Sunteți pe pagina 1din 3

Cotapaxi Required Mold Check List

b = Complete

_______ Information to be filled in: Y = Yes, N = No, NA = Not Applicable

Molded Part/ Part Design


Model ____________________________
Number of Parts ___________________________
Date Quote Returned_____________________
Date Job Placed_________________________
Purchase order #_________________________
Est. Date for Capability Run________________
Est. Date for Tryout_______________________
Est. Date in-plant for first production _________
Date in-plant for first production _____________

Material Type___________________________
Material Grade
Finishes
_____Thread size
_____Threaded holes
_____Front side ejector side determined Y/N -Location
_____Molded in Threads ________________
_____Parting Line established Y/N
_____Polish __________________________
_____Tolerances_______________________
Changes made to Part from original part
Reasoning

Cotapaxi Custom Design


and Manufacturing
Check List

Part Number _____________ Mold Number _____________

Cotapaxi Required Mold Check List

b = Complete

_______ Information to be filled in: Y = Yes, N = No, NA = Not Applicable

Cotapaxi Custom Design


and Manufacturing
Check List

Part Number _____________ Mold Number _____________

Cotapaxi Required Mold Check List

b = Complete

_______ Information to be filled in: Y = Yes, N = No, NA = Not Applicable

Cotapaxi Custom Design


and Manufacturing
Check List

Part Number _____________ Mold Number _____________

S-ar putea să vă placă și