vacuumIF

480
120

240
120

120+120+60

420

Press open, c/m shaft sealEF,MF


change 240+150
Locking
MF
BC(deshape) BC
BC, locking problem
BC,MF
120+90
4315

BC
BC
150
BC
BC
60
u/l arm adjust,Plunger updown,u/l arm sensor
MF,IF,EF 60+60+150
3670

3390

4795

6, 2015
Downtime(min)
B
C

PM

PM

240+60

Wednesday,
July 22, 2015
Respon
Downtime(min)
sible
Reasons
Depart
A
B
C
ment
270
180
120
c/w line leak, Int gland pipe leak IF,MF
Mold clean
RC
240
PM
PM
PM
PM
PM

BC

BC

60

Press overtravel, BC(L)

EF,BC

120+180

BOR leak

MF

120

BOR leak, Bottom leakage, Opening

MF,EF

60

u/l arm hold

IF

VCL deff, VCL in, Shaping

IF,EF,IF

Housing leakage
MF
c/w line leak, Dome gasket leak, Locking IF,MF,EF
vent block
EF,RC
PCI beam up
MF

60
90

480
60+60
120
120

480
480

120+240
60

240

480

120

120

360

120

120

240

30

480
420
120

480
180+120
360
120

480
480
480

180
480

120+120
480

Plunger raise, u/l arm


pl6

IF,EF
MC

480

Steam leakage, Plunger raise

IF

60

auto opening, u/l arm

IF,EF

240

360
60+120
180

120

120
120

300

480
120

480

u/l arm

MF

480

480

480

480

Gear box coupling


Top ring raise
u/l arm holding, Top ring pipe leak
Steam leakage

MF,EF
IF,EF
EF,MF
IF

480
120+360
120+180
300

480

480

c/m shaft seal change


Press operating

MF
EF

120
180

180

BC(deshape), Operating

BC,EF

60

180

90

BC(L)
Vacuum,c/m shaft deff, vacuum
Operating
BC(leak+deshape),c/m shaft

BC
IF,MF,IF
EF
BC,MF

120
180
120

90
120+120

90

VCL in out cylinder


Press operating,BC,no shaping
BOR leak
Press opening

MF
EF,BC,EF
MF
IF

60
180
60
450

Press operating

EF

180

175/70 ET,item dirty

MC,RC

480
5820

60
480

30

120

30

60
60

120

60
60

75

90

480

60

60+60+150
3570

2460

360
4740

60
4485

Reasons
PF
Bead offcure, Over travel

Friday, July 24, 2015


Respon
Downtime(min)
sible
Depart
A
B
C
ment
30
MF,EF
30
60

Top ring leaked

MF

PCI unit deff, Motor faulty


PCI locking cylinder
BC(L)

EF
MF
BC

Operating
u/l arm deff

EF
EF

45

90

280
60

Bottom O ring leak

MF

60

Steam line leak

IF

90

RC
Locking and open, PCI def
Offcure,PCI open

RC,MF
MF,IF
IF,EF

480
360
480

u/l arm deff, Press operating


u/l arm deff,Lower ring raise
PL6,Press operating

MF,EF
MF,IF
MC,EF

Steam leak
DE
Cylinder leak, u/l arm

IF
DE
MF,EF

135
85
90

480
180

120
60
480

210
480
120+120

480

480
480

480
75
135

110
120
375

480

Total
30
90
0
0
45
0
0
0
225
85
90
0
0
0
0
0
0
0
280
60
0
0
0
60
0
0
90
0
0
0
0
0
0
1440
435
795
0
0
0
0
230
180
1335
0
0
0
0
1170
960
0

Tyre
Lossed
5
0
0
2
0
0
9
3
3
0
0
0
0
0
0
0
20
4
0
0
2
0
0
5
0
0
0
0
0
29
9
16
0
0
0
0
5
4
28
0
0
0
24
16
0

u/l arm deff

MF

Motor deff,Offcure,BC,External drain valveEF,IF,BC,IF


Shaping problem,BC
IF,BC
Shaping problem, Steam line leakk
IF

Locking
SF
355,BC(pin hole)
u/l arm, 355
BC(deshape), VCL
355, Greasing work,BC(L)
c/w line leak, 355

480

480
90
210

MF
SF
RC,BC
60
MF,RC
BC,MF
120+120
RC,MF,BC 60+120
IF,RC
330

BC(deshape)

BC

210

355, B/Clamp loose

RC,BC

90+30

No shaping

EF

BC

BC

BC, 355, Mold sibe bent, 355


Press operating

480

420

480

180+180
360

420

60
90
120

60
30

90
30

330

BC,RC,DE,RC 120+90
EF
90
5160

120

60
60
4110

60
3550

0
1440
0
0
0
0
0
0
900
450
630
0
0
0
60
90
120
150
0
90
360
0
210
0
0
0
0
0
0
330
0
120
0
0
120
150
12820

0
30
0
0
0
0
0
16
8
11
0
0
1
10
13
0
8
31
0
18
0
0
0
0
0
29
0
10
0
0
10
13
395

Press #
E-Row
E-01/02
E-03/04
E-05/06
E-07/08
E-09/10
F-Row
F-01/02
F-03/04
F-05/06
F-07/08
F-09/10
F-11/12
F-13/14
F-15/16
F-17/18
F-19/20
F-21/22
F-23/24
F-25/26
G-Row
G-01/02
G-03/04
G-05/06
G-07/08
G-09/10
G-11/12
G-13/14
G-15/16
G-17/18
G-19/20
G-21/22
J-Row
J-01/02
J-03/04
J-05/06
J-07/08
J-09/10
J-11/12
J-13/14
J-15/16
J-17/18
J-19/20
K-Row
K-01
K-02
K-03
K-04
K-05
K-06/07
K-08/09
K-10/11
K-12/13
N-Row
N-01
N-02
N-03
N-04
N-05/06

Reasons

Friday, July 24, 2015


Responsible
Department
A

PCI unlocking, BC

IF,BC

180+60

BOR leak

MF

120

Top ring raise

IF

300

PCI unlocking

EF

120

greasing and oiling


VCL deff

MF
EF

240
60

Supply pipe leak

IF,MF

120+120

BC

BC

60

Housing leak
u/l arm out of order
u/l arm in problem

MF
MF
EF

480
360
240

Plunger full down

MF

480

Motor faulty
u/l arm
u/l arm return

EF
MF
EF

480
240
240

u/l arm

MF

480

Shaping lever

IF

300

h/w line leak

IF

360

Downtime(min)
B
C

Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
120
0
0
0
300
0
0
120
0
0
240
60
0
0
0
60
0
0
480
360
240
0
0
480
0
480
240
240
0
0
0
0
0
0
0
0
480
0
0
0
0
300
0
360

Tyre
Lossed
0
0
0
0
0
0
0
0
0
0
0
0
0
6
0
0
0
21
0
5
0
0
13
3
0
0
0
2
0
10
7
5
0
0
10
0
10
5
5
0
0
0
0
0
0
0
10
0
0
0
4
0
7

N-07/08
N-09/10
N-11/12
P-Row
P-09/10
P-11/12
Q-Row
Q-01/02
Q-03/04
Q-05/06
Q-07/08
Q-09/10
Q-11/12
Q-13/14
Q-15/16
Q-17/18
Q-19/20
R-Row
R-01/02
R-03/04
R-05/06
R-07/08
R-09/10
R-11/12
R-13/14
R-15/16
R-17/18

Press open problem

EF

60

Off register
tread flash

RC
MF

300
60

BC(L)
BC(deshape)
145/70 R12ST, c/w line leak
c/w line leak

BC
BC
MC,IF
IF

60
60
300+90
150

Shaping over

IF

30

Segment flash

RC

90

BC

BC

30

BC, c/m shaft seal change,Offcure

BC,MF,IF

60+240+90

press operating, segment flash

EF,RC

60+150
5400

0
0
60
0
300
60
0
0
60
60
0
150
0
0
30
0
90
0
30
0
0
0
0
0
0
0
0
5400

0
0
1
7
1
0
5
5
0
13
0
0
3
0
8
3
0
0
0
0
0
0
0
0
168

CODE

SIZE

NO OF
CAVITIES

PRODUCTION

DOWNTIME(MIN)

SCHEDULE ACTUAL% ACHIEVED

113
11160
11133
11179
11196
11193
11146

PASSENGER CAR TYRES (RADIAL)


145/70TR12 PR4 RAD.ST
P155/80 R13 PR4 XP2000II
175/70 R13 PR4 EUROTYCON
175/65 R15 PR4 EUROSTAR
195/65 R15 R15 PR4 EUROSTAR
145/80 R13 PR4 EUROTYCON

-1
0
0
0
0
0

1120
546
216
400
1816
108

0
0
0
0
0
0

300
0
0
60
330

121
12021
12025
12055
12131
12139
12195
12271

LIGHT TRUCK TYRES (BIAS)


4.50-12 PR8 PJC
4.50-12 PR8 CHIEF
6.50-14 PR10 SPJC
6.00-16 PR6 ND
6.50-16 PR14 TR
7.50-16 PR14 GLT
7.00-16 PR14 TR

9
1
0
0
0
0
0

751
69
120
126
90
152
90

0
0
0
0
0
0
0

122
12510
12560

LIGHT TRUCK TYRES (RADIAL)


145 R 12C PR8 CSS
195 R 14C OE PR8 SS

0
0

648
138

0
0

123
12002

RICKSHAW TYRES
1.35-10 PR 10 CHIEF

131
13156
13261
13375
13341
13471
13552

TRCK/BUS TYRES (BIAS)


8.25-20 PR14 TR
9.00-20 PR 14 HCT
10.00-20 PR 16 SL
10.00-20 PR16 TR
11.00-20 PR16 HCT
12.00-20 PR18 SHCT

0
0
0
0
0
0

58
58
44
52
104
44

0
0
0
0
0
0

300
60
0
240
840
0

141
14001
14011

FARM TYRES (FRONT)


6.00-16 PR6 AT
7.50-16 PR6 AT

0
0

816
268

0
0

180
0

142
14061
14049
14088
14043
14068

FARM TYRES (REAR)


12.4/11-28 PR6 PL
14.9/13-28 PR 6 SPL
12.4-28 PR12 BLACK BULL
16.9/14-30 PR8 SAGT
18.4/15-30 OE PR8 SAGT

-2
0
0
0
0
7

486
192
54
88
57
8711

0
0
0
0
0

1680
420
240
0
300

0
120
0
0

0
60

ALL PS&PA

TYRE CURING PRESSES ACTIVITY STATUS


25/7/2015
PRESS #
SIZE
F-01/02 145/70TR12 PR4 RAD.ST
F-03/04
6.00-16 PR6 AT
F-05/06
7.00-16 PR14 TR
F-07/08
6.00-16 PR6 AT
F-09/10
7.50-16 PR14 GLT
F-11/12
7.50-16 PR6 AT
F-13/14
6.50-16 PR14 TR
F-15/16
7.50-16 PR14 GLT
F-17/18
6.00-16 PR6 ND
F-19/20 P155/80 R13 PR4 XP2000II
F-21/22 P155/80 R13 PR4 XP2000II
F-23/24 P155/80 R13 PR4 XP2000II
F-25/26 145/70TR12 PR4 RAD.ST
G-01/02
6.50-14 PR10 SPJC
G-03/04
6.00-16 PR6 AT
G-05/06
6.00-16 PR6 AT
G-07/084.50-12 PR8 CHIEF, PR8 PJC
G-09/10
4.50-12 PR8 PJC
G-11/12 195 R 14C OE PR8 SS
G-13/14
6.00-16 PR6 AT
G-15/16
6.00-16 PR6 AT
G-17/18
7.50-16 PR6 AT
G-19/20
6.00-16 PR6 AT
G-21/22
7.50-16 PR6 AT
J-01/02
11.00-20 PR16 HCT
J-03/04
11.00-20 PR16 HCT
J-05/06
10.00-20 PR16 TR
J-07/08
10.00-20 PR 16 SL
J-09/10
12.00-20 PR18 SHCT
J-11/12
12.4/11-28 PR6 PL
J-13/14
12.4/11-28 PR6 PL
J-15/16
12.4/11-28 PR6 PL
J-17/18 12.4-28 PR12 BLACK BULL
J-19/20
12.4/11-28 PR6 PL
K-01
16.9/14-30 PR8 SAGT
K-02 18.4/15-30 OE PR8 SAGT
K-03
12.4/11-28 PR6 PL
K-04
12.4/11-28 PR6 PL
K-05
16.9/14-30 PR8 SAGT
P.O / P.S / P.A :

Ist 2 hr

II 2hr

III 2hr

IV 2hr

Shift:

NEXT CHANGE

PRESS #
K-06/07
K-08/09
K-10/11
K-12/13
N-01
N-02
N-03
N-04
N-05/06
N-07/08
N-09/10
N-11/12
P-09/10
P-11/12
Q-01/02
Q-03/04
Q-05/06
Q-07/08
Q-09/10
Q-11/12
Q-13/14
Q-15/16
Q-17/18
Q-19/20
R-01/02
R-03/04
R-05/06
R-07/08
R-09/10
R-11/12
R-13/14
R-15/16
R-17/18
E-01/02
E-03/04
E-05/06
E-07/08
E-09/10

SIZE
12.4/11-28 PR6 PL
12.4/11-28 PR6 PL
12.4/11-28 PR6 PL
12.4/11-28 PR6 PL
16.9/14-30 PR8 SAGT
16.9/14-30 PR8 SAGT
18.4/15-30 OE PR8 SAGT
18.4/15-30 OE PR8 SAGT
14.9/13-28 PR 6 SPL
14.9/13-28 PR 6 SPL
14.9/13-28 PR 6 SPL
14.9/13-28 PR 6 SPL
11.00-20 PR16 HCT
9.00-20 PR 14 HCT
195/65 R15 R15 PR4 EUROSTAR
195/65 R15 R15 PR4 EUROSTAR
175/65 R15 PR4 EUROSTAR
145/70TR12 PR4 RAD.ST
195/65 R15 R15 PR4 EUROSTAR
195/65 R15 R15 PR4 EUROSTAR
195/65 R15 R15 PR4 EUROSTAR
195/65 R15 R15 PR4 EUROSTAR
175/65 R15 PR4 EUROSTAR
195/65 R15 R15 PR4 EUROSTAR
145ET,145/70TR12 PR4 RAD.ST
145 R 12C PR8 CSS
145 R 12C PR8 CSS
145 R 12C PR8 CSS
145/70TR12 PR4 RAD.ST
145/70TR12 PR4 RAD.ST
145/70TR12 PR4 RAD.ST
195/65 R15 R15 PR4 EUROSTAR
175/70 R13 PR4 EUROTYCON
4.50-12 PR8 PJC
4.50-12 PR8 PJC
1.35-10 PR 10 CHIEF
4.50-12 PR8 PJC
4.50-12 PR8 PJC

EXECUTIVE.________________

Ist 2hr

II 2hr

III 2hr

IV 2hr

NEXT CHANGE

PROD.MANAGER.____________