: ] REQUEST FOR INFORMATION | @ | | | (RFI) | 6-2006- Ko/l - 0298 ‘COMPANY [| PT. GAKAKARVAENG | PROJEGT [= KDL— 120’MW/GOPP_|_INITIATOR SIGN CLIENT _|:P-IMECO LocaTion |: CLEGON INTTIATOR | "Bayi Adfo = [pate 7 September 18,2073 ASSIGNEE Mr. Matheus FINO :@-2004- Kot /RFI~0292 ‘Drawing / Speciicaion / Procedure Reference: = Drawing: 210014-1300-4609-0001 Rev.00 Sheet: 3 of 4 — Isometric For Piping Condensate System (Extraction Pump To. Condensate Tank) Description of Request For information [Maer Qo We would inform you that as per our piping section report, as per isometric drawing there are two 1” nozzle (N10 & N13) at condensate tank elevation 6110 mm for condensate pipe line from pump to hot well steam condenser, but ‘actual condition there is only one 1” nozzle present at condensate tank at elevation 6110 mm. Therefore we need your advice and solution on this matter (please see attachment included) low a September GKE Rovi NAME: Bay Adio SIGNATURE: pare: Some | Recommended Disposition: Use asis O scrap OD _ Repair Others: Proposed Corrective Acton: Resolution required by: immediate _()24Hous LI Specify: Recommended Preventative Action: PREPARED BY "APPROVED BY "APPROVED BY "APPROVED BY COMPANY PT. GKE PT. GKE ‘SNC LAVALIN PPAMECO NAME Bayu Adio Piter Sinaga DESIGNATION | _ Piping Engineer Project Manager DATE ‘September 18, 2013 | September 18, 2013 & i % ING PIPE WELDING T ‘DETAIL TYP. orks: 1) FOR NOTES HeRER SHEET OF 3 2) USES 1 1/2 AD BELOW 4 ROUTED 08 1S NE ORLY FoR GUDEUNES, rv ROUTING 59S TO BE DONE CH SE AS PER STE-COOMOL 8) SIO & NS ARE THE SAKE CONDENSATE THK BUT WO ‘OFERENT CENER SADE ORLY FOR CLEAN PREGTATON REFERANCE Psp DRAWING NUMBER- 1) 210014-PS001-UO1~0017 (SET 1 OF 2) REFERANCE GA DRAWING NUMER 1) nioore-a300-405-0002 2) no's 310-805-001 ou rams commen cvous PoweR. ur PRoveeT @ mez “se ABR Sezer I

S-ar putea să vă placă și