REQUEST FOR INFORMATION | @
|
|
|
(RFI)
| 6-2006- Ko/l - 0298
‘COMPANY [| PT. GAKAKARVAENG | PROJEGT [= KDL— 120’MW/GOPP_|_INITIATOR SIGN
CLIENT _|:P-IMECO LocaTion |: CLEGON
INTTIATOR | "Bayi Adfo = [pate 7 September 18,2073
ASSIGNEE Mr. Matheus FINO :@-2004- Kot /RFI~0292
‘Drawing / Speciicaion / Procedure Reference: =
Drawing: 210014-1300-4609-0001 Rev.00 Sheet: 3 of 4 — Isometric For Piping Condensate System (Extraction Pump
To. Condensate Tank)
Description of Request For information [Maer Qo
We would inform you that as per our piping section report, as per isometric drawing there are two 1” nozzle (N10 &
N13) at condensate tank elevation 6110 mm for condensate pipe line from pump to hot well steam condenser, but
‘actual condition there is only one 1” nozzle present at condensate tank at elevation 6110 mm. Therefore we need
your advice and solution on this matter
(please see attachment included)
low a September
GKE Rovi NAME: Bay Adio SIGNATURE: pare: Some
| Recommended Disposition: Use asis O scrap OD _ Repair
Others:
Proposed Corrective Acton:
Resolution required by: immediate _()24Hous LI Specify:
Recommended Preventative Action:
PREPARED BY "APPROVED BY "APPROVED BY "APPROVED BY
COMPANY PT. GKE PT. GKE ‘SNC LAVALIN PPAMECO
NAME Bayu Adio Piter Sinaga
DESIGNATION | _ Piping Engineer Project Manager
DATE ‘September 18, 2013 | September 18, 2013&
i
%
ING
PIPE WELDING
T
‘DETAIL TYP.
orks:
1) FOR NOTES HeRER SHEET OF 3
2) USES 1 1/2 AD BELOW 4 ROUTED 08 1S NE ORLY
FoR GUDEUNES, rv ROUTING 59S TO BE DONE CH
SE AS PER STE-COOMOL
8) SIO & NS ARE THE SAKE CONDENSATE THK BUT WO
‘OFERENT CENER SADE ORLY FOR CLEAN PREGTATON
REFERANCE Psp DRAWING NUMBER-
1) 210014-PS001-UO1~0017 (SET 1 OF 2)
REFERANCE GA DRAWING NUMER
1) nioore-a300-405-0002
2) no's 310-805-001