Sunteți pe pagina 1din 1
INSTRUMENT PIPING — CONTROL VALVE MANIFOLD CLEARANCE! AVFLPX SOE LAYOLT CODE Te 211 piping. shall contour web: contrast design renin Esconts Sotering Pla. val Je te the brdktostiral norte ot these yah fa care must be taken tonsa ther réigurceion ard assembly cf each vale is con + otuator postion will normally be as shown on this practice, all other actuator postions must be approved by the Control Systems Eraweer FO (Fail Oper Fo (Fail Closed) shall be novel on she Pac iping design shall determine she position ot the aetuctor relative to che sireov the oy sProuah she vab he control sake manrokt nek iobtstosbo) oF LS (Let mn she instrament datas ny oF rratked ap instiamert datasheet stall be forwarded 2 she Control Systems Engin rior 20 valve purchat 1p corews away be teapated pple may supply tummished Roms such ae capserons and stuebok= (as ostablict by Conttol Systems datas revler clearances tor bo removal sty clearance varies with size and askels may not be required ¥ flange facings ore fined. Check with Conérol cers Engineer hen action Hall be aecoseible For herder the + sorteal yoosel 2MFLD Type va S Through bok length CF not surnishedd 2 Gave aie orersation tor algemert on ol bolt tlarge pottean Sober CAVELPX type bypass vabe i requited, plip postion shall be the sar

S-ar putea să vă placă și