Sunteți pe pagina 1din 1

LIST OF DRAWINGS

SHEET TITLE

S-04

CONCRETE COLUMN SCHEDULE

S-05

CONCRETE BEAM SCHEDULE (SEISMIC) (1 OF 7)

S-06

CONCRETE BEAM SCHEDULE (SEISMIC) (2 OF 7)

S-07

CONCRETE BEAM SCHEDULE (SEISMIC) (3 OF 7)

S-08

CONCRETE BEAM SCHEDULE (SEISMIC) (4 OF 7)

S-09

CONCRETE BEAM SCHEDULE (SEISMIC) (5 OF 7)

S-10

CONCRETE BEAM SCHEDULE (SEISMIC) (6 OF 7)

Lc
BEAM HEIGHT

L1
B

CONCRETE COLUMN LAYOUT

S-13

WALL LAYOUT

G
ZONE A

S-14

WALL REINFORCEMENT ELEVATIONS (1 OF 2)

S-15

WALL REINFORCEMENT ELEVATIONS (2 OF 2)

S-16

WALL REINFORCEMENT PLANS

Beam Section-A

H
ZONE C

ZONE B

ZONE A

GF
ZONE A

ZONE B

TYPICAL LAP
(SEE NOTE 5)
ZONE C

BEAM HEIGHT

L1
D

HF
ZONE B

ZONE A

ZONE A

Lc1

ZONE B

Typical Concrete Beam Elevation 1S

Typical Concrete Beam Elevation 2S

L2
B

TYPICAL LAP F
(SEE NOTE 5)
ZONE C

NOTES:
NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER
5. LAP SPLICES
IS SMALLER.
SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

BEAM HEIGHT

L1
B

G
ZONE B

ZONE A

L2

GF
ZONE A

Lc2

ZONE B

TYPICAL LAP F
(SEE NOTE 5)
ZONE C

BEAM HEIGHT

L1
D

ZONE A

ZONE A

L2

HF
ZONE B

LcN

ZONE B

BEAM HEIGHT

L1
D

TYPICAL LAP F
(SEE NOTE 5)
ZONE C

HF
ZONE B

ZONE A

ZONE A

ZONE B

L2
B

TYPICAL LAP F
(SEE NOTE 5)
ZONE C

G
ZONE B

ZONE A

NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

Typical Concrete Beam Elevation 3S

Width

Depth

Width

Depth

Depth

Width

F
ZONE B

L2

A
h

S-12

Lc2

BEAM HEIGHT

L1
B

CONCRETE BEAM SCHEDULE (SEISMIC) (7 OF 7)

L2
D

A
h

S-11

Lc1

FLOOR FRAMING PLANS (2 OF 2)

S-03

FLOOR FRAMING PLANS (1 OF 2)

S-02

GENERAL NOTES

S-01

COVER SHEET

S-00

SHEET NO.

Beam Section-B

Beam Section-C

NO

DESCRIPTION

DATE

NEW DRAWING GENERATED

10/13/2014

DRAWING

GENERAL NOTES - 1
STRUCTURE

PANGLAO BEACH,
BOHOL
PROJECT

EARTHQUAKE
ENGINEERING
CLIENT

SIR
CONSULTANT

I LOVE ASPHALT
PROJECT NUMBER
DATE
DESIGNED BY
CHECKED BY

SCALE

S-ar putea să vă placă și