Sunteți pe pagina 1din 4

TABLE OF CONTENTS

S.No. Contents

Page No.

Chapter 1 PUBLIC WORKS DEPARTMENT: AN OVERVIEW

1.1 Introduction

Chapter 2 WHAT IS ROAD OR PAVEMENT?

2.1 Introduction

2.2 Purpose

2.3 functions

2.4 Types of Pavements

2.5 Types of Concrete Pavements

Chapter 3 MINERALS USED

3.1 Cement

3.2 Types of Cement

10

3.3 Sand

12

3.4 Aggregate

12

3.5 Proportioning

14

Chapter 4 PROCEDURE TO CONSTRUCT PAVEMENTS

16

4.1 Preparation of the Sub-Grade or Base Coarse

16

4.2 Mixing and Transport of Concrete

17

4.3 Placing the Concrete

19

4.4 Slip Form Concrete Paving

19

4.5 Execution

19

4.6 Measures to Obtain a Good Evenness

21

Chapter 5 EXECUTION OF JOINTS & CURING

22

5.1 Transverse Joints

22

5.2 Longitudinal Joints

24

5.3 Curing

25

Chapter 6 PROTECTION OF THE CONCRETE PAVEMENT

26

6.1 Protection against Drying Out

26

6.2 Protection against Rain

26

6.3 Protection against Frost

27

6.4 Protection against Mechanical Influences (Traffic Signposting)

27

Chapter 7 SPECIAL MEASURES

28

7.1 Workability Period

28

7.2 Paving Interruptions

28

7.3 Placement of Concrete on a Slope

29

7.4 Opening to Traffic

29

Chapter 8 COST ANALYSIS OF RIGID PAVEMENTS

31

8.1 Initial Cost

31

8.2 Maintenance Cost

31

8.3 Life Cycle Cost Analysis

31

8.4 Rigid Pavement Design and Cost of Construction per Kilometers

31

8.5 Maintenance Cost of Rigid Pavement

32

8.6 Life Cycle Cost Analysis of Rigid Pavement

32

8.7 Cement Concrete Pavement vs Bituminous Pavement- A Cost Analysis

32

Chapter 9 CONCLUSION

35

LIST OF FIGURES & TABLES


Figure/ Table Name

Page No.

Figure 2.1 Road

Figure 2.2 Flexible Pavements

Figure 2.3 Rigid Pavements

Figure 2.4 Rigid vs Flexible Pavements

Figure 3.1 Cement

10

Figure 3.2 Flexible monolithic pavement consists of aggregate

11

Figure 3.3 Leveling of Sand in Pavement

12

Figure 3.4 Natural Stone Paving

13

Figure 4.1 Preparation of Sub Grade and Base Course

16

Figure 4.2 Cross Section of Road

18

Figure 5.1 Execution of Joints

22

Figure 5.2 Joints

25

Figure 7.1 Pavement Design

29

Figure 7.2 Recommended design of PCC pavement

30

Table 3.1 Quantities of Aggregates

15

Table 8.1 Cost of Pavement Design

32

Table 8.2 Summery of initial and life cycle cost

32

Table 8.3 Life Cycle Cost Analysis

33

S-ar putea să vă placă și