Sunteți pe pagina 1din 74

15

16

13

14

L
ANALOG TO DIGITAL
ANALYZER ELEMENT

ARV
AI
AT

AIR RELEASE VALVE


ANALYZER INDICATOR
ANALYZER TRANSMITTER

BSWE
BSWR
BSWT
BE

BS & W MEASURING ELEMENT


BS & W RECORDER
BS & W TRANSMITTER
BURNER FLAME DETECTOR ELEMENT

CVA
CVP

CHOKE VALVE ADJUSTABLE


CHOKE VALVE POSITIVE

D
DT
DR
DV

DENSITY TRANSMITTER
DENSITY RECORDER
DELUGE VALVE

ESD

EMERGENCY SHUT DOWN

FA
FAH
FAL

FLOW ALARM
FLOW ALARM HIGH
FLOW ALARM LOW

FV
FE
FG
FI
FDI
FIC
FIT
FLA
FM
FPR
FPTR

FLOW CONTROL VALVE


FLOW ELEMENT
FLOW GLASS
FLOW INDICATOR
FLOW DIFFERENTIAL INDICATOR
FLOW INDICATING CONTROLLER
FLOW INDICATING TRANSMITTER
FLAME ARRESTOR
FLOW METER
FLOW PRESSURE RECORDER (TWO PEN)
FLOW-PRESS.-TEMP.
RECORDER (THREE PEN)
FLOW INGRATOR
FLOW INGRATOR AND INDICATOR
FLOW RECORDER
FLOW RATIO CONTROLLER
FLOW RECORDER CONTROLLER
FLOW SWITCH
FLOW SWITCH HIGH
FLOW SWITCH LOW
FLOW TRANSMITTER
FLAME FAILURE ALARM
FLOW CALCULATION BLOCK

This drawing and the design it covers ate the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to borrower.

FQ
FQI
FR
FFC
FRC
FS
FSH
FSL
FT
FFA
FX

G
GD

GAS DETECTOR

HAD
HCV
HIC
HS

HEAT
HAND
HAND
HAND

IH

ACTUATED DEVICE
CONTROL VALVE
INTIATED CONTROL (MANUAL LOADING)
SELECTOR
I

LY,PY
FY,TY

CURRENT TO PNEUMATIC TRANSDUCER

ILAH
ILAL
ILC
ILCV
ILG
ILIC
ILT

INTERFACE
INTERFACE
INTERFACE
INTERFACE
INTERFACE
INTERFACE
INTERFACE

LA
LAH
LAHL
LAL
LC
LV
LG
LI
LIC
LIT
LR
LRC
LS
LSH
LSL
LT
LSHH
LAHH
LSLL
LALL
LAH2
LSH2

LEVEL ALARM
LEVEL ALARM HIGH
LEVEL ALARM HIGH LOW
LEVEL ALARM LOW
LEVEL CONTROLLER
LEVEL CONTROL VALVE
LEVEL GAUGE
LEVEL INDICATOR
LEVEL INDICATOR CONTROLLER
LEVEL INDICATOR TRANSMITTER
LEVEL RECORDER
LEVEL RECORDER CONTROLLER
LEVEL SWITCH
LEVEL SWITCH HIGH
LEVEL SWITCH LOW
LEVEL TRANSMITTER
LEVEL SWITCH HIGH HIGH
LEVEL ALARM HIGH HIGH
LEVEL SWITCH LOW LOW
LEVEL ALARM LOW LOW
SECOND LEVEL ALARM HIGH
SECOND LEVEL SWITCH HIGH

LEVEL
LEVEL
LEVEL
LEVEL
LEVEL
LEVEL
LEVEL

ALARM HICH
ALARM LOW
CONTROL
CONTROL VALVE
GAUGE
INDICATING CONTROL
TRANSMITTER

M
MA
MAA
MI
MIA
MLS
MOV
MT
MFC

MOISTURE ANALYSER
MOISTURE ANALYSER ALARM
MOISTURE INDICATOR
MOISTURE INDICATOR ALARM
MANUAL LOADING SYSTEM
MOTOR OPERATED VALVE
MOISTURE TRANSMITTER
MASTER FLOW CONTROLLER

PA
PAL
PAH
PAHH
PALL
PB
PC
PV
PCV
PDA
PDC
PDCV
PDI
PDIC
PDSH
PDSL
PDT
PG
PI
PIC
P/I
PR
PRC
PS
PSH
PSLL
PSHH
PSHL
PSL
PSV
PT
PTR
PVSV
PY
PDAH
PDAL
PX
POV
PVRV
PDIS

PRESSURE ALARM
PRESSURE ALARM LOW
PRESSURE ALARM HIGH
PRESSURE ALARM HIGH HIGH
PRESSURE ALARM LOW LOW
PUSH BUTTON
PRESSURE CONTROLLER
PRESSURE CONTROL VALVE
SELF ACTUATED PRESSURE CONTROL VALVE
PRESSURE DIFFERENTIAL ALARM
PRESSURE DIFFERENTIAL CONTROLLER
PRESSURE DIFFERENTIAL CONTROL VALVE
PRESSURE DIFFERENTIAL INDICATOR
PRESSURE DIFFERENTIAL INDICATING CONTROLLER
PRESSURE DIFFERENTIAL SWITCH HIGH
PRESSURE DIFFERENTIAL SWITCH LOW
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE GAUGE
PRESSURE INDICATOR
PRESSURE INDICATING CONTROLLER
PNEUMATIC TO CURRENT TRANSDUCER
PRESSURE RECORDER
PRESSURE RECORDER CONTROLLER
PRESSURE SWITCH
PRESSURE SWITCH HIGH
PRESSURE SWITCH LOW LOW
PRESSURE SWITCH HIGH HIGH
PRESSURE SWITCH HIGH LOW
PRESSURE SWITCH LOW
PRESSURE SAFETY VALVE
PRESSURE TRANSMITTER
PRESSURE/TEMPERATURE RECORDER
PRESSURE CUM VACUUM SAFETY VALVE
PRESSURE RELAY
PRESSURE DIFFERENTIAL ALARM HIGH
PRESSURE DIFFERENTIAL ALARM LOW
PRESSURE CALCULATION BLOCK
PILOT OPERATED VALVE
PRESSURE CUM VACUUM RELIEF VALVE
PRESSURE DIFFERENTIAL INDICATOR AND SWITCH

DEW POINT ELEMENT


MISC ALARM
AUTO SELECT RELAY
BEACON ALARM
BLOW DOWN VALVE
CONVERTER
CORROSION METER
CONTROL RELAY
MISC CONTROL VALVE
DEW POINT ALARM HIGH
DEW POINT ALARM LOW
DEW POINT RECORDER
DERIVATIVE CONTROLLER
DEW POINT INDICATOR
DEW POINT TRANSMITTER
FLOW ADDER
FLOW COMPUTER
FLAME FAILURE ALARM
FLAME SENSOR
FLOW TOTALIZER
HAZARDOUS GAS DETECTOR
IGNITION PANEL
PIG ALARM
PIG DETECTOR/INOICATOR
PIG INDICATOR SWITCH
POWER SUPPLY UNIT
PILOT VALVE
RAMP GENRATOR
RATIO RELAY
SELECTOR SWITCH
SPHERE DETECTOR
SHUT DOWN VALVE
SELECTOR ALARM HIGH
SELECTOR ALARM LOW
LIMIT SWITCH HIGH
SOLENOID VALVE
TEMPERATURE CONVERTOR
TICKET PRINTER

XVB

VOLUME BOOSTER

RUPTURE DISC
RESTRICTION ORIFICE
REMOTE OPERATED VALVE
RESISTANCE TEMPERATURE TRANSMITTER
REMOTE TERMINAL UNIT (TELEMETERY SYSTEM)
RESISTANCE TO ELECTRICAL TRANSDUCER
SPEED CONTROLLER
SHUT DOWN ALARM
SIGHT GLASS
SOLENOIO OPERATED VALVE
SPEED RECORDER
SPEED SWITCH HIGH
SPEED SWITCH LOW
SUBSURFACE SAFETY VALVE
SURFACE SAFETY VALVE
SPEED TRANSMITTER
SAFETY SHUTDOWN (PANEL)

T
TA
TAH
TAL
TC
TV
TE
TG
TR
TRC
TI
TIC
TS
TSH
TSL
TSV
TT
TW
TSHH
TAHH
TSLL
TALL
TM

TEMPERATURE ALARM
TEMPERATURE ALARM HIGH
TEMPERATURE ALARM LOW
TEMPERATURE CONTROLLER
TEMPERATURE CONTROL VALVE
TEMPERATURE ELEMENT
TEMPERATURE GAUGE
TEMPERATURE RECORDER
TEMPERATURE RECORDER CONTROLLER
TEMPERATURE INDICATOR
TEMPERATURE INDICATOR CONTROLLER
TEMPERATURE SWITCH
TEMPERATURE SWITCH HIGH
TEMPERATURE SWTICH LOW
THERMAL SWITCH VALVE
TEMPERATURE TRANSMITTER
THERMOWELL
TEMPERATURE SWTICH HIGH HIGH
TEMPERATURE ALARM HIGH HIGH
TEMPERATURE SWTICH LOW LOW
TEMPERATURE ALARM LOW LOW
TIMER

UNIT (COMMOM) ALARM


UNIT (COMMOM) SHUT DOWN
UNIT CONTROL PANEL
UNIT-SURGE CONTROLLER

VM
VSV
VR
VT
VX
VSH
VAH
VSHH
VAHH

VISCOSITY MONITOR
VACUUM SAFETY VALVE
VISCOSITY RECORDER
VISCOSITY TRANSMITTER
VISCOSITY COMPENSATOR
VIBRATION SWITCH HIGH
VIBRATION ALARM HIGH
VIBRATION SWITCH HIGH HIGH
VIBRATION ALARM HIGH HIGH

AC
AO
AR

AIR TO CLOSE
AIR TO OPEN
AUTO RESET

BOH
BS&W
CC
CD
CDH

BLOW OUT HATCH


BASIS SEDIMENT & WATER
CORROSION COUPON
CONTINUOUS DRAIN
CLOSE DRAIN HEADER

CN
CO
CP
CSC
CSO
CTC

CHOKE NIPPLE
CLEAN OUT
CORROSION PROBE
CAR SEAL CLOSED
CAR SEAL OPEN
CENTRAL TELEMETRY CONTROL

DA
ID
FB
FC
FO
FL
FSD
HH
HY
LC
LO
MCC
MO
MOL
MR

DIRECT ACTION
INSIDE DIAMETER
FULL BORE
FAIL CLOSED
FAIL OPEN
FAIL LOCKED
FIRE SHUT DOWN
HAND HOLE
HYDRANT
LOCK CLOSED
LOCK OPEN
MOTOR CONTROL CENTER
MANUALLY OPERATED
MAIN OIL LINE
MANUAL RESET

MF
LCP
LEL
OD
NB
D/S
NNF
KIC

MAINTENANCE FLANGE
LOCAL CONTROL PANEL
LOWER EXPLOSIVE UNIT
OUTSIDE DIAMETER
NOMINAL BORE
DOWN STREAM
NORMALLY NO FLOW
TIME SCHEDULE INDICATOR
CONTROLLER
NORMALLY CLOSED
NORMALLY OPEN
REVERSE ACTING
REDUCED BORE
REMOTE MANIFOLD
REMOTE STATION
SAMPLE POINT
SPECIALITY ITEM
STRAINER (PERMANENT)
SEAM TO SEAM
SELECTOR SWITCH
THIEF HATCH
TIGHT SHUTOFF
UTILITY CONNECTION
TYPICAL
VENDOR FURNISHED
HIGHER EXPLOSIVE LIMIT
TANGENT TO TANGENT
FIRE & GAS PANEL
GAS CORROSION INHIBITOR
DISTRIBUTED CONTROL SYSTEM
HIGH PRESSURE FLARE
LOW PRESSURE FLARE
SHUT DOWN
FIELD MANUAL RESET

F&G
GCI
DCS
HPF
LPF
S/D
FMR
CMR
IAS
MSL
LSS
GH
ODD
HC
LTCS
TOL

A
16

15

14

13

12

CONTROL ROOM MANUAL RESET


INSTRUMENT AIR SUPPLY
MEAN SEA LEVEL
LOWER SIGNAL SELECTOR
GAUCING HATCH
OPEN DECK DRAIN
HYDROCARBON
LOW TEMP. CARBON STEEL
TOP OF LINE

11

EQUIPMENT PREFIXES

ANSI
RATING

SERVICE

PROCESS LIQUIDS & VAPOUR


RAW SEA WATER
WATER INJECTION

P
WR
WI

DRAINS & RELIEFS

CLASS & SPECIFICATION INDEX


SPEC.
NO.

LINE LEGEND
INSULATION

POSITION TRANSMITTER
HIGH LIMITERS
RUNNING LIGHT INDICATOR
RUNNING INDICATOR
VALVE POSITION SWITCH CLOSE
VALVE POSITION CLOSE INDICATOR
VALVE POSITION SWITCH OPEN
VALVE POSITION OPEN INDICATOR

NC
NO
RA
RB
RM
RS
S
SP
STR
S/S
SS
TH
TSO
UC
TYP
V/F
HEL
T/T

U
UA
USD
UCP
UIC

PROCESS LINES

LINE NO. BY SERIES


CLASS & SPECIFICATION
SERVICE & DESICNATION
SIZE

OTHER ABBREVIATIONS

R/S

XDE
XA
XAS
XBA
XBDV
XC
XCM
XCR
XCV
XDAH
XDAL
XDR
XDC
XDI
XDT
XFA
XFC
XFFA
XFS
XFT
XGD
XIP
XPA
XPI
XPIS
XPSU
XPV
XRG
XRR
XS
XSD
XV
XSRH
XSRL
XSH
SOV
XTC
XTP

XT
XLY
XL
XI
ZSC
ZIC
ZSO
XIO

RD
RO
ROV
RT
RTU
R/E
SC
SDA
SG
SOV
SR
SSH
SSL
SSSV
SSV
ST
SSD

LINE DESIGNATIONS
LINE INDENTIFICATION
12"-P-E1-1001-IS

X/Z

A/D
AE

10

GENERAL ABBREVIATIONS
A

11

12

A1

P,DW,BD,DH,C,DF,FG,FL,
SV,VG,GI,GU,HY,N,WI,WC,

150

B1

P,DW,DH,C,DF,FG,N,CI,
FL,SV,BD,VG,GU,HY,N,WI

300

D1

P,DW,BD,DH,C,FG,GI,FL
SV,VG,CU,HI,N,WI

600

E1

P,DW,BD,DH,C,N,T,FL
GI,FG,SV,VG,GU,HY,WI

900

XF1

P,PD,C,N,FL,SV,GI,GU,HY,WI

1500

F1

P,BD,C,N,FL,SV,GI,GU,HY

1500

A2

GL,T

150

B2

GL,T

300

D2

GL,T

600

E2

GL,T

900

A3

150

B3

AI,AU,C
AU

A4

WP

150

A5

WF,WU,WR,DW,SH

150

A6

EX.

150

A8

WF,WU,SW

150

A15

P,SV,CD,GI

B15

P,SV,CD,GI

300

D15

P,SV,CD,GI

600

E15

P,SV,CD,GI

900

F15

P,SV,CD,GI,C

1500

PE11

PL

900

F2

CL

1500

A1N

P,SV,CD,G1,FC,BD

150

A1H

FL

150

A10

P,SV,CD,FG,BD,LO,C

150

B10

P,SV,FG,BD,CD
LO,SO,M,C,WP
LO,SO

300

E10

900

A17

P(LTCS), FL(LTCS)

150

E17

P(LTCS), FL(LTCS)

900

300

150

BLOW DOWN
DRAIN, HYDROCARBON
DRAIN, WATER ETC
FLARE
SAFETY VALVE DISCHARGE
VENT GAS

BD
DH
DW
FL
SV
VG

STEAM & CONDENSATE


BOILER FEED WATER
STEAM

HB
S

UTILITY WATER
C/W
WC
WF
WP
SW

CHILLED WATER
COOLING WATER
FIRE WATER
POTABLE WATER
SEWER

WU

UTILITY WATER

UTILITIES, GENERAL
AIR, INSTRUMENT
AIR, UTILITY
GAS, INSTRUMENT
GAS, UTILITY
AIR, BREATHING

AI
AU
GI
GU
AB

UTILITY GAS & FUEL


BLANKET GAS
DIESEL FUEL
FUEL GAS
NITROGEN

BG
DF
FG
N

B
K
D
E
F
G
H

BLOWER
COMPRESSOR
DRYER
EXCHANGER/HEATER
FILTER
GENERATOR
HEATER

M
M
M
M
P

MIXER
MOTOR
FLAME FRONT GENERATOR
FLARE TIP
PUMP

T,TK
V
X
PK
PM
CH
CM
IM
WH
WM
OM
GLM
WIM
TG
CG
CIM
COM
DGT
AC

TANK/COLUMN
VESSEL/CAISSON
MISCELLANEOUS
PACKAGE
PRODUCTION MANIFOLD
CHLORINATOR
CENTRAL MANIFOLD
INLET MANIFOLD
WELL HEAD
WATER MAKER
OIL MANIFOLD
GAS LIFT MANIFOLD
WATER INJECTION MANIFOLD
TURBO GENERATOR
DIESEL GENERATOR
COMPRESSOR INLET MAINFOLD
COMPRESSOR OUTLET MAINFOLD
GAS TURBINE DRIVER
AIR COOLER

UTILITY OILS
LUBE OIL
SEAL OIL

LO

SO

CHEMICALS
C
GL
SH

CHEMICAL / CO2
GLYCOL
COPPER CHLORINE SOLUTION

OTHERS
PL
T
EX
PW

PIPE LINES
THERMAL
TURBINE EXHAUST
PROCESS WATER

INSULATION TYPES
IH
IC
IS
IA
IT
IE
IF

INSULATION (HOT)
INSULATION (COLD)
INSULATION (SAFETY)
INSULATION (ACCOUSTIC)
STEAM TRACING
ELECTRICAL TRACING
THERMAL FLUID TRACING

ADDITIONAL INSTRUMENT ABBREVATIONS, IF REQUIRED

THE FOLLOWING TABLE IS A GUIDE FOR ADDING ABBREVITIONS


USUAL OR PREFERRED USAGE
FIRST POSITION

SECOND POSITION

THIRD POSITION

ANALYSIS

ALARM

ALARM

BURNER

CONDUCTIVITY (ELECTRICAL)

CONTROL CONTROLLER

CONTROL, CONTROLLER, CLOSE

DENSITY OR SPECIFIC GRAVITY

DIFFERENTIAL

VOLTAGE (EMF)

ELEMENT

FLOW

FRACTION (RATIO)

GLAZING (DIMENSIONAL)

GLASS

HAND INTIATED

CURRENT (ELECTRICAL)

INDICATOR/INDICATING

POWER

SCAN

FOURTH POSITION

CONTROLLER

E
ELEMENT

HIGH

HIGH

INDICATOR

INDICATOR

TIME

CONTROL STATION

CONTROL STATION

LEVEL

LIGHT(PLOT)/LEVEL/LIMIT

LOW

LOW

MOISTURE OR HUMIDITY

MIDDLE

MIDDLE

ORIFICE RESTRICTION

OPEN

PRESSURE OR VACUUM

POINT (TEST CONNECTION)

PANEL

QUANTITY OR EVENT

INTEGRATE (TOTALIZE)

SA

SH

MSP

AC

PH

JUY

LOC

APPROVAL BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.95

APPROVAL FOR ENGG.

MSP

GRR

3.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

B
A

Date

Description of revision

Company;

RECOODER

SPEED OR FREQUENCY

SWITCH, SAFETY

SWITCH, SAFETY

TEMPERATURE

TRANSMITTER

TRABSMITTER

UNIT

COMPANY

CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

VIBRATION

VALVE

VALVE

VALVE

WEIGHT OR FORCE

WELL

UNCLASSIFIED

UNCLASSIFIED

UNGLASSIFIED

UNIGLASSIFIED

RELAY

RELAY

DRIVE

DRIVE

ENGINEERS INDIA LIMITED

Detailed Engineering:

NEW DELHI - INDIA

Worley
Limited

Basic Engineering:

PETROVIETNAM GAS UTILISATION PROJECT


CENTRAL COMPRESSION PLATFORM
WHITE TIGER FIELD

Project name:

POSITION

EIL

VIETSOVPETRO

RECORDER

EIL

PETECHIM/VIETSOPETRO

Contractor:

RECORDER

ISH

REVISED AS MARKED
APPROVAL FOR CONSTRUCTION

7.2.96

DD-MM-YY

AS - BUILT

20.11.96
20.3.96

Rev.

14.03.97

3
2

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
Document title:

FLOW SHEET & INSTRUMENT LEGEND


Page(s)

Company's document No.:


Path\File name\Initials:

10

DISTRIBUTION CODE:

37130110

NOTES: -GENERAL

PROCESS/

GLOBE VALVE

Y-TYPE STRAINER (WITH VALVE)

UTILITY LINE

2"
2. ALL SAFETY VALVES DISCHARGE & EQUIPMENT DEPRESSURIZING LINES

BASKET STRAINER

PLUG VALVE

FLAME ARRESTER

CAPILLARY LINE

BALL VALVE

ANGLE VALVE

SKID/VENDOR LIMIT LINE

NEEDLE VALVE

ANGLE BALL VALVE

CENTER LINE

SPRING LOADED VALVE

ANGLE CHOKE VALVE

AXIES AND HAVE NO POCKETS TO AND INCLUDING HEADERS.

LSH

3. DELETED

5. DELETED

HYDRAULIC LINE

DIAPHRAGM VALVE

FUTURE

CONTROL VALVE

SOFTWARE SIGNAL

CONTROL VALVE

FROM

1"

1"

3-WAY VALVE

SOV

INST.
PIPING

3-WAY CONTROL VALVE

FT

9. ALL VENT GAS PIPING SHOULD BE FREE DRAINING WITH NO POCKETS.

1/2"

FE

PIPING

(TYPICAL FOR FT, FR)

SPECS. DIAPHRAGM SEAL ALSO AS PER SPECS. ALL TAKE OFF

COONECTIONS SHALL BE SW (SOCKET WELD) UNLESS OTHERWISE

(WITH LIQUID SEAL)

2J3

ORIFICE CODE LETTER

24

OUTLET SIZE INCHES

PSV

SET PRESSURE kPa(g)

ST

PLC

TI

INST.

LO/LC
LC/LO

NORMALLY LOCK CLOSED

NORMALLY OPEN

NNF

NORMALLY NO FLOW

3/4"

DRAIN FLANGE

LG

2"

DELUGE NOZZLE

STRAIGHTENING VALVES

MAN WAY

HAND HOLE

LG

LT

FABRICATED

9.11

LOC

32. DELETED

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

INST.

BYPASS

RESTRICTION ORIFICE

LT

NEW DELHI - INDIA

12

11

SOV

10

FMR

SOV

SOV

Rev.

AR

FMR

Path\File name\Initials:

IAS

Document title:

Type of document
PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

FLOW SHEET & INSTRUMENT LEGEND

Company's document No.:

ACTUATOR

13

SCALE

CCP-WT/95

PLC-1

XV

14

Limited

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

FROM

(TYPICAL FOR DISPLACER TYPE LEVEL TRANSMITTERS)


(LT, ILT, LEVEL CONTROLLER (FIELD MOUNTED LC, ILC))

Worley

PETROVIETNAM GAS UTILISATION PROJECT

PLC-2

LT

2"

2"

2"

BORE SIZE MM

ENGINEERS INDIA LIMITED

Basic Engineering:
Project name:

FROM

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

PB

EIL

CONSORTIUM

Contractor:

40. THE SOV ASSEMBLY IS AS FOLLOWS: -(APPLICABLE FOR PLATFORM INLET/OUTLET


SHUTDOWN ISOLATION VALVES)

2"

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

15

Description of revision

Company;

39. ALL INSTRUMENT NOS. SHALL BE PREFIXED BY UNIT NO. Lo. TG-0101

1/2"

16

Date
DD-MM-YY

2"

HOSE CONN.
RO

LOC

JUY

INST.

2"
FOAM NOZZLE

101

JUY

PH

GRR

38. DELETED

PIPING

11.6

BLIND FLANGE

OFF/ON SKID OR SHOP

PH

GRR

MSP

SHALL BE READ AS 21-TC-0101 IN UNIT NO. '21'.

1/2"

CAP (WELDED)

AC

MSP

APPROVED FOR ENGG.

37. DELETED

VESSEL

MOTOR DRIVE

SDH

MSP

APPROVED BY COMPANY FOR ENGG.

36. DELETED

INST.

CAP (THREADED)

SA

APPROVED FOR CONSTRUCTION

10.1.96

35. DELETED

(TYPICAL FOR LG, ILG)

FILTER

REVISRD AS MARKED

20.3.96
7.2.96

34. DELETED

1/2"

(FLANGE MODEL)

AS - BUILT

20.11.96

33. DELETED

LG

14.3.97

30. DELETED

3/4"

3/4"

31. DELETED

29. ALL SAMPLE POINTS SHALL BE ACCESSIBLE AND LOCATED IN HORIZONTAL LINE.

3/4"
VESSEL

NO

VALVE IN THE PNEUMATIC LINE TO ENABLE LOCAL CLOSURE OF THE SHUTDOWN VALVE.

27. DELETED

PIPING

2"

MOUNTED WITH DOUBLE SEAL AND BLEED.

50. ALL SHUTDOWN VALVE WITH SINGLE SOLENOID VALVES SHALL HAVE A MANUAL 3-WAY

26. DELETED

INST.

1/2"

FSD VALVES
NORMALLY CLOSED

AS BUILT.

28. DELETED

11.5

INTERCHANGEABLE TO LO

NC

SHALL BE DECIDED BY PIPING DISCRIPLINE, THESE SHALL BE BACK DRAFTED DURING

49. ALL 4" AND LARGER SIZE BALL VALVES IN 900# CLASS AND ABOVE SHALL BE TRUNNION

25. DELETED

(TYPICAL FOR TI, TSH, TSL, TG, TT, TC)

INTERCHANGEABLE TO LC

PIPING

ELECTRIC MOTOR

DRAIN PLUGGED

FUSIBLE PLUG

48. ALL PIPING LOW POINTS SHALL HAVE DRAIN CONNECTION WITH VALVE. LOCATION

24. DELETED

4" MINIMUM

VENTURI METER

QUICK EXHAUST VALVE

1.5"

SONIC METER

SOLENOID VALVE (3WAY)

FOUR WAY VALVE

47. ALL ELECTRONIC TRANSMITERS SHALL BE FITTED WITH LOCAL INDICATION.

21. ALL INJECTION AND TRANSFER PUMPS TO HAVE ADEQUATE SPACE FOR

22. ALL OPEN DECK DRAINS SHALL BE SEAL WELDED.

TI

PIPING

SOLENOID VALVE (2WAY)

20. DELETED

MAINTENANCE AND REMOVAL OF SUCTION AND DISCHARGE VALVE. SUCTION/


DISCHARGE LINES TO HAVE FLANGE/UNION CONNECTIONS CLOSE TO PUMP

RAIN CAP
NORMALLY LOCK OPEN

PITOT TUBE

" VESSEL 1.5" FLANGED.

23. DELETED

RUNNING LIGHT (PANEL)

RELEVANT P&ID NO. FOR MULTIPLE TRAINS, A,B,C.... ARE ADDED AT THE END OF THE

FOR EASY DISASSEMBLY.

FLEXIBLE HOSE

POS. DISP. METER

3
4

46. THE FIRST TWO DIGITS OF ALL INSTRUMENTS DENOTE THE LAST TWO DIGITS OF THE
INSTRUMENT TAG NO.

19. DELETED

11.4

NITROGEN CARTIDGE

TURBINE METER

ROTAMERTER

(LOCAL PANEL)

N2

TAKE OFF CONNECTION-PIPING:

PIPING

RUNNING LIGHT (LOCAL)

RUNNING LIGHT

TO LP FLARE

PER THE GENERAL STANDARDS.

TYPICAL FOR PDI, PDT, PDSH, PDSL, PDSHL)

STANDPIPE

SPECIALITY ITEM

TO DRAWINGS NO. 3713-00-16-51-1601 TO 1806

18. PIPING REQUIRING INSULATION FOR PERSONNEL PROTECTION SHALL BE AS

MANIFOLD (PER SPECS)

SCRAPER / SPHERE TEE


SP

FLOW ON THE 1" PIPE

45. FOR LOCATION OF HEAT FIRE AND GAS DETECTORS, REFER

17. DELETED

101

FLOW ELEMENT ORIFICE

FACING THE DIRECTION OF

2"

CORROSIVE SALT LADEN MARINE ENVIRONMENT WITH 100HUMIDITY

PDI

ADAPTOR (TUBING PIPE)

INTERLOCK

PROVIDE 20 HOLES OF

15. DELETED

PDI

INSULATION JOINT

INJECTION CHEMICAL

PIECE

14. ALL EQUIPMENTS AND INSTRUMENTS SHALL BE SUITABLE FOR

FUNCTION BLOCK

SPOOL

1/2"

COMPANY

5mm EACH ON THE SIDE

RUPTURE DISK

UNION

STANDARD PRACTICE.

44. TYPICAL CHEMICAL INJECTION POINT SHALL BE AS INDICATED BELOW;

13. DELETED

BURIED

STEAM TRAP

TURBINE AND HP COMPRESSOR AUXILIARYS INCLUDING LUBE OIL COOLER AS PER SOLAR'S

SAMPLE

(GAS)

43. ALL PUMPS AND COOLER SHALL HAVE LOCAL START/STOP PUSH BUTTONS EXCEPT FOR POWER

11.2

RD

1/2"

BOMB

3
" VESSEL 1.5" FLANGED.
4
ALL DIAPHRAM SEAL TYPE INST. TO HAVE 1.5" FLANGED TAPPING.

16. DELETED
B

DCS/DIDC

FMR

ACTUATOR

PIPE

TAKE OFF CONNECTIONS-PIPING

COMPUTER LOCAL PANEL

SOV

XV

AS PER
SPEC.

11.3

REDUCER/EXPANDER

1"

1"x1/2"

(TYPICAL FOR PI, PT, PC, PIC, PSH, PSL, PSHL)

101

FLANGE

1"1/2

1"
DIAPHRAGM SEAL

1/2"

(LIQUID)

INST.

COMPUTER

3/4"

PIPING

PIPING

SPECTACLE BLIND

IAS

A1

SAMPLE POINT

1"x1/2"

INST.

INLET SIZE INCHES


BACK LOCAL PANEL

PB

PIPING

OPEN DRAIN SYSTEM

SLOPE (DOWN WARD)


HAMMER BLIND

1"
INST.

PI

BUTTERFLY CONTROL VALVE

PLC-1

PI

PI
SILENCER

BALL CONTROL VALVE

BACK-PANEL MOUNTED

FOR LIQUIDS TOWARDS FT.

EXPANSION JOINT

SHUT DOWN VALVE

PILOT-OPERATED VALVE

FROM

FMR

MOTOR OPERATED VALVE

LOCAL, PANEL MOUNTED

PB

OPEN

GAS SAMPLE TO BE SURFACE ONLY UNLESS OTHERWISE SPECIFIED.

11.1

LOCAL, PURGED

PANEL MOUNTED

OPEN

SSD PANEL

1/2"

FOR GAS AND VAPOR-TOWARDS FE

HAND-OP. VANNE VALVE

OPEN

12. SAMPLE CONNECTION SHALL BE AS PER FOLLOWING TYP. DETAIL.

HOOK-UP DETAILS.

VANNE CONTROL VALVE

(PER SPEC.)

PB

SOV

SPECIFIED. FOR INST. SUPPLIED VALVES REFER TO INSTRUMENT

PISTON OPERATED VALVE

LOCALLY MOUNTED

PLC-2

ACTUATOR

IMPULSE LINE SLOPE-

BELOW. ALL VALVES SHOULD BE AS PER APPROPRIATE PIPING

UP STREAM

INST.

XV

42. THE SOV ASSEMBLY IS AS FOLLOWS: -(APPLICABLE FOR


GENERAL PURPOSE BLOWDOWN VALVES)

FT

10. ALL LIQUID SAMPLES SHALL BE TAKEN FROM CENTER OF THE PIPE.

CONTINUOUS DRAIN

HAND-OPERATED VALVE

CMR

IAS

MANIFOLD

11. PIPING VALVES FOR INSTRUMENTS SHOULD BE AS PER DETAILS GIVENT

DEVICE IDENTIFICATION

SOV

FMR

8. PROTECTION AGAINST GALVANIC CORROSION TO BE PROVIDED WHEREVER

DOWN STREAM

SELF ACTUATED PCV

SOV

A
FMR

11.8 DELETED

FROM

SELF ACTUATED PCV

PLC-1

7. FOR PUMP HANDLING LIQUID, CASING VENTS, DRAINS AND


BASE PLATE DRAINS SHALL BE PIPED WITH VALVE TO NEAREST

CLOSE

TAKE OFF CONNECTIONS-PIPING 1" VESSEL 1.5" FLANGED.

1"x1/2"

(W/PIPING SPEC. DESIGNATION)

PB

FROM

WITH HAND WHEEL

PB

PLC-2

REQUIRED BETWEEN DISSIMILAR MATERIALS.

LINE RATING CHANGE

I
CLOSE

LSH

(TYPICAL FOR EXTERNAL TYPE LSH, ILSH, LSL, ILSL)

TUBED TO CLOSED DRAIN HEADER WITH 12MM SS TUBING.

STANDPIPE

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

UNIT PLC

11.9
ANGLE CONTROL VALVE

FROM

LSH

DECK DRAIN FUNNEL.

1"

1/2"

6. DRAINS OF LEVEL INSTRUMENTS IN HYDROCARBON SERVICE SHALL BE

41. THE SOV ASSEMBLY IS AS FOLLOWS: -(APPLICABLE FOR ALL USD ISOLATION VALVES AND FOR HP
COMPRESSOR BLOWDOWN VALVES)

2"

4. DELETED

NOTES CONTINUED ......

1"

HEADER FROM TOP WITH AN ANGLE OF 30 TO 45 WITH FLARE HEADER

TEMPORARY STRAINER

TS

BUTTERFLY VALVE

ELEC. TRACED LINE

1/2"

STANDPIPE

CHECK VALVE

PNEUMATIC LINE

BE SHOWN ON PIPING PLANS AND ELEVATION.

SHALL BE FREE DRAINING TO FLARE HEADER. THEY SHOULD JOIN FLARE

ELECTRICAL LINE

11.7

PIPING

T-TYPE STRAINER (WITH VALVE)

1. HIGH AND LOW PIPING VENTS AND DRAINS NOT SHOWN ON P&IDS SHALL

NOTES CONTINUED ......

LINES IDENTIFICATION
GATE VALVE

INST.

PIPING SYMBOLS

10

11

PIPING

LINES

12

13

14

VESSEL

15

INST.

16

Path\File name\Initials:
4

DISTRIBUTION CODE:

Page(s)
37130111

PSHH-0105

CASE

NOTE-3

ZIC

ZIO

0104

0104

B1

ZSO
0104

XV

PI

TI

0104

0101

0101

V/F

PT

0105

0103

3/4"

CS0

V/F

PSHH

0103

4"-P-B1-1002

V/F

CMR

CLOSE SIGNAL TO
RISER PLTF AND

0107

0107

0103

IAS

I/P

CAUSE PSD

ZSC
XV

0107

B1

0109

FROM RISER PLTF

30"-P-B1-1001

DWG NO. 1133

NOTE-7

NOTE-2

LOW

30"x20"

HP GAS

TO CDH

3"

FC

3/4"

NC

I
TO CLOSE
XV-0107

0105

0105

ZSO

0105

0105

XV

PI

TI

0105

0102

0102

PI

0106

0104

PAL

V/F

FC

V/F

PSHH

PT

0106

0104

3/4"

LT

LG

0102

0108

2"

6"-SV-A1-2504

PSV

2"

IAS
ZSC

ZSO

0106

0106

3/4"

TO CDH

SS TUBING

DRAIN

2"

NC

A1

DWG NO. 1137

B1

B1

A1

TO HP COMPRESSOR

30"-P-B1-1007
NOTE-2

12

11

THAT

TOTAL

IS

WITHIN

NO.

SET

POINT

1300
800
1200
850
1300
1200

kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)

1060

mm

FROM

BTL

50

mm

FROM

BTL

950

mm

FROM

BTL

100

mm

FROM

BTL

700

mm

FROM

BTL

50

mm

FROM

BTL

600

mm

FROM

BTL

200

mm

FROM

BTL

850 kPa(g)

NOTE-6

4"-FG-B1-6301-IE

FUEL GAS TO 1-K-501


DWG NO. 1131

DWG NO. 1006

0103

TO 1-T-231

3"-P-B1-1008

DWG NO. 1007

I
LALL
0115

XV-0109

0107

0109

LAH

0109

PH

JUY

LOC

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Date

Description of revision

LY

LV
0102

NEW DELHI - INDIA

3/4"

LY
0107

I/P

Limited

BLACK COND. TO
CPP-2

2"-P-A1-1024

2"-P-B1-1024

DWG NO. 1012

FC

3/4"

3/4"

2"

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
HP GAS FROM RISER PLTF AND HP SEPARATOR

Company's document No.:

A1

Path\File name\Initials:
7

Type of document

CCP-WT/95

LV
0107

Worley

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

2"

COMPANY

ENGINEERS INDIA LIMITED

Basic Engineering:

1"

3/4"

EIL

CONSORTIUM

Detailed Engineering:

NC

10

EIL

ISH

PETECHIM/VIETSOPETRO

0102

ZIO

NC

AC

APPROVED BY COMPANY FOR ENGG.

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

I/P

0109

2"

SDH

MSP

7.2.96

Contractor:

0109

SA

APPROVED FOR CONSTRUCTION

VIETSOVPETRO

CMR

ZIC

REVISRD AS MARKED

20.3.96

Company;

LAL

IAS
ZSC

AS - BUILT

20.11.96

DD-MM-YY
LIC
0102

FC

14.3.97

Rev.

FC

XV-0106

CLOSE

Document title:

13

ENSURE

DWG NO. 1002

NOTE-6

NC

14

TO

PAHH-0105/06
PAH-0103/04
LAHH-0105/0113
LALL-0106/07
LAH-0101/02
LAL-0101/02
LAH2-0108/0110
LALL-0109/0115
LAH-0103/04
LAL-0103/04
PAL-0103/04

0101

LALL

B1

15

REVIEWED

PAL-0112

2"x3"

TRIP
1-K-501

0113

16

POINT.

FROM
LSLL-0107

2"-P-B1-1009

TO CLOSE

3"x2"

BE

PAH-0112

RO

CLOSE
XV-0105

LAHH

SOV

0109

3"-DH-A1-2217

3/4"

ASSEMBLEY.

HIGHEST

A1

3"
XV

ZSO

3/4"

AT

TI

0115

3"
FC

OF

PIPE

SUCTION SCRUBBER

LSLL

3"

NC

SOV

&

0109

V/F

0104

B1

OF

FROM

SUCTION HEADER

3"

LSH2
0110

1"

DETAILS

TOP

3"-FL-A1-2405

V/F

FC

INST.

LG
0117

ASSEMBLEY.

LP COMPRESSOR

LAL

LV

2"-P-B1-1010
A1

V/F
LT

0104

FO

31.18

4"-P-B1-1020 4"-P-B1-1021

LY
0104

0106

V/F

FOR

PROVIDE

OF

No.

CSC

LAH2

LAH

LIC

I/P
XV

2"

V/F

0104

0110

2H3

LSLL

3"-DW-B1-2302

ZIO
0106

3713-00-02-41-0111

6.

TAPPING

P&ID

3/4"

1-V-211B

INTERFACE
ZIC
0106

DETAILS

LEGEND

CASE

CS0

0110

SOV

OF

B1

A1

3"

0106

3/4"

B1

LSLL-0115

I/P
LV

0107

0110

2700

A1

FROM

CMR

0106

20"-P-B1-1006

3"

CSO

LY

3/4"

LSHH

V/F

2"-P-A1-1011

ZSO

2"

0113

DWG NO. 1124

FOR

NOTE-42

START-UP

CSC 1"

OILY WATER TO 1-V-451

SOV

SHALL HAVE MIN. BENDS AND LENGHT. PIPING GA's AND ISO's

CSO

1"

V/F

ASSEMBLEY.

NC

4"-P-B1-1003

2"

V/F

ZSC

4"-P-B1-1015

CS0

B1

PAH

PAHH

ZIO
0110

FIRE

3/4"

20"-P-B1-1004

0110

FC

0104

CS0

A1

NOTE-3
IAS

ZSC

LV
0101

0108

3/4"

0103

B1

SOV

TO 1-V-254

14"x20"
6"-SV-A1-2502

SOV

CLOSE
XV-0105

0105

PSV

2700

XBDV

2"-P-B1-1022

FIRE
CASE

ZIC
0110

0101

NC

HP FLARE

1.5"-DH-A1-2246

TO CDH

DWG NO. 1137

2H3

LSHH-0113

OF

No.

REQUIRED LIMITS.

0110

LY

0108

ZIO

0109

SOV

NOTE-5

I/P

ZIC

LALL

14"x20"

PSHH-0106

3713-00-02-41-0111

P&ID

7. THE ENTIRE PIPING FROM CCP B/L UPTO THE HP COMPRESSORS

IAS

0106

A1

FROM ESD

&

PALL-0111
ESD

NC

3"x2"

LEGEND

CMR

2"

B1

OF

3713-00-02-41-0110

SHALL

LAL

0101

FC

B1

ZIO

ZSC
0108

0108

3"-DH-A1-2216

No.

DETAILS

REFER

9.16

IAS

ZSO

A1

ZIC

2"-P-B1-1008

POINT

0108

FC

3"
NC

P&ID

5.

0103

LAH

LIC

0109

3/4"

2"

3/4"

DWG NO. 1137

V/F

0103

1"

FC

INST.

30"x20"

TT

0111

LV

0107

DRAIN

0103

NOTE-41

3713-00-02-41-0110

CSO

FO

REFER

PAHH-0110

SOV

0108

LSH2
0108

V/F

SS TUBING

A1

LG

LEGEND
&

TAG.

LSLL

2"-P-B1-1011

0109

V/F
LT

LY

0107
TI

LAL

0103

ZSO

V/F

LAH

LIC

ZSO
0103

2"-FL-A1-2401

2"x3"

ZIO

6"-FL-A1-2403

ZIC

OF

FOR

LALL

FROM
LSLL-0106

XV

DWG NO. 1135

SOV

NOTE-40

3713-00-02-41-0110
3713-00-02-41-0111

0106

3"

LAH2
0108

0107

REFER

CLOSE
XV-0108

V/F

3"-DW-B1-2301

0111

NOTES.

0105

LSLL

INTERFACE

&
FOR

1-V-211A

3"

ZSC
0103

CLOSE
XV-0104
TRIP
1-K-501

I
LAHH

0106

LSLL-0109
PSLL
0111

0103

3"

FROM

PALL

0103

4.

RO

3"

V/F

0110

0110

LG
0107

ZIO

2"
CSO

2"

LT
0101

0103

ZIC

IAS

CSC

0105

ESD

4"-P-B1-1018 4"-P-B1-1019

V/F

PSHH

FROM

2"

LSHH

CAUSE PSD

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

PI
0103

SOV

NOTE-5

A1

CSC 1"

RISER PLTF AND

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

PAH

PAHH
0105

FIRE
CASE

B1

A1

No.

2700

XBDV

PAL

20"-P-B1-1001

FC
CLOSE SIGNAL TO

CLOSE

ZSC

CS0

B1

3/4"

2H3

PSV
0102

CS0

A1

IAS

0104

0101

6"-SV-A1-2503

6"-SV-A1-2501

0104

PAL

PT

PSV

SOV

0112

0112

14"x20"

2H3
2700

P&ID

FOR 1-V-211 A/B.


3.

HP FLARE

FIRE

LEGEND

3713-00-02-41-0110
3713-00-02-41-0111

DWG NO. 1007

HP FLARE

PI

PAH

FROM ESD
LSHH-0105

REFER

DWG NO. 1135

6"-P-A1-1059-IS

DWG NO. 1135

14"x20"

A1

B1

2. SYMMETRICAL PIPING REQUIRED AT INLET AND GAS OUTLET

LP GAS FROM 1-K-252


NO POCKETS

20"-P-B1-1005

2"x3"

FC

EPOXY LINING - FOR BOOT ONLY

30"x20"

0102

30"x20"

0102

BOOT DIA. = 750 mm (ID)


HEIGHT = 750 mm (T/T)

(1-K-251)

ZSO

1.

SPLIT

XV

180C

UCP

SPLIT

0102

LINING :

PAHH

NOTES

1800 mm (ID) x 7200 mm (T/T)


2700 kPa (g)

0102

I
ZSC

RANGE

ZIO

(1-K-251)

0102

0102

IAS

DESIGN TEMP. :

INLET SEPARATOR

RANGE

NOTE-4

DESIGN PRESS. :

UCP

6"-FL-A1-2402

ZIC
SOV

SIZE :

10

11

1-V-211A/B

HP FLARE

12

13

14
ESD,UCP OF 1-K-251

DWG NO. 1135

15

ITEM NAME :

XV-0104

16

ITEM NO. :

DISTRIBUTION CODE:

Page(s)
37131001

16

15

ITEM NAME:

10

11

1-PK-266
INLET GAS METERING SYSTEM
2700 KPa(g) / 180 C

NOTE-2

16"

ZIO

UCP

DWG NO. 1135

LP FLARE

DWG NO. 1135

FUTURE

0202C

ZIC

UCP

2. REFER NOTE-41 OF LEGEND P& ID 3713-00-02-41-0110


AND 0111. FOR SOV ASSEMBLY

IAS

ZSO

ZSC
0202C

3. REFER LEGEND P&ID No.

XV

16"-P-D1-1017C

16"-P-B1-1017C

1"-FL-A1-2432

1"-FL-A1-2420

0202C

B1 D1

UCP
SS TUBING

B1

30"-P-B1-1007

FT

PT

TT

TI

PI

0201

0202

0202

0204

0205

FX
0201

FROM GAS

FQ
0201

CHROMATOGRAPH

FI

REFER DWG NO. 1011

NO

0201

5. DELETED

CMR
IAS

ZSC

0201C

0201C

XV
0201C

1"-P-D1-1023C

PDT
0204C

UCP

PDI

0204C

30"-P-B1-1007

CC
PT

TT

TI

PI

A1

0203

0203

0205

0206

B1

0201

NO

CSC

1"
30"-P-B1-1007

1-PK-266

3/4"

INLET GAS METERING SYSTEM


NOTE-4

NOTE-2
ZIC

SOV

0202E

0202E
S

UCP

0202E

UCP

IAS

XV

TO 1-V-251E

ZIO

HP PLARE

ESD/UCP

ZSC

ZSO

0202E

0202E

ESD/UCP
NOTE-2

1.5"-FL-A1-2411

FT
0202

2100 MM

POINT

FE

DWG NO. 1403

0201C

10" LOW

0202

ASSEMBLY TO BE DONE BY 'SHI'

B1 D1

NC

ZIO

UCP

A1

0202B

UCP

0202B
S

I
ZSC
0202B

XV

FC
B1 D1

UCP

0201B

D1 B1

ZIC

UCP

SOV

0201E

0201E

I
ZSO

ZSC

0201B

0201B

ZSO
0201E

XV
0201B

1"-P-D1-1023B
FC
B1 D1

PDT
0204B

30"-P-B1-1007

XV

ZSC

IAS

0201E

NOTE-2

UCP

IAS

0201E

1"-P-D1-1023E
FC
D1 B1

UCP

I
PDI
0204B

LEGEND:

PDT

CONTROL PANEL

UCP

PDI

PI
0201

ESD/UCP

NOTE-2
SOV
0202D

ZIC

ZIO

PT

0202D

0202D

0207

UCP

UCP

IAS

XV

TO 1-V-251D

NOTE-2
ZIO

UCP

ZSC

ZSO

0202D

0202D

0202A

0202D

16"-P-D1-1017D

ZIC

UCP

0202A

0202A
S

IAS

ZSO

ZSC

0202A

0202A

0202A

16"-P-D1-1017A

16"-P-B1-1017A

ZIO

NOTE-2
SOV
0201D

ZIC

ZIO

0201D

0201D

UCP

UCP
UCP

ZSC

ZSO

0201D

0201D

0201A

IAS

XV

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Description of revision

DD-MM-YY

TO 1-V-251A
DWG NO. 1003

Date

Company;

ZIC

NOTE-2

ESD/UCP

VIETSOVPETRO

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

IAS

ZSO

ZSC

0201A

0201A

Worley

Basic Engineering:
XV

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

0201A

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

1"-P-D1-1023A

0201D

1"-P-D1-1023D

FC
FC

16"

D1 B1

B1 D1

FUTURE

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

0201A

EIL

CONSORTIUM

Contractor:

SOV

0201A

UCP

EIL

ISH

PETECHIM/VIETSOPETRO

FC
B1 D1

Rev.

XV

D1 B1

ESD/UCP

SOV

16"-P-B1-1017D
FC

VENDOR (NOTE-4)

DWG NO. 1003

0204E

TO STATION

0204E

ESD/UCP I

TO 1-V-251B
DWG NO. 1103

0201B

ZIO

UCP

16"-P-D1-1017B

ESD/UCP
SOV

0201B

NOTE-2

0201E

IAS

ZS0
0202B

0202B

16"-P-B1-1017E

ZIC

SOV

16"-P-B1-1017B

FC

ZIC

ZIO

16"-P-D1-1017E

0202B

I
B1

0202E

ESD/UCP

DWG NO. 1303

ZSO

1"-P-B1-1016

0201

3713-00-02-41-0111 FOR NOTES.

4. ALL ITEMS ARE SUPPLIED LOOSE BY GAS METERING VENDOR

FC

DWG NO. 1135

DWG NO. 1001

0201C

DWG NO. 1011

1"-FL-A1-2419

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

FROM 1-V-211A/B

UCP

NOTE-2

3713-00-02-41-0110 &

TO 1-V-251C
DWG NO. 1203

SOV

REFER DETAIL-A IN

NO

TO GAS CHROMATOGRAPH

ZIC

FE

3/4"
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CSC

1"

30"-P-B1-1050

0201C

A1

ESD/UCP

FC

ZIO

1. DELETED

0202C
S

0202C

NOTES:

SOV

0202C

ESD/UCP

DES. PRESS./DES. TEMP.:

LP FLARE

12

13

14

ITEM No.:

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PDT

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

0204A

Rev.

PDT
0204D

UCP

UCP

Document title:

0204A
PDI

Path\File name\Initials:
15

14

13

12

11

10

HP COMPRESSOR SUCTION MANIFOLD

Company's document No.:

0204D

16

Path\File name\Initials:

PDI

DISTRIBUTION CODE:

Page(s)
37131002

16

15

12

13

14

10

11

NOTES
ITEM NO.:

1-AC-251A

1-V-251A

ITEM NAME:

H.P. INTERSTAGE COOLER

H.P. INLET SCRUBBER

SIZE:

2110 mm(ID) x 3025 mm(T/T)


5500 kPa(g)

DESIGN PRESS :
DESIGN TEMP. :

2. UIC REFERS

180C

180C

LINING :

1. UCP REFERS TO

DUTY: 25.936 MMKJ/Hr (7.204 MW)


5500 kPa(g)

3.

EPOXY (INTERNAL)

P&ID No.

DWG NO. 1153

4.

DELETED

5.

DELETED

TAHH

5500
PSV
0301A

DWG NO. 1136

TAH
PALL

TI

0303A

0304A

TT

PSLL

TT

0301A

0303A

0304A

TAL

UCP

UCP

TAH
TIC

TSHH

SS

INST.

0307A

D1

PIPING

CSO

V/F

0311A

1.5G2.5

0304A

A1

CSO

3/4"
CSC

2"
2"-P-D1-1066A

2"-P-D1-1067A

FT

0304A

0301A

PT
0306A

V/F

PSLL

PI

0312A

0309A

PI

TI

0305A

0303A

S/D

0302A

PUMP

PSLL

PALL
0307A

PSHH

PAHH

0308A

0308A

FIVE

COMPRESSOR TRAINS

NOTE-9

0302A

TAG. NO.

SET

PB

PB

0301A

0302A

SERIAL LINKED TO

PAL-0304A
PALL-0307A
TAH-0306A
TAL-0306A

kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)

50

44

TAHH-0307A

170 C

LAH-0301A

400MM

FROM

BTL

LAL-0301A

200MM

FROM

BTL

LAHH-0304A

465MM

FROM

BTL

LALL-0303A

150MM

FROM

BTL

16"-P-D1-1017A

GOVERNOR

TOL

1-K-253A TRIP

TAH-0301A

UCP

TAL-0301A

SPEED
CONTROL

I
LSHH

FROM PT-0207

0301A

LAL

LT

LG

0301A

0302A

LIC

0304A

1-DGT-253A

V/F

LALL
0303A

BIAS

ON 2nd STAGE
COMPR. DISCHARGE

SS

OVERRIDE

LSS

VENDOR'S SCOPE (SOLAR)


NOTE-14

1-K-253A TRIP

0302A

ZIC

ZIO

0302A

0302A

IAS

XV

ZSO

FV

ZSC

V/F

0301A

V/F

ZSO
0301A

V/F

3/4"

0306A

3/4"

PB
0305A

D1
A1

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

FO

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

4"

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

NORMAL
STOP

3/4"

ESD SIGNAL

12MM SS TUBING
NNF

FAST
STOP

D1

DWG NO. 1150

E1

Rev.

Date

3/4"

1-K-253A TRIP

PLC-1 (NORMAL S/D)

SS TUBING

TO UCP "B"

XI

TO UCP "C"

CLOSE

XV-4601A, XV-0302A, XV-0401A, XV-0402A

PB

PB

0304A

START
MACHINE

0303A

START
PRESSUR1SATION

UA

USD

0301A

0302A

COMMON

COMMON

ALARM

TRIP

M/C PARAMETER

CONSORTIUM

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:
TO UCP "D"
DWG NO. 1303

TO UCP "E"

M/C PARAMETER

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

DWG NO. 1403

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

ITEM NO.:

1-DGT-253A

ITEM NAME:

1-K-253A

HP COMPRESSOR
GAS TURBINE DRIVER

CAPACITY :
DIFF. PR. :

HP COMPRESSOR

14

13

12

11

10

Document title:

Rev.

HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'A')

Company's document No.:

75450 Nm3/hr (GUARANTEE)

9.219 MW

15

Path\File name\Initials:

1st STAGE

3107 kPa

16

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

DWG NO. 1203

ON 1-K-253A TRIP

EIL

ISH

PETECHIM/VIETSOPETRO

Contractor:

DWG NO. 1103

0301A

V/F

EIL

Description of revision

DD-MM-YY

Company;
VIETSOVPETRO

1-K-253A
UCP

FROM PLC-1/2
(FAST STOP)

TO COH

METHANOL

PIPING INST.

INST. DRAIN

DWG NO. 1137

2"-DH-A1-2201A

NC

3/4"

2"

COOLER VENDOR'S SCOPE OF SUPPLY

DWG NO. 1005

0301A

LV

PB

FC

VENDOR'S SCOPE OF SUPPLY (SOLAR)

*
FROM PT-0501

SURGE CONTROL

1"

A1 D1

V/F

FY

V/F

2"-P-D1-1029A
FC

UCP

0301A

0302A

DWG NO. 1136

0301A

LY
0301A

0302A

ZIO

UCP

14"-P-D1-1037A

I/P
ZSC

0301A

NOTE-6

0302A

CMR

0301A

PANEL

I
SOV

V/F

0301A

I/P

CONTROL

LSLL-0303A

ZIC
SOV

STATION

XV-0302A

UCP

V/F

CLOSE
FROM

LEGEND:

DWG NO. 1004

0304A

0301A

F
20 kPa

FROM PIC-0410A

UCP

V/F
SIC

4250 kPa(g)
3200 kPa(g)

PDI-0311A(MAX)
SOFT

LSLL

45

165 C

PAH-0306A

VAHH-0302A

ST

0303A

VAHH-0301A

1-K-253A

0301A

DWG NO. 1002

55

TAH-0304A

PAL-0306A
LAHH

0304A

1-V-251A
LAH

ONE

POINT

4400
750
900
800
2300

PAH-0304A

NOTE-9

ARE

CONTROL PANEL.

PALL-0303A

XI

0303A

0307A

STATION

XI

TI

10"x12"

OIL

DWG NO. 1002

TO HP FLARE

UTILISED BY SOLAR FOR LUBE

PAHH-0308A

V/F

2"

FROM HP COMPRESSOR
SUCTION HEADER

CMR

PSLL SHALL BE

14. UCPS OF
FROM
VSHH-0302A

FROM
VSHH-0301A

UIC-0301A

0305A

12"x16"

DUAL PLATE WAFER TYPE.

13. THIS

UCP

2"-P-D1-1051A

SYSTEM VENDOR REQUIREMENT.


12.

VAHH

PAL

NOTE-13

10. USE 20 MESH PER VENDOR REQUIREMENT.

DWG NO. 1004

0301A

PI
0306A

LOCAL CONTROL ROOM.

0302A

MOTOR

VAHH

PAH

V/F

PT
0310A

ON

CONTROL

NOTE-8

V/F

AVAILABLE

9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN

3/4"

VSHH

0301A

S/D

UCP

SHALL BE

COMPRESSOR UCP.

11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR

16"-P-D1-1030A

D1

3/4"

PAL

MOTOR

PT

AS

NOTE-12

*
VSHH

V/F

PAH

TOL

1-AC-251A
3/4"

PIC

TO TAP-OFF POINT.

TO 1-V-252A

12"-P-D1-1031A-IS

16"-P-D1-1030A

TS

INDICATIONS

DCS AS WELL

12"-P-D1-1032A

0302A

FV-0301A CLOSE

DELETED

8. ALL THESE

TY

V/F

CSO

7.

0306A

NOTE-10

PSV

I/P

6. LOCATE

DWG NO. 1004


TAL

NOTE-11

ST-0301A

5500

0306A

3/4"

I
PDI

FIRE
CASE

FROM TT-0306A

8"-P-D1-1037A

1.5G2.5

NOTE-8
TAH

TI
0301A

4"-SV-A1-2506A

TO HP FLARE

4"-SV-A1-2505A

FIRE
CASE

NOTE-8

4"-FL-A1-2406A

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

CONTROLLER

3713-00-02-41-0111 FOR NOTES.

0307A

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

REFER LEGEND

UNIT CONTROL PANEL

ANTISURCE

3713-00-02-41-0110 &
FROM 1-P-356A
12MM SS TUBING

TO

Path\File name\Initials:
8

DISTRIBUTION CODE:

Page(s)
37131003

16

15

12

13

14

ITEM NO.
ITEM NAME
L

SIZE :
DESIGN PRESS :
DESIGN TEMP :

10

11

H.P. INTERSTAGE SCRUBBER


1710 mm (ID)X 2750 mm(T/T)
8400 kPa(g)

H.P. DISCHARGE COOLER


DUTY: 22.236 MMKJ/H (6.177 MW)
14000 kPa(g)

180 C

NOTES:

SCRUBBER
1122 mm (ID) X 2415 mm(T/T)
14000 kPa(g)

1. REFER LEGEND P&ID No.


3713-00-02-41-0110 &

65 C

EPOXY (INTERNAL)

TO 1-DGT-253A SPEED CONTROL

H.P. DISCHARGE

180 C

1-V-253A

1-AC-252A

LINING :

1-V-252A

3713-00-02-41-0111 FOR NOTES.

EPOXY (INTERNAL)

2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.

DWG NO. 1003

V/F

FY

FO

70.99

0403A

NOTE-2

V/F

IS

NO POCKETS

NOTE-7

2J3
14000

3"
F1 E1

PSV

D1 F1

RO

SS

6"-P-F1-1043A-IS

NNF

F1

INST. PIPING

NOTE-3
UCP

UCP

TAHH

PAHH

TI

0405A

0409A

0408A

TAH

FT
0402A

PSHH

TT

FT

0409A

0408A

0401A

PT

V/F

V/F

PSV
0401A

2"-P-D1-1044A

CSO

DWG NO. 1136

FIRE
CASE

TAH
TAL

TT
0401A

PI

PAH

0401A

PAL

NOTE-5

NOTE-3

1E2

PID
0412A

3/4"

D1

3/4"

CSO

CSC

2"

VENT

2"

F1

INST.

SS

TI

TAH

0406A

TAL

TAG. NO.

PALL-0407A
PALL-0412A
TAHH-0405A
VENT

172 C

TAH-0406A

CC
0402A

NO POCKETS

8"-P-E1-1035A

VSHH

FROM

0401A

VSHH-0401A

1-K-253A TRIP
VSHH

VSHH-0402A

1-V-253A

FROM

0402A

PSLL
0407A

0401A

PB

LSHH

0401A

MOTOR

NOTE-4

S/D

0402A

0402A

MOTOR

NOTE-4

LT

LG

0402A

0406A

I
FROM

BTL

LAL-0401A

130

MM

FROM

BTL

LAHH-0404A

774

MM

FROM

BTL

50

MM

FROM

BTL

LAHH-0408A

465

MM

FROM

BTL

LALL-0407A

150

MM

FROM

BTL

LAH-0402A

400

MM

FROM

BTL

LAL-0402A

200

MM

FROM

BTL

PAH-0401A

4250 kPa(g)
3200 kPa(g)

TAH-0401A

LAHH

PAH-0405A

0408A

PAL-0405A

50

44

13000 kPa(g)
10500 kPa(g)

TAH-0408A

PB

55

MM

TAL-0401A

VAHH

35

290

PAL-0401A

50

LAH-0401A

LALL-0403A

3/4"

POINT

13200 kPa(g)
4500 kPa(g)
2300 kPa(g)

PAHH-0409A

2"

3/4"

SET

0407A
TT
0406A

165

VAHH-0401A

VAHH-0402A

S/D

PI

LSLL

LALL

0407A

0407A

PDI-0412A(MAX)

20

kPa

0408A

PALL

PSLL

0412A

0412A

XI

XI

0401A

0402A

LIC
0402A

V/F
UCP

V/F

PSLL

PT

0411A

0405A

PI
0405A

LAH

LAL

XV-0402A

CLOSE

PAH

PAL

NOTE-3
TI
0402A

ENTRY

12"-P-D1-1032A

DWG NO. 1003

PIPING

PUMP CONTROL.

TI

TAHH-0409A

VAHH

UCP

2"-P-D1-1041A

TOP

CSC

TSHH
0409A

TAL-0406A

UCP

NOTE-8

FROM 1-AC-251A

3/4"

8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL


TAHH
0409A

V/F

3/4"

PSV
0402A

CSO

A1

0404A

2"

PALL
0407A

7. DUAL PLATE WAFER TYPE.

0408A

8400

2"-P-D1-1071A

1E2
8400

3"-SV-A1-2508A

CASE

TI
0401A
NOTE-3

3"-FL-A1-2407A

FIRE

3"-SV-A1-2507A

TIC-0306A

TT
0306A

SYSTEM VENDOR REQUIREMENT.


UCP

CSO

1-AC-252A

0401A

DWG NO. 1003

PSV

6"-P-F1-1042A-IS

TSHH

NOTE-6

3"-P-D1-1069A

NO POCKETS

DWG NO. 1146

TO HP FLARE

V/F

0405A

8"-P-F1-1034A-IS

0402A

TO FUEL GAS SKID

6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR


14000

CSO

TS

21.05

5. USE 20 MESH PER VENDOR REQUIREMENT.

8"-P-E1-1070A

2J3

F1

12"-P-D1-1033A

ST-0401A

RO

IN LOCAL CONTROL ROOM.

A1

3/4"

4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE

PT

F1

V/F

NO POCKETS

TI
0404A

1-K-253A TRIP

LSHH

0401A

LT

LG

LAL

0401A

0405A

LAHH
0404A

I
SOV
0401A
CMR

ZIC

ZIO

0401A

0401A

LY

LSLL

LALL

0403A

0403A

1-K-254A

0402A

I/P
0401A

TO CONDENSATE

XV

ACCUMULATOR

ZSC

ZSO

0401A

0401A

0401A

0401A

DWG NO. 1008

FC

0402A

1"

LV

3/4"

I/P
LY

LY

IAS

1"

CLOSE
XV-0401A

2"

LEGEND:

E1
A1

D1
F1

2"-DH-A1-2203A

LIC

LAH

3/4"

2"-P-D1-1036A

SS TUBING

NC

FC

FC

3/4"

B1 D1

INST. DRAIN

3/4"

3/4"
2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)


COOLER VENDOR'S SCOPE OF SUPPLY

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

NC
D1

2"-DH-A1-2202A

C
FROM

LSLL-0407A,
1-K-253A TRIP

CMR

ZIC

ZIO

0402A

0402A

IAS

XV

ZSC

ZSO

0402A

0402A

0402A

DWG NO. 1124

COMPANY

CONSORTIUM

Detailed Engineering:

ENGINEERS INDIA LIMITED

SS TUBING

NEW DELHI - INDIA

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

2"-P-E1-1074A

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

FC

1-V-254A

ITEM NO.

13

12

11

10

Path\File name\Initials:

8743 kPa

14

HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-A

Company's document No.:

2nd STAGE
67696 Nm3/hr
15

Document title:

COMPRESSOR

CAPACITY :
DIFF. PRESS :

Path\File name\Initials:

H.P.

ITEM NAME

16

EIL

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

INST. DRAIN

3/4"

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

DWG NO. 1154


Contractor:

A1 E1

Company;

Basic Engineering:

TO OILY WATER TREATMENT

12MM SS TUBING

TO CDH

SOV
0402A

FROM 1-P-357A

A1

VENDOR'S SCOPE

V/F

DWG NO. 1137

1-V-252A

FROM

LSLL-0403A, LSHH-0807
PSHH-0805, 1-K-253A TRIP

0404A

TO CDH

0401A

6"x8"

CC

0402A

10"x12"

PI

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

CSO

4"-P-F1-1125A-IS

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

12MM SS TUBING

DWG NO. 1150

0403A

53.79

0401A

3/4"

METHANOL

DWG NO. 1005

0401A

RO

0401A

DCS AS WELL AS COMPRESSOR UCP.

GAS HEADER

8"-P-E1-1038A
NO POCKETS

6"-P-FI-1073A-IS

FV

0401A

IS

DWG NO. 1136

V/F

PIC
0401A

E1

ZSC

0401A

10"-P-D1-1070A

UCI-0401A

I/P
0401A

V/F

ZSO

CMR

3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON

TO DISCHARGE

6"-SV-A1-2509A

V/F

TO HP FLARE

SOV

0403A

6"-SV-A1-2516A

V/F

ZIC
0401A

UCP

6"-FL-A1-2408A

ZIO
0401A

UCP

UCP

DISTRIBUTION CODE:

Page(s)
37131004

16

15

12

13

14

10

11

NOTES:
UCP/ESD

1.

SOV

ZIO
ZIC
0510C

IAS

UCP

I
XBDV

ZSC

0510C

0510C

NOTE-7

UCP

0510C

UCP

15.04

8"

RO

0510C

FUTURE

0500C

CSO

CSO

8"-P-E1-1038C

UCP

I
XV

ZSC

0500C

0500C

0500C

XBDV
0510D

E17

UCP
UCP

ZSO

UCP

NOTE-2

0500D

0500D

XV

0500D

0500D

8"-P-E1-1038D

0505D

17.98
UCP

15.04

ZSO

RO

0510B

0500B

CSO

2"x4"

2"-P-E1-1039B

E1

0500B

IAS

FROM 1-V-253B
DWG NO. 1104

I
XV

ZSC

0500B

0500B

UCP

ZSO

0501

0505B
PAL

0510E

PAL

UCP

SET

POINT

250 kPa(g)
50C

TAL-0501

35C

PAH-0501

13000 kPa(g)
10500 kPa(g)

PAL-0501

FROM

UCP/ESD

CSO
NOTE-2

IAS

0501

ZSC

XV

0500E

0500E

F
FROM 1-V-253E

NOTE-6

8"-P-E1-1038E

UCP

DWG NO. 1404

FC

3/4"

2"
PSL

0505B

DWG NO. 1003

NO.

0500E

0500E

0500E

ZSC

0501E

CSC
ALARM

2"-P-E1-1127B

E1

NC
NOTE-2

UCP

A1

ZIO
ZIC
0510A

IAS

UCP

I
XBDV

ZSC

0510A

0510A

17.98

ZSC

UCP

0510A

0505E

15.04

ZSO

FO

E17

E17

CSO

SOV
ZIC
0500A

IAS

8"-P-E1-1038A

0502E

0501

UCP

I
XV

ZSC

0500A

0500A

0500A

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

TT

10.1.96

APPROVED FOR ENGG.

MSP

GRR

0501

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

17.98

TO 1-T-311A/B

16"-P-E1-1040

A17

DWG NO. 1008


FLOW TEMPERATURE

ZIO

0500A

RO

CC

2"x4"

2"-P-E1-1039A

NOTE-2

14.3.97

TAL

NC

A1 E1

0500A

TAH
B

8"-P-E1-1127E

RO

0510A

TI
0501

CSC

CSO

UCP/ESD

PAL
0501E

0502B

SOV
0510A

0505E

RO

ZIC

UCP/ESD

UCP

6"-FL-A17-2408

FLARE

2 : 1000

DWG NO. 1136

NO POCKETS

Description of revision

DD-MM-YY

Company;

3/4"

PSL
0501A

ALARM

PAL

ZIO
0511

ZSC

XBDV

ZSC

ZSO

RO

0511

0511

0511

0501

CSC

CSO

2"-P-E1-1127A

FO
E1

E1

2"-P-E1-1160

CSO

2"-P-E1-1133

0505A

NC

NEW DELHI - INDIA

6.43

UCP

SEAL GAS
DWG NO. 1056

E17

FUTURE

8"

FUTURE

4"

Limited

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

FUTURE

PIPING & INSTRUMENTATION DIAGRAM

Document title:
NOTE-7

13

12

11

10

Rev.

HP

COMPRESSOR

Company's document No.:


Path\File name\Initials:

14

Path\File name\Initials:

2"

17.98

15

Type of document

SCALE

CCP-WT/95

Contractor's document identification:

RO

Worley

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

Company's contract No.:

2"x3"

E17 A17

A1

0502A

ENGINEERS INDIA LIMITED

Basic Engineering:

IAS

0501A

ZIC
0511

ZIC
0505A

SOV

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:
0511

EIL

CONSORTIUM

Contractor:

DWG NO. 1136


NO POCKETS

NOTE-4

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

VENT

4"-VG-A1-2834
ESD

Date

0500A

NOTE-6

2"

Rev.

ZSO

FC

16

CONN.
WITH

SOV
ZIC

0500E

ZSO

0501B

XBDV
0510E

ZIO

UCP

CONTROL PANEL

HEADERS

PURGE

PURGED

IAS
ZSC

E17

PAH

PT

ALARM

FO

3/4"
ZIC

DWG NO. 1004

VENT

FOR
BE

GAS.

2"-P-E1-1039E

A17

NOTE-6

0510E

ZSO

PSL

FROM 1-V-253A

AND

SHALL

CSO

2"x4"

0501B

TO STATION

FLARE

INERT

SOV

UCP

0510E

0500E

0500B

2"

WITH

0510E

ZIC

0510E

15.04

PI

8"-P-E1-1038B

FC

UCP

OF

CONNECTIONS.

HEADERS

NOTE-2

RO
0500B

5M

PURGE

FLARE

HEADERS

NC

ZIO

UCP

E17 A17

ZIC

THAN

WITH

1135.

VENT

UCP/ESD

ZIO

0500B

NO.

AND

0502D

FO

SOV

PROVIDED

P&ID

GAS

TYPE.

LONGER

RO

E17

CSO
NOTE-2

E17

UCP/ESD

8"-P-E1-1127D
A1 E1

4"-VG-A1-2634

0510B

NOTES.

CSC

16"-FL-A17-2408

16"-P-E1-1040

ZIO

0510B

VALVE.

17.98

A1

0502C

PAL

ZSC

E1
RO

ZSC

BE

WAFER

ENDS

0501D

0505D

NC
NOTE-2

XBDV

PLATE

TAG.

2"-P-E1-1127C

IAS

FOR

TAH-0501

ZIC

UCP

CSC

UCP

BLOWDOWN

DETAILS.

PAL-0501 A/B/C/D/E

ALARM

0510B

THE

DWG NO. 1304

PSL

ZSC

OPEN

FROM 1-V-253D

0501D

UCP

0505C

ASSEMBLY

DEAD

2"

3/4"

E1

PAL

0510B

TO

3713-00-02-41-0110

FC

0501C

ZIC

ALL

SHALL

ZIC

SOV

DUAL

7.

FEUL

ZSC

3/4"

0505C

0510B

6.

REFER

NOTE-6

ALARM

SOV

DELETED.

IAS

PSL

UCP/ESD

PROVIDED

No.

3713-00-02-41-0111

5.

ZSO

0501C

BE

P&ID

UCP/ESD

CSO

SOV
ZIC

0500D

0500C

2"

SHALL

4. REFER NOTE-42 OF LEGEND P&ID NO. 3713-00-02-41-0110 & 0111


FOR

ZIO

NOTE-6
FC

LCR

LEGEND

2"-P-E1-1039D

0500D

E1

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

DWG NO. 1204

ZSC
0510D

CSO

A17

ZIO
ZIC
0500C

IN

REFER
&

IAS

0510D

0500D

3.

ZSO

RO

0510D

FO

IAS

FROM 1-V-253C

15.04

FUTURE

UCP

PANEL

0510D

ZIC

0510D

E17 A17

SOV
0500C
S

FUTURE

2"x4"

FO
E1

NOTE-2

E17

2"

2"x4"

2"-P-E1-1039C

UCP/ESD

4"

ASSEMBLY DETAILS. IN ADDITION, A PUSH BUTTON MOUNTED IN SSD

SOV

ZIO

I
ZSO

2. REFER NOTE-41 OF LEGEND P&ID NO. 0110/0111 FOR SOV

UCP/ESD

NOTE-2

E1

0510C

DELETED.

NOTE-2

E17

DISTRIBUTION CODE:

DISCHARGE

MANIFOLD

Page(s)
37131005

16

15

12

13

14

10

11

PSV

PSV

0601

0602

4"x8" 4"x8"

VF

VF
VF

CSO

CSO

2"

1/2"

1/2"

VF

DWG NO. 1007

3"x6"
6"-P-A1-1047

TAL

0604

S/D

ZSC

ZSO

0602

0602

TT

PSLL

0601

0604

UCP

L3

4P6
500

SUCTION HEADER

PI

14"-P-A1-1054-IE

FC

0603

PT
0601

500

0603

0604

CSO

CSO

4"x6"

4"x6"

1/2"

1/2"

CSC

FC

1/2"

0601

ZIC

ZIO

0601

0601

1-K-251

DWG NO. 1133

S/D

IAS
XV

ZSC

ZSO

0601

0601

0601

V/F

2"

POINT

0601

TI

0602

0609

1-V-254

PSHH
0606

PAL

PI

PAHH

0605

0606

1"-FL-A1-2470

V/F

TI
0603

ZIC

ZIO
0603

0602
LSH

XV

ZSC

ZSO

0603

0603

0604

DWG NO. 1124

2"-P-A1-1053

8"x6"

FO

1-K-251

S/D

UCP

LG

UCP

CLOSE

CLOSE

LV-0602

LCP
1-K-251

LV

TT

TYPICAL

12.

FROM

OF

TAL

1"-DH-A1-2215

START

0607

ARRANGEMENT

12mm SS TUBING

A1

PROVIDED
&

I
VAHH

S/D

0601

OUTLET

OF

CYLINDER

PROVIDED

25-TT-0606

AT

OUTLET

PROVIDED

FOR

EACH

CYLINDER.

D3.

NO.

SET

POINT

40 kPa(g)
(-)8.8 kPa(g)
400 kPa(g)
370 kPa(g)
260 kPa(g)
36 kPa(g)
(-)5 kPa(g)

PAL-0605
PAH-0601
PAL-0601

TAH-0601

60C

TAL-0601

40C

TAHH-0602/04/06

135C

LAHH-0603

195MM

LALL-0604

(-)105MM FROM BTL

LAH-0602

125MM

LAL-0602

(-)25MM FROM BTL

TAH-0607

130C

PDI-0607(MAX.)

0602

FROM

BTL

FROM

BTL

10 kPa(g)
E

COMMON

UA
0601

V/F

USD
0602

ALARM

COMMON
TRIP

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

Company;

EIL

EIL

ISH

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

FOR TIE-IN DETAILS

Detailed Engineering:

ESD SIGNAL

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

FROM 1-T-T1

DWG NO. 1007

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

3/4"-DH-A1-2219
Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

1-K-251

LP COMPRESSOR 1st STAGE

ITEM NO. :
ITEM NAME :

Document title:

310 KPa

Path\File name\Initials:
15

14

13

12

11

10

Rev.

COMPRESSION OF LOW PRESSURE GAS FROM CPP2

Company's document No.:

DIFF. PRESS.

16

Path\File name\Initials:

15018 Kg/hr

CAPACITY

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

TRIP XV-0702

LSHH 0703

1"-DH-A1-2218

UCP.

NO.-1.

PAH-0605

XI

MOTOR

AT

&

FROM PLC-1/2

3/4"

DCS.

THE

1-AC-253.

25-TT-0604

25-TI-0615

PAHH-0606

3/4"

1"-DH-A1-2228

BOTTLE

TAG.

V/F

UCP
1-K-251

PERMISSIVE

B1

AND

PAHH-0609

V/F

NOTE-6

REFER NUOVO PIGNONE

NOTE 12

THE

FROM

UCP

P&ID NO. SOP-52599/1


21

25-TI-0613

CYLINDER

VOLUME

DD-MM-YY

SKID LIMITS

25-TT-0602

NO.-2

PALL-0604

DWG NO. 1007

TO CDH

OUTLET

DRG NO. 1007

TAH

1/2"

DWG NO. 1007

TO

BE

FROM VSHH-0601

NOTE-6
FC

VENDOR.

0605

TI

UCP

L2

L1

DWG NO. 1137

AT

11.

2"

TO 1-V-D5

CYLINDER

8"x6"

0607

&

SIMILARLY

OF

80C

2"

V/F

25-TI-0603

NO.-4

98C

LALL

LINKED

SHALL

THROUGH

VAHH-0601

TSO

1/2"

GAS

100C

0602

FREE DRAIN

ROUTE

TAL-0605

SOV

RO

TO

TAH-0605

0604

PACKAGE

ROOM.

XV-0603

TAL-0607

LSLL

THOSE

FACILITIES.

V/F

0604

IN

EXCEPT
BY

SERIAL

COMPRESSOR

0601

0601

TAL

LSLL-0604

TO 1-V-453

CONTROL

NOTE-5 (TYP.)

CMR

FROM

ALARMS

AUXILIARY

FOR

VSHH

0602

THE

FOR

LAHH

0602

SOV

WITH

0603

0601

LSL

SUPPLIED

0603

0602

AR

10.

TAH

8"-P-A1-1056-IS

FC
2

DWG NO. 1007

LAL

TX-0705
P&ID NO. 1007

0608

0603

12mm SS TUBING

OPEN

BE

ITEMS

LSHH

0602

THE

UCP

LAH
LI

IAS

0603

LT

UCP.

PERMISSIVE

1-AC-253

NOTE-11

TO LP FLARE

UCP

TT

PAH

1-K-251 S/D

1.5"-DH-A1-2234

UCP

TI

TRIP

14"x16"
PI

PT
0605

SHALL

COOLING

CONDENSATION

M
PI

CONTROL

DETAILS.

JACKET

TO

1"

0608

WATER

HYDROCARBON.

DCS

INDICATIONS

START

TO 1-T-231

TS

LOW

DWG NO. 1135

0601

IN

TEMPERED

AND

AND

ASSEMBLEY

7. 1-AC-253 IS SUPPLIED LOOSE BY VENDOR. PIPING TO/FROM

8"x6"
XI

AS

THE

AND

NOTE-10

1-V-D2/D3

UCP

IN

PB

TI
0601

0609

FC

DWG NO. 1137

VENT

RO
0603

1"

1-K-251

PSHH

UCP

UCP

NOTE-10

0602

1-V-D1

ST-0601

I
TSHH

0607

16"-P-A1-1052

TO CDH

0602

6"-P-A1-1045

0609

S/D

PREVENT

INSTRUMENTATION

CHANGE

IAS

1-K-251

0602

UCP

CAPACITY CONTROL

PDI
PAHH

V/F

SOV

PAL

ALL

S
TAHH

1"

0601

RO

8"x4"

NOTE-3

LP GAS FROM CPP-2

SUPPLY

A1

UCP

0601

2"

UCP

UCP

ESD

PIC

NC

N2 PURGE

B1

FROM 1-K-251 S/D.

PAL
0601

PAH

PY

PAH
0601

TO

PROVIDE

SOV

9. ON ACTUATION OF TDAL -0705 (P&ID NO. 1007). OPERATOR SHOULD

0603

4"-P-A1-1139

1/2"

TO

FOR

- LCP SHALL CONTAIN COMPRESSOR START/STOP PUSH BUTTONS

NOTE-9

SOV

0601

NOTES.

3713-00-02-41-0110

1-AC-253 SHALL BE IN PURCHASER'S SCOPE.

PV

I/P

FOR

AND

8. LOCAL/REMOTE SELECTOR SWITCH FOR 1-AC-253 START SHALL BE

2"

CSO

OF

COMPRESSOR.

IN

6"-P-A1-1140

4P6

PSV

4"-P-B1-1015

DWG NO. 1001

DWG. NO. 1007

PSV

3713-00-02-41-0110

6. COMPRESSOR SHALL HAVE A UNIT CONTROL PANEL (UCP) IN THE


CONTROL ROOM, AND A LOCAL PANEL (LCP) IN THE FIELD.
- ALL PROCESS/MECHANICAL TRIP INTERLOCKS SHALL BE EXECUTED

8"-P-A1-1055-IS

XV
0602

8"-P-A1-1015

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

IAS

FROM HP COMPRESSOR

NO.

THE

5.

FREE DRAINING

0601

VENDOR

8"-P-A1-1057-IS

0602

1-K-251

NOTE-41

SYSTEM

CONTINUED ON

0602

PALL

REFER

4.

P&ID NO. 1007

TI

P&ID

3713-00-02-41-0111

6"-P-A1-1141

ZIO

LEGEND

INDICATED

6"-SV-A1-2513

0605

3.

NOTE-11

TAH
ZIC

REFER

6"x8"

27

DELETED.

2.

3713-00-02-41-0111

LOCATION

UCP

NOTE-3
SOV

1.5"-FL-A1-2432A

6"-SV-A1-2512

VF

1.

180C

TO SAFE

CSC

3"x6"
6"-P-A1-1048
UCP

ESD

VF

VF

VF

2"

CSO

FROM 1-K-251 S/D.

500

3"-VG-A1-2637

100C

LP INTERSTAGE COOLER

DUTY: 183.46 KJ/Hr


500 kPa (g)

3L4

6"-FL-A1-2424

DESIGN TEMP.

500

1-AC-253

8"-FL-A1-2410

LP FLARE

DIA 1352mm x 2192mm (T/T)


500 kPa (g) & FULL VAC.

DESIGN PRESS.

3L4

DWG NO. 1135

LP SUCTION SCRUBBER

SIZE

8"-SV-A1-2511

1-V-254

ITEM NAME :

NOTES

DWG NO. 1135

8"-SV-A1-2510

LP FLARE

ITEM NO. :

DISTRIBUTION CODE:

Page(s)
37131006

12

13

14

1-T-231

ITEM NAME

TO HP FLARE

10

11

CONDENSATE STRIPPER
1200 mm (ID) X 8600 mm (T/T)
500 kPa (g) /F.V

SIZE
DESIGN PRESS.
DESIGN TEMP.

140

8"-FL-A1-2413

15

DWG NO. 1136

16

ITEM NO.

CONTAMINATED LIQUID FLASH DRUM


65C

2. DELETED.
3. ALL INSTRUMENTATION AND CONTROL ITEMS EXCEPT THOSE

INDICATED AS IN DCS/PLC SHALL BE SUPPLIED BY PACKAGE

PSV
0703
CSO

PSV
CSO

0701

6"-SV-A1-2522

1200

6"-SV-A1-2521

CONTINUED FROM

P & ID NO. 1006

FOR TIE IN DETAILS

VENDOR.

TAHH

S/D

TDAH
500

TDI

0708

1200

5. REFER NOTE-41 OF 3713-00-02-41-0111.

PSV
CSO

0702

0702

S/D

PAL

PT

UCP

3/4"

PI

0708

0706

1"

0705

TDAL

1-K-251

PAH

6. LOCATE PUMPS ON TILTING PLATE SEPARATOR (1-V-453)

4"-P-A1-1105-IS

3/4"

2"

CSO

CSC

TI
0703

0702
PDI

TT

TI

0702

0701

DECK TO MEET NPSH REQUIREMENTS.

TI
0704

7. STRAINERS ST-1301/1302 PREVIOUSLY PROCURED FOR


1-P-232 A/B TO BE USED.

TAH
TAL

TAG.

NO POCKETS

1"

TT

4"-P-A1-1104-IS

CSO

TX

1-V-D4

TS

10"-P-A1-1081-IE

3/4"

TI
CSC

0705

3"-P-A1-1102-IS
3"-P-A1-1103-IS

6"-P-A1-1059-IS

1-V-D5

DWG NO. 1001


4

RO
0702

1-K-252

1"

10

DWG NO. 1006

MM

FROM

BTL

100

MM

FROM

BTL

LAH-0702

430

MM

FROM

BTL

LAL-0702

270

MM

FROM

BTL

PAHH-0701

1100 kPa(g)
231 kPa(g)
340 kPa(g)
245 kPa(g)
165

TAHH-0702

PT

PSHH

0705

0701

PI

L2

TT

0707

1050 kPa(g)
900 kPa(g)
150 kPa(g)

1-K-251

DWG NO. 1006

0705

PAH

PI

0705

TAL-0704

125

PDI-0701(MAX)

15 kPa(g)

PAL-0705

1.5"-FL-A1-2432A

UCP

16

S/D

DWG NO. 1006


CSO

TAH-0704

PAH-0705

DWG NO. 1006


PI
0704

600

LALL-0701

PAL-0708

12 mm SS TUBING

LAHH-0703

PAH-0708

TO 1"-DH-A1-2125

1"

POINT

25

PALL-0702

L1

RO

SET

TDAL-0705

0704

TO 1-V-211 A/B

V/F

NO.

TDAH-0705

0701

PSV

2"

3/4"

0702

PSLL

0704

CSO

PI

UCP

1.5H3

PALL

3L4

4"-P-A1-1106-IS

1-K-251

0705

3L4

4. ROUTE LINE SO THAT SAFETY INSULATION IS MINIMISED.

L3

3"-SV-A1-2515

500

DWG NO. 1135

TO HP FLARE

PAHH

0701

PAL

2"

0703

FROM COMP. CYLINDERS

1-T-T1

LG
0602

1"-DH-A1-2273

M1

6"X3"

3"-P-A1-1101-IS

#10
PDI

#1

FROM 1-K-251 1st. STAGE

TO 1-V-453

HOT

1-T-231

75 MM

ZIO

ZIC

0702

0702

SOV

3/4"-DH-A1-2219

IAS

0702

ZSO

ZSC

0702

0702

S
XV

HC LIQUID

0702

3"-P-A1-1008

3/4"

0703

M2

LIC

ZIC

0701

0701

SOV

RO
0701

NC

ZSO

ZSC

0701

0701

S
XV

FOR PI

NOTE-5

3/4"

0701

7.47

2"-P-A1-1058-IS

V/F:

COMPRESSOR VENDOR SCOPE SUPPLY.

2"-P-A1-1174-IS

3/4"

TO 1-PK-264

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

EIL

ISH

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

ST-0701
NOTE-7

NOTE-7

PI

PI

0708

3/4"

0709

0701

PB

STOP

PB

0701

ITEM NO.
ITEM NAME
CAPACITY
DIFF. PRESS.

STOP

1-K-252

1-P-233A/B (NOTE-6)
BLACK CONDENSATE PUMPS

LP COMPRESSOR 2 nd STAGE

2.0 m3/hr

17077 Kg/hr

10

Document title:

Rev.

LOW PRESSURE GAS COMPRESSION & CONDENSATE STRIPPING

Company's document No.:


Path\File name\Initials:

719 kPa

Path\File name\Initials:

0702

350 kPa

11

Type of document
PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

0702

LSLL-0701

SCALE

CCP-WT/95

XI

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

3/4"
XI

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

2"X1"

3/4"

2"x1"

Worley

Basic Engineering:

ST-0702

LSLL-0701

12

BLACK CONDENSATE

DWG NO. 1012

FC

3/4"

13

FROM ESD.
LSLL-0701

14

DWG NO. 1001

TO LV-0702

IAS

0701

2"-P-A1-1058-IS

INTS. DRAIN
SS TUBING

ZIO

HOT

2"-P-A1-1171-IS

15

DRAIN

LAL

75 MM

2"-DH-A1-2232

XV-0701

16

A1 B1

FROM 1-V-211A/B

LOW POINT

2"-P-A1-1175-IS

TO CLOSE

TRIP 1-P-233A/B

3/4"

DWG NO. 1012

0702

0701

LT
0702

DRAIN

LSLL

LALL
0701

LG
0704

FC

LOW POINT

LAH

2"-P-A1-1172-IS

CLOSE XV-0702

3"-P-B1-1008

LSHH

LAHH
0703

2"-P-A1-1173-IS

TO 1-K-251 S/D

DWG NO. 1006

ON 1-K-251 S/D
LSHH-0703

FREE DRAINING

8"-P-A1-1056-IS

DWG NO. 1006

NOTE-3

17

0708

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

1.5H3

NO. SOP-52599/1

DWG NO. 1006

3"-FL-A1-2412

3"-SV-A1-2514

P&ID

1. DELETED.

BY VENDOR

350 kPa (g)

6"X8"

NOTES:

13

REFER NUOVO PIGNONE

1-T-T1

DISTRIBUTION CODE:

Page(s)
37131007

15

COND. HOLDUP VESSEL

HP FLARE

ITEM NAME

1300 mm (ID) X 2800 mm (T/T)


4300 kPa (g)

SIZE
DESIGN PRESS.
DESIGN TEMP.

DWG NO. 1136

12

13

14

1-V-234

65 C

10

11

1-V-232

6"-FL-A1-2409

16

ITEM NO.

6"-SV-A1-2517

PSV

CONDENSATE ACCUMULATOR

CONDENSATE COALESCER

1300 mm (ID) X 3610 mm (T/T)


4300 kPa (g)

660 mm (OD) X 2438 mm (T/F).BOOT=475 mm(O0)X 610 mm (H)


4780 kPa (g)

65 C

65 C

1.

0813

B1

3/4"
CS0

3/4"
CSC

FROM 1-V-252B

4"-P-B1-1036

FROM 1-V-252C

3/4"

NO

2"-P-B1-1036E

DWG NO. 1404

5.

PUMP

CAVITY

BYPASS

6.

PI-0806

TO

7.

PROVIDE

EITHER TRUNION

PALL-0813

4"-P-81-

PALL-0809

LAH

LT

LIC

0802

PALL-0811

0802

LAL

PAHH-0808

A/B

ZSO
0107

PAHH-0810
PAHH-0812

LAH-0802

1.5"-P-B1-1147

LAHH-0807

TRIP

1-V-231 A/B/C

1.5"-P-B1-1158

FREE DRAINING

6"-P-B1-1060

NO

NO POCKET

3"-P-B1-1062

1D2

2"

VENT

14000

PSV

3
4

"

3
4

INTERFACE
LT

LG

LSLL

0801

0804

0805

FV

0802

I/P

FY

"

0803

I/P

FY

FO

0801

3
4

FO

0802

1.5"

"

3
4

FY
0803

1.5"

"

3
4

"

LAH-0801
LAL-0801

444

mm

FROM

BTL

476 mm FROM BOOT T/T

1D2
14000

PSV

I/P

CSC

LV

0802

6"x4"

A1

3/4"

CS0

0802

6"x4"

BTL

PDI-0807 (MAX)

E1

LV

6"x4"

CS0

3/4"

PI
0807

TO 1- PK-263

3"

DWG NO. 1012


TRIP

INST. DRAIN

3
4

"

PSLL-1107
PSHH-1106

NOTE-5

NOTE-7

3"-P-F1-1130

NOTE-5

NOTE-5
PI
0802

4"x3"

3
4

"

3
4

"

PI
0803

4"x3"

FROM

3
4

ESD

"

LSLL-0808

PB

XI

PSLL-0809

0801

0801

PSHH-0810

3
4

"

JUY

LOC

PH

JUY

LOC

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Date

PB

XI

0802

0802

3
4

ESD

PSLL-1107

PSLL-0811
PSHH-0812

CONSORTIUM

Detailed Engineering:

"

ENGINEERS INDIA LIMITED

Worley

Basic Engineering:

REFER TO NIKKISO SUNDSTRAND

Limited

DWGS. NO. DE55-090A-04 FOR DETAILS

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:


STOP

PB

XI

0803

0803

SCALE

1"-DH-A1-2251

PIPING & INSTRUMENTATION DIAGRAM

DWG NO. 1137

Document title:

Path\File name\Initials:

Rev.

Path\File name\Initials:
CONDENSATE COALESCER & INJECTION PUMPS

Company's document No.:

Type of document

CCP-WT/95

Contractor's document identification:

LSLL-0808

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

9114 kPa

10

EIL

PETECHIM/VIETSOPETRO

VIETSOVPETRO

30 m3/hr

11

EIL

Description of revision

ISH

NEW DELHI - INDIA

4"x3"

FROM

CONDENSATE INJECTION PUMPS

12

PH

GRR

APPROVED FOR ENGG.

Contractor:

0804

1-P-231A/B/C

CAPACITY:

13

AC

MSP

10.1.96

PI

PSHH-1106
STOP

LSLL-0808

DIFF. PRESS.

14

SDH

MSP

APPROVED BY COMPANY FOR ENGG.

DD-MM-YY

CSO

TRIP
1-P-231C

LSLL-0806

PSHH-1106
STOP

ITEM NAME

15

SA

APPROVED FOR CONSTRUCTION

7.2.96

0803

CSO

PSLL-1107

PSLL-0807
PSHH-0808

TRIP
1-P-231B

LSLL-0806

TO CDH

2"-DH-A1-2233

DWG NO. 1137

ITEM NO.

LSLL-0806

SS TUBING

REVISRD AS MARKED

20.3.96

FT

A1

B1
ESD

A1

AS - BUILT

20.11.96

Rev.

FE

0802

CSO

TRIP
1-P-231A

3/4"

0803

14.3.97

0803

FT

0801

3/4"

B1

E1

Company;

FROM

CSO

FE
0802

FT

NC

3"

F1

F1

1"

CSO

FE
0801

2"X3"

3/4"

B1

2"-P-B1-1061
FC

4"-P-E1-1064

0812

F1

A1

CSO

0801

1"
FC

3/4"

FAL

FIC

CSO

PSHH

0810

B1

0801

2"-P-A1-1061

0806

0812

FC

3/4"

4"x3"

PSLL
0811

2"x3"

0801

LV

FAL

FIC

PAHH

0802

CSO

PSHH

F1

ZSO

0810

PSLL
0809

B1

0801

ZSC

ST-0801

XV

FAL

FIC
0801

CSO

PSHH

0811

3"-P-F1-1129

0806

PSLL
0807

PAHH

1-P-231C

PALL

4"-P-B1-1131

LALL
0805

4"x3"

ST-0803

0801

IAS

PAHH

3"-P-F1-1028

XV-0801

4"-P-B1-1063

LY

ST-0802

0801

TO CLOSE

3"-P-F1-1064

0801

I/P

2"X3"

CMR

ZIO

0809

F1

0801

ZIC

3"-P-F1-1082

SOV

4"-P-B1-1062

1-P-231B

PALL

4"x3"

NOTE-7

1-P-231A

0807

TRIP

NOTE-7

PALL

3"-P-F1-1065

FROM

16

CS0

E1

2"-P-E1-1112

I/P

A1

F1

FV

0801

2"

2"

"

LSLL-0805

FROM BTL

2"-P-E1-1132

F1

FV
3
4

1.5"

mm

0804

B1

2"

LSLL
0808

FO

TREATMENT

150

18 m3/hr
18 m3/hr
18 m3/hr
532 mm FROM BOOT T/T
494 mm FROM BOOT T/T

2"-P-E1-1064

B1

F1

DWG NO. 1124

BTL
BTL

FROM

FAL-0803

DWG NO. 1135

0803

B1

TO OILY WATER

FROM
FROM

mm

LALL-0808

6"-P-B1-1062

LALL
0808

1-V-231

mm
mm

FAL-0802

TO HP FLARE

6"-FL-A1-2418

6"-SV-A1-2519

PDI
0807

SEAL

250

LALL-0805

1-P-231A/B/C

V/F
VENDOR SCOPE

TWIN

WITH 3/4" BLEED.

POINT

2600

FAL-0801

6"-SV-A1-2520

LIC

VALVE

MOUNTED VALVE WITH

2400

LALL-0806

TRIP

0801

LINE.

FROM THIS

LAL-0802

6"-P-B1-1160

LAL

START

ROOM.

SET

PALL-0807

0107

LAH

SHALL

3800 kPa (g)


3400 kPa(g)
3900 kPa(g)
3000 kPa(g)
4500 kPa(g)
4500 kPa(g)
4500 kPa(g)
13500 kPa(g)
13500 kPa(g)
13500 kPa(g)

PAHH-0805

0107

ZIO

DWG NO. 1135

2"

VISIBLE

TAG. NO.

1-V-234

WHITE CONDENSATE TO CPP-2

BE

PAL-0801

LG

SEAL

PAH-0801
ZIO

PUMP

ZSO

0803

(FUTURE)

CONTROL

1-V-232

0107

2"

STANDBY

K
LOCAL

POINT

NC

PUMP TRIP. THE

AND BODY BLEED OR DOUBLE BLOCK VALVES

3/4"-P-B1-1149

FROM 1-V-252E

RUNNING

XV-0401A/B/C/D/E

3/4"-P-B1-1148

4"-P-B1-1036

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

ONE

LOCATED IN

1.5"-P-B1-1146

XV-0401A/B/C/D/E

LOW

2"-P-B1-1036D

DELETED

4. AUTO MANUAL SELECTOR SWITCH FOR 1-P-231A/B/C/ SHALL BE

B1 A1

CLOSE

2"

FREE DRAIN

2"

DWG NO. 1304

NOTES.

CLOSE
VENT

FROM 1-V-252D

&
FOR

DWG NO. 1136

0805

3/4"-P-B1-1147

2"-P-B1-1036C

DWG NO. 1204

No.

PAHH

0805

VENT

MIN

2"-P-B1-1036B

DWG NO. 1104

2"-P-A1-1068

FO

3/4"

PI

4"-P-B1-1107

4"-P-B1-1161

P&ID

AUTOMATICALLY.

HP FLARE

1"

0806

PSHH

LEGEND

3713-00-02-41-0110
3713-00-02-41-0111

3. ON

0801

1"

CS0

NOTE-6

2"-P-B1-1036A

DWG NO. 1004

PT
0801

2"-P-B1-1068

4"-P-B1-1109

4"-P-B1-1108

FROM 1-V-252A

PSLL
0813

1"

A1

REFER

PV

PSV

4"X2"

CS0

2"

(FUTURE)

2.

PAL

XV-0401A/B/C/D/E

0802

PY
0801

0801

CLOSE

4300

I/P

PAH

PIC

2.5J4

0801

6"-SV-A1-2518

4300

NOTES:

PALL

2.5J4

1-V-231

DISTRIBUTION CODE:

Page(s)
37131008

16

15

12

13

14

1"x2"
RO
0902A

9.72
NOTE-15

CSC

TI

10"x14"

RO

E17 A17

16"-P-E1-1076

TO BE MINIMUM.
14. FI-0902A SHOULD BE VISIBLE FROM THE

6"-FL-A17-2417

TO PIC-1101

E17 A17

METERING

TAG.
DWG NO. 1011

DWG NO. 1135

LT

0901A

0902A

LIC
0902A

LAH
LAH

1-T-311A

LSLL
0905A

2"

CLOSE

XV-0903A

50

T
HO

E1
E2

TO TRAIN # B
DWG NO. 1109

FROM 1-AC-311A

PSLL-1022A

PSV
0905A

V/F

ZIO

0903A

0903A

V/F
SOV

V/F

0903A

V/F

LV
0902A

ZSC

ZSO

0903A

0903A

V/F

2"x1"

2"x1"

1"
FC

3/4"

2"

CMR
IAS

PSV

BTL
BTL

150 mm FROM

BTL

50 kPa(g)

TO

CSC

CS0

V/F

3"x2"

3"x2"

V/F

BE SUPPLIED

BY

DEHYDRATION VENDOR SYSTEM

2"
TO 1-E-314A

2"-GL-A2-8201A

DWG NO. 1010

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

A2

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

V/F
1/2"

E2

BTL

FROM

LAL-0902A

NC

50 mm

PID-0901A(MAX)

3"x1.5"

0903A

E2

450 mm FROM

V/F

NOTE-13

FC

600 mm FROM

LAH-0902A

AHH-0902A

V/F :

3/4"

V/F

3/4"

LAHH-0903A

0906A

CS0

3/4"

XV

V/F

3"x6"

3"x1.5"

3"-GL-A2-8223A

0902A

ZIC

V/F
CS0

LSLL-1010A
LSHH-1003A

I/P

TAL-0909

700

3"x6"

LSHH-1012A

LY

1.5H3

700

V/F

PSHH-1011A

POINT

1.5H3

FROM
LSLL-0905A

SET

10000 kPa(g)
(-)40 C
(-)40 C

LALL-0905A

NOTE-15.18

DWG NO. 1310

V/F

LG

NO.

PALL-0902A

LOW TEMP. FLARE

1"-GL-A17-8225

V/F

M2

LSHH
0903A

LALL

METERING
DWG NO. 1011

TAL-0908A
E1 E17

V/F

0905A

16. LG-0906 TO BE VISIBLE FROM THIS VALVE.

TO GAS EXPORT

3"-GL-A2-8224A

LAHH

BUTTERFLY VALVE.

15. PROVIDE 0.5M DISTANCE (MIN.) BETWEEN BALL AND GLOBE VALVE

DWG NO. 1011

0906

6"-SV-A1-2533A

PALL
0902A

12"-P-E1-1077

PT

NC

V/F

CLOSE
XV-0901A

TRIP 1-P-311A/B

16"x10"

E1 E17

LG

16"x10"

13. DISTANCE BETWEEN XV-0903A AND TAPPING FOR PSV-0905A/0906A

FLARE
DWG NO. 1135

2"x6"

2"-GL-E2-8208A

0903A

NOTE-12

TO LOW TEMP.
CSO

FO

CSO

6"-SV-A1-2534A

0902A

DWG NO. 1005

0902

SYMMETRICAL

0909

TO GAS LIFT
E1

PI
0903A

TRIP 1-P-311A/B
PSLL

DISCHARGE HEADER

0902

0902

10"x14"

NOTE-8

FROM HP COMPRESSOR

XBOV

ZSO

2"

LOW

50 mm HOT

PDI

12. INLET/OUTLET PIPING TO/FROM 80TH DEHYDRATION TRAINS TO BE


ZSC

1101

CLOSE XV-0901A

TO BE TRIPPED SO THAT ONLY TWO COMPRESSORS ARE LEFT RUNNING.


TAL
11. DELETED.

POINT

0901A

0901A

TSO

0902

TT

3"-P-E1-1113A

XV

FI

0902

13.31

5 DIA

0902A

0902

0909

IAS

0907

CSO

NOTE-14

ZIO

0901

ESD

2" FC

ZIC

10"-P-E1-1040A

3/4"

9. DELETED.

10. IN CASE OF XV-0901A NOT OPEN SIGNAL, RUNNING H,P. COMPRESSORS

TI
SOV

M1

IAS

8. PI-0903A TO BE VISIBLE FROM THIS VALVE.

FROM TRAIN # B
NOTE-6

2"

PSLL-0902A

SOV

DWG NO. 1109

NOTE-12

ESD

50 mm HOT

PI
0907

10"-P-E1-1072A

FROM

0901A
ZSO
0901A

CS0

V/F
AT

7. DELETED.

10"-P-E1-1072B

0902A

LSHH-0903A

H
ZSC

3/4"

FOR SOV ASSEMBLY DETAILS.

DEW POINT

1.5"x3"

E1

3/4"

2"x3"

NOTE-5

0901A

E1

A1

6. REFER NOTE-42 OF LEGEND P&ID No. 3713-00-02-41-0110/0111

H2 O

TO LP FLARE

CS0

FOR SOV ASSEMBLY DETAILS.

0902A

DWG NO. 1135

NOTE-10

CS0

A1

5. REFER NOTE-41 OF LEGEND P&ID No. 3713-00-02-41-0110/0111


AAH

AI

0901A

PSV

4. DELETED.

0902A

3"-P-E1-1113A

2"-P-E1-1143A

10"-P-E1-1040B

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

A1

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

INST. DRAIN
SS TUBING

3/4"

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

TO CDH

2"-DH-A1-2235A

Project name:

B
DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

E1

14000

2"x6"

3. DELETED.

6"-FL-A1-2436A

2"x1"
E17

TI

CASE

2"x6"

2. DELETED.

1500 mm

1"

1.5"x3"
3"-P-E1-1114A

E17

ZIO

1.5D2

FIRE

3"-P-E1-1115A

PSV
0901A

0901A

6"-SV-A1-2526A

CASE

0908A

ZIC

16"-P-E1-1076

14000

FIRE

A17

16"-P-E1-1040

1. DELETED.

1"-FL-A1-2446A

1.5D2

TAL

0901A

DWG NO. 1135

6"-SV-A1-2525A

TT

TI
0908A

E2

65 C

6"-FL-A1-2415A

TO LT FLARE

2"-P-A17-1143A

DESIGN TEMP.

LP FLARE

1400 mm (ID) X 7900 mm (T/T)


14000 kPa (g)

TO HP FLARE

GLYCOL CONTACTOR

SIZE
DESIGN PRESS.

NOTES

ITEM NAME
DWG NO. 1135

10

11

1-T-311A
DWG NO. 1135

ITEM No

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

GAS DEHYDRATOR FACILITY TRAIN # A

Document title:

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131009

16

15

TUBE

250

250

DES. PRESSURE kPa(g)

350

700

1-E-318A

STRIPPING COLUMN

OVERHEAD CONDENSER

2621 F/F x 305 DIA

2330 F/F X 400 I/DIA

250

1-V-314A
STILL COLUMN

2725 F/F x 305 I/DIA.

250

FULL VACUUM /350

10

11

1-V-313A

FIRED HEATER BURNER

NOTE-2

450KW

1010A

VENT

1010A

6"-SV-A1-2570A-IS

1006A

TP4

4"-FL-A1-2439A-IH

1 1/2" H 3"

NOTE-1

PSV
350

TP1

2"

FLASH DRUM

4"

CSO
FB

C1136-RSL-PID-003

DWG NO. 1009

FAN

PURGE

RUNNING

COMPLETE

ON/OFF

XI

XI

XI

1005A

1006A

1007A

H 75mm

1004A

PILOT

BURNER

PROVEN

SHUTDOWN

1-E-318A
TIC
1001A

I
LY

DWG NO. 1210

XI
1009A

PALL-1017A
PALL-1012A

1005A

2"x1"

2"

2"x1"

2"-GL-A2-8247A-IH

DWG NO. 1210

NO POCKETS

FC
NC

1"

2"x1"

3/4"

H 75mm

1"

3/4"

2"x1"

400 C

PAH-1015A

30 kPa (g)
0 kPa (g)

TAH-1001A

215 C

TAL-1001A

195 C

FAH-1001A

11 m3/HR

FAL-1001A

9 m3/HR

ZIC

ZIO

1001A

1001A

TY
1001A

1015A

2"-FG-A1-6378A-IH

PAH
PAL

NOTE-4

FROM

TRIP FAN

FF

6"

PALL

ZIO

ZIO

ZIC

1004A

1002A

1002A

1017A
SOV

NOTE-4
PAHH

2"
H 100mm

NOTE-4

ZSC
1002A

NOTE-3

SET

ZSC

1020A

PCV
1001A

3"

TT

3"

1002A

FC

1 1/2"

1 1/2"
XV
1004A
SOV

TI

DWG NO. 1310

1003A

H 75mm

3/4"
S

1-V-313A

1-E-314A

2"
2"

2"-GL-A2-8241A-IH

FI
TI
1003A

1001A

PI

3/4"

3/4"

2"x1"

1001A

2"x1"

IGN
TRX

FAL

1003A

ZSO

ZSC

1002A

1003A

1003A

PCV
1013A

ELECTRODE

FIT

1"

A/S

SET

FC

1 1/2"

PCV

220VAC

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

1011A

XV

SUPPLY

Date

Description of revision

DD-MM-YY

Company;

1003A

TRANSFORMER
PI

FC

FC

3/4"

3/4"

VIETSOVPETRO

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

3/4"

Worley

Basic Engineering:

1"

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

TO GLYCOL

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

FLASH VESSEL

2"-FG-A1-6377A-IH

Company's contract No.:

SCALE

Type of document

CCP-WT/95

TO DRAIN SYSTEM

2"-DH-A1-2237A

DWG NO. 1210

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

1 1/2"-FG-A1-6376A

DWG NO. 1210

EIL

CONSORTIUM

Contractor:

1023A

NOTE-4

EIL

ISH

PETECHIM/VIETSOPETRO

IGNITION

1001A

1"

@ 30kPa(g)

@ 0.5kPa(g)

SPARK IGN

2"
2"x1"

1003A

FC

1 1/2"

BE

FAH

ZIC

1"

NOTE-3

1007A
ZIO

FC

1 1/2"x1"

FC

LALL
1008A

TO GLYCOL

2"-GL-A2-8242A-IS

PI
1019A

1002A

1 1/2"x1"

TRIP XV-1001A

LSLL
1008A

SET

PSLL
1012A
XV

1002

1 1/2"

LG
1009A

PSLL-1017A

A/S

@ 10kPa(g)

PI

PCV
1012A

1 1/2"

M1

1012A

NOTE-4

SET

@ 1kPa(g)

1004A
1021A

1001A
TAHH

MIN

SOV

PALL

1002A

PSHH
TT

LAHH
1012A

ZSO
1002A

A/S

1004A

TRIP XV-0903A

LSHH

ZSO
1004A

1002A

TSHH

H 75mm

ZIC

1021A

1-X-312A

1004A

1012A

NOTE-3

PT
1015A

1-E-314A

NOTE-5

LSLL-1008A

1-X-312A

PI

1-E-316A

TV
1001A
PB

1014A

ZSO
1001A

1004

PSLL

PI

ZSC
1001A

STOP

1017A

3/4"

TAHH-1010A

PAL-1015A

2"x1 1/2"

2"-GL-A2-8231A-IH

BTL

1.3 kPa (g)


0.2 kPa (g)
1.15 kPa (g)

1 1/2"-FG-A1-6320A

2"

3"-GL-A2-8243A-IS

TI

LV

BTL

FROM

230 C

PAHH-1021A

H
I

TAL

1-V-314A

1001A

CHARCOAL FILTER

ACCUMULATOR

FROM

mm

1001A

FROM GLYCOL

TAH

XI
1008A

POINT
mm

1305

TAHH-1002A

DWG NO. 1310

XI

SET
1700

LALL-1008A

FLASH DRUM

COND.

HEALTHY

NO.

LAHH-1012A

FROM GLYCOL

ACCUMULATOR

(BALANCE LINE)

FROM LIC-1001A

TAG.

DWG NO. 1210

3"-GL-A2-8244A-IH

INTERLOCKS

TUBING

TO/FROM GLYCOL

3/4"

PRIMARY

INSTRUMENT

C1136-RSL-PID-002

4"-FL-A1-2414A-IS

3"

TSHH-1010A

P&ID NO. C1136-RSL-PID-001

3/4"

2"

3/4"

2"-GL-A2-8220A-IH

AND

REFER READ SYSTEM LTD.

3/4"-FG-A1-6375A

2"-GL-A8-8201A-IH

TO GLYCOL

CONDENSER

LOCATION.

TP5

3"x1 1/2"

DWG NO. 1210

OVERHEAD

SAFE

4. CLOSE VALVES XV-1004A,XV-1002A AND XV-1003A.

6"x3"

FB

3/4"

2"-GL-A2-8201A

CSO

4"

LO

FROM

TO

BE-1001A

DWG NO. 1135

5.

DWG NO. 1135

TO LP PLARE

VISIBLE

2.

LP FLARE
TAHH

1010A

TP12

3"

CONTACTOR

FROM GLYCOL

NOTE-4

TSHH

TI

2"-GL-A2-8240A

1.

3. FROM PSLL-1012A,PSHH-1021A,PSLL-1017A,TSHH-1002A

VF
TT

NOTE:

FLOW 1444 m3/h

14

FULL VACUUM /350

AIR BLOWER

730KW

250

1006A

1-X-312A
500

6730 T/L TO F/F x 2000 I/DIA

FULL VACUUM /350

1-X-311A

GLYCOL REGENERATOR

2150

FULL VACUUM /350

1-E-314A

6"-FL-A1-2414A

4"-FL-A1-2439A

SHELL
DES. TEMPERATURE C

12

13

14

1-E-316A
LEAN/RICH GLYCOL HEAT EXCHANGER
2x336 I/DIA x 4070 T/T

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

2"-FG-A1-6320A
TP7

Rev.

Path\File name\Initials:
FROM LP FUEL GAS

HEADER

16

15

14

13

12

11

10

Document title:

GAS DEHYDRATION UNIT TRAIN-"A"

Company's document No.:

DWG NO. 1134

Path\File name\Initials:
4

DISTRIBUTION CODE:

Page(s)
37131010

15

DWG NO. 1135

DESIGN TEMP.

HP FLARE

DESIGN PRESS.

DWG NO. 1135

ITEM NAME:
LP FLARE

12

13

14

1-PK-261 (NOTE-6)
PIPELINE GAS METERING

14000 KPa (g)


65 C

10

11

1-PK-262
(NOTE-6)
GASLIFT GAS METERING

1"-FL-A1-2427

16

ITEM No.:

2"-FL-A17-2467

14000 KPa (g)

A17
E17

65C

1101

NOTE-11

SS TUBING

FOR SOV ASSEMBLY DETAILS.

LC

1"

FAL

6. ALL ITEMS SHALL BE SUPPLIED LOOSE BY METERING VENDOR FOR


ASSEMBLY BY SH1.

ESD

PSHH-1106

LSS

PSLL-1107

1101

7. REFER NOTE-44 ON P&ID 3713-00-02-41-0111 FOR TYPICAL


DETAIL OF CORROSION INHIBITOR POINT.

SOV
1101

FE

3/4"
1"-P-E1-1012

1101

L
FT

PT

TT

TI

PI

1101

1120

1103

1104

1121

FX

FROM GAS
CHROMA-

16"x10"

1101

TOGRAPH

FQ

FI

1101

1101

PAH

PI
1105

FE

16"x10"

PT

TT

TI

PI

1122

1105

1106

1123

1101

XV

ZSC

ZSO

1101

1101

1101

9. PT-1101 DUPLICATED IN DCS TO PIC-1102.

PV

PT

PI

1101

1105

1107

FC

3/4"

3/4"

CLOSE
XV-1101

FROM FIC-1101.

PIPELINE EXPORT GAS


TO RISER PLATFORM

PSHH

PSLL

1106

1107

11. PROVIDE 0.5M DISTANCE BETWEEN XBDV-1104 AND RO-1101.

NOTE-1
DWG NO. 1133

NOTE-7

NO

FC

CLOSE

12. PROVIDE 0.5M DISTANCE BETWEEN XBDV-1105

AND RO-1102

13. PROVIDE 0.5M DISTANCE BETWEEN XBDV-1106

AND RO-1103

PIPING
INST.

4"-P-E1-1085

TRIP PUMPS

PAHH

PALL

TRIP PUMPS

1-P-231A/B/C

1106

1107

1-P-231A/B/C

TAG NO:

1"-FL-A1-2429

HP FLARE

DWG NO. 1135

PAL-1105
PAHH-1106
PALL-1107

1"-C-E1-8104

DWG NO. 1148

PAH-1114
PAL-1114
PAHH-1115

METHANOL
12mm SS TUBING

PALL-1116

DWG NO. 1150

PAHH-1118

A1
E1

PALL-1119

REFER
PIC

DETAIL-A

NOTE-9

NOTE-3
ESD
PSHH-1115

FE
1103

FAH

FIC

FT

PT

TT

TI

PI

1103

1124

1107

1108

1125

1102

NO

FAL

NO

FX

FROM GAS
CHROMA-

1102

TOGRAPH

12"-P-E1-1077

FQ

FI

1102

1102

12"x10"

FY

PI

1102

1114

PAH
IAS

10"

3/4"

PT

PI

1114

1111

FC

3/4"

NC
FE

FT

PT

TT

TI

PI

1104

1126

1109

1110

1127

NOTE-3

ZIO
1102

XV

ZSC

ZSO

1102

1102

1102

1"

PSLL

PSHH

1116

1115

PALL

PAHH

SOV

XBDV

1116

1115

1105

1105

CLOSE

PIPING

CSC 2"

XV-1102

10"-P-E1-1077

ESD

INST.

FO

IAS

E1
E17
RO

PSHH-1118

1102

PSLL-1119

1103
S

FROM FT

FROM PT

FROM TT

NOTE-3

ZIC

ZIO

1103

1103

XV

ZSC

ZSO

1103

1103

1103

TO 1-PK-266
CLOSE

TO 1-PK-262

LIFT GAS

PSHH

PSLL

1118

1119

CLOSE
XV-1103

AC

PH

JUY

LOC

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

FROM FT

1106

1106

PALL

1118

1119

10.19

CSO

LOW TEMP. FLARE

3"-FL-A17-2469

DWG NO. 1135

DWG NO. 1148

METHANOL
12mm SS TUBING

DWG NO. 1150

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CORROSION INHIBITOR

10

COMPANY

ENGINEERS INDIA LIMITED

E17

1"-C-E1-8115

11

EIL

CONSORTIUM

Basic Engineering:

E1

2'x3"

EIL

PETECHIM/VIETSOPETRO

NEW DELHI - INDIA

FO

IAS

A17

NNF

Description of revision

DD-MM-YY

Company;

Detailed Engineering:

NOTE-13

S
PAHH

Date

ISH

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

CSO

E17

12

SDH

MSP

7.2.96

VIETSOVPETRO

XBDV

DETAIL-'A'

13

SA

APPROVED FOR CONSTRUCTION

2"-FL-E1-2469

1103

14

REVISRD AS MARKED

20.3.96

Contractor:

15

AS - BUILT

20.11.96

ESD

CSC 2"

RO

16

14.3.97

Rev.

DWG NO. 1133

SOV

FROM PT

TO 1-PK-267

XV-1103

FROM TT

FROM 1-PK-267

DWG NO. 1135

TO RISER PLATFORM

FC

TO 1-PK-261

2"-FL-A17-2468

A17

12"-P-E1-1079

FROM 1-PK-261

LOW TEMP. FLARE

CSO

E17

IAS

GAS
CHROMATOGRAPH

5.10

SOV

NOTE-6

ESD

FROM 1-PK-262

F
VENDOR

NOTE-12

NOTE-3

FROM 1-PK-266

CSO

3/4"

VENT TO SAFE HEIGHT

3.5 MMNCMD

DWG NO. 1133


FC

CLOSE

NO

3/4"

4.5 MMNCMD

FAL-1102

TO RISER PLATFORM

NOTE-7

10"

3/4"-C-E1-8123

12900 kPa(g)
11000 kPa(g)

FAH-1102

LIFT GAS

NOTE-8

XV-1102

1104

3.5 MMNCMD

PAH-1101

LEGEND:

FV
1102

LC

ZIC
1102

12"-P-E1-1077

12"x10"

4.5 MMNCMD

FAL-1101

PAL

NOTE-4

NOTE-10

12"x10"

1"-FL-E1-2430

12"x10"

SOV
1102

SS
1102

FAH-1101

PAL-1101

PSLL-1116

10"-P-E1-1083

1"-P-E1-1013
DWG NO. 1009

1102

1"

kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)

2"-FL-E1-2468

SS TUBING

LC

3/4"

12800
11000
13100
10000
12800
11000
13100
10000
13100
10000

PAH-1105

CORROSION INHIBITOR

NNF

SET POINT

DWG NO. 1012

3/4"

CONDENSATE
FROM METERING

3/4"

CSC 2"

XV-1101

3/4"-C-E1-8122

IS OUT OF SERVICE OR WHEN PV-1101 IS CONFIGURED FOR CONTROL

NOTE-8

12"

10"-P-E1-1076

10. MANUAL SELECTOR PIC-1102 TO BE USED WHEN EXPORT PIPELINE


NOTE-3

16"-P-E1-1076

16"x10"

1102

1101

PAL

12"

1"

FT
1102

ZIO

NOTE-4

LC
NC

8. CHECK VALVES TO BE CLOSE TO XV-1101 & XV-1102 RESPECTIVELY.

ZIC

IAS

1101

NO

16"-P-E1-1076

PY

NO

16"x10"

5. DELETED.

CSO

ESD

FAH

FIC
1101

RESPECTIVE SHUTDOWN VALVES.

XBDV
1104

1104

NOTE-3

10"-P-E1-1078

4. LOCATE CV ASSEMBLY AS CLOSE AS POSSIBLE TO THE

FO

SOV

PAL

MIN.

DWG NO. 1009

PIC

1"-FL-E1-2428

1"-FL-A1-2435

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

FROM 1-T-311 A/B

PAH

1101

3. REFER NOTE-40 OF LEGEND P&ID NO. 3713-00-02-41-0110/0111

6.58

E1
S

FROM PT-1101

DETAIL-A

1. CONDENSATE CONNECTION TO BE FROM TOP.

E17
IAS

REFER

DWG NO. 1135

CSO

RO

A1

DWG NO. 1009

NOTES:

2. DELETED.

E1

LOW TEMP. FLARE

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
Document title:

GAS METERING SKID & GASLIFT METERING SKID

Company's document No.:


Path\File name\Initials:
DISTRIBUTION CODE:

Page(s)
37131011

15

12

13

14

1210

4"-P-E1-1064

V/F
K

PDIS

1201

1201

OPEN

MOV

CASE

ZSO
1201

NOTE-7,8

ZIC

ZIO

1202

1202

CASE

3/4X1

3/4X1

14000

1650

1-P-231A/B/C

PSV

1202

MOV

1"

ZSO
1202

3"x4"

4"-P-E1-1086

2"x3"

1213

2"

1"

2"

FT
1201

PT

1204

1201

TW

ACTUAL CORRECTED

1201

FI

FQ

FI

1205

PT

PT
1205

1201

1201

1201

DI

TT
1202

OPEN

PI

1201

1201

ZIC

ZIO

ZIC

ZIO

1203

1203

1204

1204

ZSC

ZSO

ZSC

ZSO

1203

1203

1204

1204

OPEN
CLOSE

FQ

FI

1204

1204

1204

CLOSE MOV-1206
OPEN MOV-1214

START PROVING

DI

TT
1205

ZIC

1208

1208

1204

OPEN

1208
ZSO

ZSC

1208

1208
M

C) SELECTOR SWITH TO "STANDBY"


OPEN MOV-1205
OPEN MOV-1211
CLOSE MOV-1210
CLOSE MOV-1214
CLOSE MOV-1207

ZIO

ZIC

1209

1209

1209

MOV

ZSO

ZSC

1208

1209

1209

D) NO MOV SHOULD ACTUATE

CLOSE

IF THE PRIOR VALVE IN THE SEQUENCE HAS

NOT REACHED ITS CORRECT POSITION. THE LIMIT SWITCHES SHALL BE


USED IN THE INTERLOCK TO VERIFY THIS.

MOV
1209

6. MINIMISE DISTANCE OF MOV'S FROM METER PROVER CONNECTION.

NOTE-7,8

NOTE-7,8

CLOSE MOV-1206
OPEN
PB

CLOSE

3/4"x2"

4"-P-E1-1086

CLOSE MOV-1211
LINEUP PT-1203B

1204

PB

3"x2"

4"-P-E1-1085

7. AUTO CHANGEOVER OF METERING RUNS IS REQUIRED THROUGH A SINGLE

3/4"x2"

SELECTOR SWITCH OFFERING SELECTION OF RUN-1 OR RUN-2 FROM DCS.

MOV'S FOR THE METERING RUN BEING BROUGHT ON-LINE SHOULD BE

4"x3"

OPENED PRIOR TO CLOSURE OF MOV'S OF THE METERING RUN BEING TAKEN

3/4"-DH-A1-2242

TO CDH

DWG NO. 1137

A1

FY
1203
TO CDH

E1

1-PK-263

DWG NO. 1137

3/4"-DH-A1-2247

TO CDH

DWG NO. 1137

A1

FI

CLOSE MOV-1207
OPEN MOV-1210

1205

TT

1204
M

3"x4"

OPEN MOV-1205

TW

1204

ZIO

PB

MOV

1203

E1

B) SELECTOR SWITH TO "BLACK CONDENSATE PROVING"

PI

1204

NOTE-7,8

CLOSE MOV-1205
LINEUP PT-1203A

TI

1203

MOV

1205

1204

TI

PB

CLOSE

NOTE-7,8

3/4"

OPEN MOV-1207

1209

1204

ACTUAL CORRECTED

1202

1201

CLOSE MOV-1214
OPEN MOV-1206

PI

TW
1204

TT

OPEN MOV-1211

FE

FY

PI
1208

3"x2"

1204

TW

1201

INTERLOCK SEQUENCE SHALL BE PROVIDED IN THE DCS.

3/4"

START PROVING

1207

1201

CSO

CLOSE MOV-1210

1204

PI

FY

1206

SHALL BE PROVIDED ON THE SSD PANEL THE FOLLOWING

A) SELECTOR SWITCH TO "WHITE CONDENSATE PROVING"

1202

CSO

3/4"x2"

PT

PI

264B

1"

TO CDH

263A

CSO

2648

1212

2"-P-A1-1090

FT

3/4"

FT

1202

PSV
POIS

a/ WHITE CONDENSATE PROVING


b/ BLACK CONDENSATE PROVING &
c/ STANDBY

1650

NOTE-7,8

MOV

FT

1204

ASSEMBLY BY 'SHI'.
5. A SELECTOR SWITH WITH 3 POSITIONS-

CLOSE

1202

1212

4. ALL ITEMS SHALL BE SUPPLIED LOOSE BY METERING VENDOR FOR

3/4X1

FT

1201

1212

DWG NO. 1007

2"-P-A1-1089

1205
FE

FE

1201

PSV

FT

ZSC

3. DELETED.

FROM 1-P-233A/B

FIRE
CASE

OPEN
PB

FT

FT

ZSO

3/4"x2"

ZIC
1212

1212

NOTE-7,8
MOV

1213

PDIS

ZIO
1212

CLOSE

1213

264A

1202
FE

8. AUTO/MANUAL SELECTOR FOR EACH MOV IN THE DCS.

TAG NO:

SET POINT

10000 kPa(g)

PSLL-1210

1207

E1

3/4"-FL-A1-2472

PANEL

ZIO
1207

ACTUAL CORRECTED

DWG NO. 1135

A1

CONTROL

DI

FI

FQ

FI

1203

1203

1203

1203

LEGEND:

VENDOR

PI

( NOTE-4)

1203

NOTE-5,8

MOV

PB
ZSC

1207
ZIO

ZSO

1205

1205

CSO

1201

4"x8"

1205

1205

OPEN

PB

CLOSE

1205

NOTE-5,8

1206

ZIO

ZSO

1214

1214

ZIC

ZSC

1214

1214

MOV

NOTE-5,8

MOV

PB
1206
ZSC

1206

1206

ZSO

NOTE-5,8

ZSO

1210

1210

ZIC

ZSC

1210

1210

LV

I/P

0702

OPEN

PB

CLOSE

1210

FROM LIC-0702

OPEN

A1

CLOSE

LV

TO CPP2
DWG NO. 1133

NOTE-5,8

0702

BLACK CONDENSATE

3"-P-A1-1090

3"x2"

2"x4"

MOV

2"

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

PACKAGE

10.1.96

APPROVED FOR ENGG.

MSP

GRR

FOR DETAILS REFER

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

P&ID NO.
E1

SO-21022-POR OF

A1

PECO/BROOKS

MOV

ZIO
1211

Rev.

4"x2"

PB

1211

1211

VIETSOVPETRO

NOTE-5,8

2"-P-A1-1090-IS

10

SCALE

Type of document

CCP-WT/95

FROM 1-V-211 A/B


DWG NO. 1001

DWG NO. 1117


FROM TPS

11

Limited

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

2"-P-A1-1099

12

Worley

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

13

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

FROM LP FLARE K.O.D

14

COMPANY

CONSORTIUM

Basic Engineering:

2"-P-A1-1094

15

EIL

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

2"-P-A1-1024

16

EIL

ISH

PETECHIM/VIETSOPETRO

Contractor:

1211
ZSO

Description of revision

DD-MM-YY

Company;

1/2"x3/4"

A1

ZSC

Date

E1

4"x2"

3/4"

1203

1-PK-265

1211

1211

2"x4"
FC

3/4"

MOV
1210

1"

NOTE-6

NOTE-6

E1

VENDOR FURNISHED

NOTE-6

ZIC

DWG NO. 1007

METER PROVER

1214

4"-P-E1-1088

ZIO

2"-P-E1-1092

4"-P-A1-1170

PB
1214

1206

CSO

INJECTION INTO PIPELINE

4"-P-E1-1085

OPEN
CLOSE

V/F

TI

4"x2"

ZIO
1206

ZSO
1203

TT
1203

NOTE-6

OPEN

3/4"

DWG NO. 1011

V/F

ZSO
1207

ZSC
1203

4"-P-E1-1087

ZIC

1205

CONDENSATE

1207
M

CLOSE

3"x4"

1203B

TO CDH

PSV

ZSC

1203A

DWG NO. 1137

1500

ZIC

1/2"x3/4"

PT

3K4

PT

1207

CLOSE

V/F

2"-P-A1-1084

DWG NO. 1135

HP FLARE

OPEN

3/4"-DH-A1-2245

OFF-LINE.

LP FLARE

ZIC

8"-FL-A1-2471

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

OPEN

ZSC

1213

CSO

CSO

4"x3"

1213
PB

3/4"

4"-P-E1-1085

V/F

ZIC

1213

1202
M

3/4X1

3/4"

ZIO

264A

ZSO

2638

BLACK CONDENSATE

2"-P-A1-1058-IS

1"

PDIS

ZSC
1202

14000

CSO

CSO

263B

2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.

1202

PSV

CSO

PB

CLOSE

ZSC
1201

1201

2"x3"

CASE

ZIO

1201

CLOSE

263A

FIRE

ZIC

PB

OPEN

NOTE-7,8

1210

TRIP

1. DELETED.

120C

DT

DWG NO. 1137

DWG NO. 1008

NOTES:

1600 KPa (g)


V/F
FIRE

1-PK-264

FIRE

PALL

PSLL

1201

FROM 1-P-231A/B

BLACK CONDENSATE METERING

65C

V/F

DT

14000 KPa (g)

DESIGN PRESS.
DESIGN TEMP.

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

3/4"-DH-A1-2243

10

11

1-PK-263
WHITE CONDENSATE METERING

ITEM NAME:

3/4"-DH-A1-2244

16

ITEM No.:

DWG NO. 1124

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
Document title:

CONDENSATE METERING FACILITY

Company's document No.:


Path\File name\Initials:
DISTRIBUTION CODE:

Page(s)
37131012

16

15

12

13

14

H"-SV-A1-2555

K
HOLD
PSV

LO

1301

1.

CONDENSATE SURGE DRUM

CLOSE

PAHH

PAH

XV-0302A/B/C/D/E

PAL

No.

3713-00-02-41-0110&

FOR

GENERAL

NOTES.

I/P
PY

PIC

1305

1305

PSV

LO

1302
PI

1304

PV

PT

PSHH

1305

1305

2"

3/4"
LC

TO HP FLARE

H"-P-A1-1141

H"-P-A1-1142

P&ID

1304

LO

LEGEND

900 mm ID X 2650 mm T/T


DP: 1500 kPa (g) DT: 65 C

1303

REFER

3713-00-02-41-0111

HOLD

3/4"

NOTES:

HP INLET SCRUBBER

H"-FL-A1-2461

TO HP FLARE

SIZE

DESIGN PRESS./DESIGN TEMP.

DWG NO. 1135

ITEM NAME

1-V-233

H"-SV-A1-2556

10

11

ITEM No

2"-P-A1-1139

2"-P-A1-1139

3/4"

FC

DWG NO. 1135

3/4"

2"

H"-P-A1-1140
VENT
FROM 1-V-251A

2"
2"-P-A1-1029A

I
FROM 1-V-251B
DWG NO. 1103

2"-P-A1-1029B
2"-P-A1-1135

FROM 1-V-251C
DWG NO. 1203

2"-P-A1-1029C

FROM 1-V-251D

DWG NO. 1303

2"-P-A1-1029D

H
CLOSE

XV-0302A/B/C/D/E

FROM 1-V-251E
DWG NO. 1403

2"-P-A1-1029E

LSHH

LAHH

(FUTURE)

2"

1-V-233

1303

1303

G
(FUTURE)

2"

LG

LT

1301

1302

LIC
1302

1304

1304

LAL

M
1.5"-P-A1-1144

TRIP

1-P-232 A/B

LAH

LSLL

LALL

FV

FROM

1301

LSHH-0807
HOLD:

PSHH-0805

PSV-1301/1302 SIZE.
PSV INLET/OUTLET LINE SIZE.

I/P

3/4"
1.5"

3/4"

LY

SOV

ZIC

ZIO

LV-1302

SIZE.

1302

1301

1301

1301

FV-1302

SIZE.

ZSC

ZSO

CMR
S

IAS
A1 B1
LV

FT

FE

XV

1302

1301

1301

1301

1301

1301

TO 1-V-232

2"-P-B1-1134

2"-P-A1-1138

2"-P-B1-1134

FC

2"

3/4"

DWG NO. 1008

FC

2"-P-B1-1136

3/4"

I/P
FY
1301

FAL

FC

L
D

FIC
1302

2"-P-A1-1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

DWG NO. 1003

14.3.97

AS - BUILT

20.3.96

APPROVED FOR CONSTRUCTION

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

10.1.96

APPROVED FOR ENGG

MSP

GRR

29.12.95

ISSUED FOR COMPANY'S APPROVAL

MSP

GRR

EIL

EIL

Rev.

Date

Description of revision

DD-MM-YY

Company;
PI

3/4"

1302

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

PI

3/4"

1301

JUY

PH

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

3/4"

3/4"
FROM
LSLL-1304

FROM
LSLL-1304

LSHH-0807

LSHH-0807

PSHH-0805

PSHH-0805

Worley

Basic Engineering:

XI

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

NOTE-2

XI
1301

Detailed Engineering:

3/4"

3/4"

NOTE-2

1302

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

1-P-232A/B

HP INLET SCRUBBER

COND. TRANSFER PUMPS


CAPACITY

DIFF. PRESS

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Document title:

: 3120 kPa

Path\File name\Initials:
15

14

13

12

11

10

Path\File name\Initials:

: 6.75 m3/hr

HP INLET SCRUBBER CONDENSATE HANDLING

Company's document No.:

16

Rev.

DISTRIBUTION CODE:

Page(s)
37131013

16

15

12

13

14

ITEM NAME

DESIGN TEMP.

NOTES:

1. QUICK CLOSING VALVE AT SKID EDGE.

VENDOR
VENDOR

2. PIPES ARE ACID CLEANED.

VENDOR

130C

FILTER-COALESCER

1.73 MMKJ/HR (481 KW)


10.8 kPa (g)

DESIGN PRESS.

FSA-901A

LUBE OIL COOLER

DUTY

10

11

1-LC-252A (HX901-1)

ITEM NO.

3. USE HOSE AND PNEUMATIC TRANSFER PUMP


TO COLLECT LUBE OIL IN DRUMS.

VENT TO
SAFE LOCATION

TAG NO.

SET POINT

VAHH-5601A

V/F

PDI

3/4"-VG-A1-2645A

*
3.0

901A

RO
5601A

PDI-903A(MAX)

FA-901A
FLA

903A

V/F

8"-VG-A1-2638A

A1

RT

33

34

149291

149291

SHT 6

SHT 6

FROM D-R
149291
SHT 6

149291

149770

SHT 6

SHT 2
149770

586A

FE-930A

3"-FG-B1-6330-IE

DWG NO. 1134

NOTE-2

INTERFACE

B149370

20

317-962
SHT 1

PT

V/F

586A

DWG NO. 1003

CENTRIFUGAL

TURBINE

(TR586)

TO 1-K-253A UCP

FG. FILOT VENT

SEAL VENT

SEAL VENT

2"-VG-A1-2642A

Z3

(TPO586)

2"-VG-A1-2641A

T3

586A

TO 1-K-253A UCP

2"-VG-A1-2646A

W3

COMPRESSOR

317-962
SHT 2

2"-VG-A1-2640A

V3

PDT

V/F

SHT 3

V/F

SHT 2

HP COMPRESSOR TRAIN- 'A'

NOTE-1

FUEL GAS

SEAL VENT

DUCT

PACKACE

EXHAUST

AIR/GAS VENT

AIR
INTAKE
DUCT

SEAL VENT

8"-VG-A1-2638A

LUBE OIL VENT

5601A

(RT586)

2"-VG-A1-2647A

U3

DWG NO. 1003

2"-VG-A1-2648A

AA3
AE3

INST. AIR

1"x1/2"

1"-A1-A3-5116A

DWG NO. 1140

K3

317-962

B149370

SHT-1

SHT 3

1"-VG-A1-2649A

30

F
START-UP

REFER SOLAR P&ID's:

SEAL GAS

2"-FG-E1-6366

126

ODD

(FUTURE)

B149770

B149770

SHT 2

SHT 2

D1

F1

A1

A1

1"

SHT 6

V/F

WATER
WASH
CONN.

2"

2"

VENDOR FURNISHED

126
VENDOR

26

19/1

21

H3

2"

NOTE-3

COOLER

VENDOR

(SOLAR)

(SOLAR)

FURNISHED

2"

G3

2"-DW-A1-2316A

65

COMBUSTOR DRAINS

1"-DH-A1-2264A

ODD

SEAL GAS HEATER

CONDENSATE DRAIN

DWG NO. 1456

1"-P-E1-1160E

1/4"x3/4"

TRAIN-E

SHT 3

22

1"-DW-A1-2256A

TO HP COMPR.

B149471

SHT 2

EXHAUST COLLECTOR &

DWG NO. 1356

164

HP. CASING DRAIN

2"
1"-P-E1-1160D

64

LUBE OIL DRAIN

TRAIN-D

54

LUBE OIL DRAIN

1"-P-E1-1160C

TO HP COMPR.

B149770

SHT 6

AG3

1"-DH-A1-2266A

DWG NO. 1256

E
LEGEND:

B149291

149291

126

2"-DW-A1-2351A

TRAIN-C

V/F

1"-C-A3-8138A (EXTENDED)

98

126

LP. CASING DRAIN

1"-P-E1-1160B

TO HP COMPR.

(MAIN)

CO2 SYSTEM

SHT 5

317-962 SHT 1-3. (GAS SEAL SYSTEM)

1/4"

TRAIN-B
DWG NO. 1156

1.5"-C-A3-8137A

97
149746

REFER DRESSER-RAND P&ID's:

2"-DH-A1-2268A

TO HP COMPR.

SHT-1

RESERVOIR DRAIN

2"-P-E1-1160

317-962

1"-DH-A1-2265A

DWG NO. 1005

J3

HYDRAULIC STARTER

1"-P-E1-1160A

SEAL GAS

49901-B149370 SHT 1-3. (FUEL GAS SYSTEM)


49901-149291 SHT 1-6. (LUBE OIL SYSTEM)
49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN)
49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM)
49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)

(FUTURE)

AIR INLET DUCT DRAIN

LC

LUBE OIL FILTER DRAIN

B1 E1

1"-DW-A1-2267A

DWG NO. 1131

2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

VF

FSA-901A

6"x4"

VSHH

VAHH
5601A

4"-LO-A10-9501A

6"x4"

LUBE OIL TANK VENT

4"-LO-A10-9501A

4"-VG-A1-2639A

MOTOR S/D

V/F

A10 NOTE-2

1-LC-252A

AIR/GAS VENT

NOTE-2

LUBE OIL
TANK DRAIN

14.3.97

AS - BUILT

18.10.96

REVISRD AS MARKED

20.3.96

APPROVED FOR CONSTRUCTION

Rev.

Date

Company;
ODD

ODD

SDH

SA

Description of revision

DD-MM-YY

ISH

MSP

AC

PH

JUY

EIL

EIL

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

ODD

ODD

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2269A

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

HP COMPRESSOR TRAIN-A INTERFACES

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131056

16

15

12

13

14

10

11

NOTES
1-V-251B

ITEM NO.:

1-AC-251B

H.P. INLET SCRUBBER

ITEM NAME:

H.P. INTERSTAGE COOLER

2110 mm(ID) x 3025 mm(T/T)


5500 kPa(g)

SIZE:
DESIGN PRESS :
DESIGN TEMP. :

DUTY: 25.936 MMKJ/Hr (7.204 MW)


5500 kPa(g)

180C

LINING :

180C

1.

UCP

2.

UIC

3.

EPOXY (INTERNAL)
FROM 1-P-356B
12MM SS TUBING

DWG NO. 1153

REFER

LEGEND

UNIT

CONTROL

ANTISURCE

P&ID

No.

3713-00-02-41-0110

&

3713-00-02-41-0111

FOR

4.

DELETED

5.

DELETED

6.

LOCATE

7.

DELETED

PANEL

CONTROLLER

NOTES.

1.5G2.5
5500
PSV
0301B

DWG NO. 1136

NOTE-8
TAH

TAH

TI

PALL

TI

0303B

0304B

TT

PSLL

TT

0301B

0303B

0304B

0301B

TAL

UCP

UCP

CSO

V/F

0311B

1.5G2.5

TIC

TSHH

SS

INST.

0307B

D1

PIPING

I/P

3/4"

0304B

PAL

A1

CSO

3/4"
CSC

2"
2"-P-D1-1066B

2"-P-D1-1067B

FT
0301B

PT
0306B

PSLL

PI

0312B

0309B

V/F

PI

TI

0305B

0303B

S/D

THIS

2"-P-D1-1051B
16"-P-D1-1017B

0303B

NOTE-9

0302B

TYPE.

BE

UTILISED

PSHH

PAHH

0308B

0308B

NO.

BY

SET

SOLAR

FOR

LUBE

OIL

PUMP

PAL-0304B
PALL-0307B

PB

PB

0301B

0302B

TAH-0306B

50

TAL-0306B

UCP

CONTROL

POINT

4400
750
900
800
2300

PAH-0304B

NOTE-9

SPEED

1-K-253B TRIP

WAFER

SHALL

TAG.

PALL
0307B

GOVERNOR

TOL

ROOM.

PALL-0303B

XI

8"-P-D1-1037B

10"x12"

12"x16"

FROM HP COMPRESSOR
SUCTION HEADER

PLATE

PSLL

XI

DWG NO. 1002

DUAL

13.

2"

ON

SYSTEM VENDOR REQUIREMENT.


12.

UCP
PSLL

CONTROL

PAHH-0308B

V/F

0307B

AVAILABLE

UCP.

FROM
VSHH-0302B

FROM
VSHH-0301B

UIC-0301B

TI

BE

0302B

PAL

NOTE-13

0305B

SHALL

COMPRESSOR

VAHH

0301B

PI
0306B

AS

10. USE 20 MESH PER VENDOR REQUIREMENT.

DWG NO. 1104

VAHH

PAH

V/F

PT
0310B

INDICATIONS

WELL

CONTROL

NOTE-8

V/F

THESE
AS

LOCAL

3/4"

VSHH

S/D

UCP

POINT.

9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN

0302B

MOTOR

16"-P-D1-1030B

D1

3/4"

PT

TAP-OFF

11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR

MOTOR 0301B

0304B

TO

NOTE-12

*
VSHH

V/F

PAH

TOL

1-AC-251B
3/4"

PIC

CLOSE

TO 1-V-252B

12"-P-D1-1031B-IS

16"-P-D1-1030B

TS

ALL
DCS

12"-P-D1-1032B

CSO

8.

TY

V/F

0302B

FV-0301B

DWG NO. 1104


TAL

0306B

NOTE-10

PSV

0306B

NOTE-11

ST-0301B

5500

FROM TT-0306B

TAH

I
PDI

FIRE
CASE

4"-SV-A1-2506B

TO HP FLARE

4"-SV-A1-2505B

FIRE
CASE

NOTE-8

4"-FL-A1-2406B

kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)

44

TAHH-0307B

170

LAH-0301B

400MM

FROM

BTL

LAL-0301B

200MM

FROM

BTL

LAHH-0304B

465MM

FROM

BTL

LALL-0303B

150MM

FROM

BTL

TAH-0301B

55

TAL-0301B

45

TAH-0304B

165

PAH-0306B

4250 kPa(g)
3200 kPa(g)

PAL-0306B

VAHH-0301B
LSHH

F
LAH

0301B

LAL

LT

LG

0301B

0302B

LIC

LAHH

0304B

1-V-251B

1-DGT-253B

V/F

0304B

1-K-253B

VAHH-0302B

PDI-0311B(MAX)

ST

ON 2nd STAGE
COMPR. DISCHARGE
BIAS

SIC

0303B

OVERRIDE

LSS

VENDOR'S SCOPE (SOLAR)

XV-0302B

I/P

LSLL-0303B

0302B

ZIO

0302B

0302B

XV

ZSO

ZSC

V/F

0301B

V/F

ZSO
0301B

CONTROL PANEL

FC

3/4"

PB
0306B

PB

2"-DH-A1-2201B

ESD SIGNAL

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

FO

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

4"

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

NORMAL
STOP

3/4"

METHANOL
12MM SS TUBING
NNF

FAST
STOP

D1

DWG NO. 1150

E1

Rev.

Date

Description of revision

DD-MM-YY

Company;

3/4"

XI

1-K-253B TRIP

PB

PB

0304B

0303B

START
MACHINE

ENGINEERS INDIA LIMITED

CLOSE

START
PRESSUR1SATION

UA

NEW DELHI - INDIA

XV-4601B, XV-0302B, XV-0401B, XV-0402B

Worley

Basic Engineering:

ON 1-K-253B TRIP

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

USD

0301B

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

0302B

COMMON

COMMON

ALARM

TRIP

M/C PARAMETER

Company's contract No.:

M/C PARAMETER

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

ITEM NO.:

1-DGT-253B

ITEM NAME:
A

1-K-253B

HP COMPRESSOR

CAPACITY :
DIFF. PR. :

HP COMPRESSOR

GAS TURBINE DRIVER

1st STAGE

15

14

13

12

11

10

Document title:

Rev.

HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'B')

Company's document No.:

3107 kPa

16

Path\File name\Initials:

75450 Nm3/hr (GUARANTEE)

9.219 MW

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

PLC-1 (NORMAL S/D)

SS TUBING

EIL

CONSORTIUM

Contractor:

0301B

V/F

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

1-K-253B
UCP

FROM PLC-1/2
(FAST STOP)
INST. DRAIN

PIPING INST.

TO COH

0305B

D1
A1

NC

COOLER VENDOR'S SCOPE OF SUPPLY

3/4"

2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)

V/F

SURGE CONTROL

DWG NO. 1003

3/4"

A1 D1

FV

0301B

FROM STATION

1"

V/F
*

LV

2"-P-D1-1029B
FC

UCP

0301B

0302B

DWG NO. 1136

0301B

FY

LY
0301B

0302B

ZIO

UCP

14"-P-D1-1037B

IAS
ZSC

0301B

NOTE-6

I/P

0302B

V/F

0301B

TO HP FLARE

CMR

V/F

CMR

ZIC
SOV
0301B

1-K-253B TRIP

UCP

CLOSE
FROM

LEGEND:

DWG NO. 1104

0304B

0301B

ZIC

kPa

FROM PIC-0410B

V/F

LALL

LSLL
0303B

SOV

20

0301B

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

TO

TO

TAHH
0307B

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

REFERS

REFERS

Path\File name\Initials:
8

DISTRIBUTION CODE:

Page(s)
37131103

16

15

12

13

14

ITEM NO.
ITEM NAME
L

SIZE :
DESIGN PRESS :
DESIGN TEMP :

10

11

180 C

H.P. DISCHARGE SCRUBBER


1122 mm (ID) X 2415 mm(T/T)
14000 kPa(g)

1. REFER LEGEND P&ID No.

3713-00-02-41-0110 &

EPOXY (INTERNAL)

EPOXY (INTERNAL)

TO 1-DGT-253B SPEED CONTROL

NOTES:

65 C

180 C

1-V-253B

1-AC-252B
H.P. DISCHARGE COOLER
DUTY: 22.236 MMKJ/H (6.177 MW)
14000 kPa(g)

LINING :

1-V-252B
H.P. INTERSTAGE SCRUBBER
1710 mm (ID)X 2750 mm(T/T)
8400 kPa(g)

3713-00-02-41-0111 FOR NOTES.

2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.

DWG NO. 1103

V/F

FY

FV

0401B

FO

70.99

0403B

NOTE-2

V/F

IS

NO POCKETS

NOTE-7

2J3
14000

3"
F1 E1

PSV

D1 F1

RO
0401B

CSO

4"-P-F1-1125B-IS

NNF

SS

F1

INST. PIPING
UCP

UCP

TAHH

PAHH

TI

0405B

0409B

0408B

TAH

FT
0402B

PSV
0401B

2"-P-D1-1044B

CSO

DWG NO. 1136

TAL

TT
0401B

NOTE-3

FIRE
CASE

2"-P-D1-1071B

1E2
8400

TAH

1E2
8400

PSV
0402B

CSO

PI

PAH

0401B

PAL

NOTE-5

PSHH

TT

FT

0409B

0408B

0401B

PID
0412B

3/4"

D1

2"

3/4"

FROM 1-AC-251B

12"-P-D1-1032B

TAL

PIPING

F1

INST.

SS

NO.

SET

PALL-0407B
PALL-0412B
VENT

CC
0402B

VSHH

FROM

0401B

8"-P-E1-1035B

VSHH-0401B

1-K-253B TRIP
VSHH

VSHH-0402B

1-V-253B

FROM

0402B

VAHH

PSLL

PB

0401B

0407B

0401B

MOTOR

NOTE-4

S/D

0402B

0402B

NOTE-4

35

TAHH-0409B

55

290

MM

FROM

BTL

LAL-0401B

130

MM

FROM

BTL

LAHH-0404B

774

MM

FROM

BTL

50

MM

FROM

BTL

LAHH-0408B

465

MM

FROM

BTL

LALL-0407B

150

MM

FROM

BTL

LAH-0402B

400

MM

FROM

BTL

LAL-0402B

200

MM

FROM

BTL

PAH-0401B

4250 kPa(g)
3200 kPa(g)
50

TAL-0401B
LSHH

LT

LG

0402B

0406B

LAH-0401B

TAH-0401B

44

LAHH

PAH-0405B

0408B

PAL-0405B

C
C

13000 kPa(g)
10500 kPa(g)

TAH-0408B

PB

MOTOR

50

TAL-0406B

PAL-0401B

VAHH

172

TAH-0406B

LALL-0403B

NO POCKETS

3/4"

POINT

13200 kPa(g)
4500 kPa(g)
2300 kPa(g)

PAHH-0409B

2"

3/4"
3/4"

TAG.

0407B
TT
0406B

CSC

165

VAHH-0401B

VAHH-0402B

S/D

LALL

LSLL

PDI-0412B(MAX)

0407B

0407B

XI

XI

0401B

0402B

LIC

PSLL

0402B

0412B

V/F
UCP

V/F

PSLL

PT

0411B

20

kPa

0405B

PI
0405B

LAH

LAL

XV-0402B

CLOSE

PAH

PAL

NOTE-3
TI

2"-P-D1-1041B

TOP

TAH

0408B

0412B

2"

TI
TI
0406B

PI

PALL

CSC

CSO

PUMP CONTROL.

V/F

UCP

UCP

VENT

TSHH
0409B

TAHH-0405B

PALL
0407B

NOTE-8

DWG NO. 1103

3/4"

8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL


TAHH
0409B

0408B

NOTE-3

A1

7. DUAL PLATE WAFER TYPE.

0404B

6"-P-F1-1042B-IS

TSHH

NOTE-6

V/F
TI
0401B

SYSTEM VENDOR REQUIREMENT.


UCP

CSO

V/F

0405B

8"-P-F1-1034B-IS

V/F

0306B

3"-SV-A1-2508B

FIRE
CASE

3"-SV-A1-2507B

TIC-0306B

TO HP FLARE

DWG NO. 1103

PSV

CSO

TS

PT
0401B

TT

1-AC-252B

ST-0401B

3"-P-D1-1069B

NO POCKETS

DWG NO. 1146

3"-FL-A1-2407B

6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR


14000

F1

21.05

TO FUEL GAS SKID

5. USE 20 MESH PER VENDOR REQUIREMENT.

8"-P-E1-1070B

2J3

A1

12"-P-D1-1033B

0402B

IN LOCAL CONTROL ROOM.

6"-P-FI-1073B-IS

3/4"

4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE

PT

F1

V/F

RO

DWG NO. 1005

NO POCKETS

2"

0402B

ENTRY

NO POCKETS

TI
0404B

1-K-253B TRIP

LAH

LT

LG

0401B

LAL

0401B

0405B

I
SOV
0401B
CMR

ZIC

ZIO

0401B

0401B

LY
LALL

LSLL

0403B

0403B

0402B

D
TO CONDENSATE

XV

ZSC

ZSO

0401B

0401B

0401B

0401B

DWG NO. 1008

FC

0402B

1"

LV

3/4"

I/P

I/P
0401B

ACCUMULATOR

1-K-254B
LY

LY

IAS

1"

CLOSE
XV-0401B

2"

LEGEND:

E1
A1

D1
F1

2"-DH-A1-2203B

LIC

0404B

3/4"

2"-P-D1-1036B

SS TUBING

NC

FC

FC

3/4"

B1 D1

INST. DRAIN

3/4"

3/4"
2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)


COOLER VENDOR'S SCOPE OF SUPPLY

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

NC
D1

2"-DH-A1-2202B

C
FROM

LSLL-0407B,
1-K-253B TRIP

I
0402B

CMR

ZIC

ZIO

0402B

0402B

IAS

XV

ZSC

ZSO

0402B

0402B

0402B

DWG NO. 1124

3/4"

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED

SS TUBING

NEW DELHI - INDIA

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

2"-P-E1-1074B

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

FC

1-V-254B

ITEM NO.

14

13

12

11

Path\File name\Initials:
10

HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-B

Company's document No.:

8743 kPa

15

Document title:

2nd STAGE
67696 Nm3/hr

CAPACITY :
DIFF. PRESS :

Path\File name\Initials:

H.P. COMPRESSOR

ITEM NAME

16

EIL

CONSORTIUM

Contractor:

A1 E1

VIETSOVPETRO

DWG NO. 1154

EIL

ISH

PETECHIM/VIETSOPETRO

Basic Engineering:

TO OILY WATER TREATMENT

12MM SS TUBING

Company;

INST. DRAIN

TO CDH

SOV

FROM 1-P-357B

A1

VENDOR'S SCOPE

V/F

DWG NO. 1137

1-V-252B

FROM

LSLL-0403B, LSHH-0807
PSHH-0805, 1-K-253B TRIP

LAHH

0404B

TO CDH

0402B

LSHH

6"x8"

CC
0401B

10"x12"

PI

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

NOTE-3

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

6"-P-F1-1043B-IS

12MM SS TUBING

DWG NO. 1150

0403B

53.79

3/4"

METHANOL

8"-P-E1-1038B

0401B

RO

0401B

IS

DCS AS WELL AS COMPRESSOR UCP.

GAS HEADER

PIC
0401B

E1

ZSC

0401B

10"-P-D1-1070B

V/F

0401B

V/F

ZSO

UCI-0401B

I/P

DWG NO. 1136

V/F

CMR

6"-SV-A1-2509B

TO HP FLARE

I
SOV

0403B

6"-SV-A1-2516B

V/F

ZIC
0401B

UCP

6"-FL-A1-2408B

ZIO
0401B

UCP

3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON

TO DISCHARGE

UCP

DISTRIBUTION CODE:

Page(s)
37131104

16

15

12

13

14

1.5D2
14000

FIRE

FIRE

PSV

1.5D2

TI

14000

0901B

CASE

2"x6"

0901B

3. DELETED.
4. DELETED.

5. REFER NOTE-41 OF LEGEND P&ID No. 3713-00-02-41-0110/0111


FOR SOV ASSEMBLY DETAILS.
AAH

AI
0902B

6. REFER NOTE-42 OF LEGEND P&ID No. 3713-00-02-41-0110/0111


FOR SOV ASSEMBLY DETAILS.

H2 O
DEW POINT

8. PI-0903B TO BE VISIBLE FROM THIS VALVE.

AT

9. DELETED.

TO DEHYDRATION

0902B

0902B

OUTLET MANIFOLD

A17

3"-P-E1-1114B

1"

1.5"x3"
RO

0902B

9.72

2"x1"
E17

NOTE-15

E1

CS0

A1

CS0

E1

A1
E1

3/4"

3/4"

CS0

10"-P-E1-1072B

1.5"x3"

3"-P-E1-1115B

1"x2"

E17

CSC

7. DELETED.

V/F

PSV

2"x6"

2. DELETED.

1"-FL-A1-2446B

6"-SV-A1-2526B

CASE

0908B

TAL

LP FLARE

DWG NO. 1135

6"-SV-A1-2525B

TT

TI
0908B

6"-FL-A1-2415B

TO LT FLARE

2"-P-A17-1143B

65 C

1. DELETED.

DWG NO. 1135

1400 mm (ID) X 7900 mm (T/T)


14000 kPa (g)

TO HP FLARE

GLYCOL CONTACTOR

SIZE
DESIGN TEMP.

NOTES

ITEM NAME
DESIGN PRESS.

1-T-311B

DWG NO. 1135

10

11

ITEM No

10. IN CASE OF XV-0901B NOT OPEN SIGNAL, RUNNING H,P. COMPRESSORS


TO BE TRIPPED SO THAT ONLY TWO COMPRESSORS ARE LEFT RUNNING.

DWG NO. 1009

11. DELETED.

12. DELETED.

10"x14"

13. DISTANCE BETWEEN XV-0903B AND TAPPING FOR PSV-0905B/0906B


TO BE MINIMUM.

2"-P-E1-1143B

3"-P-E1-1113B

14. FI-0902B SHOULD BE VISIBLE FROM THE

LSHH-0903B
PSLL-0902B

0901B

PI

IAS

0901B

0903B

TAG.

5 DIA

10"-P-E1-1040B
2" FC
TSO

0901B

CLOSE XV-0901B

NOTE-8

TRIP 1-P-311C/D
PSLL

0902B

CLOSE

DWG NO. 1009

XV-0901B

V/F

PALL
0902B

LG

LT

0901B

0902B

LIC
0902B

LAH
LAH

0905B

0905B

TRIP 1-P-311C/D

10"-P-E1-1040B

V/F

1-T-311B

LSLL

LALL

TAL-0909B
LAHH-0903B

600

mm

FROM

BTL

50

mm

FROM

BTL

LAH-0902B

450

mm

FROM

BTL

LAL-0902B

150

mm

FROM

BTL

2"

CLOSE
XV-0903B

50

m
m

T
HO

E1
E2

1.5H3
700

700

V/F

PSHH-1011B
PSLL-1022B

PSV
0905B

3"x6"

LSHH-1012B
LSLL-1010B

V/F

ZIO

0903B

0903B

V/F
SOV

V/F

0903B

V/F

LV

ZSC

ZSO

0902B

0903B

0903B

CMR
IAS

3"-GL-A2-8223B

0902B

ZIC

2"x1" 1"

2"x1"
FC

3/4"

2"

V/F

CS0

CS0

3"x6"

PSV

3/4"
CSC

CS0

V/F

3"x2"

3"x2"

V/F

2"-GL-A2-8201B

E2

NOTE-13

BE

SUPPLIED

DEHYDRATION

DWG NO. 1110

BY

VENDOR

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

V/F
1/2"

E2

SYSTEM

DD-MM-YY

A2

NC

TO

3"x1.5"

3/4"

TO 1-E-314B

V/F
FC

V/F :

0903B

3/4"

V/F

0906B

2"

XV

V/F

V/F

3"x1.5"

LSHH-1003B

I/P
LY

1.5H3

FROM
LSLL-0905B

50 kPa(g)

PID-0901B(MAX)

DISCHARGE HEADER

AHH-0902B

V/F

M2

0903B

0903B

FROM HP COMPRESSOR

POINT

LALL-0905B

V/F
LSHH

LAHH

SET

10000 kPa(g)
(-)40 C
(-)40 C

TAL-0908B

10"x14"

XV

NO.

PALL-0902B

3"-GL-A2-8224B

0902B

0901B

ZSO

6"-SV-A1-2534B

FI

ZSC

PDI

ESD

SOV
0901B

NOTE-14

DWG NO. 1510

TO LP FLARE

NOTE-5

2"-GL-E2-8208B

M1

DWG NO. 1135

0901B

3"-P-E1-1113B
E1

0901B

2"x3"

FROM

50 mm HOT

ZIO

50 mm HOT

ZIC

I
FROM 1-AC-311B

CSO

6"-FL-A1-2436B

6"-SV-A1-2533B

NOTE-10

E2

BUTTERFLY VALVE.

15. PROVIDE 0.5M DISTANCE (MIN.) BETWEEN BALL AND GLOBE VALVE
2"

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

A1

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

INST. DRAIN
SS TUBING

3/4"

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

TO CDH

DWG NO. 1137

2"-DH-A1-2235B

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

GAS DEHYDRATOR FACILITY TRAIN # B

Document title:

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131109

16

15

TUBE

250

250

DES. PRESSURE kPa(g)

350

700

1-E-318B

STRIPPING COLUMN

OVERHEAD CONDENSER

2621 F/F x 305 DIA

2330 F/F X 400 I/DIA

250

1-V-314B
STILL COLUMN

2725 F/F x 305 I/DIA.

250

FULL VACUUM /350

10

11

1-V-313B

FIRED HEATER BURNER

450KW

NOTE-4
LP FLARE

TSHH

TAHH

1010B

1010B

6"-SV-A1-2570B-IS

1006B

4"-FL-A1-2439B-IH

1 1/2" H 3"

NOTE-1

PSV
350

TP1

2"

FLASH DRUM

4"

CSO
FB

DWG NO. 1109

FAN

PURGE

RUNNING

COMPLETE

ON/OFF

XI

XI

XI

1005B

1006B

1007B

H 75mm

PILOT

BURNER

PROVEN

SHUTDOWN

1-E-318B
TIC
1001B

I
LY

DWG NO. 1410

XI
1009B

1005B

2"x1"

2"

2"x1"

2"-GL-A2-8247B-IH

DWG NO. 1410

NO POCKETS

FC
NC

1"

2"x1"

3/4"

H 75mm

1"

3/4"

2"x1"

PALL-1017B
PALL-1012B

400 C

PAH-1015B

30 kPa (g)
0 kPa (g)

PAL-1015B
TAH-1001B

215 C

TAL-1001B

195 C

FAH-1001B

11 m3/HR

FAL-1001B

9 m3/HR

PI
1015B

2"-FG-A1-6378B-IH

ZIC

ZIO

1001B

1001B

TY
1001B

PAH
PAL

NOTE-4

FROM

TRIP FAN

TV
1001B

NOTE-5

FF

6"

PALL

ZIO

ZIO

ZIC

1004B

1002B

1002B

1017B
SOV

NOTE-4
PAHH

2"
H 100mm

NOTE-4

ZSC
1002B

NOTE-3

SET

ZSC

1020B

PCV
1001B

3"

TT

3"

1002B

FC

1 1/2"

1 1/2"
XV
1004B
SOV

TI

DWG NO. 1510

1003B

H 75mm

3/4"
S

1-V-313B

1-E-314B

2"
2"

2"-GL-A2-8241B-IH

FI
TI
1003B

1001B

PI

3/4"

3/4"

2"x1"

1001B

2"x1"

IGN
TRX

FAL

1003B

ZSO

ZSC

1002B

1003B

1003B

PCV
1013B

ELECTRODE

FIT

1"

A/S

SET

FC

1 1/2"

PCV

220VAC

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

1011B

XV

SUPPLY

Date

Description of revision

DD-MM-YY

Company;

1003B

TRANSFORMER
PI

FC

FC

3/4"

3/4"

VIETSOVPETRO

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

3/4"

Worley

Basic Engineering:

1"

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

TO GLYCOL

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

FLASH VESSEL

2"-FG-A1-6377B-IH

Company's contract No.:

SCALE

Type of document

CCP-WT/95

DRAIN SYSTEM

2"-DH-A1-2237B

DWG NO. 1410

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

1 1/2"-FG-A1-6376B

DWG NO. 1410

EIL

CONSORTIUM

Contractor:

1023B

NOTE-4

EIL

ISH

PETECHIM/VIETSOPETRO

IGNITION

1001B

1"

@ 30kPa(g)

@ 0.5kPa(g)

SPARK IGN

2"
2"x1"

1003B

FC

1 1/2"

BE

FAH

ZIC

1"

NOTE-3

1007B
ZIO

FC

1 1/2"x1"

FC

LALL
1008B

TO GLYCOL

2"-GL-A2-8242B-IS

PI
1019B

1002B

1 1/2"x1"

TRIP XV-1001B

LSLL
1008B

SET

PSLL
1012B
XV

1002

1 1/2"

1009B

PSLL-1017B

A/S

@ 10kPa(g)

PI

PCV
1012B

1 1/2"

LG

M1

1012B

NOTE-4

SET

@ 1kPa(g)

1004B
1021B

1001B
TAHH

MIN

SOV

PALL

1002B

PSHH
TT

LAHH
1012B

ZSO
1002B

A/S

1004B

TRIP XV-0903B

LSHH

ZSO
1004B

1002B

TSHH

H 75mm

ZIC

1021B

1-X-312B

1004B

1012B

NOTE-3

PT
1015B

1-E-314B

ZSO
1001B

LSLL-1008B

1-X-312B

PI

1-E-316B

ZSC
1001B

PB

1014B

TO

1008

PSLL

TAHH-1010B

STOP

1017B

3/4"

BTL

1.3 kPa (g)


0.2 kPa (g)
1.15 kPa (g)

2"x1 1/2"

2"-GL-A2-8231B-IH

BTL

FROM

230 C

PAHH-1021B

1 1/2"-FG-A1-6320B

2"

3"-GL-A2-8243B-IS

TI

LV

ACCUMULATOR

FROM

mm

H
I

TAL

1-V-314B

1001B

CHARCOAL FILTER

POINT
mm

1305

1001B

FROM GLYCOL

TAH

XI
1008B

SET
1700

LALL-1008B
TAHH-1002B

DWG NO. 1510

XI

NO.

LAHH-1012B

FLASH DRUM

COND.

HEALTHY

TUBING

FROM GLYCOL

ACCUMULATOR

1004B

FROM LIC-1001B

TAG.

TO/FROM GLYCOL
3"-GL-A2-8244B-IH

INTERLOCKS

TSHH-1010B

DWG NO. 1410

(BALANCE LINE)

INSTRUMENT

C1136-RSL-PID-003

3/4"

PRIMARY

AND

C1136-RSL-PID-002

4"-FL-A1-2414B-IS

3"

CONDENSER

P&ID NO. C1136-RSL-PID-001

3/4"

2"

3/4"

2"-GL-A2-8220B-IH

OVERHEAD

REFER READ SYSTEM LTD.

3/4"-FG-A1-6375B

2"-GL-A8-8201B-IH

TO GLYCOL

FROM

LOCATION.

TP5

3"x1 1/2"

DWG NO. 1410

SAFE

4. CLOSE VALVES XV-1004B,XV-1002B AND XV-1003B

6"x3"

FB

3/4"

2"-GL-A2-8201B

CSO

4"

LO

TO

BE-1001B

DWG NO. 1135

5.
TP12

TP4

VISIBLE
VENT

3. FROM PSLL-1012B,PSHH-1021B,PSLL-1017B,TSHH-1002B

TI

DWG NO. 1135

TO LP PLARE

1010B

3"

CONTACTOR

FROM GLYCOL

2.

TT

2"-GL-A2-8240B

1.

VF

1006B

FLOW 1444 m3/h

NOTE-2

NOTE:

730KW

FULL VACUUM /350

AIR BLOWER

1/14

250

1-X-312B
500

6730 T/L TO F/F x 2000 I/DIA

FULL VACUUM /350

1-X-311B

GLYCOL REGENERATOR

2150

FULL VACUUM /350

1-E-314B

6"-FL-A1-2414B

4"-FL-A1-2439B

SHELL
DES. TEMPERATURE C

12

13

14

1-E-316B
LEAN/RICH GLYCOL HEAT EXCHANGER
2x336 I/DIA x 4070 T/T

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

2"-FG-A1-6320B
TP7

Rev.

Path\File name\Initials:
FROM LP FUEL GAS

HEADER

16

15

14

13

12

11

10

Document title:

GAS DEHYDRATION UNIT TRAIN-"B"

Company's document No.:

DWG NO. 1134

Path\File name\Initials:
4

DISTRIBUTION CODE:

Page(s)
37131110

16

15

12

13

14

10

11

NOTES
ITEM No.
L

1-T-352

ITEM NAME

GLYCOL STORAGE TANK

SIZE

1710 mm (ID) X 3762 mm (H)

DESIGN PRESS.

FULL OF LIQUID + 50 mm WATER COLUMN

DESIGN TEMP.

1.

DELETED

2.

FOR

GENERAL

AND

0111.

60 C

3.

TO

BE

4.

DELETED

5.

GLYCOL

NOTES

ACCESSIBLE

REFER

FROM

P&ID

NO.

3713-00-02-41-0110

DECK.

ANHYDROUS
CALCIUM CHLORIDE

AIR DRYER

STORAGE

AND

ANTI

FOAM

STORAGE

SYSTEM

(REF.P&ID NO. 3713-35-02-41-1149) ARE ON A COMMON SKID.


2"-VG-A1-2602

2"-VG-A1-2601
TP6

6.

LOCATE

7.

MANHOLE

IN

SIGHT

FITTED

OF

VENT.

NOTE-7

CONNECTION
PORTABLE DRUM

MANHOLE

ODD

NOTE-6

2"-GL-A2-8203

TRANSFER PUMP

TAG.

TP5

NO.

SET

POINT

3325

mm

540

mm

FROM

BTL

LAH-1602

3050

mm

FROM

BTL

LAL-1602

800

mm

FROM

BTL

LAHH-1604
LALL-1601

FROM

BTL

I
LSHH

LAHH

1604

1604

LT

LI

1602

1602

LAH
LAL

LG
1603

LSLL

LALL

1601

1601

1-T-352
I
TRIP

1-P-352A/B

TP7

2"-DH-A1-2204

A1

TO GLYCOL ACCUMULATOR

DWG NO. 1137

A2

2"-GL-A2-8205

2"-GL-A2-8222B

2"-GL-A2-8222A

LOW
POINT

PI

PI

1601

1604

CONTD. ON P&ID NO : 1149

REFER TO POSITIVE
3/4"

STOP

METERING SYSTEM

3/4"

1-P-352A

1-P-352B

1601

P&ID NO. C-1138/21

3/4"

3/4"

PB

(1-V-312 A)
DWG NO. 1310

3/4"

2"-GL-A2-B219

3"-GL-A2-B205

2"-GL-A2-B222

TO GLYCOL ACCUMULATOR

TP8

(1-V-312 B)
DWG NO. 1510

TO CDH

2"-GL-A2-B210

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

EMERGENCY

NOTE-3

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

LG-1603.

WITH

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

VENDOR'S SCOPE

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:
XI

1601

FROM

FROM

LSLL-1601

LSLL-1601

XI

PB

1602

1602

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

STOP

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

1-P-352A/B

ITEM No.
A

ITEM NAME
CAPACITY

Document title:

6.8 M3/hr

15

14

13

12

11

10

Rev.

TRIETHYLENE GLYCOL STORAGE & TRANSFER PUMP

Company's document No.:

208.7kPa

Path\File name\Initials:

16

Path\File name\Initials:

GLYCOL TRANSFER PUMPS

DIFF. PRESS.

DISTRIBUTION CODE:

Page(s)
37131116

16

15

12

13

14

ITEM NO. :
L

ITEM NAME :
SIZE
DESIGN PRESS.
DESIGN TEMP.

LOW TEMP. FLARE HEADER


DWG NO. 1135

LP FLARE SCRUBBER

2500 mm (ID) x 6300 mm (T/T)


700 kPa (g)/50 mm WATER COLUMN VAC.
180C/(-45)C

1500 mm (ID) x 4500 mm (T/T)


350 kPa (g)/50 mm WATER COLUMN VAC.
180C/(-29)C

2:1000

1. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110/0111.


2.

ALL

LEVEL

AND

INSTRUMENTS

1-V-362

3.

DELETED.

4.

DELETED.

5.

DELETED.

6.

DELETED.

7.

DELETED.

ARE

CONNECTION

ELECTRICALLY

AND

TUBING

TRACED

AND

ON

1-V-361

INSULATED.

TO FLARE STACK

10"-FL-A17-2421

NO POCKETS

DWG NO. 1121

2:1000

10"-FL-A1-2425

DWG NO. 1135

NOTES

FREE DRAINING
HP FLARE HEADER

SLOPE

10"x6"

1-V-362

HP FLARE SCRUBBER

2:1000

10"-FL-A17-2464

10

11

1-V-361

NO POCKET

4"x2"
PI
1701

LAHH

LSHH

1703A

1703A

LSHH

LAHH

1703C

1703C

2"

9. AUTO/MANUAL SELECTOR FOR 1-P-361A/B AND DUTY/SPARE SELECTOR


(SS-1701) LOCATED IN LOCAL CONTROL ROOM.

LSHH

LAHH

1703B

1703B

LX

1-V-361

TI

LAL

LT

1701

1702

TAG.
FROM
LSH-1705
AR

1703

1702

1702
LG

A17

2 OUT OF 3 VOTING

LY

1707

A1

SOV

FROM

1702

LSLL-1701

LV

1703

4"x2"

ZIO
1701

CSO

A1

FC

3/4"

TSLL
1703

ZSC

ZSO

1701

1701

1701

2"

CSO

SET

POINT

(-28C)

LAH-1702

350

MM

FROM

BTL

LAL-1702

200

MM

FROM

BTL

LAHH-1703A/B/C

450

MM

FROM

BTL

LALL-1701

150

MM

FROM

BTL

LAHH-1704A/B/C

450

MM

FROM

BTL

LALL-1706

150

MM

FROM

BTL

LAH-1705

LAL-1705

**

350

MM

250

MM

FROM
FROM

BTL
BTL

FC

3/4"

A17

A1

ON

**

CLOSE
XV-1701
TO CDH
DWG NO. 1137

XV

NO.

TALL-1703

3"-P-A17-1120

A17

XV-1701

1702

1.5"

2"

CLOSE

ZIC
1701

IAS
LAHH

1701

SOV
1701

LSLL

1701

CMR

TSLL-1703

CAUSE PSD
LALL

I/P

LAH
LIC

DCS

ON

DCS

400

MM

200

FROM

MM

BTL

FROM

BTL

I
TALL

2"-DH-A1-2252

1703

G
3"-P-A1-1120

NO POCKETS

LP FLARE HEADER

2:1000

10"-FL-A1-2426

DWG NO. 1135

2:1000

TO FLARE STACK

10"-FL-A1-2422

NO POCKETS

NO POCKETS

DWG NO. 1121

FREE DRAINING

4"x2"
PI
1702

2"

START

1-P-361 A/B

E
LAHH

LSHH

1704A

1704A

LAHH

1704C

1704C

LSHH

LAHH

1704B

1704B

M
LG
1708

1-V-362

2 OUT OF 3 VOTING
LX

TI

LT

1702

1705

LSH
1705
LSL

LI
1705

CAUSE PSD
LALL

LSLL
1706

1705

LAH

1704

1706

CLOSE LV-1702

LSHH

LAL

I
LAHH

TO BLACK COND. LINE

2"-P-A1-1094

STOP

1-P-361 A/B

1704

4"x2"

2"

3"-P-A1-1121

3"-P-A1-1119

TRIP PUMPS

CSO

1-P-361A/B

DWG NO. 1012

2"-P-A1-1095

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

8. PUMPS 1-P-361A/B ARE DUTY-SPARE.

3/4"
LOW

DWG NO. 1137

INST. DRAIN

2"-DH-A1-2253

ST-1171

A1

XI

1701

FROM LSLL-1706

FROM LSH/LSL-1705

A1

ST-1172

B1

3/4"

PB

XI

1701

1702

JUY

LOC

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Date

Description of revision

A1

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

A1

B1

Detailed Engineering:

B1

ENGINEERS INDIA LIMITED

11

10

START/STOP

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

1702

SS

FROM
LSLL-1706

Path\File name\Initials:

LP FLARE KOD PUMP

Document title:

5.0 M3/hr.

Company's document No.:

190 kPa

Path\File name\Initials:
4

Type of document
PIPING & INSTRUMENTATION DIAGRAM

1-P-361A/B

SCALE

CCP-WT/95

Contractor's document identification:

1701

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

PB

Limited

STOP

Company's contract No.:

DIFF. FRESS.

12

3/4"

TRIP

CAPACITY

13

Worley

Basic Engineering:

TRIP

ITEM NAME :

14

PH

MSP

Contractor:

3"x2"

CSO

STOP

ITEM NO. :

15

AC

APPROVED BY COMPANY FOR ENGG.

NEW DELHI - INDIA

3"x2"

CSO

16

SDH

MSP

7.2.96

1704

SS TUBING

SA

APPROVED FOR CONSTRUCTION

Company;

2"x1"

B1

REVISRD AS MARKED

20.3.96

DD-MM-YY

POINT

1703

TO CDH

AS - BUILT

20.11.96

PI

2"x1"

3/4"

14.3.97

Rev.

CSO

PI

DISTRIBUTION CODE:

Rev.

HP/LP FLARE SCRUBBERS


Page(s)
37131117

16

15

12

13

14

10

11

ITEM NAME :

1-K-411A/B

CAPACITY

1.

DELETED.

2.

DELETED.

AIR COMPRESSORS

DIFF. FRESS.

1450 Kg/hr
1034 kPa

3.

DELETED.

4.

AIR

INTAKE

FILTERS

ACCESSIBLE

K
2 OUT OF 2

UX
1801

ESD SIGNAL

ESD SIGNAL

FROM PLC-1/2

FROM PLC-1/2

COMMON

COMMON

COMMON

COMMON

PRE-ALARM

TRIP-ALARM

TRIP-ALARM

PRE-ALARM

1-K-411A

1-K-411A

1-K-411B

1-K-411B

UA

USD

USD

UA

1801

1802

1804

1803

I
"B"

TRIP INERT GAS


SYSTEM

5.

DELETED.

6.

DELETED.

AND

SILENCERS

TAG.

NO.

SET

PDHH-1801A/B
TAHH-1801A/B
TAHH-1802A/B
TAHH-1803A/B

508

PDT

AIR FILTER

1801A

1801A

NOTE-4

TAHH

TI

1802A

1802A

1803A

1803A

PSV

PSV

1801A

1802A

PSV
1803A

TSHH

TSHH

TSHH

1801A

1802A

1803A

PDAH

TT

1801A

1801A

CSO

CSO

INTER

TT

TT

1802A

1803A

CSO

AFTER

PI

STAGE COOLER

PI

COOLER

1802A

SILENCER

1803A

SILENCER

NOTE-4

PAH

NOTE-4

PI
1811

TT
PSH

1804B

CW

PAL

1805

CW

PSL

XI

PLC1

1801

CD

1-K-141A

CD

TO ATM

SILENCER

1801A

TI

1100

1801A

PDSH

370

TAHH

H2O

1034 kPa(g)
965 kPa(g)
896 kPa(g)
1050 kPa(g)
750 kPa(g)

PAL-1811
TO ATM

POINT

mm

220C

PAH-1811
370

1801A
TI

AN

90C

PAL-1812

TAHH

AT

220C

PAH-1805

PDI

BE

PAL-1806

SHOULD

LOCATION.

7. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.

"A"

1806

TI
1804B

PSL
1812
PT

RUNNING

1811

INDICATION

TO 1-V-412

1-K-141A

2"-DW-A1-2305

3"-AU-A3-5208

DWG NO. 1119

PDI
1801B

PDT

AIR FILTER

TAHH

TI

1801B

1801B

NOTE-4
PDSH
1801B

TO ATM
370

370

TAHH

TI

1802B

1802B

TAHH

TI

1803B

1803B

TO ATM
1100

1801B

PSV

PSV

1801B

1802B

PSV

SILENCER

1803B
TSHH

TSHH

TSHH

1801B

1802B

1803B

E
PDAH

TT

1801B

1801B

CSO

CSO

INTER

TT

TT

1802B

1803B

CSO
AFTER

PI

STAGE COOLER

PI

COOLER

1816

SILENCER

1817B

SILENCER

NOTE-4

NOTE-4
TT
1804B

CW

XI

PLC2

1802

CW

CD

1-K-141B

CD

TI
1804B

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

RUNNING

Date

Description of revision

DD-MM-YY

INDICATION

Company;

1-K-141B

VIETSOVPETRO

COMPANY

CONSORTIUM

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

2"-DW-A1-2305

SKID DRAIN

EIL

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

EIL

ISH

PETECHIM/VIETSOPETRO

Contractor:
REFER TO TIDE AIR P&ID NO: 261808-FS1

2"-DW-A1-2304

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

NOTES

ITEM NO. :

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:


ODD

ODD

Rev.

Path\File name\Initials:
A

Document title:

AIR COMPRESSOR SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131118

16

15

UTILITY AIR RECEIVER

ITEM NAME :

12

13

14

1-V-412

ITEM NO. :

DESIGN PRESS.

PRE FILTER

INSTRUMENT AIR RECEIVER

168 mm OD x 622 mm F/F


1150 KPa (g)

168 mm OD x 622 mm FF

65 C

65 C

INSTRUMENT AIR RECEIVER

1908

INCLUDING

DELETED.

DELETED.

6.

ATM

AS

DETAILS

3.

5.

2J3

SYSTEM

2.

4.

PALL

INDICATIVE

GENERAL
0111

PI-1911

TO

NOTES

BE

REFER

VISIBLE

P&ID

FROM

2"

2"-AI-A3-5119

CSO

1909

PAL

NO

THIS

TO

AND

GIVE

FILTERS.

3713-00-02-41-0110

VALVE.

CAUSE PSD
TAG.

NO.

SET

POINT

LAH-1901

400mm

PALL-1908A/B/C

450 KPa(g)
1034 KPa(g)
600 KPa(g)
(-) 15C
89 kPa(g)
750 kPa(g)

PAH-1909

VENDOR

DRYERS

FOR

PAL-1909

PAH

ONLY.

PANELS

DELETED.

PX

3/4"

PALL

PALL

PALL

1908A

1908B

1908C

AAH-1901
PDAH-1905
PAL-1907

PI

PSLL

PSLL

PSLL

1912

1908A

1908B

1908C

FROM

BTL

INST. AIR HEADER

3"-AI-A3-5106

PT

DWG NO. 1140

1909

UTILITY AIR HEADER

2"-AU-A3-5211

UTILITY AIR HEADER

2"-AU-A3-5211

DWG NO. 1140

H
SET

REFER TO TIDE AIR

PI

@ 650 KPa(g)

1902

P&ID NO. 261808-FS2

PCV
1901

2"

FIRE

2"

CASE

1-F-411

3"x2"

1.5F2
1150

3"x2"

3"-AU-A3-5210

PSV

2"

1901

ATM

ATM

3/4"X1

TP1

2"

3/4"X1

1150

2"-AU-A3-5233

ATM

1150

PSV

PSV

1903

1904

PDAH
1905

CSO

2"

2"

2J3

PDI

DWG NO. 1118

1901

1901

LG
1902

2"x1"

CHAMBER

PCV

PI
1911

2"

CSO

2"

CD

3"x2"

TP2

PI

2"-AI-A3-5112

NOTE-6

1910

2"

1901
RO
1901

NO
NO
PI

NC

1902

3"-AI-A3-5104

3/4"

1-D-411 A/B

1901

SET

@ 830 KPa(g)

1902

3"

1-F-412 A/B

1906

1"-DW-A1-2308

ST

CHAMBER

RIGHT
ATM

PSV

3"-AI-A3-5102

LSH

ATM

1905

1-V-411

1 1/2"-DW-A1-2311
AT

AAH

AI

1901

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

1901

2"

Company;

NC

ODD

1"

TP4
ODD

2"-DW-A1-2332

Detailed Engineering:

DRAIN

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

DRAIN

Company's contract No.:

SCALE

Type of document

CCP-WT/95

ODD

ODD

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES


SKID

PRE FILTER

EIL

CONSORTIUM

Contractor:

TP3

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

1"

1"-DW-A1-2310

LAH

LEFT

NO

1"-DW-A1-2306

1-K-411A/B
E

PT
1907

1150

3"-AU-A3-5208

1-V-412

PI
1907

CASE

CD

2"x1.5"
1.5"

PAL

FIRE

PI
1901

3"-AI-A3-5105

3/4"

1"-DW-A1-2307

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

IS

CONTROL

1908

PSV

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

SHOWN

AND

1905

PI

1. AUXILIARY EQUIPMENT FOR DRYERS ARE NOT SHOWN

65 C

1030

NOTES

2815 mm (ID) x 5000 mm (T/T)


1150 KPa (g)

1150 KPa (g)

1-V-411

1230 Kg/hr

65 C

DESIGN TEMP.

1-F-412A/B

1-F-411

DESICCANT AIR DRYER

1300 mm (ID) x 2600 mm (T/T)


1150 KPa (g)

SIZE

10

11

1-D-411A/B

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

UTILITY AIR/INSTRUMENT, AIR SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131119

16

15

12

13

14

10

11

ITEM NAME :

INERT GAS SYSTEM

DESIGN PRESS.

150 NM3/hr
1150 KPa (g)

DESIGN TEMP.

65 C

1.

VENDOR
TAKE
TO

TO ATM AT

3.

ALARM
COMMON

AAH

ESD, UX-1801

UA

XI
2001

PAH

AI

PI

2001

2007

TERMINATION

ALARM

&

AT

TRIP

SKID

EDGE

SIGNALS

TO

FURTHER

INERT

GAS

HEADER

HAS

DISTINGUISHED

DIFFERENT

FROM

COLOUR

UTILITY

AND

TO

BE

INSTRUMENT

FI

4.

DELETED.

AIR

5.

DELETED.

2001

6. FOR LEGEND REFER P&ID NO. 3713-00-02-41-0110/0111.

PAL

7.

SUITABLE
STATUS

HEADER.

TRIP SIGNAL

2001

PROVIDE

DIFFERENT

DELETED.

EASILY

12"-VG-A1-2610

TO

THE

LCR.

SAFE LOCATION
2.

DELETED.

J
2"-VG-A1-2617

TP4

I
RO

RO

2712

2722

3"x2"

TAG.

NO.

SET

FIC
KIC
2700

2730

IA

FC

POINT

850 KPa(g)
570 KPa(g)

PAH-2007
PAL-2007
AAH-2001

5.25

PAL-8303

550 KPa(g)

TO
SILENCER

KIC

KIC

2700

2700

FC

IA

IA

SOV

XV

TO

2713

2713

SILENCER

1"x1"

FC

FI

PT

1050

7411

2730

H
PI

XV

SOV

SOV

XV

PI

2712

2712

2722

2001

2792
PI

PI

TI

FY

SOV

2001

2730

2001

2730

2730

SOV
2724

XV

XV

2714

2724

AT

PT

TE

FT

2730

2730

2730

2730

PCV

DWG NO. 1142

1-V-421

FE

FC

2730

SILENCER

KIC

INERT GAS

2'-N-A1-6408

FC

2012

TP3

2730

1-V-422

FROM
PSV 7401

KIC

2700

FC

PI

NC

1"x2"

1-H-421A

@ 500 KPa(g)

FCV

FROM
PSV 2701

SET

7435

%2

1-H-421B

PI

2700

7401

7493

KIC
SOV
2714

IA

2793

2701
KIC

AI

1050

PSV

2700

PSV

1"x1"
2791

VENT GAS

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

NOTES

CAPACITY

will not be reproduced copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

ITEM NO. :

2700

IA

IA

XV

SOV

SOV

XV

2711

2711

2721

2721

FC

3"x2"
RO

RO

2711

2721

QE
2751

INSTRUMENT AIR (FEED GAS)


DWG NO. 1140

TP1

2"-AI-A3-5107

D
PAL

SET

8303

REFER LINE P & ID NO. PFP DWN

@ 600 KPa(g)
PCV

DWG NO. 1140

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

8303

Date

Description of revision

DD-MM-YY

TP2

INSTRUMENT AIR

100 FOR SKID DETAILS.

PSL

8315

Company;

1"-AI-A3-5111

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

PI
8315

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

PACKAGE UNIT

NOTE-3

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

INERT GAS SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131120

16

15

12

13

14

10

11

NOTES

ITEM NO. :

1-M-361

ITEM NAME :

1-M-366

FLAME FRONT GENERATOR

SIZE

FLARE TIP

1.

DIA = 16"(HP) / 8"(LP)


71000 Kg/hr(HP)/20000 Kg/hr(LP)

CAPACITY

FOR

GENERAL

AND

3713-00-02-41--0111.

2.

DELETED.

3.

DELETED.

NOTES

REFER

P&ID

NO.

3713-00-02-41-0110

4. FLARE VENDOR SHALL PROVIDE PCV'S IF REQUIRED FOR FUEL


GAS

VENT TO SAFE
LOCATION

6.

DELETED.

7.

DELETED.

8.

DELETED.

GAS

LINES.

NOTE-9

FLA

CSO

VENT HEADER

2101

4"-VG-A1-2621

DWG NO. 1135

3/4"

LOW

FLA

CSC

POINT

2102

CSO

1-M-366

CSO

REFER TO KALDAIR

PDI
2101

VENDOR PACKAGE

DWG. NO. P-1119-100

BYPASS
STACK
VARIABLE

EL (+) 87658

SLOT

6"

TE
2101

ABOVE MSL

TE

690

2102

BURNER-I

BURNER-II
RO

THERMOCOUPLE

2101

G
THERMOCOUPLE

PCV
2103

PI

FIELD SET

EL (+) 84000

2103

ABOVE MSL

8"x10"

1"-FG-A1-6357

PILOT LINE

14"x16"

FLAME FAILURE
BURNER-II

1.5"-FG-A1-6350

IGNITION LINE

XA

IGNITION

2102

PANEL
FLAME FAILURE

XA

BURNER-I

2101

1-M-361
PCV

2101

FUEL GAS

SET

@ 176 KPa(g)

IGNITOR
WITH SIGHT
PI

SOV

RO

2101

2102

2101

14"-FL-A17-2421

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

PILOT

DELETED.

9. FLA-2101/2102 SHALL BE ACCESSIBLE FROM DECK.

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

TO

5.

GLASS

1.59

DWG NO. 1134

2"x1"

2"-FG-A1-6346

1"x1/2"
PCV

A1
A3

INST. AIR

1"-AI-A3-5114

DWG NO. 1140

2102

SET

@ 176 KPa(g)

PI
2102

RO

RO

2101

2102

5.36

1"x1/2"

D
REFER TO KALDAIR
DWG. NO. P-1119-103

1-M-361

VENDOR PACKAGE

FROM LP FLARE SCRUBBER

10"-FL-A17-2422

DWG NO. 1117

10"x14"

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

FROM HP FLARE SCRUBBER

DWG NO. 1117

EIL

EIL

COMPANY

PETECHIM/VIETSOPETRO

10"-FL-A17-2421

FREE DRAINING

ISH

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

FLARE SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131121

16

15

12

13

14

10

11

NOTES
L

1-V-441A/B

ITEM NO. :
ITEM NAME :

SEA WATER SERVICE PUMP CAISSON

SIZE

16" (ID)

1. LOCATE PCV, ARV, AND PI AT CELLAR DECK UPSTREAM OF THE


CHECK

2.

FI

3.

DELETED.

4.

PAL

FIELD

BE

LOCATED

SAMPLE

ON

CELLAR

DECK.

CONNECTION.

MAINTENANCE.

STANDBY

SHALL

5. PROVIDE HOOK FOR CHAIN PULLEY BLOCK (HANGING FROM


MIDDLE DECK BOTTOM) TO FACILITATE PUMP PULL OUT FOR

2201

START

VALVE.

6.

DELETED.

PUMP
PSL

PI

2201

2203

7.

3/4"

4"-WU-A5-4508

UTILITY

HIGH

WATER HEADER

POINT

8.

DWG NO. 1143

3/4"

FOR

GENERAL

AND

0111.

V/F

1379

1.5"

4"-WU-A5-4501B
NOTE-2

1"-WU-A1-4505B

FI
2201

PI
2201

2"

NOTE-1

PI

FI

2201

1.5"

2202

3"x4"

ARV

V/F

CONTROL

NO.:

ROOM.

SET

POINT

877 kPa(g)

1"x1"
1379

2202

3"x1"

3"-WU-A5-4502B

4"-WU-A5-4503A

4"-WU-A5-4501A
NOTE-2

@ 1160 KPa(g)

LOCAL

PSV

CSO

4"x1"

SET

3713-00-02-41-0110

2201

4"x1"

SET

@ 1160 KPa(g)
PI
2202

2"

4"-WU-A5-4503B

3"-WU-A5-4502A

1"-WU-A1-4505A

NOTE-1

PI
2202

3"x4"

ARV

V/F

2202

COPPER-CHLORINE

DWG NO. 1125

EL (+) 16700mm

1.5"-SH-A5-8302

NOTE-5

EL (+) 16700mm

ABOVE MSL

NOTE-5

ABOVE MSL
CELLAR DECK

EL(+)0

ATM

STANDBY
PUMP START
ON PSL-2201

BELOW MSL

XA

2101

EL (-) 9370mm

INDICATION

1-P-441B

OVER BOARD

RUNNING

BELOW MSL

1-P-441A

PUMP START
ON PSL-2201

EL (-) 15000mm

COPPER-CHLORINE

STANDBY

XA
2102

INDICATION

BELOW MSL

BELOW MSL

RUNNING

EL (-) 15000mm

1-V-441B

EL(+)0

1-V-441A

EL (-) 9370mm

CELLAR DECK

ATM

4"-WU-A5-4504B

SOLUTION

4"-WU-A5-4506A

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

1"x1"

2201

3"x1"

IN

PAL-2201

PSV

CSO

NO.

LOCATED

1" NO

V/F

P&ID

DELETED.

TAG

1" NO

REFER

9. AUTO/MANUAL SELECTOR SWITCH FOR 1-P-441A/B SHALL

NOTE-4

BE

NOTES

OVER BOARD

SOLUTION
DWG NO. 1125

1.5"-SH-A5-8303

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

ITEM NAME :
CAPACITY:

DISCH. PRESS.:

SCALE

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

SEA WATER SERVICE PUMP

34.0 m3/hr
1060 KPa(g) (AT CELLAR DECK)

Path\File name\Initials:

Document title:

Path\File name\Initials:
15

14

13

12

11

10

DISTRIBUTION CODE:

Rev.

SERVICE WATER SYSTEM

Company's document No.:

16

Type of document

CCP-WT/95

1-P-441A/B

ITEM NO. :

Page(s)
37131122

16

15

12

13

14

10

11

SLOPS CAISSON

SIZE

1.

1219 mm(ID) x 45600 mm(H)


350 KPa(g) & 50 mm WATER COLUMN VAC.

DESIGN TEMP.

65C

2.

HEADER

3.

TO VENT

AT SAFE

4"

4"

4"

LOCATION

4"

4.

BE

HEADER

SEALS

SAMPLE

LCP

NOTE-1

500 MM

6"-DW-A1-2331

1-V-254

MAN

POINT

SHALL

SHOULD

INDEPENDENT

BE

GENERAL

LOCATED

SHOULD

BE

AT

FROM

SHALL

BE

CELLAR

FROM
NOT

LOCATED

TAKEN

SEALS

EACH

FOR

BE

ACCESSIBLE

DECK

CONVENIENT

BE

AT

LOCATED

CELLAR

CENTRE

PROVIDED

DECK

OF

OR
LOCATION.

NEAR

BOAT

AND

LANDING.

TAPPING

PIPE.

FOR

OPEN

DECK

DRAINS

FUNNEL.

NOTES

REFER

P&ID

NO.

3713-00-02-41-0110

0111.

GAS

LIFT

TYPE

TREATED

SAMPLER

WATER

SHALL

FROM

BE

SLOP

PROVIDED

CAISSON

FOR

BOTTOM.

TAKING
ALL

SAMPLES

NECESSARY

PROVISIONS VIZ INERT GAS PIPING UPTO SAMPLE CONNECTION, PRESSURE


GAUCES, VENT GAS PIPING , ETC. SHALL BE IN THE SCOPE OF SUPPLY

4"-VG-A1-2613

SLOPE 1:200

IT

FOR

OF

XI
2301

NO POCKETS

SLOPE 1:200

4"

1"-VG-A1-2612

4"

6"-DW-A1-2330

5.

4"

4"

SHALL

SHOULD

THESE

&

FROM ALL DECK OPEN DRAINS SLOPE 1:200 (TYPICAL)


NOTE-3

SEALS

THESE

FOR

OF PURCHASER.

6.

ONE

PUMP

7.

STRUTURE

IS

WARE

CAN

BE

HOUSE

SPARE.

BUOYANT.

PROVIDE

PROPER

RESTRAINTS.

AUTO

V/F

LOCATE AT CELLAR DECK

FLA
2301

SLOPE 1:200

LI
2301
PI

CELLAR

1"

SLOPE 1:200

INERT GAS

1"x1/2"
NOTE-1

PI

4"-PW-A1-9401

HEADER OF CPP-2

2"-P-A1-1096

DWG NO. 1133

NC

1/2"

TPS DRAIN
DWG NO. 1124

TO CLOSED DRAIN

CSO

3/4"

NO POCKETS

FROM TPS
DWG NO. 1124

2301

3"x2"

1"

DWG NO. 1142

NOTE-2

LO

SLOPE 1:200

TREATED WATER

1"-N-A1-6418

V/F

4"-VG-A1-2613

2302

500 MM

DECK

MINIMUM FOR PIPING

2"-PW-A1-9402

NOTE-5

LT

LS

2301

2301

SAMPLER
SYSTEM

3"

EL(+) 8230
JACKET LEVEL FROM MSL

LEGEND:

V/F

VENDOR FURNISHED.

PUMP

EL(-) 5486
FROM MSL

MOTOR

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

1-V-454

ITEM NAME :
DESIGN PRESS.

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

NOTES

ITEM NO. :

EL(-) 6096
FROM MSL

SAMPLER

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

1-V-454

EIL

EIL

ISH

VIETSOVPETRO

CONSORTIUM

Contractor:

EL(-) 38986

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

REFER TO ENGINEERING

12"

FROM MSL

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

SPECIALITIES P&ID NO. 021396

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

1-P-453A/B

ITEM NO. :
ITEM NAME :
A

(NOTE-6)

14

13

12

11

10

Rev.

SLOP CAISSON SYSTEM

Company's document No.:


Path\File name\Initials:

15

Document title:

5.67 M3/hr
350 KPa (AT JACKET)

DIFF. PRESS.:

Path\File name\Initials:

OIL RECOVERY PUMPS

CAPACITY:

16

COMPANY

PETECHIM/VIETSOPETRO

DISTRIBUTION CODE:

Page(s)
37131123

16

15

12

13

14

ITEM NO. :
L

10

11

1-V-451

ITEM NAME :

SIZE/CAPACITY:

DESIGN PRESS.:

PRODUCED WATER DEGASSER

TILTING PLATE SEPARATOR (TPS)

1219 mm (ID) x 2438 mm (T/T)


350 KPa(g) & 50 mm WATER COLUMN VAC.

7.63 m3/hr
1.9 KPa(g)

65C

65C

1.

3.

DELETED.

4.

DELETED.

5.

ROTAMETER
NITROGEN
VENT

OF

2"-N-A1-6422

8.

IN

THE

VERTICAL

LINE

WHERE

BY

THROUGH

UPWARDS.
BE

SIZED

FOR

GAS

BLOW

LV-2401.

LOOP

TO

ENSURE

FULL

BORE

FLOW

FOR

SAMPLING.

3/4"

V/F

LO

FROM

PI

3/4"
3"

V/F

NOTE-6

LSLL-2408

V/F

LSHH-2407

2401

2"

(FUTURE)

FREE DRAINING

2"
FROM 1-V-253A
DWG NO. 1004

2"-P-A1-1074A

FROM 1-V-253B
DWG NO. 1104

3"-P-A1-1122

2"-P-A1-1074B

CLOSE

LSLL
2408

LT

LIC

LY

2402

2402

2402

LAHH

LSHH

2407

2407

2"-P-A1-1074D

LV

FREE DRAINING
FACE

LG
2405

LALL

LSLL

2406

2406

1-V-451

V/F

LT
2401

LIC
2401

V/F
V/F

FC

INC. P&ID NO. 021396

2"

2"

LAL

(FUTURE)

BTL

LALL-2406

1445

MM

FROM

BTL

LAH-2402

1975

MM

FROM

BTL

LAL-2402

1850

MM

FROM

BTL

LAH-2401

1800

MM

FROM

BTL

LAL-2401

1625

MM

FROM

BTL

LAH-2403

2170

MM

FROM

BTL

LAL-2404

1970

MM

FROM

BTL

1-V-453
LCP

SS
2401

BYPASS

LY

2"

2401

NOTE-7

V/F
2"-PW-A1-9403

SOV

V/F

2401

2401

V/F
3/4"

FC

V/F
3/4"

2403

2404

TREATED WATER TO

1"

3"x4"

SLOPS CAISSON
DWG NO. 1123

NO POCKETS
NOTE-8

FREE DRAINING

S
S
NC

FREE DRAINING

NC

NC

RECOVERED OIL TO

2"-P-A1-1098

2"

FREE DRAINING

1"x1'

1"x1"

345

345

PSV

4"

3"x4"
LOW POINT

2402
PI

PI

2403

2404

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

3/4"

1/2"

3/4"

Company;

XI

VIETSOVPETRO

SYSTEM

ENGINEERS INDIA LIMITED

PUMP 1-P-452B START/STOP

NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

SAND JET
CONNECTION

TO SLOPS CAISSON
FREE DRAINING

2"-PW-A1-9402

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

DWG NO. 1123

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

1-P-452A/B

ITEM NO. :
ITEM NAME :
A

CAPACITY:

CONDENSATE RECOVERY PUMPS

Path\File name\Initials:

2.27 m3/hr

Document title:

276 KPa

DIFF. PRESS.:

15

14

13

12

11

10

DISTRIBUTION CODE:

Rev.

OILY WATER SEPARATOR

Company's document No.:


Path\File name\Initials:

16

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

EIL

CONSORTIUM

Contractor:

XI
2401

START/STOP

EIL

ISH

PETECHIM/VIETSOPETRO

2402

PUMP 1-P-452A

CHEMICAL INJ.

V/F: TPS VENDOR SCOPE OF SUPPLY

DWG NO. 1012

PSV

2401

LEGEND:

BLACK COND. HOR.

2"-P-A1-1099

PRODUCED WATER FROM

2"-P-A1-1053

3"-PW-A1-9401

1-V-453

2"x4"

2" 3

CLOSED HEADER DRAIN

4"-DH-A1-2223

LSL

1:200

4"x3"

LV

4"x2"

LSH

300

LSLL-2406

2"-P-A1-1097

4"-P-A1-1123

NC
FROM

V/F

DWG NO. 1006

BTL

FROM

STOP DUTY PUMP

1"x1/2"

I/P

LP SUCTION SCRUBBER (1-V-254)

FROM

MM

2401

LV-2401

DWG NO. 1137

POINT
MM

1865

START DUTY PUMP

1/2"

NOTE-5

V/F

CLOSE

SET
1790

LAHH-2407

LAH

FI

2"-P-A1-1074E

REFER ENGINEERING SPECIALTIES

2401

3/4"

FROM 1-V-253E
DWG NO. 1404

NO.

LALL-2408

2402

FLA

3/4"

INTER

LAL
2404

V/F

2"-P-A1-1162

V/F

TAG.
LAH
2403

2402

LAL

V/F

INTERFACE

FROM 1-V-253D

I/P

LG
2406

CLOSE

2"-P-A1-1074C

LAH

V/F

FROM 1-V-253C

DWG NO. 1304

V/F

V/F

V/F

LALL
2408

LV-2402

DWG NO. 1204

LV-2402

SOV

V/F

2-"-P-A1-1100

2"-P-A1-1011

6"-VG-A1-2615

DWG NO. 1001

FREE DRAINING

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

OR

PROVIDED

IS

9. 1-V-453 CP TO HAVE SUITABLE SAFETY SIGN (380V).

2"-P-A1-1061

FROM 1-V-211A/B

BE

SHALL

TO ATM AT
SAFE LOCATION

FROM 1-V-231
DWG NO. 1008

TO

FLOW
TPS

7. PUMP 1-P-452A/B ARE DUTY/SPARE, START/STOP AND


SELECTOR SWITCH (SS-2401) OF DUTY PUMP ARE ON THE
LOCAL CONTROL PANEL (LCP).

INERT GAS

DELETED.

2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.

LV-0602

NOTES

6.

DWG NO. 1142

4"-FL-A1-2423

LP FLARE

DWG NO. 1135

DESIGN TEMP.:

1-V-453

Page(s)
37131124

16

15

14

13

12

10

11

NOTES

ITEM No.:

1-PK-461

ITEM NAME:

BFCC TYPE CHLORINE GENERATOR

CAPACITY

20 M3/HR
1379 kPa (g)

DESIGN PRESS.
DESIGN TEMP.

1.

DELETED

2.

PIPPING

L
FROM

PSV-2501

BY

CONTRACTOR

65 C

TAG.

NO.

SET

POINT

15 M3/hr

FSL-2501

3"-SH-A5-8301

1.5"-SH-A5-8309

TO CAISSON OF FIRE WATER PUMP 1-P-481B


DWG NO. 1130

J
1.5"-SH-A5-8308

TO CAISSON OF FIRE WATER PUMP 1-P-481A

1.5"-SH-A5-8303

TO CAISSON OF FIRE WATER PUMP 1-P-441B

DWG NO. 1129

I
1.5"-SH-A5-8302

TO CAISSON OF FIRE WATER PUMP 1-P-441A

DWG NO. 1122

TP2

3/4X1
1300

PSV

1-PK-461

2501

ESD SIGNAL

FROM PLC-1/2

FSL
2501

DC COPPER POWER OUTPUT(S)


DC MMO POWER OUTPUT(S)

FAL
XI

2501

2501

UA

1-PK-461
3"-WU-A5-4510

DWG NO. 1143

COMMON

ALARM

LOCAL CONTROL

TP1

UTILITY WATER

2501

PANEL

NEGATIVE DC RETURN

E
NOTE-2
FOR DETAILS SEE
BHPS P&ID NO.
BA08-K-001

TP3

PACKAGE-UNIT

2"-DW-A1-2320

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

DWG NO. 1122

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

ODD

EIL

ISH

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

CHLORRINATION SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131125

16

15

3713-00-02-41-0110 &0111.
6. LSH-2612 IS MOUNTED ON CRANE-1 DIESEL TANK AND LSH-2613

TO CRANE-2
NOTE-8
NOTE-6

ODD

1"

V/F

NO

1"

LSHH

CSO

LAHH

2607

2607

2601

NC

1-F-471A

ST

LG

1-F-471B

ST

2602

2601

NO

V/F

2602

NO

CD
2601

2"-DH-A1-2226

1"
1"

1"

3/4"

NO

3/4"

1"

1"-DH-A1-2207

LI
2605

NC

1-T-471

2"-DH-A1-2205

4"-VG-A1-2627

TAG

SS TUBING

CONNECT HOSE

1-F-472B

LG

ST

2604

2604

NO

CD
2604

1"

SS TUBING

1"

3/4"

INST.

3/4"

3/4"

NC

1900

LALL-2609

150

2"-DF-A1-6209

LOW
POINT

2607

A1
B1

3"x2"

3/4"
STOP

PB
2601

XI

2601

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Date

Description of revision

PB

XI
2602

PB
2603

A1

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT


CENTRAL COMPRESSION PLATFORM
WHITE TIGER FIELD

XI

Company's contract No.:

2603

SCALE

Type of document

CCP-WT/95

ESD

1-P-471A/B

ITEM No.
A

16

14

13

12

11

Rev.

DIESEL STORAGE SYSTEM

Company's document No.:

400 kPa

Document title:

6.8 m3/hr

10

Path\File name\Initials:

TREATED DIESEL TRANSFER PUMP

400 kPa

15

ESD

6.8 m3/hr

CAPACITY
DIFF. PRESS.

FROM LSLL-2610

1-P-472

UNTREATED DIESEL TRANSFER PUMPS

ITEM NAME.

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

LSHH-2609

COMPANY

CONSORTIUM

Project name:

EIL

PETECHIM/VIETSOPETRO

Basic Engineering:

FROM LSLL-2606

EIL

ISH

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

3/4"
STOP

DWG NO. 1144

Contractor:

A1 B1

2602

DIESEL LINE

AS - BUILT

B1

3"x2"

A1 B1
STOP

14.3.97

Detailed Engineering:

3/4"

A1 B1

PI
2607
ST

1"x2"

1"x2"

1"x2"

A1
B1

3"x2"

BTL
BTL

VIETSOVPETRO

PI
2604
ST
2606

FROM

DD-MM-YY

PI

MM

BTL
BTL

FROM

2"-DF-A1-6217

Company;

2603

MM

BTL
BTL

FROM
FROM

DWG NO. 1137

NC

POINT

3"-DF-A1-6207

LAHH-2610

FROM
FROM

MM
MM

TO CDH

2"-DH-A1-2214

C
ST

1800
300

POINT
MM

MM

NO

1"

2"-DF-A1-6208

3"-DF-A1-6206

500

PDI-2601/02/05/06(MAX)

Rev.

2605

SET
9720

LALL-2606
LAL-2611

DRAIN

3/4"

NO.

LAHH-2607

LAH-2611

INST.

1"

NO

LOW

TO CDH

2"-DH-A1-2208

TO CDH

DWG NO. 1137

DRAIN

DWG NO. 1137

NO

3"-DF-A1-6214

DRIPLESS QUICK

V/F

DWG NO. 1144

1-P-472

NO

LALL

NOTE-1

DRIPLESS QUICK CONNECT HOSE

LINE

I
TRIP

1"

TO BE PROVIDED AT BOAT LANDINGS

DIESEL GRAVITY

2"-DF-A1-2613

2606

2"-DF-A1-6211

REEL

1"

CSO
LSLL

1"-DH-A1-2254

NORTH

EAST

HOSE

V/F

LAL

2610

2610

1"

2606

LI
2611

LAH

LSLL

LALL

2"

AT CELLAR
DECK
LEVEL

700

2604

NC

LT
2611

1E2

CASE

NO

1"

INST.

A/B

2612

1-T-472

2606

1-P-471A/B

NO

LG

2609

2609

PSV

1"

ODD

LSHH

LAHH

V/F

TRIP

SS TUBING

NO

1"

FIRE

LT
2605

TRIP

1-P-471A/B
1"

NO

CSO

DRAIN

1"x2"

4"-DW-A1-2329
1"

NOTE-4

CD
2602

2"-DH-A1-2205

LOCATE

1"

PDI

1"

NO

NC

2603

2"-DH-A1-2214

LG

8"
MAN HOLE

CD

1"-DH-A1-2212

V/F

1"

2601

4"-DF-A1-6202

4"-DF-A1-6210

4"-DF-A1-6201

FE-2601

CRANE PEDESTAI

NO

1"

ST

2"-DF-A1-6216

NO

1"

V/F VENDOR FURNISHED

SAFE LOCATION

2604

NO

J
LEGEND:

NO

1-F-472A

LG
2603

2602

1"

CSO

FT

2"

V/F
HOOTER AT
BOAT LANDING
AND ALARM IN CPP2

2"-DF-A1-6217

PDI

V/F

V/F

TO ATM AT

2"-DF-A1-6212

2"-DH-A1-2214

PDI

PSV
2602

CSO

2"

2601

900

CASE

V/F

FDI
2601

1E2

FIRE

900
PSV
2601

CSO

1"

1"

2"-DH-A1-2211

FIRE
CASE

NC

HOLES

6"-DW-A1-2340

1133

FROM RISER PLTF.

25 mm

4"-DF-A1-6205
4"-DF-A1-6204

ODD

4"-DF-A1-6203

4"-DF-A1-6219

1"
CSO

3/4"
CSO

OPEN DECK DRAINS.

V/F

2"

1"

CSC

700
PSV
2603

NOTE-2

6"-VG-A1-2626

TSV

1E2

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

6"-VG-A1-2625

VENT AT SAFE LOCATION

900

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CASE
CSO

NOTE-7

3/4x1

NOTE-5
NOTE-6

2601

8. CRANE DAY TANK SHALL HAVE OVERLOW LINES ROUTED TO

1E2

FIRE

1.5"x1"
2"x1.5

2"-DF-A1-6222

DWG NO. 1144

ON CRANE-2 DIESEL TANK, TO ALARM IN DCS


7. LOCATE VALVE AT CRANE DAY TANK NEAR CRANE PLATFORM.

1"-DH-A1-2210

DWG NO. 1140

PDI
2605

NOTE-7

1"-AU-A3-5227

V/F

2"-DF-A1-6215

UTILITY AIR

DIESEL

3. ONLY ONE CRANE PEDESTAL (i.e. CRANE-1) SHALL BE USED FOR STORING
4. LI SHOULD BE READABLE FROM CELLAR DECK LEVEL NEAR 1-P-471A/B
5. FOR GENERRAL NOTES REFER P&ID No.

2"x1.5"

NOTE-7

DIESEL

BY DECK CRANE FOR BOATS UNLOADING DURING ROUGH WEATHER


2. ALL FLAME ARRESTORS SHALL BE ACCESSIBLE FROM PLATFROM DECK

60C

2"-DF-A1-6223

DWG NO. 1144

1. THIS HOSE REEL SHALL BE KEPT ON DECK AND SHALL BE ACCESSIBLE

1.5"x1"

1"-AU-A3-5226

DWG NO. 1140

NOTES:

1750mm(D) X 2250mm(H)
FULL OF LIQ. + 150 mmWC/-50 mmWC VACUUM

60C

TREATED DIESEL STORAGE TANK

6.8 m3/hr
700 kPa (g)

60C

NOTE-7

UTILITY AIR

1-T-472

DIESEL FILTER COALESCER

13.0 m3

FULL OF LIQ. + 150 mmWC/-50 mmWC VACUUM

60C

1-F-472A/B

DIESEL STORAGE (CRANE-1 PEDESTAL)

6.8 m3/hr
900 kPa (g)

DESIGN TEMP.

1-T-471

INLET FILTER COALESCER

CAPACITY/ZISE
DESIGN PRESS.

10

11

1-F-471A/B

ITEM NAME.

12

13

14

ITEM No.

Path\File name\Initials:

DISTRIBUTION CODE:

Page(s)
37131126

16

15

12

13

14

10

11

NOTES:
L

1.

(TYPICAL-ONE UNIT)

HOSE REEL

(NOTE-7)

EDUCTOR

K
11 "

11 "

11 "

OF

WATER

DELETED

3.

THE

THE

BE

HERE

IS

ACTUAL

&

ARRANGEMENT

BASED

ON

FINAL

WATER

HEADERS

FROM

DAMAGE

SHALL

EACH

OF

BE

HEADER

BOTH

LAID

TO

MINIMISE

HEADERS

DUE

TO

FIRE

MANUAL

THE

BYPASS

VALVE

ACCESSIBLE
FROM

ASSOCIATED

SHOULD

AREA

THE

FIRE

SUCH
IN

SPRINKLER

BE

LOCATED

THAT

THE

IT

AREA

IS

COVERED

SYSTEM.

227 LITERS

5.

PB-2701
SSD

(ZONE-2)

OF

&

2702

PANEL.

THEY

RESPECTIVE

ARE

LOCATED

SHALL

DELUGE

BE

IN

USED

FOR

OPENING

VALVES.

QTY: 1 UNIT

CSO

CSO

CSO

6.

DELETED

7.

DELETED

8.

FLUSH

9.

DELETED

LINES

10.

DELETED

11.

DELETED

12.

DELETED

SHALL

BE

LOCATED

AT

END

OF

HEADERS.

11 "-WF-A5-4265

11 "-WF-A5-4264

11 "-WF-A5-4263

11 "-WF-A5-4262

11 "-WF-A5-4267

DWG NO. 1129

DWG NO. 1129

FIRE WATER HEADER

DWG NO. 1130

14"-WF-A5-4203

FIRE WATER HEADER

NOTE-3

13. POV 2701/2702 HAVE A MANUAL SWITCH TO OPEN XV-2701/2

11 "-WF-A5-4266

DWG NO. 1129

11 "-WF-A5-4269

11 "-WF-A5-4268

DWG NO. 1129

11 "-WF-A5-4261

I
11 "-WF-A5-4260

DWG NO. 1128

14. ADEQUATE NO. OF ISOLATION VALVES SHALL BE PROVIDED


IN
NO

NOTE-15

HOSE

PI

2702

2702

FLUSH LINES TO SEA

CHARGER PANEL

PSL

PI

2704

PLC-1

FUSIBLE PLUG

2706

(NOTE-8)

SOV

SOV

2701

2703

2701

NOTE-13

14"x12"
14"
NOTE-4

XV

POV

SOV

SOV

FMR

IAS

TAG

2702

2704

2702

PAL

FMR

IAS

PLC-1

PAL

PSL

2701

BE

LOCATED

SET

PSH

PI

2704

2703

POINT

14.3.97

AS - BUILT

20.11.96

REVISED AS MARKED.

26.3.96

REVISED AS PER HAZOP COMMENTS

SA

PSH

PI

2708

2707

PAH
2708

RB

PH
PH

9.2.96

APPROVED FOR ENGINEERING

VP

RB

6.2.96

REVISED AND ISSUED FOR APPROVAL

VP

RB

9.1.96

VP

RB

19.12.95

REVISED AS PER COMMENTS AND


ISSUED FOR APPROVAL

RLT

ISSUED FOR COMMENTS

Date

Description of revision

SP

TYP.
NOTE-1

LOC

JUY

RB

EIL

EIL

WORLEY

SHI

COMPANY

PETECHIM/VIETSOPETRO
CONSORTIUM

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

SPRINKLER LOOP

10"-WF-A5-4256

VP

& ISSUED FOR APPROVAL

VIETSOVPETRO

SPRINKLER LOOP

ISH

SDH

ZSC
2702

2702

Contractor:

10"-WF-A5-4256

NOTE-1

NORMALLY

200 kpa(g)
200 kpa(g)

PAL-2704

Company;

SP

AND

450 kpa(g)
450 kpa(g)

PAL-2702
NOTE-4

DD-MM-YY

TYP.

ACCESSIBLE

200 kpa(g)
200 kpa(g)

PAH-2705

10"

Rev.

IN

NO

2705

PAH

OR

ZSO

ZIC

2701

2704

WATER

ZONE

2702

2702

ZSC

ZIC

SHALL

PAH-2704

I
2701

FIRE

ANY

FMR

ZIO

2705

2701

I
PSL

FOR

FO

14"x12"

ZSO

ZIO
2701

AREA

EFFECTING

AREA.

PAL-2705

XV

FO

2701

SAFE

WITHOUT

2702

FMR

NORMALLY

ISOLATION

PAL-2701

NOTE-13

2701

AND

CSO

2702

2701

POV

LOOP

REEL.

ST-1272

PB

SP

VALVE
SAFE

NOTE:5

PB

SP

CSO

NOTE:5

15.

10"-WF-A5-4259

2704

PLC-2

CSO

ST-1271

10"-WF-A5-4258

PAL

PLC-2

CSC

CSO

DWG NO. 1128

IAS

CHARGER PANEL

PLC-1

IAS

FUSIBLE PLUG

14"-WF-A5-4257

2702

PLC-2

PSL

14"-WF-A5-4256

PAL

PLC-2

CSC

14"-WF-A5-4224

DWG NO. 1130

14"-WF-A5-4204

FIRE WATER HEADER

ACCESSIBLE

STANDBY
FIRE WATER HEADER

14"-WF-A5-4221

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

CSO

FIRE

EASILY

BY

FOAM

CELLAR DECK

QTY: 3 UNIT

CSO

SHALL

THE

SIZES

TANK

227 LITERS

(ZONE-1)

QTY: 1 UNIT

SHOWN

DECK.

LINE

CONCENTRATE

TANK

CELLAR DECK

TANK
227 LITERS

JACKET LEVEL

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CONCENTRATE

CONCENTRATE

LOOPS

SEPARATED

PROTECTED

11 "

FOAM

FOAM

EACH

IN
11 "

TWO

WIDELY

SIMULTANEOUS

4.

11 "

FIRE

ARRANGEMENT

FOR

SPRINKLERS.

4"

11 "

11 "

OF

2.

FILL VENT

3/4"

4"

11 "

11 "

SYSTEM

INDICATIVE

NUMBER

EQUIPMENT LAYOUT

EDUCTOR

FILL VENT

3/4"

4"

11 "

11 "

HOSE REEL

EDUCTOR

FILL VENT

3/4"

DELUGE

ONLY

PACKAGED UNIT
HOSE REEL

THE

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

FUSIBLE PLUG

FUSIBLE PLUG

LOOP

LOOP

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

3
2" FLUSH CONN.

16

15

14

13

11

10

Path\File name\Initials:
8

Rev.

F.W.DISTBN. SYSTEM FOR CELLAR DECK & JACKET LEVEL

Company's document No.:

(ZONE-2)
12

Document title:

CELLAR DECK

(ZONE-1)

Path\File name\Initials:

2" FLUSH CONN.

CELLAR DECK & JACKET LEVLE

DISTRIBUTION CODE:

Page(s)
37131127

16

15

12

13

14

10

11

NOTES:
L

(TYPICAL-ONE UNIT)

(TYPICAL-ONE UNIT)

(TYPICAL-ONE UNIT)

(TYPICAL-ONE UNIT)

1.

(TYPICAL-ONE UNIT)

(NOTE-7)

HOSE REEL

HOSE REEL

EDUCTOR

EDUCTOR

FILL VENT

3/4"
NC

11
2

11 "

HOSE REEL

"

EDUCTOR

FILL VENT

3/4"

4"

11 "

NC

11
2

11 "

HOSE REEL

"

FILL VENT

3/4"

4"

11 "

NC

11
2

11 "

HOSE REEL

EDUCTOR

"

3/4"

4"

11 "

NC

11
2

11 "

"

11
2

"

11
2

11 "

FOAM

CONCENTRATE
TANK

TANK

THE

4.

FILL VENT

"

CSO

CSO

CSO

CSO

CSO

CSO

CSO

EASILY

CONCENTRATE

CSO

6.

TANK

TANK

CSO

7.

227 LITERS

COOLER DECK

8.

CSO

THE

BASED

ON

&

2802
THEY

FIRE

FINAL

SUCH

DELUGE

MINIMISE
DUE

TO

FIRE

LOCATED
IT

AREA

IS

COVERED

SYSTEM.

LOCATED
BE

BE

THAT

THE

SPRINKLER

ARE
SHALL

LAID

TO

HEADERS

SHOULD

IN

BE

HEADER

BOTH

AREA

THE

SHALL

EACH

OF

VALVE

ASSOCIATED

IN

USED

FOR

OPENING

VALVES.

DELETED
FLUSH

LINES

TOP

9.

DELETED
DELETED

11.

DELETED

12.

DELETED

SHALL

BE

LOCATED

AT

END

OF

HEADERS.

DECK.

ACCESSIBLE

STANDBY
HOSE
15.

AND

LOOP

NORMALLY

ISOLATION

SAFE

WITHOUT

AREA

FOR

EFFECTING

FIRE

ANY

WATER

ZONE

OR

REEL.

GRIDDED
ONLY

WET

SPRINKLER

INDICATIVE

FOR

SYSTEM

ROOMS

IN

ARRANGEMENT
MIDDLE

DECK

SHOWN

HERE

IS

CONSIDERING

AS ORDINARY HAZARD. NUMBER OF SPRINKLERS, LINE SIZES

IS

ARRANGEMENT

14. ADEQUATE NO. OF ISOLATION VALVES SHALL BE PROVIDED

11 "-WF-A5-4212

11 "-WF-A5-4211

HEADERS

FROM

BYPASS

FROM

PANEL

10.

&

DWG NO. 1129

ARRANGEMENT

OF

FIRE

WATER

LOOPS

SHALL

BE

BASED

ON

FINAL EQUIPMENT LAYOUT.

H
DWG NO. 1127

BE

HERE

ACTUAL

&

13. POV 2801/2 HAVE A MANUAL SWITCH TO OPEN XV-2801/2

CSO

11 "-WF-A5-4210

11 "-WF-A5-4209

11 "-WF-A5-4280

11 "-WF-A5-4279

11 "-WF-A5-4278

11 "-WF-A5-4277

11 "-WF-A5-4276

11 "-WF-A5-4275

11 "-WF-A5-4274

11 "-WF-A5-4273

11 "-WF-A5-4272

11 "-WF-A5-4271

11 "-WF-A5-4286

11 "-WF-A5-4285

11 "-WF-A5-4284

11 "-WF-A5-4283

11 "-WF-A5-4282

11 "-WF-A5-4281

11 "-WF-A5-4292

11 "-WF-A5-4291

11 "-WF-A5-4290

11 "-WF-A5-4289

11 "-WF-A5-4287

DWG NO. 1129

SHOWN
THE

SIZES

DELETED

IN

DWG NO. 1129

DECK.

LINE

SHALL

DAMAGE

RESPECTIVE

ON

QTY: 2 UNIT

CSO

WATER

ACCESSIBLE

PB-2801

OF

FOAM

I
11 "-WF-A5-4288

14"-WF-A5-4203

FIRE WATER HEADER

16.

NOTE-3

VALVE
SAFE

SHALL

BE

LOCATED

IN

ACCESSIBLE

AND

NORMALLY

AREA.

NO
NOTE-16

PI

2802

2802

CSO

ST-1281

PSL

PI

2804

2807

CSO

SOV

SOV

2803

2801

FMR

8"
NOTE-4

XV

POV

SOV

SOV

2802

2804

2802

NOTE-13

PLC-1

ZIO

FMR

FMR

IAS

NC

2810

FMR

NC

ZSO

PAL

2801

2806

PLC-1

4"-WF-A5-4294

4"-WF-A5-4293

3"-WF-A5-4239

200 kpa(g)
200 kpa(g)

NO FLOW
INDICATION

FS
2810

E
LEGEND:

WATER

PSH

PI
2804

ALARM

14.3.97

AS - BUILT

20.11.96

REVISED AS MARKED.

SA

SDH

26.3.96

HAZOP COMMENTS INCORP. 4

VP

RB

PH
PH

PI

2802

2802

2810

PAH
2809

PSH

PI

2809

2808

& ISSUED FOR APPROVAL


0

9.2.96

APPROVED FOR ENGINEERING

VP

RB

6.2.96

REVISED AND ISSUED FOR APPROVAL

VP

RB

9.1.96

19.12.95

Rev.

COMMENTS INCORPORATED

VP

AND ISSUED FOR APPROVAL


ISSUED FOR COMMENTS

Date

Description of revision

DD-MM-YY

Company;

NOTE-1

TYP.

SP

NOTE-15

FUSIBLE PLUG

FUSIBLE PLUG

LOOP

LOOP

RB

RLT

RB

EIL

EIL

WORLEY

SHI

COMPANY

CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

WET SPRINKLER LOOP

SPRINKLER LOOP

SPRINKLER LOOP

NOTE-1

SP

TYP.

LOC

JUY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

Contractor:

SP

ISH

ZSC

ZIC

2804

FLOW

2802

2806

TYP.

ZSO

ZIO
2802

PSL

2801

PAH

6.8 M3/HR

PAL-2802

(NOTE-8)

2801

2804

450 kpa(g)
450 kpa(g)

FA-2810

PAL-2804

8"

ZSC

ZIC
2801

PAH-2809

PROCESS PLC

FO

I
PSL

FA

NOTE-4

8"

2801

200 kpa(g)
200 kpa(g)

PAH-2804

CSC

POINT

FLOW/

8"

XV
2802

FO

PAL

SET

PAL-2806

FLUSH LINES TO SEA

CONNECTION

NO

PAL-2801

2802

NOTE-13

2801

CSC

PB

SP

2801

IAS

CSO

1.5" DRAIN

2801

POV

CSO

NOTE:5

PB

2801

CSO

TAG

ST-1282

NOTE:5
SP

3"-WF-A5-4232

CHARGER PANEL

8"-WF-A5-4298

IAS

FUSIBLE PLUG

PLC-1

PSL

CSO

PAL
2804

PLC-2

PLC-2

PLC-1

CHARGER PANEL

PLC-2

FUSIBLE PLUG

8"-WF-A5-4296

PAL
2802

PLC-2

8"-WF-A5-4297

14"-WF-A5-4204

FIRE WATER HEADER

8"-WF-A5-4295

DWG NO. 1127

IAS

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CSO

FIRE

MANUAL

SSD

QTY: 2 UNITS

EACH

LOOPS

SEPARATED

PROTECTED

227 LITERS

QTY: 3 UNITS

QTY: 3 UNITS

THE
IN

4"

11 "

11 "

MAIN UPPER DECK

TWO

WIDELY

CONCENTRATE

TANK

ARRANGEMENT

FOR

SPRINKLERS.

SIMULTANEOUS

FOAM

227 LITERS

MAIN DECK

MEZZANINE DECK

QTY: 3 UNITS

CONCENTRATE

227 LITERS

MIDDLE DECK

WATER

FIRE

BY

11 "

FOAM

CONCENTRATE

227 LITERS

FOAM

OF

3.

11 "

OF

DELETED

5.
11 "

SYSTEM

INDICATIVE

EQUIPMENT LAYOUT

3/4"

4"

11 "

DELUGE

NUMBER

2.

EDUCTOR

FILL VENT

THE

ONLY

PACKAGED UNIT

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

3
2" FLUSH CONNECTION

Document title:

MAIN UPPER DECK

15

14

13

12

11

10

Rev.

F.W.DISTBN. SYSTEM FOR MAIN DECK AND OTHER DECKS

Company's document No.:

MIDDLE DECK

Path\File name\Initials:

16

Path\File name\Initials:

2" FLUSH CONNECTION

MAIN. MEZZANINE & MIDDLE DECK

DISTRIBUTION CODE:

Page(s)
37131128

16

15

12

13

14

10

11

NOTES:
ITEM No.
L

ITEM NAME:

1-P-481A

1-PK-481A

FIRE WATER PUMP

FIRE WATER PUMP-A PACKAGE

CAPACITY: m3/hr:
DISCH. PRESS. Kpa(g):
(AT CELLAR DECK)

1. THE TWO FIRE WATER HEADERS SHALL BE LAID OUT


WIDELY SEPARATED FROM EACH OTHER TO AVOID

710

SIMULTANEOUS DAMAGE OF BOTH THE HEADERS DUE TO FIRE

1060
TO PLC-1

TO PLC-2
2. INDICATING TYPE BUTTERFLY VALVE SHALL BE PROVIDED.

3. LINE FOR INJECTING COPPER- CHLORINE SOLUTION INTO FIRE


WATER PUMP

SHALL BE PROTECTED AGAINST MECHANICAL

DAMAGE LANDING AT BOAT LANDING AREA.

2909

4. LOCATE PAL-2908 & PAL-2909 IN SSD PANEL.

2907

NC

NOTE-7

PSL

PSL

2908

2909

7. ON PSL ACTUATION DUTY FIRE WATER PUMP STARTS


IN CASE DUTY FIRE WATER PUMP FAILS TO START

NOTE-7

STANDBY PUMP STARTS.

DUTY / STANDBY SELECTOR FOR FIRE WATER PUMP

1 1/2"-WF-A5-4260
CSO

2"

1 1/2"-WF-A5-4262

CSO

2"

2"

SHALL BE LOCATED IN SSD PANEL.

CSO

2"

2"

8. PROVIDE A SEAL BY ENSURING THE BOTTOM OF THE SEAL

2"

14"-WF-A5-4203

FIRE WATER HEADER

14"-WF-A5-4204

FIRE WATER HEADER

14"-WF-A5-4214

11. PROVIDE FLOW ORFICE & DOWN STREAM GLOBE VALVE ON

NO

NO

APPROACHABLE AREA.
15. PIPE TO BE SLOPED DOWNWARD TOWARDS OPEN END
AND CUT AT 45 IN HORIZONTAL PLANE TO PROVIDE

8"-EX-A6-4336

1"
NO

2901

14"

14"-WF-A5-4205

PSV
2902

8"-WF-A5-4215

V/F

START

START

10"x8"

ARV

V/F

PACKAGE UNIT LIMIT

EXPANSION

PUMP START

V/F

1-PK-481A

PB

DAY TANK

12"x14"

TP13

TP1

3"-WF-A5-4212

FAIL TO START

(NOTE-7)

TP2

TP6

TP21

TP4

FAIL TO START

XA

TP5

2902

TAG NO

SET POINT

PAL-2908/09

600 kPa (g)

ODD

NC

ODD

VENDOR

SIGNALS

TO

LCR

E
B

14.3.97

AS - BUILT

20.11.96

REVISED AS MARIKED

28.3.96

AND ISSUED FOR APPROVAL

COMMENTS FROM SHI INCORP.

6.2.96

COMMENTS FROM COMPANY INCORP.

8.1.96

PH

RB

PH

27.12.95

COMMENTS FROM M/S SHI INCORREVISED & ISSUED FOR APPROVAL

15.12.95

REVISED & ISSUED FOR APPROVAL

RLT

22.11.89

ISSUED FOR COMMENTS

VP

Date

NL/SS

Description of revision

Company;

EIL

LOC

JUY

RB

RB

RB

RLT

PORATED & REISSUED FOR APPROVAL

DD-MM-YY

AC
RB

EIL

WORLEY

SHI

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:
ODD

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

TO CDH

2"-DH-A1-2272

RB

VP

22.12.95

1.5"-SH-A5-8308

VP

Rev.

OVER BOARD

SDH

VP

AND ISSUED FOR APPROVAL

ISH

SA

VP

AND ISSUED FOR APPROVAL

HOZOP COMMENTS INCORPORATED

APPROVED FOR ENGINEERING

9.2.96

1"-DF-A1-4244

FI
2902

1"-DF-A1-4233

NOTE-6

HOLD:

12 mm SS TUBING

EL (+) 0

3/4"-DH-A1-2279

1.5"-DH-A1-2278

LO

(NOTE-3)

DWG NO. 1144

NOTE-22

TP9

DWG NO. 1125

TP14

2902

1-PK-481A

SEE SPP DRG. NO: E15831/03

1.5"-SH-A5-8308

DIESEL SUPPLY

NOTE-17

NOTE-10

COPPER CHLORINE SOLUTION

1.5"-DF-A1-6220

TP16

22. 250# ON PUMP TO BE MATED WITH 150# FLANCE


ON PIPING (V/F).

ATM

NOTE-19

10"-WF-A5-4206

OVER BOARD

A TIME DELAY OF 1 MINUITE.

TP10

2"-WF-A5-4207

(+ 5500mm)

HEADER THE STANDBY FIRE WATER PUMP SHALL START AFTER

2901A

( NOTE 12, 14, 16, 18 & 21)

JOINT

2901

V/F

BEING PUT ON MANUAL


21. IN CASE THE LOW PRESSURE PERSISTS IN THE FIRE WATER

FLA

TP12

8"

PCV

20. INTERLOCK SHOULD BE PROVIDED TO PREVENT BOTH PUMPS

PUMP ON MANUAL

V/F

CSO

2901

19. DELETED

2901

2902

BETWEEN A & B FIRE WATER PUMPS.

2903

PB

XI

LOCATION

TP15

CSO

SET @

1060 kPa(g)

XA

PIPE TO SAFE

14"-WF-A5-4201

1379

NOTE-6

18. PROVIDE FACILITY FOR INTERCHANGING OF AUTO START

NOTE-15

TP20

8"x8"

WEATHER PROTECTION.

17. TANK LEVEL GAUGE TO BE VISIBLE FROM THIS VALVE.

1"-DH-A1-2281

8"-WF-A5-4208

NOTE-20

16. PUMP SHALL STOP MANUALLY

ARRESTOR

CSC
FE
2901

SILENCER/

NOTE-11

13. DELETED

CSC

500mm

CHARGE ACCUMULATOR AND AUTO CHARGING FACILITY.

DWG NO. 1128

14. FIRE WATER PUMP SHALL BE LOCATED IN SAFE AND EASILY

12mm SS TUBING

14"

12. IN ADDITION TO BATTERY STARTING, DIESEL ENGINE SHALL


BE DISIGNED WITH HYDRAULIC STARTING SYSTEM INCLUDING

1 1/2"-WF-A5-4287

NOTE-8

FI

HORIZONTAL RUN
DWG NO. 1127

PIPING INST.

TP11

DWG NO. 1130

10. TEST FIRE WATER PUMP START (SIMULATING FSD LOOP


LOSS OF SIGNAL) WITHOUT ACTULLY CAUSING FSD.

1.5"-DH-A1-2282

2"-WU-A5-4509

1-P-481B

9. DELETED

DWG NO. 1130

1 1/2"-WF-A5-4266

1"-DH-A1-2280

UTILITY WATER HEADER

2"

1"-DF-A1-4233

2"

CSD

1"-DF-A1-4244

1 1/2"-WF-A5-4291

PIPE IS MINIMUM 500mm HIGHER THAN TOP OF HDR. PIPE.


DWG NO. 1130

1 1/2"-WF-A5-4289

CSO

DWG NO. 1143

6. LOCATE AT CELLAR DECK.

NOTE-4

NOTE-2

DWG NO. 1128

NOTE-4

NC

NOTE-2

DWG NO. 1127

DWG NO. 1128

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

2908

PT

1 1/2"-WF-A5-4269

NOTE-2

DWG NO. 1127

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

2907

5. DELETED

NOTE-2

DWG NO. 1127

PAL

8"-WF-A5-4237

DWG NO. 1133

PAL

TO/FROM RISER
PLATFROM

14"-WF-A5-4202

PI

Detailed Engineering:

DWG NO. 1130

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

EL (-) 14.000mm (MIN.)

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

FIRE WATER PUMP SYSTEM - PUMP A

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131129

16

15

12

13

14

10

11

NOTES:
ITEM No.
L

ITEM NAME:

1-P-481B

1-PK-481B

FIRE WATER PUMP

FIRE WATER PUMP-B PACKAGE

CAPACITY: m3/hr:
DISCH. PRESS. Kpa(g):
(AT CELLAR DECK)

1. THE TWO FIRE WATER HEADERS SHALL BE LAID OUT


WIDELY SEPARATED FROM EACH OTHER TO AVOID

710

SIMULTANEOUS DAMAGE OF BOTH THE HEADERS DUE TO FIRE

1060

2. INDICATING TYPE BUTTERFLY VALVE SHALL BE PROVIDED.


3. LINE FOR INJECTING COPPER- CHLORINE SOLUTION INTO FIRE
WATER PUMP

SHALL BE PROTECTED AGAINST MECHANICAL

DAMAGE LANDING AT BOAT LANDING AREA.


4. DELETED

5. DELETED
6. LOCATE AT CELLAR DECK.

7. IN CASE DUTY PUMP FAILS TO START, STANDBY PUMP START,

DUTY / STANDBY SELECTOR FOR FIRE WATER PUMP


DWG NO. 1129

FIRE WATER HEADER

14"-WF-A5-4203

(NOTE-1) FIRE WATER HEADER

FIRE WATER HEADER

14"-WF-A5-4204

(NOTE-1) FIRE WATER HEADER

SHALL BE LOCATED IN SSD PANEL.


DWG NO. 1127
8. DELETED

DWG NO. 1127

10. TEST FIRE WATER PUMP START (SIMULATING FSD LOOP


LOSS OF SIGNAL) WITHOUT ACTULLY CAUSING FSD.
11. DELETED

12. IN ADDITION TO BATTERY STARTING, DIESEL ENGINE SHALL


BE DISIGNED WITH HYDRAULIC STARTING SYSTEM INCLUDING

NO

NO

CHARGE ACCUMULATOR AND AUTO CHARGING FACILITY.

NOTE-2

NOTE-2

13. DELETED
PIPING

14. FIRE WATER PUMP SHALL BE LOCATED IN SAFE AND EASILY

INST.

APPROACHABLE AREA.
15. PIPE TO BE SLOPED DOWNWARD TO OPEN END
AND CUT AT 45 IN HORIZONTAL PLANE TO PROVIDE

8"-EX-A6-4240

12mm SS TUBING

1"
NO

8"x8"
1379

NOTE-6
PSV

START

START

20. INTERLOCK SHOULD BE PROVIDED TO PREVENT BOTH PUMPS

PUMP ON MANUAL

BEING PUT ON MANUAL

V/F

TP20

PACKAGE UNIT LIMIT

EXPANSION

21. IN CASE THE LOW PRESSURE PERSISTS IN THE FIRE WATER

FLA

V/F

HEADER THE STANDBY FIRE WATER PUMP SHALL START AFTER

2901B

A TIME DELAY OF 1 MINUITE.

( NOTE 12, 14, 16, 18 & 21)

JOINT

PUMP START

1.5"-DF-A1-6221

TP16

FROM SSD PLC

DIESEL SUPPLY

ARV

NOTE-10

V/F

3001

DAY TANK

12"x14"

TP1

ODD

NOTE-22

3"-WF-A5-4243

TP13

ATM

NOTE-19

10"-WF-A5-4246

TP14

3002

1-PK-481B

2"-WF-A5-4247

V/F

1-PK-481B

PB

1.5"-DH-A1-2277

10"x8"

PCV

HOLD:

FAIL TO START

(NOTE-7)

TP4

XA

TP5

3002

FI
3002

NC

ODD

1"-DF-A1-4218

NOTE-6

(NOTE-3)

1"-DF-A1-4219

DWG NO. 1125

TO

14.3.97

AS - BUILT

20.11.96

REVISED AS MARIKED

28.3.96

LCR

AND ISSUED FOR APPROVAL

COMMENTS FROM SHI INCORP.

6.2.96

COMMENTS FROM COMPANY INCORP.

8.1.96

VP

RB

PH

VP

RB

PH

27.12.95

COMMENTS FROM M/S SHI INCOR-

22.12.95

REVISED & ISSUED FOR APPROVAL

15.12.95

REVISED & ISSUED FOR APPROVAL

RLT

22.11.89

ISSUED FOR COMMENTS

VP

Rev.

Date

NL/SS

Description of revision

Company;

EIL

LOC

JUY

RB

RB

RB

RLT

PORATED & REISSUED FOR APPROVAL

DD-MM-YY

AC
RB

EIL

WORLEY

SHI

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

OVER BOARD

SDH

VP

AND ISSUED FOR APPROVAL

ISH

SA

VP

AND ISSUED FOR APPROVAL

HOZOP COMMENTS INCORPORATED

APPROVED FOR ENGINEERING

9.2.96

12 mm SS TUBING

EL (+) 0
1.5"-SH-A5-8309

3/4"-DH-A1-2273

1.5"-DH-A1-2274

FAIL TO START

1"-DH-A1-2276

TP21

1"-DH-A1-2275

TP6

1"-DF-A1-4219

TP2

SIGNALS

E
1"-DF-A1-4218

TP9

VENDOR

LO

SEE SPP DRG. NO: E15831/03

COPPER CHLORINE SOLUTION

8"-WF-A5-4241

3001

22. 250# ON PUMP TO BE MATED WITH 150# FLANCE


ON PIPING (V/F).

DWG NO. 1144

(NOTE-22)

CSO

8"

19. DELETED

3001

3002

BETWEEN A & B FIRE WATER PUMPS.

3003

PB

XI

LOCATION

TP12

1060 kPa(g)

XA

PIPE TO SAFE

NOTE-17

3002

V/F
SET @

18. PROVIDE FACILITY FOR INTERCHANGING OF AUTO START

NOTE-15

TP15

CSO

WEATHER PROTECTION.

17. TANK LEVEL GAUGE TO BE VISIBLE FROM THIS VALVE.

ARRESTOR

14"-WF-A5-4241

NOTE-20

16. PUMP SHALL STOP MANUALLY

SILENCER/

14"-WF-A5-4214

TP11

1-P-481A
DWG NO. 1129

8"-WF-A5-4248

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

9. DELETED

14"-WF-A5-4242

DWG NO. 1129

CONSORTIUM

Contractor:
ODD

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

1.5"-SH-A5-8309

Detailed Engineering:

2"-DH-A1-2272

DWG NO. 1129

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

EL (-) 14.000mm (MIN.)

TO CDH

2"-DH-A1-2272

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

DWG NO. 1137

Worley

Basic Engineering:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

FIRE WATER PUMP SYSTEM - PUMP B

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131130

16

15

12

13

14

SUCTION : 180C, DISCH.: 180C

1. DELETED

610mm ID x 1436mm(T/T)
3600 kPa (g)

180C

NOTES:

FG RECEIVER

BY VENDOR

3600 kPa (g)

1-V-501

FG COMPRESSOR AFTER COOLER

3650 Kg/hr
DIFF. PRESS. 2250 kPa

DISIGN TEMP.

1-E-344

FUEL GAS BOOSTER COMPRESSOR

CAPACITY
DISIGN PRESS.

1-K-501

ITEM NAME:

10

11

ITEM NO.:

2. DELETED
3. DELETED

180C

4. DELETED

TO SAFE LOCATION

5. DELETED

1"

6. DELETED

1"-VG-A1-2622

K
7. ALL FIELD INST. WITHIN THE SKID LIMITS ARE IN VENDOR SCOPE
OF SUPPLY. DCS INST. ARE NOT IN VENDOR SCOPE.

8. REFER NOTE-41 OF LEGEND P&ID NO. 3713-00-02-41-0110 &


0111 FOR SOV ASSEMBLY DETAILS.

NOTE-11

I/P

PY

REFER NUOVO PIGNONE

2"-SV-A1-2532

1"-A1-A3-5115

NOTE-8

PALL
3105

SOV
3101

TRIP
1-K-501

ZSC
3101

XV

PDI

3101

3104

PI

PSLL

3101

3105

3/4"
NC

OVERHEAD (1-V-211A)
4"-FG-B1-6301-IE

DWG NO. 1001

TI
3101

3/4"

2"-FG-B1-6323

NC

2"-FG-B1-6321-IS

TSHH

3104

TRIP
SIGNAL

3/4"x1"
300mmH20

3101

200mm H20

3300 kPa(g)

LSHH-3121

530 mm FROM BTL

LSL-3121

220 mm FROM BTL

PDI-3104(MAX)

75 kPa(g)

DWG NO. 1146

FROM
LSL-3121

3103

TRIP
1-K-501

PAHH

TAHH

LSL

3104

3102

LAL

3121

3121

IAS

LCP

RO
3122

RO
PCV

3121

TRIP
1-K-501

3121
SOV

3121

I
CLOSE
XV-3121

3121

3121

TRIP
1-K-501

DWG NO. 1056

PSLL

START/STOP

PI
3121

LAHH

3121

3121

LC

3102

1-V-501

XI

DWG NO. 1142

PALL

LO

50mm H2O

PAH-3102

CONDITIONING SKID

3121

3121

HP FLARE

170C

PALL-3121

3"

XI

SET@

1"-N-A1-6414

TAHH-3102

TO FG

1-E-344

LG

PI

3102

TRIP
1-K-501

PSV

INERT GAS

3102

LSHH
PSHH

1-K-501

PAHH-3104

PT

3/4"

3/4"

TI
3103

ATM

SET POINT

700 kPa(g)
3500 kPa(g)

PALL-3105

3"-FG-B1-6322

ST-3101

2"

B1

TS

FC

COMP. VENT

ZSO

3/4"

CSO

A1

IAS

3101

3101

B1

FROM HP SEP. OVHD

I
TAG NO

PSV

A1

ZIC
3101

3/4"

3475

3121

RO

2"-FG-B1-6366

3101

3/4"

1"x2"

START-UP SEAL GAS

ZIO

FO

1.5F2

CSO

ESD/LCP

11. VENT FOR UNLOADING VALVES AND DISTANCE PIECE.

1"

LO

1"x4"

1.5"x2"

1"-VG-A1-2622

UCP

1"x1/2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

UCP

10. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111

2"-FG-B1-6326

FOR SKID DETAILS

110

3102

3102

A1 B1

4"-FG-A1-6326

2"-FG-B1-6325

DWG NO. 1140

PAH

PIC

3102
PV

P&ID NO. N.SOP52606/2


AND N.SOP52607/2

1"x1/2"

INST. AIR

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

9. DELETED .

HOLD:
1-E-344

DUTY.

3101

DWG NO. 1135

4"-FL-A1-2431

XV

LV

3121

3121

5
FC

TRIP
1-K-501

LOCAL

CONTROL PANEL
CLOSE
XV-3101

FC

3/4"

3/4"

1"

TRIP
1-E--344 MOTOR

1-K-501

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

31.8.95

WORLEY

SHI

Rev.

TITLE BLOCK DWEEL & ISSUED FOR COMMENTSGB/NL

ISH

SS/AC

ISSUED FOR KICK OFF MEETING

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

FROM

ESD FROM

LSHH-0105

PLC-1/2

LSHH-0113

UA

USD

3101

3102

COMMON

COMMON

Company's contract No.:

3101

SCALE

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

PSHH-4603
LSHH-3102

PSLL-4606
PSLL-3121

Document title:

Path\File name\Initials:
14

13

12

FUEL GAS BOOSTER COMPRESSOR

Company's document No.:

15

Rev.

Path\File name\Initials:

16

Type of document

CCP-WT/95

STOP

LSHH-4602

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

TRIP ALARM

PB

PSLL-3105
PSHH-3104
TSHH-3102

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

M/C PARAMETER M/C PARAMETER


PRE-ALARM

Worley

Basic Engineering:

11

10

DISTRIBUTION CODE:

Page(s)
37131131

16

15

13

14

12

11

10

NOTES

1.

DELETED.

2. DELETED.

3. FOR GENERAL NOTES REFER P&ID NO. 3713-02-00-41-0110 & 0111.


4.

INSULATION

GASKET

SHALL

BE

PROVIDE

ON

THE

FIRST

FLANGE

ON

THE CCP PLATFORM/BRIDGE FOR ALL LINES IN ORDER TO ENSURE


ELECTRICAL

DISCONTINUITY

BETWEEN

RISER

PLATFORM

AND

CCP.

5. VALVES TO BE INSTALLED ON RISER PLATFORM PIPING.

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

HP GAS

30"-P-B1-1001

LP GAS

16"-P-A1-1052

LIFT GAS

12"-P-E1-1077

LIFT GAS

12"-P-E1-1079

PIPELINE GAS

15"-P-E1-1076

BLACK CONDENSATE

3"-P-A1-1090

FIRE FIGHTING WATER

8"-WF-A5-4237

FUEL GAS

6"-FG-B1-6340

DIEZEL FUEL

4"-DF-A1-6219

CORROSION INHIBITOR

2"-C-A1-8117

POTABLE WATER

2"-WP-A4-4301

INST. AIR

2"-N-A3-5130

CLOSED DRAIN

2"-P-A1-1096

INERT GAS

2"-N-A1-6417

NOTE-5

NOTE-5

I
DWG NO. 1001

DWG NO. 1006

DWG NO. 1011

DWG NO. 1011

NOTE-5

DWG NO. 1011

DWG NO. 1012

4"x3"

RISER

DWG NO. 1129

DWG NO. 1134

COMPRESSION PLATFORM

8"x6"
DWG NO. 1126

PLATFORM

CCP
DWG NO. 1148

3"x2"
DWG NO. 1143

F
DWG NO. 1140

DWG NO. 1123

4"x2"

HOLD

DWG NO. 1142

3"x2"

:-

TIE-IN
WHITE CONDENSATE

4"-P-B1-

DETAILS

AND

NO.

DWG NO. 1008

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

BRIDGE INTERCONNECTIONS

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131133

16

15

12

13

14

PSV

4"-SV-A1-2558

2H3
1800

DWG NO. 1136

HP FLARE

4"-SV-A1-2557

DWG NO. 1456

HP COMP. TRAIN-"E"

TO 1-DGT-253E

HP COMP. TRAIN-"D"

TO 1-DGT-253D

DWG NO. 1256

HP COMP. TRAIN-"C"

TO 1-DGT-253C

DWG NO. 1156

HP COMP. TRAIN-"B"

TO 1-DGT-253B

DWG NO. 1056

HP COMP. TRAIN-"A"

TO 1-DGT-253A

4"-FL-A1-2443

200 C

HP FLARE

BY VENDOR

3450 KPa (g)

DESIGN TEMP.

NOTES

1.

2"-FG-B1-6338

FUEL GAS EXPORT METERING SYSTEM

SIZE
DESIGN PRESS.

DWG NO. 1135

ITEM NAME:

2H3
1800

DELETED.

2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.

3401

DONE BY "SHI".

3402

4. REFER NOTE 40 OF LEGEND P&ID NO. 3713-00-02-41-0110 AND 3713

3"-FG-B1-6318

3"-FG-B1-6317

3"-FG-B1-6334-IE

3"-FG-B1-6333-IE

3"-FG-B1-6332-IE

B1

CSO

2"

3/4"

3/4"

CSC

B1

NO POCKETS

PY

PIC

3405

3405

PAH
PAL
PT

PV

3405

3405

1.5"

ASSEMBLY.

SET POINT

PAH-3405

1700 kPa(g)

PAL-3405

1300 kPa(g)

FAH-3401

210000NCMD

HP FUEL GAS HEADER

PI
3406

2"-FG-B1-6337-IE

DWG NO. 1338

TO 1-PK-501A

2"

TO 1-PK-501C

2"-FG-B1-6335-IE

6"-FG-B1-6340-IE

SOV

NO POCKETS

3/4"

2"-FG-B1-6336-IE

FC

3/4"

DWG NO. 1238

3"-FG-B1-6315-IE

OF

TAG NO:

8"-FG-B1-6310-IE

3"-FG-B1-6316

I/P

DETAILS

2"

3"

TOL

FOR

A1

FUTURE

A1

3"

TO 1-PK-501B

10"x8"

CSO

FUTURE

DWG NO. 1138

TOL

3"-FG-B1-6331-IE

3"-FG-B1-6330-IE
HP FUEL GAS

2"-FG-A1-6343

FOR END HEADER PURGING

2"-FG-A1-6344

FOR END HEADER PURGING

2"-FG-A1-6346

TO FLARE PILOT SYSTEM

4"-FG-A1-6309

LP FUEL GAS HEADER

2"-FG-A1-6320A

TO DEHYDRATION-"A"

DWG NO. 1135

DWG NO. 1136

HP FUEL GAS
DWG NO. 1147

DWG NO. 1121

DWG NO. 1010

2"-FG-A1-6320B

TO DEHYDRATION-"B"

LP FLARE

DWG NO. 1135

E
VENDOR

FURNISHED

(NOTE-3)

A1

1-PK-267
S

(NOTE-3)

1"-P-B1-1163-IE

ESD

CSC

STRAIGHTENING

VANES

1"-FL-B1-2437

DRAWING NO.
3713-26-02-41-1011

1"-FL-B1-2438

LEGEND:

B1
REFER DETAIL-A

SS TUBING

LP FLARE

DWG NO. 1135

DWG NO. 1110

1"-FL-A1-2444

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CSO

3. ALL ITEMS ARE SUPPLIED LOOSE BY METERING VENDOR ASSEMBLY TO BE

PSV

-00-02-41-0111

DWG NO. 1147

1-PK-267

DWG NO. 1356

10

11

ITEM No.:

6"-FG-B1-6339-IE
NOTE-4
SOV

FE

3/4"

3401

3401
FT

PT

TT

TI

PI

3401

3401

3401

3402

3402

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

ZIC

ZIO

3401

3401

Date

Description of revision

DD-MM-YY

Company;

IAS

NO

VIETSOVPETRO

FX

CHROMATOGRAPH

3401

(P&ID NO. 1011)

FQ

FI

3401

3401

FAH

3/4"

XV

HIGH
POINT

STRAIGHTENING
VANES

FE

FT

PT

TT

TI

PI

3402

3403

3403

3404

3404

ZSO
3401

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

DWG NO. 1133

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

FC

LOW POINT

Worley

Basic Engineering:

DRAIN

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CSC NO

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

3402

SCALE

Type of document

CCP-WT/95

6"-FG-B1-6340-IE

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

3/4"

1-PK-267

COMPANY

CONSORTIUM

Contractor:
TO RISER PLTF.

6"-FG-B1-6340

3/4"

NC

ZSC
3401

3401

EIL

PETECHIM/VIETSOPETRO

NO

FROM GAS

EIL

ISH

Rev.

Path\File name\Initials:
A

Document title:

HP & LP

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

FUEL GAS DISTRIBUTION SYSTEM

Page(s)
37131134

DWG NO. 1134

A
DWG NO. 1136

DWG NO. 1136

1ST STAGE LIQUID HDR

DWG NO. 1136

DWG NO. 1136

16
15

FUEL GAS

2"-FG-A1-6343

LOW TEMP. FLARE HEADER

(FROM MAIN & MIDDLE DECK)


6"-FL-A1-2462

(FROM MAIN DECK)


6"-FL-A17-2464

VENT HEADER

(FROM MAIN DECK)


2"-FL-A1-2445

(FROM MAIN & MIDDLE DECK)


4"-VG-A1-2621

14
13

12
11

10
DWG NO. 1012

9
8
7

6
DWG NO. 1012

DWG NO. 1009

3/4"-FL-A1-2472

10"-FL-A1-2425

6"-FL-A17-2464
NOTE-3

5
10"-FL-A1-2416

DWG NO. 1011

DWG NO. 1146

FROM PSV-4601A/4601B

DWG NO. 1146

FROM 1-V-342

DWG NO. 1147

FROM XBDV-4603

DWG NO. 1131

FROM FG COMPRESSOR SKID

DWG NO. 1001

FROM PSV-0103/0104

DWG NO. 1134

FROM PSV-3401/02

DWG NO. 1124

FROM 1-V-451

DWG NO. 1147

FROM FG SKID

DWG NO. 1010

GLYCOL REGEN SKID TRAIN "A"

DWG NO. 1010

GLYCOL REGEN SKID TRAIN "A"

DWG NO. 1134

SAMPLE POINT

DWG NO. 1147

FROM PSV-4706/4707

DWG NO. 1109

SAMPLE POINT

DWG NO. 1009

SAMPLE POINT

DWG NO. 1007

FROM PSV-0703/0704

DWG NO. 1134

FROM 1-PK-267

DWG NO. 1110

GLYCOL REGEN SKID TRAIN "B"

DWG NO. 1009

FROM PSV-0905A/0906A

DWG NO. 1109

FROM PSV-0905B/0906B

DWG NO. 1110

GLYCOL REGEN SKID TRAIN "B"

2"-P-A1-1091

2"-FL-A1-2452

4"-FL-A1-2431

6"-FL-A1-2403

4"-FL-A1-2443

6"-FL-A1-2417

6"-FL-A1-2415B

4"-FL-A1-2423

1.5"-FL-A1-2455

DWG NO. 1002


SAMPLE POINT

FROM XBDV-0902

DWG NO. 1109

6"-FL-A1-2415A

6"-FL-A1-2402

2"-FL-A1-2401

6"-FL-A1-2414A

4"-FL-A1-2439A

1"-FL-A1-2444

4"-FL-A1-2457

DWG NO. 1006


SAMPLE POINT

FROM PSV-0901B/0902B

DWG NO. 1009

FROM PSV-0901A/0902A

DWG NO. 1001

FROM PSV-0101/0102

DWG NO. 1001

BLOWDOWN

1"-FL-A1-2429

6"-FL-A1-2416

3"-FL-A1-2405

DWG NO. 1002

FROM PSV-0603/0604

FROM LP GAS

DWG NO. 1011

FROM 1-PK-262

DWG NO. 1008

FROM PSV-0803-/0804

DWG NO. 1001

BLOWDOWN

1"-FL-A1-2427

1.5"-FL-A1-2411

1"-FL-A1-2446B

1"-FL-A1-2446A

DWG NO. 1007

FROM 1-PK-266

10

FROM 1-V-211A/B

DWG NO. 1011

FROM 1-PK-261

DWG NO. 1002

30"-P-B1-1007

8"-FL-A1-2471

3"-FL-A1-2412

1"-FL-A1-2438

4"-FL-A1-2439B

6"-FL-A1-2436A

6"-FL-A1-2436B

6"-FL-A1-2414B

1"-FL-A1-2435

1"-FL-A1-2432

8"-FL-A1-2424

1"-FL-A1-2420

DWG NO. 1006

FROM PSV-0701/0702

11

FROM PSV-1201

DWG NO. 1009

1"-FL-A17-8225

2"-P-A17-1143B

2"-P-A17-1143A

2"-FL-A17-2468

3"-FL-A17-2469

8"-FL-A1-2413

FROM SAMPLE VENT

DWG NO. 1006

FROM PSV-0601/02

12

FROM 16"-P-E1-1076

DWG NO. 1109

FROM 1-T-311B

3503

1"-FL-A1-2470

8"-FL-A1-2410

DWG NO. 1009

3502

13

FROM 1-T-311A

3501

DWG NO. 1011

FI

FROM XBDV-1105

FI

DWG NO. 1011

FI

2"-FL-A17-2467

1"-FG-A1-6360

1"-FG-A1-6352

14

FROM XBDV-1106

E
1"-FG-A1-6351

DWG NO. 1011

15

FROM XBDV-1104

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

16
5
4

10"-FL-A1-2426
NOTE-3

VENT HEADER
DWG NO. 1121

1.

Rev.

3
7
1

DD-MM-YY

B
14.3.97
AS - BUILT

3
20.11.96
REVISRD AS MARKED
SA
SDH

2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC

1
7.2.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC

0
10.1.96
APPROVED FOR ENGG.
MSP
GRR

E
03.11.95

ISSUED FOR COMPANY'S APPROVAL


GRR
SS

D
15.10.95

ISSUED FOR CLIENT'S APPROVAL


GRR
SS

C
25.9.95
ISSUED FOR PRELIMINARY HAZOPS

NL/SS
AC

B
11.9.95
TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

A
31.8.95
ISSUED FOR KICK OFF MEETING

WORLEY
SHI

Date

Company;

Contractor:
VIETSOVPETRO

Detailed Engineering:

HP FLARE HEADER

Project name:

Company's contract No.:

CCP-WT/95
3

DISTRIBUTION CODE:

Document title:

Path\File name\Initials:

6
0

Company's document No.:


37131135

NOTES
L

2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.

DELETED.

3. THESE CONNECTIONS SHOULD BE AS CLOSE TO 1-V-361 AS POSSIBLE.

Description of revision
EIL

Basic Engineering:

4
1

EIL

Contractor's document identification:

SCALE

1
1
3
5

J
J

I
I

LP HEADER

HP HEADER

DWG NO. 1117

LOW TEMP. FLARE HEADER

DWG NO. 1117

DWG NO. 1117

F
F

A17

A1

ISH

PETECHIM/VIETSOPETRO

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

CONSORTIUM

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

PETROVIETNAM GAS UTILISATION PROJECT

Worley

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Limited

PIPING & INSTRUMENTATION DIAGRAM

Type of document
Rev.

Path\File name\Initials:

FLARE DISTRIBUTION-II (CELLAR DECK)


Page(s)

16

15

12

13

14

10

11

FUTURE

COMPRESSOR

TRAINS.

DWG NO. 1003

1-V-251A

3. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.

2"-P-A1-1029A

DWG NO. 1203

1-V-251B

DWG NO. 1103

2"-P-A1-1029B

DWG NO. 1303

1-V-251C

2"-P-A1-1029C

DWG NO. 1403

1-V-251E

1-V-251D

2"-P-A1-1029D

2"-P-A1-1068

2"-P-A1-1029E

DWG NO. 1008

FROM 1-V-232

DWG NO. 1004

FROM PSV-0401A/0402A

DWG NO. 1004

6"-FL-A1-2408A

3"-FL-A1-2407A

DWG NO. 1003

FROM PSV-0403A/0404A

FROM PSV-0301A/0302A

4"-FL-A1-2406A

6"-FL-A1-2409

DWG NO. 1008

FROM PSV-0801/0802

DWG NO. 1104

DWG NO. 1104

FROM PSV-0401B/0402B

3"-FL-A1-2407B

DWG NO. 1103

FROM PSV-0403B/0404B

6"-FL-A1-2408B

FROM PSV-0301B/0302B

4"-FL-A1-2406B

DWG NO. 1204

DWG NO. 1204

FROM PSV-0401C/0402C

3"-FL-A1-2407C

DWG NO. 1203

FROM PSV-0403C/0404C

6"-FL-A1-2408C

FROM PSV-0301C/0302C

4"-FL-A1-2406C

DWG NO. 1304

DWG NO. 1304

FROM PSV-0401D/0402D

3"-FL-A1-2407D

DWG NO. 1303

FROM PSV-0403D/0404D

6"-FL-A1-2408D

FROM PSV-0301D/0302D

4"-FL-A1-2406D

DWG NO. 1404

DWG NO. 1404

FROM PSV-0401E/0402E

3"-FL-A1-2407E

DWG NO. 1403

FROM PSV-0403E/0404E

6"-FL-A1-2408E

FROM PSV-0301E/0302E

4"-FL-A1-2406E

6"-FL-A17-2408

FOR

2. DELETED.

6"

6"

1.

6"

6"

6"

6"

6"

LOW TEMP. FLARE HEADER

(MAIN DECK)

MIN.

HP FLARE HEADER

(MAIN DECK)

MIN.

NOTE-1

2"

1ST STAGE LIQUID HDR

A17
NOTE-1

A1

2"-FL-A1-2445

DWG NO. 1135

6"-FL-A1-2462

6"-FL-A17-2463

4"-VG-A1-2634

2"-FG-A1-6344

1"-FG-A1-6354

FUEL GAS

FROM

FI
3603

1"-FG-A1-6359

DWG NO. 1134

FI
3604

DWG NO. 1005

G
8"-P-E1-1038A/B/C/D/E

LOW TEMP. FLARE HEADER


DWG NO. 1135

HP FLARE HEADER
MIN.

DWG NO. 1135


VENT HEADER

4"-VG-A1-2621

VENT HEADER

DWG NO. 1135

(MAIN DECK)

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

FI

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

3605
VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

INERT GAS

1"-N-A1-6423

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

DWG NO. 1134

8"-FG-B1-6310

2"-FG-A1-6338

DWG NO. 1005

& FROM XBDV-0511

FROM XBDV-0510A/B/C/D/E

NOTES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

DWG NO. 1142

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

FLARE DISTRIBUTION-I (MAIN DECK & MIDDLE DECK)

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131136

16
15
14
13

12
11

10

9
8
7
2"-DH-A1-2232

DWG NO. 1008

4"-DH-A1-2223

6
DWG NO. 1117

FROM 1-V-362

MAIN DECK UPPER LEVEL

DWG NO. 1117

FROM 1-V-361

2"-DH-A1-2253

DWG NO. 1146

FR FG SKID

2"-DH-A1-2214

J
SS TUBING

INST. DRAIN

2"-DH-A1-2250

2"-DH-A1-2203E

2"-DH-A1-2202E

2"-DH-A1-2203D

2"-DH-A1-2202D

2"-DH-A1-2203C

2"-DH-A1-2202C

DWG NO. 1303

DWG NO. 1153

FROM 1-T-356

DWG NO. 1404

FROM 1-V-253E

DWG NO. 1404

FROM 1-V-252E

DWG NO. 1304

FROM 1-V-253D

DWG NO. 1304

FROM 1-V-252D

DWG NO. 1204

FROM 1-V-253C

DWG NO. 1204

FROM 1-V-252C

DWG NO. 1104

FROM 1-V-253B

DWG NO. 1104

FROM 1-V-252B

DWG NO. 1004

FROM 1-V-253A

DWG NO. 1004

FROM 1-V-252A

DWG NO. 1126

FROM 1-T-471

DWG NO. 1456

HP COMP TRAIN 'E'

DWG NO. 1403

FROM 1-V-251E

DWG NO. 1356

HP COMP TRAIN 'D'

2"-DH-A1-2253

2"-DH-A1-2252

DWG NO. 1139

FROM 1-PK-502

2"-DH-A1-2222

DWG NO. 1126

FROM 1-V-231

1"-DH-A1-2228

2"-DH-A1-2229C

(FUTURE)

FROM 1-T-472

2"-DH-A1-2233

DWG NO. 1006

FROM 1-K-251

DWG NO. 1338

FROM 1-PK-501C

2"-DH-A1-2203B

2"-DH-A1-2202B

DWG NO. 1256

FROM 1-V-251D

DWG NO. 1007

2"-DH-A1-2236B

2"-DH-A1-2229B

2"-DH-A1-2203A

DWG NO. 1203

HP COMP TRAIN 'C'

FROM 1-T-231

DWG NO. 1410

FROM GDU TR-'B'

DWG NO. 1238

FROM 1-PK-501B

2"-DH-A1-2229A

2"-DH-A1-2202A

2"-DH-A1-2208

DWG NO. 1156

FROM 1-V-251C

10

DWG NO. 1210

2"-DH-A1-2236A

DWG NO. 1138

(FUTURE)

DWG NO. 1001

FROM 30"-P-B1-1001

2"-DH-A1-2240

FROM 1-PK-501A

1.5"-DH-A1-2246

1:200

DWG NO. 1012

FROM 1-PK-265

1:200

3/4"-DH-A1-2245

DWG NO. 1012

FROM 1-PK-264(RUN-2)

DWG NO. 1012

FROM 1-PK-264(RUN-1)

2"-DH-A1-2269E

2"-DH-A1-2201E

2"-DH-A1-2269D

2"-DH-A1-2201D

2"-DH-A1-2269C

2"-DH-A1-2201C

DWG NO. 1103

HP COMP TRAIN 'B'

11

FROM GDU TR-'A'

1"-DH-A1-2251

3/4"-DH-A1-2244

3/4"-DH-A1-2243

DWG NO. 1012

FROM 1-PK-263(RUN-2)

MAIN DECK LOWER LEVEL

3/4"-DH-A1-2242

DWG NO. 1012

FROM 1-PK-263(RUN-1)

1"-DH-A1-2263C

1"-DH-A1-2263B

2"-DH-A1-2228

3/4"-DH-A1-2247

DWG NO. 1338

FROMM 1-PK-501C

DWG NO. 1238

1"-DH-A1-2263A

DWG NO. 1056

FROM 1-V-251B

12

DWG NO. 1008

2"-DH-A1-2205

FROMM 1-PK-501B

DWG NO. 1138

FROMM 1-PK-501A

2"-DH-A1-2269B

2"-DH-A1-2201B

2"-DH-A1-2269A

HP COMP TRAIN 'A'

DWG NO. 1003

FROM 1-V-251A

13

FROM 1-P-231A/B/C

DWG NO. 1126

CLOSED DRAIN HEADER FROM CELLAR DECK

FROM 1-F-471A/B

2"-DH-A1-2206

DWG NO. 1109

FROMM 1-T-311B

DWG NO. 1008

FROMM 1-T-311A

CLOSED DRAIN HEADER FROM MIDDLE DECK

2"-DH-A1-2235B

2"-DH-A1-2235A

DWG NO. 1130

2"-DH-A1-2201A

14

DWG NO. 1149

2"-DH-A1-2204

2"-DH-A1-2213

FW PUMP(1-PK-481A/B)

15

FROM 1-T-355

DWG NO. 1116

FROM 1-T-352

DWG NO. 1148

2"-DH-A1-2272

FROM 1-T-353

2"-DH-A1-2227

1.5"-DH-A1-2234

DWG NO. 1150

DWG NO. 1006

16"-P-A1-1052

(FUTURE)

FROM 1-T-351

3"-DH-A1-2217

DWG NO. 1001

FROM 1-V-211B

D
3"-DH-A1-2216

DWG NO. 1001

FROM 1-V-211A

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

16
6
5

1:200

1:200

4"-DH-A1-2223

Rev.

DD-MM-YY

B
14.3.97
AS - BUILT

3
20.11.96
REVISRD AS MARKED

2
20.3.96
APPROVED FOR CONSTRUCTION
MSP
AC
PH
JUY
LOC

1
7.1.96
APPROVED BY COMPANY FOR ENGG.
MSP
GRR
PH
JUY
LOC

0
10.1.96
APPROVED FOR ENGG.
MSP
GRR

B
3.11.95

ISSUED FOR COMPANY'S APPROVAL


GRR
SS

WORLEY
SHI

15.10.95

7
1

Date

Company;

Contractor:
VIETSOVPETRO

Detailed Engineering:

Project name:

Company's contract No.:

CCP-WT/95
3

DISTRIBUTION CODE:

Document title:

Path\File name\Initials:

5
0

Company's document No.:


37131137

NOTES:

1. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111.

K
K

2"-DH-A1-2241

(FUTURE)

I
1:200

H
H

4"x2"

TO TILTING PLATE

SEPARATOR (1-V-453)
DWG NO. 1124

1:200

SA

Basic Engineering:

SDH

ISSUED FOR CLIENT'S APPROVAL


NL

Description of revision
EIL

EIL

SCALE

ISH

PETECHIM/VIETSOPETRO

Contractor's document identification:

1
3
7

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

CONSORTIUM

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

PETROVIETNAM GAS UTILISATION PROJECT

Worley

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Limited

PIPING & INSTRUMENTATION DIAGRAM

Type of document
Rev.

Path\File name\Initials:

CLOSED DRAIN HEADER SYSTEM

Page(s)

16

15

12

13

14

HX901A-1/2

ITEM NAME

NOTES:

1. QUICK CLOSING VALVE AT ACCESSIBLE LOCATION.

2.8 MW

176C

DESIGN TEMP.

POWER GENERATOR

2068 kPa (g)

DESIGN PRESS.

1-PK-501A

LUBE OIL COOLERS

DUTY

10

11

ITEM NO.

2. DRAWING HAS BEEN REVISED. 1-PK-501B AND 1-PK-501C ARE


ON P&ID NO. 3713-50-02-41-1238 AND 3713-50-02-41-1338
RESPECTIVELY.
3. UCP LOCATED IN LCR.
4. PIPES ARE ACID CLEANED.

K
VENT TO
SAFE LOCATION

HX901A-2
2"-LO-A10-9513A

2"-LO-A10-9512A
NOTE-4

FA-901A

NOTE-4

FLA
901A

V/F

M
4"x6"

4"-VG-A1-2650A

33

34

B149531

B149531

B149531

SHT 5

SHT 5

SHT 5

FSA-901A

EXHAUST
DUCT
AIR
INTAKE

FUEL GAS PILOT VENT

NOTE-4

DUCT

1
AN-0002 276

NOTE-1

FUEL GAS
DWG NO. 1134

2"-FG-B1-6335-IE

NOTE-4

20

V/F

SHT 6
B149532

1-PK-501A

OUTSIDE

INSIDE

TURBINE

TURBINE

ROOM

ROOM

B149532

FS-931A

SHT 6

30

3/4"-VG-A1-2651A

TURBINE

GEN

F
ESD SIGNAL FROM

PLC-1/2
I

RUNNING
INDICATION

SHT 3

50061-B149531 SHT 1-5 LUBE OIL SYSTEM


50061-B149532 SHT 1-6 GAS FUEL SYSTEM

V/F

50061-AN-0002 SHT 1-2 EXHAUST SYSTEM

3801A

CO2 SYSTEM

B149776

REFER SOLAR P&ID's:

UCP
1-PK-501A

XI

3/4"-C-A3-8135A

97

NOTE-3

V/F

1/2"-C-A3-8136A

98

50061-B149536 SHT 1-4 HYDRAULIC START SYSTEM


50061-B149776 SHT 1-11 MECHANICAL INSTALLTION

LEGEND:

V/F

SHT 5
25

B149532

B149532

B149536

SHT 6

SHT 6

SHT 4

B149531
SHT 5

SHT 6

22

19

65

25

21

LUBE OIL

126

B149532

3/4"

WATER
WASH
CONN.

RESERVOIR DRAIN

HYDRAULIC STARTER

1"-DH-A1-2263A

TANK DRAIN

COMBUSTOR DRAINS

3/4"-DH-A1-2262A

ENGINE EXHAUST COLLECTOR &

ENGINE AIR

INLET DUCT DRAIN

1"-DH-A1-2261A

LUBE OIL DRAIN

3/4"-DH-A1-2260A

3/4"-DH-A1-2259A

ODD

LUBE OIL FILTER DRAIN

2"

ODD

FURNISHED

VENDOR
B149531

126

2"-DW-A1-2324A

VENDOR

B149776
SHT 3

2"-DW-A1-2322A

126

2"-DW-A1-2323A

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

NOTE-4

4"-VG-A1-2650A

2"-LO-A10-9511A

2"-LO-A10-9510A

V/F

LUBE OIL TANK VENT

HX901A-1

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.
ODD

Date

Description of revision

DD-MM-YY

Company;
VIETSOVPETRO

COMPANY

CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

DWG NO. 1137

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2229A

EIL

PETECHIM/VIETSOPETRO

Contractor:

TO CDH

EIL

ISH

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

POWER GENERATOR- 'A'

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131138

16

15

14

12

13

10

11

ITEM NO. :

ITEM NAME :

NOTES:
L

MERCENCY GENERATOR

CAPACITY

1-PK-502

1.

1000 KW

FOR
&

EXHAUST TO SAFE LOCATION

GENERAL

DELETED

3.

DELETED

4.

DELETED

5.
6.

NOTES

REFER

P&ID

3713-00-02-41-0110

3713-00-02-41-0111

2.

TANK

LEVEL

CAUSE

EMERGENCY
MAIN

TO

BE

GENERATOR

POWER

VISIBLE

SHALL

FROM

START

THIS

VALVE.

AUTOMATICALLY

ON

FAILURE

SUPPLY.

8"-EX-A6-3601-IH

OF

REFER
P&ID

MUSTANG

NO.

POWER

11316C01

SYSTEMS

FOR

TIE-IN

DETAILS & OUTLET/INSTALLATION


NO.

11316A01

6"-WC-A1-9505

104
6"x5"

12"x8"

SILENCER
AND SPARK

6"-WC-A1-9504

6"x5"

6"x5"

ARRESTOR

104

12" EXHAUST FLEX

6"x5"

1-PK-502
LOCAL PANEL

GEN.

STOP

DIESEL

TRIP ON LEVEL-1
SHUTDOWN

FROM PLC-1/2

ENGINE

G
XI
3901

RUNNING
INDICATION

DAY TANK

DIESEL OVERFLOW DRAIN

LEGEND:

LUBE OIL DRAIN

DIESEL TANK DRAIN

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

3.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

29.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

WORLEY

SHI

B
A

1.5"-DW-A1-2327

Rev.

DIESEL
DWG NO. 1144

ODD

1"-DF-A1-6218

Date

Description of revision

DD-MM-YY

1"-DW-A1-2326

2"-DH-A1-2258

Company;
1"-DH-A1-2257

VENDOOR

NOTE-5

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

DWG.

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

ODD

TO CDH

2"-DH-AI-2258

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

EMERGENCY GENERATOR

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131139

16

15

12

13

14

10

11

NOTES
1.

2.

DELETED
FOR
&

GENERAL

NOTES

REFER

P&ID

NO.

3713-00-02-41-0110

0111

3. REQUIRED NUMBER OF 3/4" INSTRUMENT TAP POINTS SHALL


AS

PER

INST.

HOOK-UP

DRAWING.

HP COMP. TRAIN - 'E'

DWG NO. 1456

1"-AI-A3-5116E

HP COMP. TRAIN - 'D'

DWG NO. 1356

1"-AI-A3-5116D

HP COMP. TRAIN - 'C'

DWG NO. 1256

1"-AI-A3-5116C

HP COMP. TRAIN - 'B'

DWG NO. 1156

1"-AI-A3-5116B

HP COMP. TRAIN - 'A'

DWG NO. 1056

TO 1-M-381

DWG NO. 1121

1"-AI-A3-5116A

1"-AI-A3-5113

1"-AI-A3-5114

TO 1-K-251

DWG NO. 1155

GLYCOL REGEN. SKID TRAIN -'B'

DWG NO. 1510

1"-AI-A3-5117B

DWG NO. 1310

1"-AI-A3-5117A

1"-AI-A3-5115

TO 1-K-501

DWG NO. 1131

DWG NO. 1120

INERT GAS SYSTEM

2"-AI-A3-5107

1"-AI-A3-5111

INERT GAS SYSTEM

DWG NO. 1147

3/4"-AI-A3-5120

PROVIDED

(FUTURE)

(FUTURE)

NOTE 3

3/4"

3"-AI-A3-5116

SS. TUBING

INSTRUMENT AIR

DWG NO. 1133

2"-AU-A3-5211

UTILITY AIR
DWG NO. 1119

1"-AU-A3-5264/5265

1"-AU-A3-5256

F
1"-AU-A3-5257

1"-AU-A3-5252

1"-AU-A3-5258/5259/5260

2"-AU-A3-5245

1"-AU-A3-5225

1"-AU-A3-5261

1"-AU-A3-5226

1"-AU-A3-5224

1"-AU-A3-5227

1"-AU-A3-5262/5263

TO FROM RISER PLTF.

2"-AI-A3-5130
CSC

3"-AI-A3-5106

DWG NO. 1119

1"-AU-A3-5251/5253/5254/5255

& 1-P-357 A~F

DECK

TO 1-P-356 A~F

MEZZANINE

1"

DWG NO. 1153

(2NOS)

DWG NO. 1155

ZONE-1

(4NOS)

1"

TO 1-K-251

CELLAR DECK

ZONE-1

TO CRANE-2

CELLAR DECK

DWG NO. 1126

1"

TO CRANE-1

1"

DWG NO. 1126

DWG NO. 1141

TO 1-PK-511

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

DWG NO. 1120

GLYCOL REGEN. SKID TRAIN - 'A'

BE

1"

1"

1"

1"

MIDDLE DECK

DRUM STORAGE

MAIN DECK

CELLAR DECK

CELLAR DECK

(3NOS)

AREA

ZONE-2

ZONE-2

SAFE AREA

(2NOS)

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

3.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

29.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

WORLEY

SHI

B
A

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

INST./UTILITY AIR DIDTRIBUTION

Document title:

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131140

16

15

12

13

14

3028 L/day

CAPACITY

NOTES

SEWAGE TREATMENT UNIT

ITEM NAME :

12"-MAX. LENGHT

2"-VG-A1-2636

10

11

1-PK-511

ITEM NO. :

1. FOR GENERAL NOTES REFER P&ID 3713-00-02-41-0110 & 0111


2. VENT LINE FROM SEWAGE TREATMENT UNIT SHALL BE ROUTED TO
AVOID DENOXIOUS DOOURS ON DECK
3. DELETED
4. DELETED

1.5"x2"

5. OUTLET TO BE MINIMUM 10M FROM FIRE WATER/UTILITY WATER INTAKES.


6. EJECTOR TO BE AT LEAST 20FT (6M) ABOVE TOP OF 1-PK-511

7. VENT TO BE AT LEAST 10FT (3.05M) ABOVE TOP OF SUGRE TANK V-1


UTILITY AIR

DWG NO. 1140

EJECTOR

1"-AU-A3-5224

V/F

1"x1/4"

2"-VG-A1-2644

NOTE-2.7

E
REFER

P&ID

ELTECH

NO.

INTERNATIONAL

6MC-F-01.

FOR

CORPORATION

DETAILS

2"

2"

1 1/2"

UR

2"

UR

WC

WC

K2

LCP

2"

WC

2"

G
4"-SW-A8-4401

1-PK-511
F

ALARM

CELL

HIGHT LEVEL

TSH

LSH
2

PUMP ON
RO

LSH

J1

E
4"-SW-A8-4401

TOILET WASTE
SLOPE 20:1000

4"
NO

1 1/2"

2"x4"

PUMP OFF
LSL

NC
NC

V-2

D
NC

DWG NO. 1143

UYILITY WATER

1"x1/2"

V-1
MACERATOR

1 1/2"
P

1"-WU-A5-4514

3"

EFFLUENT TANK

SURGE TANK

1 1/2"

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

3.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GB

GRR

WORLEY

SHI

NO

Rev.

3"

Date

Description of revision

DD-MM-YY

Company;

3"

C
R

EIL

COMPANY

CONSORTIUM

Contractor:

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

SLOPE 20:1000

4"-SW-A8-4403

3"-SW-A8-4405

Worley

Basic Engineering:

NC

V-1 DRAIN

3"

NC

BYPASS

1"-SW-A8-4404

3"

NC

V-2 DRAIN

3"

2"-SW-A8-4406

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

2"-VG-A1-2620

J2

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

NOTE-6

2"x1/2"

V-1 VENT

V-2 VENT

2"-VG-A1-2643

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:


EMERGENCY BYPASS

4"-SW-A8-4407

Document title:

(-) 3000

14

13

12

11

10

SEWAGE TREATMENT UNIT

Company's document No.:


Path\File name\Initials:

15

Rev.

Path\File name\Initials:

NOTE-5

16

DISTRIBUTION CODE:

Page(s)
37131141

16

15

12

13

14

10

11

NOTES
1.
2.

DELETED
FOR
&

3.

GENERAL

NOTES

REFER

P&ID

NO.

3713-00-02-41-0110

0111.

INERT
EASLY

GAS

HEADER

HAS

DISTINGUISHED

DIFFRENT

FROM

COLOUR

UTILITY

&

TO

INST.

BE

AIR

HEADER.

1-K-253A &

1-K-253B &

1-K-253C &

1-K-253D &

1-K-253E &

1-K-254A

1-K-254B

1-K-254C

1-K-254D

1-K-254E

1"-N-A1-8412

1"-N-A1-8411

1"-N-A1-8410

1"-N-A1-8408

1"-N-A1-8409

TO/FROM RISER
PLATFORM

2"-N-A3-6417

DWG NO. 1133

CSC

H
INERT GAS
DWG NO. 1120

2"-N-A1-6404

NOTE-3

PI
4201

1"-N-A1-6441/6442

1"-N-A1-6440

1"-N-A1-6423

1"-N-A1-6436

1"-N-A1-6418

1"-N-A1-6422

1"-N-A1-6415

1"-N-A1-6435

1"-N-A1-6414

1"-N-A1-6425

1"-N-A1-6407

1"-N-A1-6437/6438

1"-N-A1-6431/6432/6433

1"-N-A1-6424

DWG NO. 1123

(2NOS)

TO 1-V-454

MIDDLE DECK

DWG NO. 1124

SAFE AREA

(4NOS)

TO 1-V-453

CELLAR DECK

ZONE-1

DWG NO. 1150

CELLAR DECK

TO 1-T-351

DWG NO. 1131

1-K-501

TO 1-K-501

DWG NO. 1155

1-K-251/252

1"

CELLAR DECK
ZONE-2

DWG NO. 1136

E
1"

VENT HEADER PURGE

TO 1-K-251/252

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

MEZZANINE

MAIN DECK

DECK

(2NOS)

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

3.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

7.10.95

ISSUED FOR PRELIMINARY HAZOPS

WORLEY

SHI

B
A

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

INERT GAS DISTRIBUTION SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131142

16

15

12

13

14

10

11

NOTES
1"-WP-A4-4335

TOILET WC

3/4"-WP-A4-4336

3.

DELETED

4.

SEVEN

MAKE-UP

TO HVAC

WATER TANK

NOTE-5,6

(1-K-253 A-E)

HP COMPRESSOR GTS

FOR WATER WASH OF

NOTE-5,6

TO 1-K-501

JACKET WATER

SURGE TANK

NOTE-5,6

GENERAL

NOTES

REFER

P&ID

NO.

3713-00-02-41-0110

0111

AS

(1-PK-502)

TO EMERGENCY GENERATOR

NOTE-5,6

(1-PK-501A/B/C)

POWER GENERATOR TURBINES

FOR WATER WASH OF

NOTE-5,6

TO 1-K-521

JACKET WATER

SURGE TANK

NOTE-5,6

1-K-411A/B

INST. AIR COMP

PUMP 1-K-481A/B

NOTE-5,6

TO FIRE WATER

TO CRANE-1

SERVICE PLATFORM

TO CRANE-2

FOR
&

SINK

NOTE-5,6

1/2"
K

DELETED

2.

SINK

SERVICE PLATFORM

1/2"

1.

BATTERY ROOM

SAFETY

PER

THE

TWO

SAFETY SHOWER &

&

EYE

COMPRESSOR

TWO

ON

CELLAR

NEAR

CHEMICAL

NEAR

CHLORINATOR

SHOWERS

THREE

WASH

FACLITIES

PROVIDED

FOLLOWING:

ON

ON

DECK

MIDDLE

IN

BATTERY

NEAR

LP

NEAR

STORE

DECK

STORAGE

DECK

ROOM

COMPRESSOR

EYE WASH

3/4"-WP-A4-4311-4317

3/4"-WP-A4-4337

3/4"-WP-A4-4310

3/4"-WP-A4-4309

3/4"-WP-A4-4307

3/4"-WP-A4-4305

3/4"-WP-A4-4306

3/4"-WP-A4-4322

3/4"-WP-A4-4304

3/4"-WP-A4-4302

3/4"-WP-A4-4319

3/4"-WP-A4-4318

SIGN

HOSE

SHALL

PROVIDED

BE

FOF

PROVIDED

ON

FURTURE

CONNECTION

POTABLE

WATER

HOSE

STATIONS

"NOT DRINKING WATER"

ODD

FUTURE

FUTURE

2"-WP-A4-4301

PI

POTABLE WATER

2"-WP-A4-4301

DWG NO. 1133

UTILITY WATER

2401

4"-WU-A5-4508

DWG NO. 1122

G
1.5"-WU-A5-4521/4522/4523/4524

NC

CSO

PCV

4"-WU-A5-4513

2"-WU-A5-4509

3"-WU-A5-4510

2"x1"

2"-WU-A5-4514

1.5"-WU-A5-4526

4301

2"-WU-A5-4512

1.5"-WU-A5-4525

1.5"-WU-A5-4527/4528/4529

1.5"-WU-A5-4538

1.5"-WU-A5-4531/4532/4533/4534

SET @

DWG NO. 1129

TO FIRE WATER HEADER

DWG NO. 1125

TO CHLORINE GENERATOR

(1-PK-461)

DWG NO. 1141

SEWAGE TREATMENT

UNIT (1-PK-511)

(4NOS)

CELLAR DECK ZONE 1

SAFE AREA

CELLAR DECK ZONE 1

(3NOS)

MIDDLE DECK

DECK

MEZZANINE

(4NOS)

1"

MAIN DECK

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

THREADED

6.

2"-WP-A4-4308

NOTE-4

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

5.

OVERBOARD

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

3.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

28.9.95

ISSUED FOR PRELIMINARY HAZOPS

WORLEY

SHI

B
A

Rev.

Date

Description of revision

DD-MM-YY

Company;

C
1"

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

2"

EIL

ISH

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:
1"

1"

1"

1/2"

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

1/2"

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

WC

WC

WC

URINALS

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

WATER DISTRIBUTION DIAGRAM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131143

16

15

12

13

14

11

10

NOTES

1.

FOR
&

GENERAL

NOTES

REFER

P&ID

NO.

3713-00-02-41-0110

0111

DWG NO. 1130

TO DAY TANK

1.5"-DF-A1-6221

OF 1-PK-481B

DWG NO. 1129

TO DAY TANK

OF 1-PK-481A

1.5"-DF-A1-6220

1"-DF-A1-6218

DIESEL (GRAVITY FLOW)


DWG NO. 1126

2"-DF-A1-6213

3/4"

LOW POINT

G
DIESEL FROM

1-P-471A/B & 1-P-472

2"-DF-A1-6217

DWG NO. 1126

CRANE NO.2

DAY TANK

DWG NO. 1126

CRANE NO.1

DAY TANK

2"-DF-A1-6223

2"-DF-A1-6222

DWG NO. 1126

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

DWG NO. 1139

TO DAY TANK

OF 1-PK-502

14.3.97

AS - BUILT

20.11.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

3.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

7.10.95

ISSUED FOR PRELIMINARY HAZOPS

WORLEY

SHI

Rev.

Date

Description of revision

Company;

EIL

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

DIESEL DISTRIBUTION SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131144

16

15

12

13

14

10

11

860 mm (ID) X 2300 mm (T/T)


3450 kPa(g)

SIZE :
DESIGN PRESS. :

200 C

DESIGN TEMP. :

NOTES

DWG NO. 1135

ITEM NAME :

HP FLARE

FUEL GAS SCRUBBER

1. DELETED

2. PV-4601/4602 ARE FAIL LOCK DRIFT CLOSE.

10"-FL-A1-2416

1-V-342

ITEM NO. :

3. NECESSARY INSTRUMENTS TO BE PROVIDED BY VENDOR


4. DELETED.
5. REFER NOTE-41 OF LEGEND P&ID NO.3713-00-02-41-0110 &
3713-00-02-41-0111 FOR SOV ASSEMBLY DETAILS.

PAL

4601

4P6
3450

4"

PALL
4606

PV
4601

PSV
4601A

PSLL
4606

FROM ESD

8"-FG-D1-6304

PSLL-4606
ZIO

4601A

4601A

ZSO
46O1A

3/4"

3/4"

4602

FC

4601B

ZSO
46O1B

kpa(g)
kpa(g)
kpa(g)
kpa(g)
kpa(g)

PAL

FROM PT-4602

6"x4"

4"

6"
6"x10"

4"x6"

CLOSE

XV-4601 A/B/C/D/E

10"-FG-B1-6304
2"

3/4"

3/4"

D1 B1

XV

TRIP

4601B

1-K-501
CLOSE

(TRAIN # B)

XV-4601

3"-P-D1-1069B

PAH -4602 280 0

TRIP 1-K-501

FROM 1-V-252B
DWG NO. 1104

PAL-4601 2850
PAL-4602 2 550

4602

IAS
ZSC
4601B

PAH-4601 3050

PV

LSHH-4602
PSHH-4603
TRIP

NOTE-5

PALL-4606 2500

DWG NO. 1147

PY

ON 1-K-253B

SOV
4601B

LAHH-4602 600mm

4602

PSLL-4606

4601B

LAH-4601 450mm

PAH

I/P

6"
FROM ESD

LAL-4601 150mm

DWG NO. 1147


FROM PT-4601

2"

ZIO

LALL-4603 0mm

DWG NO. 1147

(TRAIN # A)

ZIC

PAHH-4603 3270kpa(g)

TI
4605

FUTURE

PIC

3"-P-D1-1069A

CSO

4605

4601A

CSC

J
TAG NO. SET POINT

PI

XV

3/4"

2"

10"-FG-B1-6306

FROM 1-V-252A
DWG NO. 1004

B1

3/4"

9. PV-4601/4602 ARE FAIL LOCK DRIFT CLOSE.

N1
3"

IAS
ZSC
4601A

8. PSLL-4606 INSTALLED BY SHI

FUEL GAS TO FILTERS

TRIP

NOTE-5

CSO
A1

4"

PSHH-4603

SHALL BE SUPPLIED BY PACKAGE VENDOR.

PSV

NOTE-8

FC

1-V-342
PSHH

LSHH

4603

4602

LG

FROM ESD

LAHH

4602

A-E

4603

PSLL-4606
ZIC

ZIO

4601C

4601C

I
4601C

PAHH

PSHH-4603

4603

LT
4601

ON 1-K-253C

SOV

LSHH-4602

TRIP

NOTE-5

LSLL

LALL

4603

4603

IAS
ZSC

ZSO

4601C

46O1C

XV
4601C

DWG NO. 1204

(TRAIN # C)
3"-P-D1-1069C

2"

FROM 1-V-252C
LIC

LAH

4601

LAL

FC

CLOSE
XV-4602

E
FROM ESD
PSLL-4606
ZIC

ZIO

4601D

4601D

LSHH-4602
PSHH-4603
ON 1-K-253D

SOV
4601D

A1 B1

TRIP

NOTE-5

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

NC

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

1/2"

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

ZSO

4601D

46O1D

XV

I/P

4601D

FROM 1-V-252D
DWG NO. 1304

(TRAIN # D)
3"-P-D1-1069D

LY

LV

4601

4601

3/4"

FC 1"

2"x1"

ZSC

1"x2"

IAS

FC

3/4"

FROM
FROM ESD

REFER

PSLL-4606

ZIC

ZIO

4601E

4601E

I
4601E

READ

LSHH-4602
PSHH-4603

P&ID

ON 1-K-253E

SOV
S

NO.

SYSTEMS

ZSO

LTD

4602

C1341-RSL-PID-001
FOR

TRIP

NOTE-5

LSLL-4603

ZSO

4601E

46O1E

ZSC

ZIC
4602

B1

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

XV

CLOSED DRAIN
ATM

N7

SKID LIMITS

FC

2"-DH-A1-2255

N3

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

15

14

13

12

11

10

Type of document
PIPING & INSTRUMENTATION DIAGRAM

3
HP FLARE

2"-P-A1-1091

Rev.

DWG NO. 1135

Document title:

FUEL GAS SCRUBBER

Company's document No.:

Path\File name\Initials:

Path\File name\Initials:

16

SCALE

CCP-WT/95

Contractor's document identification:

3"

Worley

Basic Engineering:

DWG NO. 1147

TO CDH

FUTURE

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:
4602

(TRAIN # E)

EIL

CONSORTIUM

Contractor:

4602

2"-DH-A1-2222

VIETSOVPETRO

A1

XV

EIL

PETECHIM/VIETSOPETRO

IAS

4601E

3"-P-D1-1069E

Description of revision

Company;

ISH

SOV

CMR

FC

FROM 1-V-252E
DWG NO. 1404

Date
DD-MM-YY

4602

4602
IAS

ZSC

ZIO

Rev.

DETAILS

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

4601A

4"x6"

LSHH-4602
ON 1-K-253A

SOV

6"x4"

7. ALL INSTRUMENTATION AND CONTROL ITEMS, EXCEPT THOSE AS DCS/PLC,

3450

4601B

6"-FG-B1-6305

ZIC

6"

8"x6"

3713-00-02-41-0111 FOR SOV ASSEMBLY DETAILS.

6"x10"
CSO

6. REFER NOTE-42 OF LEGEND P&I D NO.3713-00-02-41-0110 &

FLARE

6"x10"

6"-FG-B1-6302
4"x6"

TRIP 1-K-501

LC
B1 D1

DWG NO. 1147

4P6

4"x6"

4601

3"-FG-B1-6322

6"-FG-B1-6303

PIC

CLOSE

DWG NO. 1131

PAH

10"-SV-A1-2524

FROM BOOSTER COMPRESSOR

PY

10"-SV-A1-2523

I/P

START UP FUEL GAS

2"-FL-A1-2456

N4

XV-4601A/B/C/D/E

DISTRIBUTION CODE:

Page(s)
37131146

10

11

FUEL GAS FILTERS

LP FLARE

NOTE-6

381mm (ID) X 3110mm (T/F)


3450 kPa(g)
200C

1. REFER P&ID NO.3713-00-02-41-0110 & 3713-00-02-41-0111


FOR NOTES.
2. DELETED

DUTY: 400KW

3. HEAT TRACING WITHIN THE SKID IS NOT IN VENDORS'S SCOPE

1.5"-FL-A1-2455

DESIGN TEMP. :

LP FLARE

200 C

HP FLARE

DESIGN PRESS. :

NOTES

FUEL GAS HEATER

500 mm (ID) X 2892 mm (T/F)


3450 kPa(g)

SIZE :

DWG NO. 1135

ITEM NAME :

1-E-342

DWG NO. 1135

12

13

14

1-F-342 A/B

DWG NO. 1135

15

1.5G2.5

4"-FL-A1-2457

16

ITEM NO. :

4"-SV-A1-2552

600

4. DELETED.

5. ALL INSTRUMENTATION AND CONTROL ITEMS, EXCEPT THOSE AS IN

DCS/PLC, SHALL BE SUPPLIED BY PACKAGE VENDOR.

1.5G2.5

4"-SV-A1-2553

600

PSV

PSV
4706

CSO

a) 50KW FOR START-UP, POWERED FROM EMERGENCY BUS.


b) 350KW+50KW FOR PRODUTION, POWERED FROM 6.3KV BUS.

4707

CSO

6. HEATER DESIGNED FOR DUAL SERVICE

7. REFER NOTE-42 OF LEGEND P&ID NO.3713-00-02-41-0110 &

3/4"

N5

TO PIC-4601

DWG NO. 1146


TO PIC-4602

@ 400 kPa(g)
TRIP HEATER
1-E-342

FALL

FI

4701

FR

PT

PT

4602

4601

2"-FL-A1-2452

PSV
4704

LO 1"x2"

1"x2"

3/4"
2"-FG -B1-6371

LO

B1 A1

RO

FROM 1-V-342

2"-DH-B1-2221

10"-FG-B1-6306

1"X1"

A1 B1

3450

ZSC

ZIC
4603

ZSO

ATM

ZIO

4603

4603

TAH-4701 67 C
TAHH-4707 195 C
TAHH-4709 350 C

kpa(g)

LO

TAHH

TAHH

4706

4707

TRIP
HEATER

TAHH

FROM

4709

ESD
TSHH-4704

TSHH-4706
FSLL-4701

TT

TE

TE

4706

4707

4709

TSHH-4708
TSHH-4707

1-E-342

NC

B1

4702

THYRISTOR

XI

PANEL

4701

RUNNING
INDICATION

POWER

TE
4708

A1
TT
4705

10"-FG-B1-6308

PSV

2"-SV-A1-2551

1-E-342

TI

1"
CSO

TDAL -4701 1 5 C

10"-FG-B1-6310-IE

TDAL

1-E-342

TEMP.

TDAH-4701 25 C
TO HP FUEL GAS USERS

TAHH-4708 350 C

2"-FG-B1-6373-IS

IAS

4603

4701

TRIP HEATER

SKIN

NM3/HR
kpa(g)
kpa(g)

TDAH

TDIC

ESD

SOV
4603

FO

10"-FG-B1-6308

1.5"-FL-A1-2455

LG
4705

10"-FG-B1-6307

4603

NO
LSH
4708

LAH

NOTE-6

XBOV

4601

FALL-4701 700

TO LP FUEL GAS USERS

NO POCKET

TRIP HEATER

3/4"

4701

4708

4708

TI
4703

1"x2"

1"x2"

10"-FG-B1-6311

1"

10"-FG-B1-6306

1-F-342A

TAHH-4704 72 C

P DI-4708/09(MAX) 95

4701

PSV

350mm FROM BTL

TAHH-4706

TAH

TT

4701

A1
B1

DWG NO. 1134

4701

3450

CSO

TI

4704

B1

NO POCKET

LAH-4607/08

DWG NO. 1134

TT

A1

PDI

FUEL GAS HEADER

kPa(g)
kPa(g)

PAH -4707 5 00

N2

LO

PI

PAL-4707 300
PT

PAL-4707 300

FE-4701

1"x2"

PAH-4707 500

NOTE-3

1"X1"

NO

3/4"

TAG NO. SET POINT

PAL

4707

B1 A1

1-E-342

2"-FL-A1-2456

B1

2"x4"

PAH

2"

4704

TRIP HEATER

1.5"-FL-A1-2454

2"-FL-A1-2453

A1

2"-SV-A1-2550

4705
TI

LO 1"x2"

4705

B1 A1

1"x2"

3/4"
2"-FG -B1-6372
B1 A1

D
NC
PI

1"

PDI

1-F-342B

4702

10"-FG-B1-6313

LO

INST. AIR

4709

3/4"-A1-A3-5120

N9

DWG NO. 1140

NO

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY
LAH
4707

LSH

LG

4707

4706

Company;
VIETSOVPETRO

EIL

COMPANY

CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

2"-DH-B1-2220

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

N8

B1

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

A1

CLOSED DRAIN

Document title:

13

12

11

10

Rev.

FUEL GAS FILTER AND HEATER

Company's document No.:

ODD

14

Path\File name\Initials:

15

Type of document
PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

DWG NO. 1146

16

SCALE

CCP-WT/95

2"-DW-A1-2328

EIL

ISH

PETECHIM/VIETSOPETRO

Contractor:

CONT. FROM P&D NO. 1146

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

FT
4701

PI
4707

4"-FG-A1-6309

3/4"
FSLL
4701

TAHH

3450

PI
4706

2"

2"

1"X1"

PCV

B1 A1

FR

3713-00-02-41-0111 FOR SOV ASSEMBLY DETAILS.

CSO

2"-FG-A1-6363

4702

FO

I
will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

2"

CSC

SET

DWG NO. 1146

DWG NO. 1146

3/4"
2"-FG-A1-6364

N6

DWG NO. 1146

2"-FG-A1-6362

FLARE

Path\File name\Initials:
5

DISTRIBUTION CODE:

Page(s)
37131147

16

15

12

13

14

10

11

ITEM NO. :

2. DELETED

60C

BOAT LANDING

900

AND ALARM IN CPP-2

I
1"

LAHH

LAHH

4801

4803

0111

3"-VG-A1-2603

3/4X1

3. FOR GENERAL NOTES REFER P&ID NO.3713-00-02-41-0110 &

TO SAFE LOCATION

HOOTER AT
TRIP

1-P-353A/B/C

4801

4. ALL INSTRUMENT INDICATIONS AND CONTROL ITEMS SHOWN AS

APPEARING ON DCS/PLC ARE OUTSIDE,

4802

CSO

6 VENDOR TO PROVIDED A COMMON GLASS CALIBRATION TUBE, THE


PUMP TO BE CALIBRATED SHALL BE FITTED WITH CALIBRATION
TUBE AT THIS POINT.

FLA
4801

NOTE-1

7. DESTINATION SIGNS TO BE PROVIDED ON PUMP OUTLET VALVES.

NOTE-8

TO/FROM

RISER PLATFORM

REFER TO POSITIVE

MANHOLE

CSC

2"-C-A1-8117

DWG NO. 1133

8. MANHOLE FITTED WITH EMERGENCY VENT.

METERING SYSTEM

TAG NO. SET POINT

P&ID NO. C-1138/41

TP6

LALL-4801

520 mm FROM BTL

LAHH-4803 1700 mm FROM BTL


CONECTION TO

L AH-4802 1 5 00 mm FROM BTL

2"-C-A1-8105

PORTABLE DRUM

LAL -4802

TRANSFER PUMP

700 mm FROM BTL

PAH-4804 6000

kPa(g)

PAH-4805 6000 k P a(g)

3/4"
2"

PAH-4806 6000 k P a(g)

3/4"
LSHH

2"

DRIPLESS

QUICK

1-T-353

NORTH

HOSE

EAST

BOAT

BOAT

LANDING

LANDING

LT
4802

CONN.

4803

2"-C-A1-8126

2"-C-A1-8125

LSLL

LG

4801

4804

TP8

2"-DH-A1-2213

2"-C-A1-8103

TO CDH

TP10

NOTE-7

NOTE-7

NOTE-7

PI
4801

PI

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

PI

10.1.96

APPROVED FOR ENGG.

MSP

GRR

4802

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

1/2"X1
13705

1/2"

PSV

4801

PSH
4805

NOTE-6

A1 E1

1/2"X1
13705

1/2"

PSV

4803

4802

NOTE-5

A1 E1

A1 E1

A1 E1

Rev.

Date

Description of revision

DD-MM-YY

Company;

1-P-353A
PAH

PB

XI

4804

4801

4801

DIAPHRAM
RUPTUBE

FROM LSLL-4801

PAH

PB

XI

4806

4803

4803

DIAPHRAM

STOP

RUPTUBE

ITEM NO. :

VIETSOVPETRO

STOP

PAH

PB

XI

4805

4802

4802

DIAPHRAM

FROM LSLL-4801

RUPTUBE

STOP

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

14

13

12

Document title:

Rev.

CORROSION INHIBITOR SYSTEM

Company's document No.:

12449 kPa

15

Type of document
PIPING & INSTRUMENTATION DIAGRAM

Path\File name\Initials:

15 LPH

DIFF. PRESS

SCALE

CCP-WT/95

CORROSION INHIBITOR INJECTION PUMPS

CAPACITY

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Contractor's document identification:

FROM LSLL-4801

COMPANY

CONSORTIUM

Company's contract No.:

EIL

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

1-P-353B

1-P-353A/B/C

ITEM NAME :

16

1-P-353C

EIL

ISH

PETECHIM/VIETSOPETRO

Contractor:

Project name:

CONTINUED ON P&ID. 1150

PSV

A1 E1

DAMPENER

1/2"

PSH
4806

NOTE-6

PULSATION

13705

DAMPENER

1/2"X1

PULSATION

A1 E1

DAMPENER

PSH
4804

PULSATION

4803

NOTE-6

DWG NO. 1137

1"-C-E1-8104

1"-C-E1-8104

DWG NO. 1011

2"-C-A1-8103

INJECTION INTO EXPORT PIPELINE

TP9

1"-C-E1-8119

1"-C-E1-8115

2"-C-A1-8118

DWG NO. 1011

1"-C-E1-8102

INJECTION INTO GASLIFT PIPELINE

2"-C-A1-8101

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

5. CORROSION INHIBITOR SYSTEM AND METHENOL SYSTEM (P&ID


NO. 3713-35-02-41-1150) ARE ON A COMMON SKID.

LAL

TP7
OOO

VENDOR SCOPE OF

SUPPLY.

LAH

LI

3/4"

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

1. PROVIDED ACCESS FOR FLAME ARRESTOR.

FULL OF LIQUID + 50 mm WATER COLUMN

DESIGN TEMP. :

NOTES

1219 mm (ID) X 2134 mm (H)

DESIGN PRESS. :

TSV

CORROSION INHIBITOR TANK

SIZE :

1-T-353

ITEM NAME :

Path\File name\Initials:
11

10

DISTRIBUTION CODE:

Page(s)
37131148

16

15

12

13

14

10

11

1-T-355

ITEM NO. :

ANTI-FOAM CHEMICAL TANK

ITEM NAME :

NOTES

500 mm (ID) X 1200 mm (T/T)

SIZE :

FULL OF LIQUID + 50 mm WATER COLUMN

DESIGN PRESS. :

60C

DESIGN TEMP. :

1. PROVIDED ACCESS FOR FLAME ARRESTOR.

TO SAFE LOCATION

2. DELETED

3"-VG-A1-2606

3. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110


& 0111

4 VENDOR TO PROVIDED A GLASS CALIBRATION TUBE, THE PUMP


THIS POINT.

TP2

TAG NO. SET POINT

FLA
4901

CONECTION TO

TP1

2"-C-A1-8110

PORTABLE DRUM
TRANSFER PUMP

NOTE-5

NOTE-1

LALL-4902 380 mm FROM BTL

MANHOLE

NC

TO BE CALIBRATED SHALL BE FITTED WITH CALIBRATION TUBE AT

5. MANHOLE FITTED WITH EMERGENCY VENT.

3/4"

REFER TO POSITIVE

LAH-4903 950 mm FROM BTL

METERING SYSTEM

L AL -4903 450

P&ID NO. C-1138/21

PAH-49 0 2 160

mm FROM BTL
k P a(g)

LOW

LG
4904

1-T-355

LSLL

LALL

4902

4902

LT
4903

LI

LAH

4903

LAL

I
TRIP 1-P-355

NC

2"
TP3

2"-DH-A1-2206

2"-C-A1-8017

TO CDH

1"-C-A1-8108A

332

1/2"

PSV
4901

DAMPENER

1/2"X1

4901

NOTE-4

(1-P-311 A/B)
E

DWG NO. 1310

TO SUCTION OF GLYCOL
RECIRCULATION PUMPS

1"-C-A1-8108B

PSH

PULSATION

TO SUCTION OF GLYCOL
RECIRCULATION PUMPS
TP4

1"-C-A1-8108

DWG NO. 1137

CONTINUED FROM P&ID NO.1116

(1-P-311 C/D)
DWG NO. 1510

PI
4901

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

PAH

PB

XI

4902

4901

4901

DIAPHRAM

RUPTUBE

STOP

Date

Description of revision

DD-MM-YY

1-P-355

Company;

VIETSOVPETRO

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

TP5

2"-DW-A1-2338

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

POINT

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

FROM LSLL-4902

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

ODD

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

ITEM NO. :
A

1-P-355

ITEM NAME :

16

14

13

12

11

Path\File name\Initials:
10

Rev.

ANTIFOAM CHEMICAL STORAGE & INJECTION PUMPS

Company's document No.:

200 kPa

15

Document title:

0.63 LPH

DIFF. PRESS

Path\File name\Initials:

ANTI-FOAM CHEMICAL INJECTION PUMP

CAPACITY

DISTRIBUTION CODE:

Page(s)
37131149

16

15

12

13

14

1829 mm (ID) X 3353 mm (H)

DESIGN PRESS. :

FULL OF LIQUID + 65 kPa & 40

2. DELETED

TO SAFE LOCATION

TO SAFE LOCATION

OVERBOARD

OVERBOARD

2"-VG-A1-2635

K
SET

3. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0111

4. ALL INSTRUMENTATION AND CONTROL ITEMS INDICATED ON DCS/PLC ARE NOT IN


VENDOR'S SCOPE OF SUPPLY.

5 VENDOR TO PROVIDED A COMMON GLASS CALIBRATION TUBE, THE PUMP TO BE


CALIBRATED SHALL BE FITTED WITH CALIBRATION TUBE AT THIS POINT.

TP3

PCV
PI
5005

TAG NO. SET POINT

INERT GAS
DWG NO. 1142

1"-N-A1-6415

1"

TP1

2"-C-A1-8116

PORTABLE DRUM

2"X2"
NOTE-6

PVSV

PVSV

5003

5004

L ALL- 5001
FV-0301A INLET
12mm SS TURBING

12mm SS TURBING

2"-C-A1-8124

MANHOLE

3/4"

METERING SYSTEM

NORTH

5004

5004

LG
5003

HOSE

EAST

BOAT

BOAT

LANDING

LANDING

LALL

LSLL

5001

5001

LT

1-T-351

LI

5002

5002

12mm SS TURBING

DWG NO. 1203

DWG NO. 1303

DWG NO. 1403

LAH
LAL

DWG NO. 1004


FV-0401B INLET

12mm SS TURBING

DWG NO. 1104

FV-0401C INLET
12mm SS TURBING

DWG NO. 1204


FV-0401D INLET

12mm SS TURBING

TRIP

DWG NO. 1304


FV-0401E INLET

1-P-351A/B

DWG NO. 1103

FV-0401A INLET

LSHH

LAHH

2"-C-E1-8114

2"-C-A1-8106

12mm SS TURBING

CONN.

PAH-5004 6000 k P a(g)

FV-0301E INLET

QUICK

mm FROM BTL

750 mm FROM BTL

PAH-5003 6000 k P a(g)

FV-0301D INLET
12mm SS TURBING

P&ID NO. C-1138/41

BOAT LANDING

DRIPLESS

PAH-5002

REFER TO POSITIVE
HOOTER AT

2"

DWG NO. 1003

FV-0301C INLET
12mm SS TURBING

3/4"

500 mm FROM BTL

LAH - 5002 2650

2"

FV-0301B INLET
CSO

TRANSFER PUMP

2"-C-A1-8127

12mm SS TURBING

DWG NO. 1404

FV-1101 INLET
12mm SS TURBING
NC

2"

DWG NO. 1011


FV-1102 INLET

12mm SS TURBING
TP4

DWG NO. 1011

2"-DH-A1-2227

TO CDH

DWG NO. 1137

2"-C-A1-8113

2"-C-A1-8113

2"-C-A1-8111

1"-C-E1-8112

NOTE-7

5004

A1

E1

1/2"X1
13925

PSV

INST.

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

PI

10.1.96

APPROVED FOR ENGG.

MSP

GRR

5002

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

DAMPENER

PSV
5001

PSH

NOTE-5

1/2"

PULSATION

13925

DAMPENER

PULSATION

1/2"X1
A1 E1

PIPING

Rev.

5002

A1 E1

LOW

3/4"

3/4"

POINT

PAH
5003

DIAPHRAM
RUPTUBE

PB
5001

STOP

LOW

1-P-351B

XI

PAH

5001

5004

FROM

DIAPHRAM

LSLL-5001

RUPTUBE

PB
5002

STOP

NEW DELHI - INDIA

Company's contract No.:

12

Document title:

METHANOL STORAGE & INJECTION PUMPS

Company's document No.:


Path\File name\Initials:
11

Rev.

Path\File name\Initials:

85 LPH

13

Type of document
PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

12645 kPa

14

SCALE

CCP-WT/95

ODD

LSLL-5001

METHANOL INJECTION PUMPS

15

Limited

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

XI

1-P-351A/B

DIFF. PRESS

Worley

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CAPACITY

ENGINEERS INDIA LIMITED

Basic Engineering:

ITEM NO. :
ITEM NAME :

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

5002

FROM

EIL

CONSORTIUM

Contractor:

POINT

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

A1 E1

1-P-351A

16

Description of revision

DD-MM-YY

Company;

Date

TP11

2"-DW-A1-2337

PSH
5003

VENT

POINT

5001

NOTE-5

POINT

LOW

PI

1/2"

HIGHT

3/4"

1"x2"

1"-C-E1-8114

TP5

CONTINUED FROM P&ID NO.1148

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CONECTION TO

1"x2"

TP2

LAHH-5004 2920 mm FROM BTL

TP12

2"X2"
NOTE-6

6. SET PRESS IS 65 kPa(g) & 40mm WATER COLUUM VACUUM

@ 35 kPa(g)
5001

1. DELETED.

mm WATER COLUMN VACUUM

60C

DESIGN TEMP. :

NOTES

METHANOL STORAGE TANK

SIZE :

1-T-351

ITEM NAME :

2"-VG-A1-2655

10

11

ITEM NO. :

10

DISTRIBUTION CODE:

Page(s)
37131150

16

15

13

14

12

ITEM NAME :
L

10

11

CAPACITY

NOTES

300 Lbs (PURPLE K POWER)


1725 kPa(g)

OPERATING PRESS

1-PK-485 TO 494 (NOTE-3)


DRY CHEMICAL SKID (DCS)

ITEM NO. :

1. DELETED.
2. DELETED

3. TEN DRY CHEMICAL SKIDS ARE PROVIDED. FOR LOCATION OF THESE

SKIDS REFER TO EQUIPMENT LAYOUTS.


4. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110 & 0110

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

PI

I
H

PI

HOLD
2930

DISCHARGE
NOZZLE
H

25.4 MM x 30.48 M
DISCHARGE HOSE

N2 CYLINDER

DRY CHEMICAL CYLINDER

CAPACITY : 1.56 M3

D
FOR DETAILS REFER DOOLEY TACKABERRY P&ID NO. 1155M02 SHT 2 OF 2

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

ISH

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

DRY CHEMICAL SYSTEM

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131151

16

15

12

13

14

1-T-356

ITEM NAME :
L

10

11

ITEM NO. :

CORROSION INHIBITOR DAY TANK

SIZE :

OD.800 mm

DESIGN PRESS. :

x DIA.1200 mm

FULL OF WATER + 50 kPa

DESIGN TEMP. :

NOTES

/ 0.5 m3
1. PROVIDED DRIPLESS CLICK CONNECTION HOSE.

65C

2. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110


TO SAFE LOCATION

& 0111

JUST ABOVE 1000 LITRE DRUM


3. VENDOR SHALL PROVIDED ALL INSTRUMENTATION FOR PUMP
OPERATION.

4. VENDOR TO PROVIDE A COMMON LOOSE GLASS CALIBRATION

2"-VG-A1-2635

1000 LITRE
CHEMICAL DRUM
NOTE-6

TUBE. THE PUMP TO BE CALIBRATED SHALL BE FITTED WITH


CALIBRATION TUBE AT THIS POINT.
LI
5302

5. DELETED.
LAL

6. VENDOR SUPPLIED CONTAINER (RETURNABLE).


7. 1-P-356F IS WAREHOUSE SPARE.

8. A STEEL STRUCTURE WITH LEGS, TO SUPPORT 1000 LITRE DRUM


ABOVE 1-T-356 SHALL BE PROVIDED BY VENDOR.

NOTE-8
TAG NO. SET POINT

2"-C-A1-8131
NOTE-1

TRANSFER PUMP

HAND HOLD

NC

* FROM 1-K-253 TRIP

A1

A1

A10

A10

10mm HOLE

200mm FROM BTL

LG

LT

5301

5302

CONTD. ON P&ID NO. 1154

PORTABLE DRUM

1-T-356

TO-CDH

2"-DH-A1-2250

DWG NO. 1137

A1 A10

TO-1-P-357 A-E SUCTION

1"-C-A10-8130

INST.

DWG NO. 1154


TO 1-AC-251A
DWG NO. 1003

CALIBRATION

TO 1-AC-251B

POT

DWG NO. 1103

TO 1-AC-251C
DWG NO. 1203
TO 1-AC-251D

PSV

PI

PSV

PI

5303

5303

5304

5304

A1

D1

610

400 kPa(g)

5301

PSV

1/2"
PCV

VENT

12mm SS TUBING

TUBING

12mm SS

1"

1-P-356E

PCV
5303

SDH

MSP

AC

17.2.96

ISSUED FOR COMMENTS

MSP

GRR

EIL

EIL

Description of revision

3/4"X1"

PSV

610

5307

NEW DELHI - INDIA

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT


CENTRAL COMPRESSION PLATFORM
WHITE TIGER FIELD

PI
5307

Company's contract No.:

SCALE

Type of document

CCP-WT/95

1-P-356A/B/C/D/E/F

(NOTE-7)

10

Path\File name\Initials:
9

Rev.

COMPRESSOR CORROSION INHIBITOR SYSTEM-I

Company's document No.:

4060 kPa

11

Document title:

1.0 LPH

DIFF. PRESS

Path\File name\Initials:

I-STAGE CORROSION INHIBITOR INJECTION PUMPS

CAPACITY

12

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

ITEM NAME :

13

LOC

COMPANY

ENGINEERS INDIA LIMITED

TURBING

400 kPa(g)

14

SHI

CONSORTIUM

Project name:

SET @

JUY

WORLEY

PETECHIM/VIETSOPETRO

Detailed Engineering:

12 MM OD SS

TURBING

ISH
PH

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

1/2"

15

Date

Basic Engineering:

ITEM NO. :

16

SA

APPROVED FOR CONSTRUCTION

VIETSOVPETRO

DWG NO. 1154

REVISRD AS MARKED

20.3.96

Company;

2"-AU-A3-5245

AS - BUILT

20.11.96

Contractor:

12 MM OD SS

TURBING

14.3.97

Rev.

1/2"

12 MM OD SS

DD-MM-YY

5305

1-P-356D

1/2"

TURBING

TURBING

DWG NO. 1140

12 MM OD SS

12 MM OD SS

UTILITY AIR

NOTE-3

SOV

5304

PI
5305

VENT

1"

1-P-356C

1/2"

5306

PI
5306

PSV
5305

D1

SOV

5303

1-P-356B
S

3/4"X1"

4650

VENT

1"
SOV

5302

1-P-356A

1/2"X1"

NOTE-3

1"

A1

D1

VENT

NOTE-3

SOV

DWG NO. 1403


DWG NO. 1154

A1

D1

VENT

NOTE-3

SOV

SET @

12mm SS TUBING

PI
5302

VENT

12mm SS TUBING

PSV
5302

1"
5301

12mm SS TUBING

PI
5301

A1

TO 1-AC-251E

1/2"

4650

PSV

NOTE-3

NOTE-4

1/2"X1"

1/2"

4650

5301

D1

NOTE-4

1/2"X1"

1/2"

4650

A1

NOTE-4

1/2"X1"

1/2"

4650

12mm SS TUBING

12mm SS TUBING

NOTE-4

1/2"X1"

1/2"

12mm SS TUBING

NOTE-4

12mm SS TUBING

12mm SS TUBING

DWG NO. 1303

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

L AL - 5302

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CONECTION TO

DISTRIBUTION CODE:

Page(s)
37131153

16

15

12

13

14

10

11

NOTES

1. FOR GENERAL NOTES REFER P&ID NO. 3713-00-02-41-0110


& 0111
2. VENDOR SHALL PROVIDED ALL INSTRUMENTATION FOR PUMP
OPERATION.
3. VENDOR TO PROVIDE A COMMON LOOSE GLASS CALIBRATION
TUBE. THE PUMP TO BE CALIBRATED SHALL BE FITTED WITH

4. 1-P-357F IS WAREHOUSE SPARE.

* FROM 1-K-253 TRIP

FROM 1-T-356

INST.

1"-C-A10-8130

DWG NO. 1153

TO 1-AC-252A
DWG NO. 1004

TO 1-AC-252B
DWG NO. 1104
TO 1-AC-252C
DWG NO. 1204
TO 1-AC-252D

DWG NO. 1153

12mm SS TUBING

PSV

PI

PSV

PI

5401

5401

5402

5402

5403

5403

5404

5404

1/2"X1"
15300

A1

A1

A1

A1

A1

E1

E1

E1

E1

E1

VENT

VENT

NOTE-2

VENT

NOTE-2

VENT

NOTE-2

1"

SOV

SOV

5404

5405

1-P-357D
I

1-P-357E
S

1/2"

1/2"

1/2"

1/2"

12 MM OD SS

12 MM OD SS

12 MM OD SS

12 MM OD SS

TURBING

TURBING

TURBING

1"

SOV
5403

1-P-357C

PI
5405

VENT

1"

SOV
5402

1-P-357B

PSV
5405

NOTE-2

1"

SOV
5401

1-P-357A

TUBING

DWG NO. 1404

12mm SS

12mm SS TUBING

PI

12 MM OD SS
UTILITY AIR

12mm SS TUBING

PSV

TO 1-AC-252E

1/2"

15300

PI

1/2"

NOTE-3

1/2"X1"

1/2"

15300

PSV

1"

NOTE-3

1/2"X1"

1/2"

15300

NOTE-2

NOTE-3

1/2"X1"

1/2"

15300

12mm SS TUBING

NOTE-3

1/2"X1"

1/2"

12mm SS TUBING

NOTE-3

12mm SS TUBING

DWG NO. 1153

12mm SS TUBING

12mm SS TUBING

DWG NO. 1304

12mm SS TUBING

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

CALIBRATION TUBE AT THIS POINT.

CONTD. ON P&ID NO. 1153

TURBING

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

17.2.96

ISSUED FOR COMMENTS

MSP

GRR

EIL

EIL

Rev.

Date

Description of revision

DD-MM-YY

Company;

TURBING

2"-AU-A3-5245

ISH
PH

JUY

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

1-P-357A/B/C/D/E

ITEM NO. :

(NOTE-4)

II-STAGE CORROSION INHIBITOR INJECTION PUMPS

ITEM NAME :

Document title:

12750 kPa

DIFF. PRESS

15

14

13

12

11

10

Rev.

COMPRESSOR CORROSION INHIBITOR SYSTEM-II

Company's document No.:


Path\File name\Initials:

16

Path\File name\Initials:

1.0 LPH

CAPACITY

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

DISTRIBUTION CODE:

Page(s)
37131154

16

15

12

13

14

11

10

NOTES

1. FAN IS SHARED BY 1-AC-253 (DWG.NO. 1006) AND AC-1.


2. SURGE TANK SHALL BE LOCATED ABOVE THE HIGHEST SYSTEM
POINT.


TAG NO. SET POINT

LAL-0620 700 MM FROM BTL

1"x1/2"

REFER NUOVO PIGNONE

P&ID. SOP 52601/1

INERT GAS

1"-N-A1-6407

DWG NO. 1142

130

1"x1/2"
I

REFER NUOVO PIGNONE

P&ID. SOP 52600/2

INST. AIR

1"-AI-A3-5113

DWG NO. 1140

UTILITY AIR

90

1"-AU-A3-5225

DWG NO. 1140

REFER NUOVO PIGNONE

P&ID. SOP 31938/2

120

1"x1/2"

RECIPROCATING

MOTOR

COMPRESSOR

POTABLE WATER
FILL CONN.

2"

2"

VF

VF
LSL

LG

0620

0620

UCP
LAL
0620

BLEED LINE 1/4"

BLEED LINE 1/4"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

110

1"-WC-A1-9503

FOR LP COMPRESSOR DETAILS REFER

42

SOP
3"-WC-A1-9502

40

CYLINDERS & PACKINGS LUBE OIL

SOP 48907/1

P&ID NO. SOP 46627/1

-COMPRESSOR FRAME LUBE


-COOLING SYSTEM
52601/1 -CAPACITY CONTROL
52600 / 2
N2 BUFFER / PURGING

OIL

SOP 46627/1
SOP
SOP

3"-WC-A1-9501

52599/1 -PROCESS GAS

SOP 48906/ 3

REFER NUOVO PIGNONE

AC-1

NUOVO PIGNONE P&ID NO.:

41

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

Rev.

Date

Description of revision

DD-MM-YY

Company;

EIL

EIL

ISH
PH

JUY

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES


NOTE-1

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

LP COMPRESSOR MECHANICAL INTERFACE

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131155

16

15

12

13

14

ITEM NAME

DESIGN TEMP.

NOTES:

1. QUICK CLOSING VALVE AT SKID EDGE.

VENDOR
VENDOR

2. PIPES ARE ACID CLEANED.

VENDOR

130C

FILTER-COALESCER

1.73 MMKJ/HR (481 KW)


10.8 kPa (g)

DESIGN PRESS.

FSA-901B

LUBE OIL COOLER

DUTY

10

11

1-LC-252B (HX901-1)

ITEM NO.

3. USE HOSE AND PNEUMATIC TRANSFER PUMP


TO COLLECT LUBE OIL IN DRUMS.

VENT TO
SAFE LOCATION

TAG NO.

SET POINT

VAHH-5601B

V/F

PDI

3/4"-VG-A1-2645B

*
3.0

901B

RO
5601B

PDI-903B(MAX)

FA-901B
FLA

903B

V/F

8"-VG-A1-2638B

A1

RT

33

34

149291

149291

SHT 6

SHT 6

FROM D-R
149291
SHT 6

149291

149770

SHT 6

SHT 2
149770

586B

H
DWG NO. 1134

3"-FG-B1-6331-IE

FE-930B

NOTE-2

INTERFACE

B149370

20

317-962
SHT 1

PT

V/F

586B

DWG NO. 1103

CENTRIFUGAL

TURBINE

(TR586)

TO 1-K-253B UCP

FG. FILOT VENT

SEAL VENT

SEAL VENT

2"-VG-A1-2642B

Z3

(TPO586)

2"-VG-A1-2641B

T3

586B

TO 1-K-253B UCP

2"-VG-A1-2646B

W3

COMPRESSOR

317-962
SHT 2

2"-VG-A1-2640B

V3

PDT

V/F

SHT 3

V/F

SHT 2

HP COMPRESSOR TRAIN- 'B'

NOTE-1

FUEL GAS

SEAL VENT

DUCT

PACKACE

EXHAUST

AIR/GAS VENT

AIR
INTAKE
DUCT

SEAL VENT

8"-VG-A1-2638B

LUBE OIL VENT

5601B

(RT586)

2"-VG-A1-2647B

U3

DWG NO. 1103

2"-VG-A1-2648B

AA3
AE3

INST. AIR
DWG NO. 1140

1"x1/2"

1"-A1-A3-5116B

K3

317-962

B149370

SHT-1

SHT 3

1"-VG-A1-2649B

30

REFER SOLAR P&ID's:


49901-B149370 SHT 1-3. (FUEL GAS SYSTEM)
49901-149291 SHT 1-6. (LUBE OIL SYSTEM)
49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN)
49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM)
49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)

SEAL GAS
317-962
SHT-1

REFER DRESSER-RAND P&ID's:

126

164

3/4"x1"

B149471

SHT 2

SHT 3

22

65

3/4"x1"

G3

3/4"x1"

B149770

B149770

SHT 2

SHT 2

D1

F1

A1

A1

1"

WATER

1"-DW-A1-2256B

HP. CASING DRAIN

LP. CASING DRAIN

2"-DH-A1-2268B

RESERVOIR DRAIN

CONN.

HYDRAULIC STARTER

AIR INLET DUCT DRAIN

LUBE OIL DRAIN

LUBE OIL DRAIN

1"-DH-A1-2266B

1"-DH-A1-2265B

1/4"
1"-DH-A1-2264B

LUBE OIL FILTER DRAIN

SEAL GAS HEATER

CONDENSATE DRAIN

SHT 6

V/F

2"

2"

VENDOR FURNISHED

126
VENDOR

26

19/1

21

H3

WASH

ODD

LEGEND:

2"

NOTE-3

COOLER

VENDOR

(SOLAR)

(SOLAR)

FURNISHED

2"

2"-DW-A1-2351B
ODD

64

3/4"x1"

1/4"x3/4"

B149770

SHT 6
54

126

B149291

149291

126

317-962 SHT 1-3. (GAS SEAL SYSTEM)

AG3

V/F

1"-C-A3-8138B (EXTENDED)

98

2"-DW-A1-2316B

CO2 SYSTEM

SHT 5

COMBUSTOR DRAINS

J3

1.5"-C-A3-8137B (MAIN)

97
149746

EXHAUST COLLECTOR &

1"-P-E1-1160B

1"-DW-A1-2267B

DWG NO. 1056

2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

VF

FSA-901B

6"x4"

VSHH

VAHH
5601B

4"-LO-A10-9501B

6"x4"

LUBE OIL TANK VENT

4"-LO-A10-9501B

4"-VG-A1-2639B

MOTOR S/D

V/F

A10 NOTE-2

1-LC-252B

AIR/GAS VENT

NOTE-2

LUBE OIL
TANK DRAIN

14.3.97

AS - BUILT

18.10.96

REVISRD AS MARKED

20.3.96

APPROVED FOR CONSTRUCTION

Rev.

Date

Company;
ODD

ODD

SDH

SA

Description of revision

DD-MM-YY

ISH

MSP

AC

PH

JUY

EIL

EIL

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

ODD

ODD

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2269B

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

HP COMPRESSOR TRAIN-B INTERFACES

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131156

16

15

12

13

14

10

11

NOTES
1-V-251C

ITEM NO.:

1-AC-251C

H.P. INLET SCRUBBER

ITEM NAME:

H.P. INTERSTAGE COOLER

2110 mm(ID) x 3025 mm(T/T)


5500 kPa(g)

SIZE:
DESIGN PRESS :
DESIGN TEMP. :

DUTY: 25.936 MMKJ/Hr (7.204 MW)


5500 kPa(g)

180C

LINING :

180C

1.

UCP

2.

UIC

3.

EPOXY (INTERNAL)
FROM 1-P-356C
12MM SS TUBING

DWG NO. 1153

REFER

LEGEND

UNIT

CONTROL

ANTISURCE

P&ID

No.

3713-00-02-41-0110

&

3713-00-02-41-0111

FOR

4.

DELETED

5.

DELETED

6.

LOCATE

7.

DELETED

PANEL

CONTROLLER

NOTES.

1.5G2.5
5500
PSV
0301C

DWG NO. 1136

NOTE-8
TAH

TAH

TI

PALL

TI

0303C

0304C

TT

PSLL

TT

0301C

0303C

0304C

0301C

TAL

UCP

UCP

CSO

V/F

0311C

1.5G2.5

TIC

TSHH

SS

INST.

0307C

D1

PIPING

I/P

3/4"

0304C

PAL

A1

CSO

3/4"
CSC

2"
2"-P-D1-1066C

2"-P-D1-1067C

FT
0301C

PT
0306C

PSLL

PI

0312C

0309C

V/F

PI

TI

0305C

0303C

S/D

THIS

2"-P-D1-1051C
16"-P-D1-1017C

0303C

NOTE-9

0302C

TYPE.

BE

UTILISED

PAHH

0308C

0308C

NO.

BY

SET

SOLAR

FOR

LUBE

OIL

PUMP

PAL-0304C
PALL-0307C

PB

PB

0301C

0302C

TAH-0306C

50

TAL-0306C

UCP

CONTROL

POINT

4400
750
900
800
2300

PAH-0304C

NOTE-9

SPEED

1-K-253C TRIP

WAFER

SHALL

TAG.

PALL
0307C

PSHH

GOVERNOR

TOL

ROOM.

PALL-0303C

XI

8"-P-D1-1037C

10"x12"

12"x16"

FROM HP COMPRESSOR
SUCTION HEADER

PLATE

PSLL

XI

DWG NO. 1002

DUAL

13.

2"

ON

SYSTEM VENDOR REQUIREMENT.


12.

UCP
PSLL

CONTROL

PAHH-0308C

V/F

0307C

AVAILABLE

UCP.

FROM
VSHH-0302C

FROM
VSHH-0301C

UIC-0301C

TI

BE

0302C

PAL

NOTE-13

0305C

SHALL

COMPRESSOR

VAHH

0301C

PI
0306C

AS

10. USE 20 MESH PER VENDOR REQUIREMENT.

DWG NO. 1204

VAHH

PAH

V/F

PT
0310C

INDICATIONS

WELL

CONTROL

NOTE-8

V/F

THESE
AS

LOCAL

3/4"

VSHH

S/D

UCP

POINT.

9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN

0302C

MOTOR

16"-P-D1-1030C

D1

3/4"

PT

TAP-OFF

11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR

MOTOR 0301C

0304C

TO

NOTE-12

*
VSHH

V/F

PAH

TOL

1-AC-251C
3/4"

PIC

CLOSE

TO 1-V-252C

12"-P-D1-1031C-IS

16"-P-D1-1030C

TS

ALL
DCS

12"-P-D1-1032C

CSO

8.

TY

V/F

0302C

FV-0301C

DWG NO. 1204


TAL

0306C

NOTE-10

PSV

0306C

NOTE-11

ST-0301C

5500

FROM TT-0306C

TAH

I
PDI

FIRE
CASE

4"-SV-A1-2506C

TO HP FLARE

4"-SV-A1-2505C

FIRE
CASE

NOTE-8

4"-FL-A1-2406C

kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)

44

TAHH-0307C

170

LAH-0301C

400MM

FROM

BTL

LAL-0301C

200MM

FROM

BTL

LAHH-0304C

465MM

FROM

BTL

LALL-0303C

150MM

FROM

BTL

TAH-0301C

55

TAL-0301C

45

TAH-0304C

165

PAH-0306C

4250 kPa(g)
3200 kPa(g)

PAL-0306C

VAHH-0301C
LSHH

F
LAH

0301C

LAL

LT

LG

0301C

0302C

LIC

LAHH

0304C

1-V-251C

1-DGT-253C

V/F

0304C

1-K-253C

VAHH-0302C

PDI-0311C(MAX)

ST

ON 2nd STAGE
COMPR. DISCHARGE
BIAS

SIC

0303C

OVERRIDE

LSS

VENDOR'S SCOPE (SOLAR)

XV-0302C

I/P

LSLL-0303C

0302C

ZIO

0302C

0302C

XV

ZSO

ZSC

V/F

0301C

V/F

ZSO
0301C

CONTROL PANEL

FC

3/4"

PB
0306C

PB

2"-DH-A1-2201C

ESD SIGNAL

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

FO

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

4"

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

NORMAL
STOP

3/4"

METHANOL
12MM SS TUBING
NNF

FAST
STOP

D1

DWG NO. 1150

E1

Rev.

Date

Description of revision

DD-MM-YY

Company;

3/4"

XI

1-K-253C TRIP

PB

PB

0304C

0303C

START
MACHINE

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

CLOSE

START
PRESSUR1SATION

UA

XV-4601C, XV-0302C, XV-0401C, XV-0402C

Worley

Basic Engineering:

ON 1-K-253C TRIP

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

USD

0301C

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

0302C

COMMON

COMMON

ALARM

TRIP

M/C PARAMETER

Company's contract No.:

M/C PARAMETER

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

ITEM NO.:

1-DGT-253C

ITEM NAME:
A

1-K-253C

HP COMPRESSOR

CAPACITY :
DIFF. PR. :

HP COMPRESSOR

GAS TURBINE DRIVER

1st STAGE

15

14

13

12

11

10

Document title:

Rev.

HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'C')

Company's document No.:

3107 kPa

16

Path\File name\Initials:

75450 Nm3/hr (GUARANTEE)

9.219 MW

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

PLC-1 (NORMAL S/D)

SS TUBING

EIL

CONSORTIUM

Contractor:

0301C

V/F

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

1-K-253C
UCP

FROM PLC-1/2
(FAST STOP)
INST. DRAIN

PIPING INST.

TO COH

0305C

D1
A1

NC

COOLER VENDOR'S SCOPE OF SUPPLY

3/4"

2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)

V/F

SURGE CONTROL

DWG NO. 1003

3/4"

A1 D1

FV

0301C

FROM STATION

1"

V/F
*

LV

2"-P-D1-1029C
FC

UCP

0301C

0302C

DWG NO. 1136

0301C

FY

LY
0301C

0302C

ZIO

UCP

14"-P-D1-1037C

IAS
ZSC

0301C

NOTE-6

I/P

0302C

V/F

0301C

TO HP FLARE

CMR

V/F

CMR

ZIC
SOV
0301C

1-K-253C TRIP

UCP

CLOSE
FROM

LEGEND:

DWG NO. 1204

0304C

0301C

ZIC

kPa

FROM PIC-0410C

V/F

LALL

LSLL
0303C

SOV

20

0301C

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

TO

TO

TAHH
0307C

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

REFERS

REFERS

Path\File name\Initials:
8

DISTRIBUTION CODE:

Page(s)
37131203

16

15

12

13

14

ITEM NO.
ITEM NAME
L

SIZE :
DESIGN PRESS :
DESIGN TEMP :

10

11

180 C

H.P. DISCHARGE SCRUBBER


1122 mm (ID) X 2415 mm(T/T)
14000 kPa(g)

1. REFER LEGEND P&ID No.

3713-00-02-41-0110 &

EPOXY (INTERNAL)

EPOXY (INTERNAL)

TO 1-DGT-253C SPEED CONTROL

NOTES:

65 C

180 C

1-V-253C

1-AC-252C
H.P. DISCHARGE COOLER
DUTY: 22.236 MMKJ/H (6.177 MW)
14000 kPa(g)

LINING :

1-V-252C
H.P. INTERSTAGE SCRUBBER
1710 mm (ID)X 2750 mm(T/T)
8400 kPa(g)

3713-00-02-41-0111 FOR NOTES.

2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.

DWG NO. 1203

V/F

FY

FV

0401C

FO

70.99

0403C

NOTE-2

V/F

IS

NO POCKETS

NOTE-7

2J3
14000

3"
F1 E1

PSV

D1 F1

RO
0401C

CSO

4"-P-F1-1125C-IS

NNF

SS

F1

INST. PIPING
UCP

UCP

TAHH

PAHH

TI

0405C

0409C

0408C

TAH

FT
0402C

V/F

1E2
8400

PSV
0401C

2"-P-D1-1044C

CSO

DWG NO. 1136

FIRE
CASE

2"-P-D1-1071C

CASE

TAH
TAL

TT
0401C

NOTE-3

3"-FL-A1-2407C

FIRE

3"-SV-A1-2507C

TIC-0306C

0306C

3"-SV-A1-2508C

DWG NO. 1203

TI
0401C

1E2
8400

PSV
0402C

CSO

PI

PAH

0401C

PAL

NOTE-5

NOTE-3
PID
0412C

PSHH

TT

FT

0409C

0408C

0401C

VENT

3/4"

D1

2"

3/4"

FROM 1-AC-251C

12"-P-D1-1032C

DWG NO. 1203

TAL

PIPING

F1

INST.

SS

NO.

SET

PALL-0407C
PALL-0412C
VENT

CC
0402C

VSHH

FROM

0401C

8"-P-E1-1035C

VSHH-0401C

1-K-253C TRIP
VSHH

VSHH-0402C

1-V-253C

FROM

0402C

PB

0401C

0407C

0401C

MOTOR

NOTE-4

S/D

0402C

0402C

NOTE-4

55

LSHH

LT

LG

0402C

0406C

LAH-0401C

290

MM

FROM

BTL

LAL-0401C

130

MM

FROM

BTL

LAHH-0404C

774

MM

FROM

BTL

50

MM

FROM

BTL

LAHH-0408C

465

MM

FROM

BTL

LALL-0407C

150

MM

FROM

BTL

LAH-0402C

400

MM

FROM

BTL

LAL-0402C

200

MM

FROM

BTL

PAH-0401C

4250 kPa(g)
3200 kPa(g)

TAH-0401C

50
44

LAHH

PAH-0405C

0408C

PAL-0405C

C
C

13000 kPa(g)
10500 kPa(g)

TAH-0408C

PB

MOTOR

35

TAHH-0409C

TAL-0401C

VAHH

50

TAL-0406C

PAL-0401C

0408C
VAHH

PSLL

172

TAH-0406C

LALL-0403C

NO POCKETS

3/4"

POINT

13200 kPa(g)
4500 kPa(g)
2300 kPa(g)

PAHH-0409C

2"

3/4"
3/4"

TAG.

0407C
TT
0406C

V/F

UCP

165

VAHH-0401C

VAHH-0402C

S/D

LALL

LSLL

PDI-0412C(MAX)

0407C

0407C

XI

XI

0401C

0402C

LIC
0402C

0412C

V/F

V/F

PSLL

PT

0411C

0405C

NOTE-8

20

kPa

PI
0405C

LAH

LAL

XV-0402C

CLOSE

PAH

PAL

NOTE-3
TI

2"-P-D1-1041C

TOP

TAH

CSC

PSLL

UCP

TI
0406C

PI

0412C

2"

PUMP CONTROL.

0408C

PALL

CSC

CSO

TSHH
0409C
TI

F1

3/4"

8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL


TAHH
0409C

TAHH-0405C

PALL
0407C

UCP

A1

7. DUAL PLATE WAFER TYPE.

0404C

6"-P-F1-1042C-IS

TSHH

NOTE-6

V/F

SYSTEM VENDOR REQUIREMENT.


UCP

CSO

V/F

0405C

8"-P-F1-1034C-IS

PT
0401C

TT

PSV

CSO

TS

3"-P-D1-1069C

NO POCKETS

DWG NO. 1146

TO HP FLARE

6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR


14000

1-AC-252C

ST-0401C

TO FUEL GAS SKID

5. USE 20 MESH PER VENDOR REQUIREMENT.

8"-P-E1-1070C

2J3

A1

12"-P-D1-1033C

21.05

0402C

IN LOCAL CONTROL ROOM.

6"-P-FI-1073C-IS

3/4"

4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE

PT

F1

V/F

RO

DWG NO. 1005

NO POCKETS

2"

0402C

ENTRY

NO POCKETS

TI
0404C

1-K-253C TRIP

LAH

LT

LG

0401C

LAL

0401C

0405C

I
SOV
0401C
CMR

ZIC

ZIO

0401C

0401C

LY
LALL

LSLL

0403C

0403C

0402C

D
TO CONDENSATE

XV

ZSC

ZSO

0401C

0401C

0401C

0401C

DWG NO. 1008

FC

0402C

1"

LV

3/4"

I/P

I/P
0401C

ACCUMULATOR

1-K-254C
LY

LY

IAS

1"

CLOSE
XV-0401C

2"

LEGEND:

E1
A1

D1
F1

2"-DH-A1-2203C

LIC

0404C

3/4"

2"-P-D1-1036C

SS TUBING

NC

FC

FC

3/4"

B1 D1

INST. DRAIN

3/4"

3/4"
2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)


COOLER VENDOR'S SCOPE OF SUPPLY

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

NC
D1

2"-DH-A1-2202C

C
FROM

LSLL-0407C,
1-K-253C TRIP

I
0402C

CMR

ZIC

ZIO

0402C

0402C

IAS

XV

ZSC

ZSO

0402C

0402C

0402C

DWG NO. 1124

3/4"

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED

SS TUBING

NEW DELHI - INDIA

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

2"-P-E1-1074C

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

FC

1-V-254C

ITEM NO.

14

13

12

11

Path\File name\Initials:
10

HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-C

Company's document No.:

8743 kPa

15

Document title:

2nd STAGE
67696 Nm3/hr

CAPACITY :
DIFF. PRESS :

Path\File name\Initials:

H.P. COMPRESSOR

ITEM NAME

16

EIL

CONSORTIUM

Contractor:

A1 E1

VIETSOVPETRO

DWG NO. 1154

EIL

ISH

PETECHIM/VIETSOPETRO

Basic Engineering:

TO OILY WATER TREATMENT

12MM SS TUBING

Company;

INST. DRAIN

TO CDH

SOV

FROM 1-P-357C

A1

VENDOR'S SCOPE

V/F

DWG NO. 1137

1-V-252C

FROM

LSLL-0403C, LSHH-0807
PSHH-0805, 1-K-253C TRIP

LAHH

0404C

TO CDH

0402C

LSHH

6"x8"

CC
0401C

10"x12"

PI

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

NOTE-3

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

6"-P-F1-1043C-IS

12MM SS TUBING

DWG NO. 1150

0403C

53.79

3/4"

METHANOL

8"-P-E1-1038C

0401C

RO

0401C

IS

DCS AS WELL AS COMPRESSOR UCP.

GAS HEADER

PIC
0401C

E1

ZSC

0401C

10"-P-D1-1070C

V/F

0401C

V/F

ZSO

UCI-0401C

I/P

DWG NO. 1136

V/F

CMR

6"-SV-A1-2509C

TO HP FLARE

I
SOV

0403C

6"-SV-A1-2516C

V/F

ZIC
0401C

UCP

6"-FL-A1-2408C

ZIO
0401C

UCP

3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON

TO DISCHARGE

UCP

DISTRIBUTION CODE:

Page(s)
37131204

16

15

12

13

14

10

11

GLYCOL FLASH DRUN

1-F-311A/B

1-V-311A

DES. TEMPERATURE C: 75

DES. PRESSURE kPa(g):700

DES. PRESSURE kPa(g): 700

1.

DIMENSION-864 O/DIA x 1522 T/T

DIMENSION-230 I/DIA x 1233 T/F.F

DES. TEMPERATURE C: 75

NOTE:

GLYCOL CHARCOAL FILTER

GLYCOL CARTRIDGE FILTER

DIMENSION 1300 I/DIA x 3900 T/T

1-F-312A

TO

BE

LOCATED

CLOSE

TO

PCV-1010A

DES. TEMPERATURE C: 75

DES. PRESSURE kPa(g): 700


TO LP PLARE

4"-FL-A1-2414A-IS

1009A

2"

2"-P-A1-1080A
2"x1"

3/4"

FO

1"

1010A

2"x1"

2"x1"

1001A

2"x1 1/2"

PSV

1"X1"

1004A

700

2"

2"x1"

3/4"
2"

1016B

2"x1 1/2"

3/4"

PI

PSHH

PSLL

1010A

1011A

1022A

2"

2"x3/4"

H 50mm

I
LSHH

LI
1011A

LAL

LT

1011A

SG

CLOSE XV-0903A

LSLL

LALL

1010A

0101A

LG

LT
1001A

TI
1009A

PSV

1"X1"

1003A

700

2"

2"

2"

1"

2"

2"x1"

BTL

FROM

BTL

mm

FROM

BTL

LAH-1001A

550

mm

FROM

BTL

LAL-1001A

450

mm

FROM

BTL

PAH-1009A

400 kPa (g)


300 kPa (g)

PDI-1007A(MAX.)
PDI-1008A(MAX.)

PI

2"x3/4"

CSO

PI
1016A

2"x1"

1-F-312A

3/4"

2"

2"

2"x3/4"

2"

2"x1"

2"

1-F-311A

1"
2"x1"

NO

NO

2"

1"

2"-GL-A2-8257A-IH

2"x1"

1"
2"x1"

2"-DV-A1-2341A

BTL

FROM

mm

350

FB

H 50mm

FROM

mm

650

LAL-1011A

1013A

CLOSE XV-0903A

1002A

mm

350

LAH-1011A

3/4"

2"

LAHH

CSO

2"x1 1/2"

NC

2"x1"

1003A

650

LALL-1010A

FB

1-F-311B

2"x1"

2"x3/4"

1003A

3"

3"x2"

PSV

1"

1-V-311A

LAH

2"
NC

1 1/2" F 2"

1005A

2"-GL-A2-8251A-IS

XV-0903A

PT
1009A

700

H 50mm

DWG NO. 1010

2"x3/4"

2"-GL-A2-8248A-IS

2"-GL-A2-8220A-IH

I
CLOSE

2"-GL-A2-8245A-IH

CONDENSER

I
CLOSE
XV-0903A

2"-P-A1-1116A-IS

FROM OVER HEAD

PALL
1022A

2"-GL-A2-8252A-IS

PAL

2"-P-A1-1117A-IS
2"

PAHH
1011A

2"-GL-A2-8250A-IH

PAH

POINT

LAHH-1003A

PAL-1009A

NC

2"-GL-A2-8246A-IH

PI
1009A

H 50mm

LC
FB

2"

2"-GL-A2-8249A-IS

2"-P-A1-1118A-IS

SET

500 kPa(g)
200 kPa(g)

PALL-1022A

DWG NO. 1310

3"-GL-A2-8254A-IS

2"

FB

NO.

PAHH-1011A

ACCUMULATOR

2"x1"

2"

2"

2"-GL-A2-8253A-IS

CSO

3/4"

4"x2"

PI

3/4"

TO LV 1001A
DWG NO. 1010

H 50mm

FB

GAS SYSTEM

NOTE-1

FB

700

LO
LO

2"x1"

DWG NO. 1010

LAL

PSV

4"

1"

2"-FG-A1-6377A-IH

TO GLYCOL

4"x2 1/2"

2"-FL-A1-2414A-IS

1 1/2" G 2 1/2"
1002A

4"x2 1/2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

FB

LAH

LIC
1001A

FC

TAG.
LO

4"-SV-A1-2528A-IS

700

4"

4"-SV-A1-2527A-IS

FROM LP FUEL

2"

PSV

SET @345 kPa(g)

PCV

2"-FG-A1-6374A-IH

1 1/2" G 2 1/2"

DWG NO. 1010

SET @355 kPa(g)

PCV

1"

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

PDI

PDI

1007A

1008A

TO LEAN/RICH
GLYCOL HEAT

DWG NO. 1010

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

EXCHANGER

2"-GL-A2-8231A-IH

EIL

ISH

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

2"-GL-A2-8216A-IH

3/4"

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

B
FROM GLYCOL

TO

REGENERATOR

DRAIN SYSTEM

2"-DH-A1-2237A
DWG NO. 1010

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

DWG NO. 1310

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:


TP8

DWG NO. 1137

2"-DW-A1-2236A

Document title:

GAS DEHYDRATION UNIT TRAIN-"A"

Company's document No.:


Path\File name\Initials:

16

Rev.

Path\File name\Initials:

TO CDH

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131210

16

15

12

13

14

HX901B-1/2

ITEM NAME

NOTES:

1. QUICK CLOSING VALVE AT ACCESSIBLE LOCATION.

2.8 MW

176C

DESIGN TEMP.

POWER GENERATOR

2068 kPa (g)

DESIGN PRESS.

1-PK-501B

LUBE OIL COOLERS

DUTY

10

11

ITEM NO.

2. UCP LOCATED IN LCR.


3. PIPES ARE ACID CLEANED.

K
VENT TO
SAFE LOCATION

HX901B-2
2"-LO-A10-9513B

2"-LO-A10-9512B
NOTE-3

FA-901B

NOTE-3

FLA
901B

V/F

M
4"x6"

4"-VG-A1-2650B

33

34

B149531

B149531

B149531

SHT 5

SHT 5

SHT 5

FSA-901B

EXHAUST
DUCT
AIR
INTAKE

FUEL GAS PILOT VENT

NOTE-3

DUCT

1
AN-0002 276

NOTE-1

FUEL GAS
DWG NO. 1134

2"-FG-B1-6336-IE

NOTE-3

20

SHT 6

V/F

B149532

1-PK-501B

OUTSIDE

INSIDE

TURBINE

TURBINE

ROOM

ROOM

B149532

FS-931B

SHT 6

30

3/4"-VG-A1-2651B

TURBINE

GEN.

F
ESD SIGNAL FROM

PLC-1/2
I

RUNNING
INDICATION

SHT 3

50061-B149531 SHT 1-5 LUBE OIL SYSTEM


50061-B149532 SHT 1-6 GAS FUEL SYSTEM

V/F

50061-AN-0002 SHT 1-2 EXHAUST SYSTEM

3801B

CO2 SYSTEM

B149776

REFER SOLAR P&ID's:

UCP
1-PK-501B

XI

3/4"-C-A3-8135B

97

NOTE-2

V/F

1/2"-C-A3-8136B

98

50061-B149536 SHT 1-4 HYDRAULIC START SYSTEM


50061-B149776 SHT 1-11 MECHANICAL INSTALLTION

LEGEND:

V/F

SHT 5
25

B149532

B149532

B149536

SHT 6

SHT 6

SHT 4

B149531
SHT 5

SHT 6

22

19

65

25

21

LUBE OIL

126

B149532

3/4"

WATER
WASH
CONN.

RESERVOIR DRAIN

HYDRAULIC STARTER

1"-DH-A1-2263B

TANK DRAIN

COMBUSTOR DRAINS

3/4"-DH-A1-2262B

ENGINE EXHAUST COLLECTOR &

ENGINE AIR

INLET DUCT DRAIN

1"-DH-A1-2261B

LUBE OIL DRAIN

3/4"-DH-A1-2260B

3/4"-DH-A1-2259B

ODD

LUBE OIL FILTER DRAIN

2"

ODD

FURNISHED

VENDOR
B149531

126

2"-DW-A1-2324B

VENDOR

B149776
SHT 3

2"-DW-A1-2322B

126

2"-DW-A1-2323B

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

NOTE-3

4"-VG-A1-2650B

2"-LO-A10-9511B

2"-LO-A10-9510B

V/F

LUBE OIL TANK VENT

HX901B-1

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.
ODD

Date

Description of revision

DD-MM-YY

Company;
VIETSOVPETRO

COMPANY

CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

DWG NO. 1137

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2229B

EIL

PETECHIM/VIETSOPETRO

Contractor:

TO CDH

EIL

ISH

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

POWER GENERATOR- 'B'

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131238

16

15

12

13

14

ITEM NAME

DESIGN TEMP.

NOTES:

1. QUICK CLOSING VALVE AT SKID EDGE.

VENDOR
VENDOR

2. PIPES ARE ACID CLEANED.

VENDOR

130C

FILTER-COALESCER

1.73 MMKJ/HR (481 KW)


10.8 kPa (g)

DESIGN PRESS.

FSA-901C

LUBE OIL COOLER

DUTY

10

11

1-LC-252C (HX901-1)

ITEM NO.

3. USE HOSE AND PNEUMATIC TRANSFER PUMP


TO COLLECT LUBE OIL IN DRUMS.

VENT TO
SAFE LOCATION

TAG NO.

SET POINT

VAHH-5601C

V/F

PDI

3/4"-VG-A1-2645C

*
3.0

901C

RO
5601C

PDI-903C(MAX)

FA-901C
FLA

903C

V/F

8"-VG-A1-2638C

A1

RT

33

34

149291

149291

SHT 6

SHT 6

FROM D-R
149291
SHT 6

149291

149770

SHT 6

SHT 2
149770

586C

H
DWG NO. 1134

3"-FG-B1-6332-IE

FE-930C

NOTE-2

INTERFACE

B149370

20

317-962
SHT 1

PT

V/F

586C

DWG NO. 1203

CENTRIFUGAL

TURBINE

(TR586)

TO 1-K-253C UCP

FG. FILOT VENT

SEAL VENT

SEAL VENT

2"-VG-A1-2642C

Z3

(TPO586)

2"-VG-A1-2641C

T3

586C

TO 1-K-253C UCP

2"-VG-A1-2646C

W3

COMPRESSOR

317-962
SHT 2

2"-VG-A1-2640C

V3

PDT

V/F

SHT 3

V/F

SHT 2

HP COMPRESSOR TRAIN- 'C'

NOTE-1

FUEL GAS

SEAL VENT

DUCT

PACKACE

EXHAUST

AIR/GAS VENT

AIR
INTAKE
DUCT

SEAL VENT

8"-VG-A1-2638C

LUBE OIL VENT

5601C

(RT586)

2"-VG-A1-2647C

U3

DWG NO. 1203

2"-VG-A1-2648C

AA3
AE3

INST. AIR
DWG NO. 1140

1"x1/2"

1"-A1-A3-5116C

K3

317-962

B149370

SHT-1

SHT 3

1"-VG-A1-2649C

30

REFER SOLAR P&ID's:


49901-B149370 SHT 1-3. (FUEL GAS SYSTEM)
49901-149291 SHT 1-6. (LUBE OIL SYSTEM)
49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN)
49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM)
49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)

SEAL GAS
317-962
SHT-1

REFER DRESSER-RAND P&ID's:

126

164

3/4"x1"

B149471

SHT 2

SHT 3

22

65

3/4"x1"

G3

3/4"x1"

B149770

B149770

SHT 2

SHT 2

D1

F1

A1

A1

1"

WATER

1"-DW-A1-2256C

HP. CASING DRAIN

LP. CASING DRAIN

2"-DH-A1-2268C

RESERVOIR DRAIN

CONN.

HYDRAULIC STARTER

AIR INLET DUCT DRAIN

LUBE OIL DRAIN

LUBE OIL DRAIN

1"-DH-A1-2266C

1"-DH-A1-2265C

1/4"
1"-DH-A1-2264C

LUBE OIL FILTER DRAIN

SEAL GAS HEATER

CONDENSATE DRAIN

SHT 6

V/F

2"

2"

VENDOR FURNISHED

126
VENDOR

26

19/1

21

H3

WASH

ODD

LEGEND:

2"

NOTE-3

COOLER

VENDOR

(SOLAR)

(SOLAR)

FURNISHED

2"

2"-DW-A1-2351C
ODD

64

3/4"x1"

1/4"x3/4"

B149770

SHT 6
54

126

B149291

149291

126

317-962 SHT 1-3. (GAS SEAL SYSTEM)

AG3

V/F

1"-C-A3-8138C (EXTENDED)

98

2"-DW-A1-2316C

CO2 SYSTEM

SHT 5

COMBUSTOR DRAINS

J3

1.5"-C-A3-8137C (MAIN)

97
149746

EXHAUST COLLECTOR &

1"-P-E1-1160C

1"-DW-A1-2267C

DWG NO. 1056

2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

VF

FSA-901C

6"x4"

VSHH

VAHH
5601C

4"-LO-A10-9501C

6"x4"

LUBE OIL TANK VENT

4"-LO-A10-9501C

4"-VG-A1-2639C

MOTOR S/D

V/F

A10 NOTE-2

1-LC-252C

AIR/GAS VENT

NOTE-2

LUBE OIL
TANK DRAIN

14.3.97

AS - BUILT

18.10.96

REVISRD AS MARKED

20.3.96

APPROVED FOR CONSTRUCTION

Rev.

Date

Company;
ODD

ODD

SDH

SA

Description of revision

DD-MM-YY

ISH

MSP

AC

PH

JUY

EIL

EIL

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

ODD

ODD

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2269C

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

HP COMPRESSOR TRAIN-C INTERFACES

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131256

16

15

12

13

14

10

11

NOTES
1-V-251D

ITEM NO.:

1-AC-251D

H.P. INLET SCRUBBER

ITEM NAME:

H.P. INTERSTAGE COOLER

2110 mm(ID) x 3025 mm(T/T)


5500 kPa(g)

SIZE:
DESIGN PRESS :
DESIGN TEMP. :

DUTY: 25.936 MMKJ/Hr (7.204 MW)


5500 kPa(g)

180C

LINING :

180C

1.

UCP

2.

UIC

3.

EPOXY (INTERNAL)
FROM 1-P-356D
12MM SS TUBING

DWG NO. 1153

REFER

LEGEND

UNIT

CONTROL

ANTISURCE

P&ID

No.

3713-00-02-41-0110

&

3713-00-02-41-0111

FOR

4.

DELETED

5.

DELETED

6.

LOCATE

7.

DELETED

PANEL

CONTROLLER

NOTES.

1.5G2.5
5500
PSV
0301D

DWG NO. 1136

NOTE-8
TAH

TAH

TI

PALL

TI

0303D

0304D

TT

PSLL

TT

0301D

0303D

0304D

0301D

TAL

UCP

UCP

CSO

V/F

0311D

1.5G2.5

TIC

TSHH

SS

INST.

0307D

D1

PIPING

I/P

3/4"

0304D

PAL

A1

CSO

3/4"
CSC

2"
2"-P-D1-1066D

2"-P-D1-1067D

FT
0301D

S/D

V/F

PT
0306D

PSLL

PI

0312D

0309D

V/F

PI

TI

0305D

0303D

S/D

THIS

2"-P-D1-1051D
16"-P-D1-1017D

0303D

NOTE-9

0302D

TYPE.

BE

UTILISED

PAHH

0308D

0308D

NO.

BY

SET

SOLAR

FOR

LUBE

OIL

PUMP

PAL-0304D
PALL-0307D

PB

PB

0301D

0302D

TAH-0306D

50

TAL-0306D

UCP

CONTROL

POINT

4400
750
900
800
2300

PAH-0304D

NOTE-9

SPEED

1-K-253D TRIP

WAFER

SHALL

TAG.

PALL
0307D

PSHH

GOVERNOR

TOL

ROOM.

PALL-0303D

XI

8"-P-D1-1037D

10"x12"

12"x16"

FROM HP COMPRESSOR
SUCTION HEADER

PLATE

PSLL

XI

DWG NO. 1002

DUAL

13.

2"

ON

SYSTEM VENDOR REQUIREMENT.


12.

UCP
PSLL

CONTROL

PAHH-0308D

V/F

0307D

AVAILABLE

UCP.

FROM
VSHH-0302D

FROM
VSHH-0301D

UIC-0301D

TI

BE

0302D

PAL

NOTE-13

0305D

SHALL

COMPRESSOR

VAHH

0301D

PI
0306D

AS

10. USE 20 MESH PER VENDOR REQUIREMENT.

DWG NO. 1304

VAHH

PAH

V/F

PT
0310D

INDICATIONS

WELL

CONTROL

NOTE-8

UCP

THESE
AS

LOCAL

0302D

MOTOR

16"-P-D1-1030D

D1

3/4"

PT

POINT.

9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN

3/4"

VSHH

MOTOR 0301D

0304D

TAP-OFF

11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR

VSHH

V/F

TO

NOTE-12

3/4"
PAH

TOL

1-AC-251D

12"-P-D1-1031D-IS

PIC

CLOSE

TO 1-V-252D

16"-P-D1-1030D

TS

ALL
DCS

12"-P-D1-1032D

CSO

8.

TY

V/F

0302D

FV-0301D

DWG NO. 1304


TAL

0306D

NOTE-10

PSV

0306D

NOTE-11

ST-0301D

5500

FROM TT-0306D

TAH

I
PDI

FIRE
CASE

4"-SV-A1-2506D

TO HP FLARE

4"-SV-A1-2505D

FIRE
CASE

NOTE-8

4"-FL-A1-2406D

kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)

44

TAHH-0307D

170

LAH-0301D

400MM

FROM

BTL

LAL-0301D

200MM

FROM

BTL

LAHH-0304D

465MM

FROM

BTL

LALL-0303D

150MM

FROM

BTL

TAH-0301D

55

TAL-0301D

45

TAH-0304D

165

PAH-0306D

4250 kPa(g)
3200 kPa(g)

PAL-0306D

VAHH-0301D
LSHH

F
LAH

0301D

LAL

LT

LG

0301D

0302D

LIC

LAHH

0304D

1-V-251D

1-DGT-253D

V/F

0304D

1-K-253D

VAHH-0302D

PDI-0311D(MAX)

ST

ON 2nd STAGE
COMPR. DISCHARGE
BIAS

SIC

0303D

OVERRIDE

LSS

VENDOR'S SCOPE (SOLAR)

XV-0302D

I/P

LSLL-0303D

0302D

ZIO

0302D

0302D

XV

ZSO

ZSC

V/F

0301D

V/F

ZSO
0301D

CONTROL PANEL

FC

3/4"

PB
0306D

PB

2"-DH-A1-2201D

ESD SIGNAL

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

FO

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

4"

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

NORMAL
STOP

3/4"

METHANOL
12MM SS TUBING
NNF

FAST
STOP

D1

DWG NO. 1150

E1

Rev.

Date

Description of revision

DD-MM-YY

Company;

3/4"

XI

1-K-253D TRIP

PB

PB

0304D

0303D

START
MACHINE

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

CLOSE

START
PRESSUR1SATION

UA

XV-4601D, XV-0302D, XV-0401D, XV-0402D

Worley

Basic Engineering:

ON 1-K-253D TRIP

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

USD

0301D

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

0302D

COMMON

COMMON

ALARM

TRIP

M/C PARAMETER

Company's contract No.:

M/C PARAMETER

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

ITEM NO.:

1-DGT-253D

ITEM NAME:
A

1-K-253D

HP COMPRESSOR

CAPACITY :
DIFF. PR. :

HP COMPRESSOR

GAS TURBINE DRIVER

1st STAGE

15

14

13

12

11

10

Document title:

Rev.

HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'D')

Company's document No.:

3107 kPa

16

Path\File name\Initials:

75450 Nm3/hr (GUARANTEE)

9.219 MW

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

PLC-1 (NORMAL S/D)

SS TUBING

EIL

CONSORTIUM

Contractor:

0301D

V/F

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

1-K-253D
UCP

FROM PLC-1/2
(FAST STOP)
INST. DRAIN

PIPING INST.

TO COH

0305D

D1
A1

NC

COOLER VENDOR'S SCOPE OF SUPPLY

3/4"

2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)

V/F

SURGE CONTROL

DWG NO. 1003

3/4"

A1 D1

FV

0301D

FROM STATION

1"

V/F
*

LV

2"-P-D1-1029D
FC

UCP

0301D

0302D

DWG NO. 1136

0301D

FY

LY
0301D

0302D

ZIO

UCP

14"-P-D1-1037D

IAS
ZSC

0301D

NOTE-6

I/P

0302D

V/F

0301D

TO HP FLARE

CMR

V/F

CMR

ZIC
SOV
0301D

1-K-253D TRIP

UCP

CLOSE
FROM

LEGEND:

DWG NO. 1304

0304D

0301D

ZIC

kPa

FROM PIC-0410D

V/F

LALL

LSLL
0303D

SOV

20

0301D

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

TO

TO

TAHH
0307D

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

REFERS

REFERS

Path\File name\Initials:
8

DISTRIBUTION CODE:

Page(s)
37131303

16

15

12

13

14

ITEM NO.
ITEM NAME
L

SIZE :
DESIGN PRESS :
DESIGN TEMP :

10

11

180 C

H.P. DISCHARGE SCRUBBER


1122 mm (ID) X 2415 mm(T/T)
14000 kPa(g)

1. REFER LEGEND P&ID No.

3713-00-02-41-0110 &

EPOXY (INTERNAL)

EPOXY (INTERNAL)

TO 1-DGT-253D SPEED CONTROL

NOTES:

65 C

180 C

1-V-253D

1-AC-252D
H.P. DISCHARGE COOLER
DUTY: 22.236 MMKJ/H (6.177 MW)
14000 kPa(g)

LINING :

1-V-252D
H.P. INTERSTAGE SCRUBBER
1710 mm (ID)X 2750 mm(T/T)
8400 kPa(g)

3713-00-02-41-0111 FOR NOTES.

2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.

DWG NO. 1303

V/F

FY

FV

0401D

FO

70.99

0403D

NOTE-2

V/F

IS

NO POCKETS

NOTE-7

2J3
14000

3"
F1 E1

PSV

D1 F1

RO
0401D

CSO

4"-P-F1-1125D-IS

NNF

SS

F1

INST. PIPING
UCP

UCP

TAH

TAHH

PAHH

TI

0405D

0409D

0408D

FT
0402D

V/F

1E2
8400

PSV
0401D

2"-P-D1-1044D

CSO

DWG NO. 1136

FIRE
CASE

2"-P-D1-1071D

CASE

TAH
TAL

TT
0401D

NOTE-3

3"-FL-A1-2407D

FIRE

3"-SV-A1-2507D

TIC-0306D

0306D

3"-SV-A1-2508D

DWG NO. 1303

TI
0401D

1E2
8400

PSV
0402D

CSO

PI

PAH

0401D

PAL

NOTE-5

NOTE-3
PID
0412D

PSHH

TT

FT

0409D

0408D

0401D

VENT

3/4"

D1

2"

3/4"

FROM 1-AC-251D

12"-P-D1-1032D

DWG NO. 1303

TAL

PIPING

F1

INST.

SS

NO.

SET

PALL-0407D
PALL-0412D
VENT

CC
0402D

VSHH

FROM

8"-P-E1-1035D

0401D

VSHH-0401D

1-K-253D TRIP
VSHH

VSHH-0402D

1-V-253D

FROM

0402D

PB

0401D

0407D

0401D

MOTOR

NOTE-4

S/D

0402D

0402D

NOTE-4

55

LSHH

LT

LG

0402D

0406D

LAH-0401D

290

MM

FROM

BTL

LAL-0401D

130

MM

FROM

BTL

LAHH-0404D

774

MM

FROM

BTL

50

MM

FROM

BTL

LAHH-0408D

465

MM

FROM

BTL

LALL-0407D

150

MM

FROM

BTL

LAH-0402D

400

MM

FROM

BTL

LAL-0402D

200

MM

FROM

BTL

PAH-0401D

4250 kPa(g)
3200 kPa(g)

TAH-0401D

50
44

LAHH

PAH-0405D

0408D

PAL-0405D

C
C

13000 kPa(g)
10500 kPa(g)

TAH-0408D

PB

MOTOR

35

TAHH-0409D

TAL-0401D

VAHH

50

TAL-0406C

PAL-0401D

0408D
VAHH

PSLL

172

TAH-0406D

LALL-0403D

NO POCKETS

3/4"

POINT

13200 kPa(g)
4500 kPa(g)
2300 kPa(g)

PAHH-0409D

2"

3/4"
3/4"

TAG.

0407D
TT
0406D

V/F

UCP

165

VAHH-0401D

VAHH-0402D

S/D

LALL

LSLL

PDI-0412D(MAX)

0407D

0407D

XI

XI

0401D

0402D

LIC
0402D

0412D

V/F

V/F

PSLL

PT

0411D

0405D

NOTE-8

20

kPa

PI
0405D

LAH

LAL

XV-0402D

CLOSE

PAH

PAL

NOTE-3
TI

2"-P-D1-1041D

TOP

TAH

CSC

PSLL

UCP

TI
0406D

PI

0412D

2"

PUMP CONTROL.

0408D

PALL

CSC

CSO

TSHH
0409D
TI

F1

3/4"

8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL


TAHH
0409D

TAHH-0405D

PALL
0407D

UCP

A1

7. DUAL PLATE WAFER TYPE.

0404D

6"-P-F1-1042D-IS

TSHH

NOTE-6

V/F

SYSTEM VENDOR REQUIREMENT.


UCP

CSO

V/F

0405D

8"-P-F1-1034D-IS

PT
0401D

TT

PSV

CSO

TS

3"-P-D1-1069D

NO POCKETS

DWG NO. 1146

TO HP FLARE

6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR


14000

1-AC-252D

ST-0401D

TO FUEL GAS SKID

5. USE 20 MESH PER VENDOR REQUIREMENT.

8"-P-E1-1070D

2J3

A1

12"-P-D1-1033D

21.05

0402D

IN LOCAL CONTROL ROOM.

6"-P-FI-1073D-IS

3/4"

4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE

PT

F1

V/F

RO

DWG NO. 1005

NO POCKETS

2"

0402D

ENTRY

NO POCKETS

TI
0404D

1-K-253D TRIP

LAH

LT

LG

0401D

LAL

0401D

0405D

I
SOV
0401D
CMR

ZIC

ZIO

0401D

0401D

LY
LALL

LSLL

0403D

0403D

0402D

D
TO CONDENSATE

XV

ZSC

ZSO

0401D

0401D

0401D

0401D

DWG NO. 1008

FC

0402D

1"

LV

3/4"

I/P

I/P
0401D

ACCUMULATOR

1-K-254D
LY

LY

IAS

1"

CLOSE
XV-0401D

2"

LEGEND:

E1
A1

D1
F1

2"-DH-A1-2203D

LIC

0404D

3/4"

2"-P-D1-1036D

SS TUBING

NC

FC

FC

3/4"

B1 D1

INST. DRAIN

3/4"

3/4"
2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)


COOLER VENDOR'S SCOPE OF SUPPLY

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

NC
D1

2"-DH-A1-2202D

C
FROM

LSLL-0407D,
1-K-253D TRIP

I
0402D

CMR

ZIC

ZIO

0402D

0402D

IAS

XV

ZSC

ZSO

0402D

0402D

0402D

DWG NO. 1124

3/4"

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED

SS TUBING

NEW DELHI - INDIA

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

2"-P-E1-1074D

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

FC

1-V-254D

ITEM NO.

14

13

12

11

Path\File name\Initials:
10

HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-D

Company's document No.:

8743 kPa

15

Document title:

2nd STAGE
67696 Nm3/hr

CAPACITY :
DIFF. PRESS :

Path\File name\Initials:

H.P. COMPRESSOR

ITEM NAME

16

EIL

CONSORTIUM

Contractor:

A1 E1

VIETSOVPETRO

DWG NO. 1154

EIL

ISH

PETECHIM/VIETSOPETRO

Basic Engineering:

TO OILY WATER TREATMENT

12MM SS TUBING

Company;

INST. DRAIN

TO CDH

SOV

FROM 1-P-357D

A1

VENDOR'S SCOPE

V/F

DWG NO. 1137

1-V-252D

FROM

LSLL-0403D, LSHH-0807
PSHH-0805, 1-K-253D TRIP

LAHH

0404D

TO CDH

0402D

LSHH

6"x8"

CC
0401D

10"x12"

PI

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

NOTE-3

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

6"-P-F1-1043D-IS

12MM SS TUBING

DWG NO. 1150

0403D

53.79

3/4"

METHANOL

8"-P-E1-1038D

0401D

RO

0401D

IS

DCS AS WELL AS COMPRESSOR UCP.

GAS HEADER

PIC
0401D

E1

ZSC

0401D

10"-P-D1-1070D

V/F

0401D

V/F

ZSO

UCI-0401D

I/P

DWG NO. 1136

V/F

CMR

6"-SV-A1-2509D

TO HP FLARE

I
SOV

0403D

6"-SV-A1-2516D

V/F

ZIC
0401D

UCP

6"-FL-A1-2408D

ZIO
0401D

UCP

3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON

TO DISCHARGE

UCP

DISTRIBUTION CODE:

Page(s)
37131304

16

15

12

13

14

10

11

GLYCOL ACCUMULATOR

1-P-311A/B

1-V-312A

REFER

TO

NOTE

41-0111

DES. TEMPERATURE C 150

FOR

DUTY kw 10.5 (INSTALLED)

DWG NO. 1010

3
4

3"-GL-A2-8244A-IH

OF

LEGEND

OF

P&ID

CHEMICAL

NO.3713-00-02-

INJECTION

POINT.

DUTY kw 100
2.

PORTABLE

PUMP

TAG.

-44

DETAILS

DES. PRESSURE kPa(g) 14000

DIFFERENTIAL TEMPERATURE 12750 kPa

DES. PRESSURE kPa(g) FULL VACUUM/350

NOTES:
1.

FLOW 3300 kg/hr

DES. TEMPERATURE C 150

LEAN GLYCOL COOLER

GLYCOL CIRCULATION PUMPS

DIMENSION 915 I/DIA X 2200 T/T

1-AC-311A

FROM GLYCOL

"

2"

4"x2"

2"

STORAGE TANK

2"

2"-GL-A2-8222A

DWG NO. 1116

(BALANCE LINE)

TP10

S 50mm

CONNECTION

NO.

SET

POINT

LALL-1007A

200

PAH-0908A/10A
PALL-0907A/09A

13200 kPa(g)
11000 kPa(g)

mm

FROM

BTL

TAHH-0908A

65 C

FAL-0901A

2805 kg/HR

LAH-1013A

450

mm

FROM

BTL

LAL-1013A

250

mm

FROM

BTL

50 C

TAH-0906A

2"-GL-A2-8214A-IS

1-V-312A
J
LSLL

TI

LG

LT

1008A

1004A

1013A

LALL

1007A

1007A

LAH

LI
1013A

LAL

VAHH-0901A

TRIP PUMPS

FROM FILTER

FROM LEAN/RICH

DWG NO. 1210

1004A

GLYCOL

DWG NO. 1010

RELIEF VALES

4"-GL-A2-8253A-IS

TI

1
2

2"-GL-A2-8242A-IS

"x1"

2"

A2

F2
PSV

1400

2"

2"x1"

0903A

CSO

2"-GL-A2-8213A-IS

FB

1
2

"x1"

A2

F2

14000

2"

2"x1"

PSV

2"x1/2"

CSO

0904A

2"-GL-F2-8255A-IS

PI

TI

0904A

0905A

H
F2

2"-GL-F2-8207A-IS

2"

1-P-311A

CSO

2"

PI
0905A

PSLL

2"

TAH

3/4"

CSO
NC

LOW POINT

2"

PALL

0909A

VSHH

0909A

TRIP PUMPS

0901A

PB

1001

3/4"-AI-A3-5139A

M
F2

F2

XI

TSHH 0908A

1"-C-A1-8108A

PSLL 0907A

1"

1"

NOTE-1

TY

XI

0906A

0903A
I

A2

XI
0902A

3"

1"

PB

3"

3"

1"

LSLL 1007A
A2

"

0901A

1-P-311B

A2

0901A

TRIP FROM

A1

1
2

0908A

3"x2"

3"x2"

1-P-311A

STOP

2"x1

0903A

NC

1002

2"-GL-E2-8208A-IS

"

0910A

TAHH

STOP

VAHH

DAMPNER

1
2

PULSATION

2"x1
1"

PUMPS

TI

PB

FAN

DAMPNER

PAH

DAMPNER

PULSATION

DAMPNER

PAH

TRIP

1-P-311A/B

1003

TRIP

0908A

I
FROM

TRIP PUMPS
1-P-311B

PULSATION

0908A

TSHH

VSHH-0901A

PULSATION
NOTE-2

0901A

PSH

1-P-311A

TIC
0906A

G
TT
0908A

PSLL

0907A

0908A

TT
0906A

0906A

2"-GL-F2-8209A

PSH

TE
0906A

PI

PALL

0907A

E2

2"x1/2"
2"-GL-F2-8256A-IS

3"-GL-A2-8219A-IS

FB

SPARE

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

1-P-311A/B
I

HEAT EXCHANGER

3"

STOP

PSLL 0909A

FAL
0901A

3"-GL-A2-8212A-IS

FT

FE

0901A

0901A

TP2

LEAN GLYCOL TO
GLYCOL CONTACTOR
DWG NO. 1009

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

TP9

DWG NO. 1210

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

2"-DH-A1-2237A

GLYCOL DRAIN

TP6

EIL

ISH

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

TP3
Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

1"x3/4"
B

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

1"-AI-A3-5117A

CONTAINER

CHEMICAL

SCALE

Type of document

CCP-WT/95

ACCESS FOR

2"-GL-A2-8217A

AMTL. FOAM

DWG NO. 1149

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

INST. AIR
DWG NO. 1140

Worley

Basic Engineering:

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

1"-C-A1-8108A

Rev.

Path\File name\Initials:
A

Document title:

GAS DEHYDRATION UNIT TRAIN-"A"

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131310

16

15

12

13

14

HX901C-1/2

ITEM NAME

NOTES:

1. QUICK CLOSING VALVE AT ACCESSIBLE LOCATION.

2.8 MW

176C

DESIGN TEMP.

POWER GENERATOR

2068 kPa (g)

DESIGN PRESS.

1-PK-501C

LUBE OIL COOLERS

DUTY

10

11

ITEM NO.

2. UCP LOCATED IN LCR.


3. PIPES ARE ACID CLEANED.

K
VENT TO
SAFE LOCATION

HX901C-2
2"-LO-A10-9513C

2"-LO-A10-9512C
NOTE-3

FA-901C

NOTE-3

FLA
901C

V/F

M
4"x6"

4"-VG-A1-2650C

33

34

B149531

B149531

B149531

SHT 5

SHT 5

SHT 5

FSA-901C

EXHAUST
DUCT
AIR
INTAKE

FUEL GAS PILOT VENT

NOTE-3

DUCT

1
AN-0002 276

NOTE-1

FUEL GAS
DWG NO. 1134

2"-FG-B1-6337-IE

NOTE-3

20

SHT 6

V/F

B149532

1-PK-501C

OUTSIDE

INSIDE

TURBINE

TURBINE

ROOM

ROOM

B149532

FS-931C

SHT 6

30

3/4"-VG-A1-2651C

TURBINE

GEN.

F
ESD SIGNAL FROM

PLC-1/2
I

RUNNING
INDICATION

SHT 3

50061-B149531 SHT 1-5 LUBE OIL SYSTEM


50061-B149532 SHT 1-6 GAS FUEL SYSTEM

V/F

50061-AN-0002 SHT 1-2 EXHAUST SYSTEM

3801C

CO2 SYSTEM

B149776

REFER SOLAR P&ID's:

UCP
1-PK-501C

XI

3/4"-C-A3-8135C

97

NOTE-2

V/F

1/2"-C-A3-8136C

98

50061-B149536 SHT 1-4 HYDRAULIC START SYSTEM


50061-B149776 SHT 1-11 MECHANICAL INSTALLTION

LEGEND:

V/F

SHT 5

B149532

B149532

B149536

SHT 6

SHT 6

SHT 4

B149531
SHT 5

SHT 6

22

19

65

25

21

LUBE OIL

126

B149532

3/4"

WATER
WASH
CONN.

RESERVOIR DRAIN

HYDRAULIC STARTER

1"-DH-A1-2263C

TANK DRAIN

COMBUSTOR DRAINS

3/4"-DH-A1-2262C

ENGINE EXHAUST COLLECTOR &

ENGINE AIR

INLET DUCT DRAIN

1"-DH-A1-2261C

LUBE OIL DRAIN

3/4"-DH-A1-2260C

3/4"-DH-A1-2259C

ODD

LUBE OIL FILTER DRAIN

2"

ODD

FURNISHED

VENDOR
B149531

25

2"-DW-A1-2324C

VENDOR

B149776
SHT 3

2"-DW-A1-2322C

126

2"-DW-A1-2323C

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

NOTE-3

4"-VG-A1-2650C

2"-LO-A10-9511C

2"-LO-A10-9510C

V/F

LUBE OIL TANK VENT

HX901C-1

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.
ODD

Date

Description of revision

DD-MM-YY

Company;
VIETSOVPETRO

COMPANY

CONSORTIUM
BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

DWG NO. 1137

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2229C

EIL

PETECHIM/VIETSOPETRO

Contractor:

TO CDH

EIL

ISH

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

POWER GENERATOR- 'C'

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131338

16

15

12

13

14

ITEM NAME

DESIGN TEMP.

NOTES:

1. QUICK CLOSING VALVE AT SKID EDGE.

VENDOR
VENDOR

2. PIPES ARE ACID CLEANED.

VENDOR

130C

FILTER-COALESCER

1.73 MMKJ/HR (481 KW)


10.8 kPa (g)

DESIGN PRESS.

FSA-901D

LUBE OIL COOLER

DUTY

10

11

1-LC-252D (HX901-1)

ITEM NO.

3. USE HOSE AND PNEUMATIC TRANSFER PUMP


TO COLLECT LUBE OIL IN DRUMS.

VENT TO
SAFE LOCATION

TAG NO.

SET POINT

VAHH-5601D

V/F

PDI

3/4"-VG-A1-2645D

*
3.0

901D

RO
5601D

PDI-903D(MAX)

FA-901D
FLA

903D

V/F

8"-VG-A1-2638D

A1

RT

33

34

149291

149291

SHT 6

SHT 6

FROM D-R
149291
SHT 6

149291

149770

SHT 6

SHT 2
149770

586D

H
DWG NO. 1134

3"-FG-B1-6333-IE

FE-930D

NOTE-2

INTERFACE

B149370

20

317-962
SHT 1

PT

V/F

586D

DWG NO. 1303

CENTRIFUGAL

TURBINE

(TR586)

TO 1-K-253D UCP

FG. FILOT VENT

SEAL VENT

SEAL VENT

2"-VG-A1-2642D

Z3

(TPO586)

2"-VG-A1-2641D

T3

586D

TO 1-K-253D UCP

2"-VG-A1-2646D

W3

COMPRESSOR

317-962
SHT 2

2"-VG-A1-2640D

V3

PDT

V/F

SHT 3

V/F

SHT 2

HP COMPRESSOR TRAIN- 'D'

NOTE-1

FUEL GAS

SEAL VENT

DUCT

PACKACE

EXHAUST

AIR/GAS VENT

AIR
INTAKE
DUCT

SEAL VENT

8"-VG-A1-2638D

LUBE OIL VENT

5601D

(RT586)

2"-VG-A1-2647D

U3

DWG NO. 1303

2"-VG-A1-2648D

AA3
AE3

INST. AIR
DWG NO. 1140

1"x1/2"

1"-A1-A3-5116D

K3

317-962

B149370

SHT-1

SHT 3

1"-VG-A1-2649D

30

REFER SOLAR P&ID's:


49901-B149370 SHT 1-3. (FUEL GAS SYSTEM)
49901-149291 SHT 1-6. (LUBE OIL SYSTEM)
49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN)
49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM)
49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)

SEAL GAS
317-962
SHT-1

REFER DRESSER-RAND P&ID's:

126

164

3/4"x1"

B149471

SHT 2

SHT 3

22

65

3/4"x1"

G3

3/4"x1"

B149770

B149770

SHT 2

SHT 2

D1

F1

A1

A1

1"

WATER

1"-DW-A1-2256D

HP. CASING DRAIN

LP. CASING DRAIN

2"-DH-A1-2268D

RESERVOIR DRAIN

CONN.

HYDRAULIC STARTER

AIR INLET DUCT DRAIN

LUBE OIL DRAIN

LUBE OIL DRAIN

1"-DH-A1-2266D

1"-DH-A1-2265D

1/4"
1"-DH-A1-2264D

LUBE OIL FILTER DRAIN

SEAL GAS HEATER

CONDENSATE DRAIN

SHT 6

V/F

2"

2"

VENDOR FURNISHED

126
VENDOR

26

19/1

21

H3

WASH

ODD

LEGEND:

2"

NOTE-3

COOLER

VENDOR

(SOLAR)

(SOLAR)

FURNISHED

2"

2"-DW-A1-2351D
ODD

64

3/4"x1"

1/4"x3/4"

B149770

SHT 6
54

126

B149291

149291

126

317-962 SHT 1-3. (GAS SEAL SYSTEM)

AG3

V/F

1"-C-A3-8138D (EXTENDED)

98

2"-DW-A1-2316D

CO2 SYSTEM

SHT 5

COMBUSTOR DRAINS

J3

1.5"-C-A3-8137D (MAIN)

97
149746

EXHAUST COLLECTOR &

1"-P-E1-1160D

1"-DW-A1-2267D

DWG NO. 1056

2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

VF

FSA-901D

6"x4"

VSHH

VAHH
5601D

4"-LO-A10-9501D

6"x4"

LUBE OIL TANK VENT

4"-LO-A10-9501D

4"-VG-A1-2639D

MOTOR S/D

V/F

A10 NOTE-2

1-LC-252D

AIR/GAS VENT

NOTE-2

LUBE OIL
TANK DRAIN

14.3.97

AS - BUILT

18.10.96

REVISRD AS MARKED

20.3.96

APPROVED FOR CONSTRUCTION

Rev.

Date

Company;
ODD

ODD

SDH

SA

Description of revision

DD-MM-YY

ISH

MSP

AC

PH

JUY

EIL

EIL

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

ODD

ODD

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2269D

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

HP COMPRESSOR TRAIN-D INTERFACES

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131356

16

15

12

13

14

10

11

NOTES
1-V-251E

ITEM NO.:

1-AC-251E

H.P. INLET SCRUBBER

ITEM NAME:

H.P. INTERSTAGE COOLER

2110 mm(ID) x 3025 mm(T/T)


5500 kPa(g)

SIZE:
DESIGN PRESS :
DESIGN TEMP. :

DUTY: 25.936 MMKJ/Hr (7.204 MW)


5500 kPa(g)

180C

LINING :

180C

1.

UCP

2.

UIC

3.

EPOXY (INTERNAL)
FROM 1-P-356E
12MM SS TUBING

DWG NO. 1153

REFER

LEGEND

UNIT

CONTROL

ANTISURCE

P&ID

No.

3713-00-02-41-0110

&

3713-00-02-41-0111

FOR

4.

DELETED

5.

DELETED

6.

LOCATE

7.

DELETED

PANEL

CONTROLLER

NOTES.

1.5G2.5
5500
PSV
0301E

DWG NO. 1136

NOTE-8
TAH

TAH

TI

PALL

TI

0303E

0304E

TT

PSLL

TT

0301E

0303E

0304E

0301E

TAL

UCP

UCP

CSO

V/F

0311E

1.5G2.5

TIC

TSHH

SS

INST.

0307E

D1

PIPING

I/P

3/4"

0304E

PAL

A1

CSO

3/4"
CSC

2"
2"-P-D1-1066E

2"-P-D1-1067E

FT
0301E

S/D

V/F

PT
0306E

PSLL

PI

0312E

0309E

V/F

PI

TI

0305E

0303E

S/D

DUAL

13.

THIS

UIC-0301E

2"-P-D1-1051E

0303E

TI

PSLL

PALL

0305E

0307E

0307E

WAFER

SHALL

TAG.

NOTE-9

0302E

TYPE.

BE

UTILISED

PSHH

PAHH

0308E

0308E

NO.

BY

SET

SOLAR

FOR

LUBE

OIL

PUMP

PAL-0304E
PALL-0307E

PB

PB

0301E

0302E

TAH-0306E

50

TAL-0306E

UCP

CONTROL

POINT

4400
750
900
800
2300

PAH-0304E

NOTE-9

8"-P-D1-1037E

10"x12"

12"x16"

ROOM.

PALL-0303E

XI

SPEED

1-K-253E TRIP

PLATE

PSLL

XI

GOVERNOR

TOL

CONTROL

PAHH-0308E

V/F

2"

16"-P-D1-1017E

ON

FROM
VSHH-0302E

FROM
VSHH-0301E

DWG NO. 1002

AVAILABLE

UCP.

SYSTEM VENDOR REQUIREMENT.


12.

UCP

FROM HP COMPRESSOR
SUCTION HEADER

BE

0302E

PAL

NOTE-13

SHALL

COMPRESSOR

VAHH

0301E

PI
0306E

AS

10. USE 20 MESH PER VENDOR REQUIREMENT.

DWG NO. 1404

VAHH

PAH

V/F

PT
0310E

INDICATIONS

WELL

CONTROL

NOTE-8

UCP

THESE
AS

LOCAL

0302E

MOTOR

16"-P-D1-1030E

D1

3/4"

PT

POINT.

9. LOCAL/REMOTE SELECTOR FOR FAN START SHALL BE IN

3/4"

VSHH

MOTOR 0301E

0304E

TAP-OFF

11. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR

VSHH

V/F

TO

NOTE-12

3/4"
PAH

TOL

1-AC-251E

12"-P-D1-1031E-IS

PIC

CLOSE

TO 1-V-252E

16"-P-D1-1030E

TS

ALL
DCS

12"-P-D1-1032E

CSO

8.

TY

V/F

0302E

FV-0301E

DWG NO. 1404


TAL

0306E

NOTE-10

PSV

0306E

NOTE-11

ST-0301E

5500

FROM TT-0306E

TAH

I
PDI

FIRE
CASE

4"-SV-A1-2506E

TO HP FLARE

4"-SV-A1-2505E

FIRE
CASE

NOTE-8

4"-FL-A1-2406E

kPa(g)
kPa(g)
kPa(g)
kPa(g)
kPa(g)

44

TAHH-0307E

170

LAH-0301E

400MM

FROM

BTL

LAL-0301E

200MM

FROM

BTL

LAHH-0304E

465MM

FROM

BTL

LALL-0303E

150MM

FROM

BTL

TAH-0301E

55

TAL-0301E

45

TAH-0304E

165

PAH-0306E

4250 kPa(g)
3200 kPa(g)

PAL-0306E

VAHH-0301E
LSHH

F
LAH

0301E

LAL

LT

LG

0301E

0302E

LIC

LAHH

0304E

1-V-251E

1-DGT-253E

V/F

0304E

1-K-253E

VAHH-0302E

PDI-0311E(MAX)

ST

ON 2nd STAGE
LALL
0303E

SIC

COMPR. DISCHARGE

V/F

BIAS

OVERRIDE

LSS

VENDOR'S SCOPE (SOLAR)

XV-0302E

I/P

LSLL-0303E

0302E

ZIO

0302E

0302E

XV

ZSO

ZSC

V/F

0301E

V/F

ZSO
0301E

CONTROL PANEL

FC

3/4"

PB
0306E

PB
0305E

D1
A1

ESD SIGNAL

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

FO

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

4"

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

NORMAL
STOP

3/4"

METHANOL
12MM SS TUBING
NNF

FAST
STOP

D1

DWG NO. 1150

E1

Rev.

Date

Description of revision

DD-MM-YY

Company;

3/4"

XI

1-K-253E TRIP

PB

PB

UA

USD

0304E

0303E

0301E

0302E

START
MACHINE

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

CLOSE

START
PRESSUR1SATION

COMMON

COMMON

ALARM

TRIP

M/C PARAMETER

XV-4601E, XV-0302E, XV-0401E, XV-0402E

Worley

Basic Engineering:

ON 1-K-253E TRIP

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

M/C PARAMETER

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

ITEM NO.:

1-DGT-253E

ITEM NAME:
A

1-K-253E

HP COMPRESSOR

CAPACITY :
DIFF. PR. :

HP COMPRESSOR

GAS TURBINE DRIVER

1st STAGE

15

14

13

12

11

10

Document title:

Rev.

HP INLET SCRUBBER, COMPRESSOR & INTERSTAGE COOLER (TRAIN'E')

Company's document No.:

3107 kPa

16

Path\File name\Initials:

75450 Nm3/hr (GUARANTEE)

9.219 MW

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

PLC-1 (NORMAL S/D)

SS TUBING

EIL

CONSORTIUM

Contractor:

0301E

V/F

EIL

ISH

PETECHIM/VIETSOPETRO

VIETSOVPETRO

1-K-253E
UCP

FROM PLC-1/2
(FAST STOP)
INST. DRAIN

PIPING INST.

TO COH

2"-DH-A1-2201E

NC

COOLER VENDOR'S SCOPE OF SUPPLY

3/4"

2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)

V/F

SURGE CONTROL

DWG NO. 1003

3/4"

A1 D1

FV

0301E

FROM STATION

1"

V/F
*

LV

2"-P-D1-1029E
FC

UCP

0301E

0302E

DWG NO. 1136

0301E

FY

LY
0301E

0302E

ZIO

UCP

14"-P-D1-1037E

IAS
ZSC

0301E

NOTE-6

I/P

0302E

V/F

0301E

TO HP FLARE

CMR

V/F

CMR

ZIC
SOV
0301E

1-K-253E TRIP

UCP

CLOSE
FROM

LEGEND:

DWG NO. 1404

0304E

ZIC

kPa

FROM PIC-0410E

LSLL
0303E

0301E

SOV

20

0301E

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

TO

TO

TAHH
0307E

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

REFERS

REFERS

Path\File name\Initials:
8

DISTRIBUTION CODE:

Page(s)
37131403

16

15

12

13

14

ITEM NO.
ITEM NAME
L

SIZE :
DESIGN PRESS :
DESIGN TEMP :

10

11

180 C

H.P. DISCHARGE SCRUBBER


1122 mm (ID) X 2415 mm(T/T)
14000 kPa(g)

1. REFER LEGEND P&ID No.

3713-00-02-41-0110 &

EPOXY (INTERNAL)

EPOXY (INTERNAL)

TO 1-DGT-253E SPEED CONTROL

NOTES:

65 C

180 C

1-V-253E

1-AC-252E
H.P. DISCHARGE COOLER
DUTY: 22.236 MMKJ/H (6.177 MW)
14000 kPa(g)

LINING :

1-V-252E
H.P. INTERSTAGE SCRUBBER
1710 mm (ID)X 2750 mm(T/T)
8400 kPa(g)

3713-00-02-41-0111 FOR NOTES.

2. LOCATE FV-0401A CLOSE TO TAP-OFF POINT.

DWG NO. 1403

V/F

FY

FV

0401E

FO

IS

NO POCKETS

NOTE-7

2J3
14000

3"
F1 E1

PSV

D1 F1

RO
0401E

CSO

4"-P-F1-1125E-IS

NNF

SS

F1

INST. PIPING
UCP

UCP

TAH

TAHH

PAHH

TI

0405E

0409E

0408E

FT
0402E

PT

V/F

V/F

1E2
8400

PSV
0401E

2"-P-D1-1044E

CSO

DWG NO. 1136

FIRE
CASE

2"-P-D1-1071E

CASE

TAH
TAL

TT
0401E

NOTE-3

3"-FL-A1-2407E

FIRE

3"-SV-A1-2507E

TIC-0306E

0306E

3"-SV-A1-2508E

DWG NO. 1403

TI
0401E

1E2
8400

PSV
0402E

CSO

PI

PAH

0401E

PAL

NOTE-5

NOTE-3
PID
0412E

TSHH

PSHH

TT

FT

0409E

0408E

0401E

VENT

3/4"

D1

2"

3/4"

0412E

0412E

12"-P-D1-1032E

DWG NO. 1403

TAH
TAL

PIPING

F1

INST.

SS

NO.

SET

PALL-0407E
PALL-0412E
VENT

2"

0402E

VSHH

FROM

8"-P-E1-1035E

0401E

VSHH-0401E

1-K-253E TRIP
VSHH

VSHH-0402E

1-V-253E

FROM

0402E

PB

0401E

0407E

0401E

MOTOR

NOTE-4

S/D

0402E

0402E

NOTE-4

55

LSHH

LT

LG

0402E

0406E

LAH-0401E

290

MM

FROM

BTL

LAL-0401E

130

MM

FROM

BTL

LAHH-0404E

774

MM

FROM

BTL

50

MM

FROM

BTL

LAHH-0408E

465

MM

FROM

BTL

LALL-0407E

150

MM

FROM

BTL

LAH-0402E

400

MM

FROM

BTL

LAL-0402E

200

MM

FROM

BTL

PAH-0401E

4250 kPa(g)
3200 kPa(g)

TAH-0401E

LAHH

PAH-0405E

0408E

PAL-0405E

50
44

C
C

13000 kPa(g)
10500 kPa(g)

TAH-0408E

PB

MOTOR

35

TAHH-0409E

TAL-0401E

VAHH

50

TAL-0406E

PAL-0401E

0408E
VAHH

PSLL

172

TAH-0406E

LALL-0403E

NO POCKETS

3/4"

POINT

13200 kPa(g)
4500 kPa(g)
2300 kPa(g)

PAHH-0409E

CSC

3/4"
3/4"

TAG.

0407E
TT
0406E

V/F

UCP

165

VAHH-0401E

VAHH-0402E

S/D

XI

XI

0401E

0402E

LIC
0402E

V/F

V/F

PSLL

PT

0411E

LSLL

LALL

0407E

0407E

PDI-0412E(MAX)

20

kPa

0405E

PI
0405E

LAH

LAL

XV-0402E

CLOSE

PAH

PAL

NOTE-3
TI

2"-P-D1-1041E

TOP

TI
0406E

TAHH-0405E

PALL

NOTE-8

FROM 1-AC-251E

CSO

PUMP CONTROL.

PI

PSLL

UCP

2"

TSHH
0409E
TI

F1

3/4"

8. THIS PSLL SHALL BE UTILISED BY SOLAR FOR LUBE OIL


TAHH
0409E

0408E

PALL

CSC

CSO

0404E

6"-P-F1-1042E-IS

0407E

UCP

A1

SYSTEM VENDOR REQUIREMENT.


7. DUAL PLATE WAFER TYPE.

CSO

1-AC-252E

0401E

TT

PSV

UCP

CC

NOTE-6

3"-P-D1-1069E

NO POCKETS

DWG NO. 1146

TO HP FLARE

V/F

0405E

8"-P-F1-1034E-IS

TO FUEL GAS SKID

6. INJECTION QUILL TO BE AS PER CORROSION INHIBITOR


14000

A1

3/4"

TS

21.05

5. USE 20 MESH PER VENDOR REQUIREMENT.

8"-P-E1-1070E

2J3

6"-P-FI-1073E-IS

12"-P-D1-1033E

ST-0401E

0402E

IN LOCAL CONTROL ROOM.

F1

V/F

RO

4. LOCAL/REMOTE SELECTOR FOR FANS START SHALL BE

PT

2"

0402E

ENTRY

NO POCKETS

TI
0404E

1-K-253E TRIP

LAH

LT

LG

0401E

LAL

0401E

0405E

I
SOV
0401E
CMR

ZIC

ZIO

0401E

0401E

LY

LSLL

LALL

0403E

0403E

0402E

D
TO CONDENSATE

XV

ZSC

ZSO

0401E

0401E

0401E

0401E

DWG NO. 1008

FC

0402E

1"

1"

LV

3/4"

I/P

I/P
0401E

ACCUMULATOR

1-K-254E
LY

LY

IAS

CLOSE
XV-0401E

2"

LEGEND:

E1
A1

D1
F1

2"-DH-A1-2203E

LIC

0404E

3/4"

2"-P-D1-1036E

SS TUBING

NC

FC

FC

3/4"

B1 D1

INST. DRAIN

3/4"

3/4"
2"

VENDOR'S SCOPE OF SUPPLY (SOLAR)


COOLER VENDOR'S SCOPE OF SUPPLY

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

NC
D1

2"-DH-A1-2202E

C
FROM

LSLL-0407E,
1-K-253E TRIP

I
0402E

CMR

ZIC

ZIO

0402E

0402E

IAS

XV

ZSC

ZSO

0402E

0402E

0402E

DWG NO. 1124

3/4"

COMPANY

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

Detailed Engineering:

ENGINEERS INDIA LIMITED

SS TUBING

NEW DELHI - INDIA

Worley

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

2"-P-E1-1074E

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

FC

1-V-254E

ITEM NO.

14

13

12

11

Path\File name\Initials:
10

HP GAS COMPRESSION & CONDENSATE SEPARATOR TRAIN-E

Company's document No.:

8743 kPa

15

Document title:

2nd STAGE
67696 Nm3/hr

CAPACITY :
DIFF. PRESS :

Path\File name\Initials:

H.P. COMPRESSOR

ITEM NAME

16

EIL

CONSORTIUM

Contractor:

A1 E1

VIETSOVPETRO

DWG NO. 1154

EIL

ISH

PETECHIM/VIETSOPETRO

Basic Engineering:

TO OILY WATER TREATMENT

12MM SS TUBING

Company;

INST. DRAIN

TO CDH

SOV

FROM 1-P-357E

A1

VENDOR'S SCOPE

V/F

DWG NO. 1137

1-V-252E

FROM

LSLL-0403E, LSHH-0807
PSHH-0805, 1-K-253E TRIP

LAHH

0404E

TO CDH

0402E

LSHH

6"x8"

CC
0401E

10"x12"

PI

DWG NO. 1137

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

NOTE-3

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

6"-P-F1-1043E-IS

12MM SS TUBING

DWG NO. 1150

0403E

53.79

3/4"

METHANOL

DWG NO. 1005

NO POCKETS

70.99

0403E

NOTE-2

V/F

8"-P-E1-1038E

0401E

RO

0401E

IS

DCS AS WELL AS COMPRESSOR UCP.

GAS HEADER

PIC
0401E

E1

ZSC

0401E

10"-P-D1-1070E

V/F

0401E

V/F

ZSO

UCI-0401E

I/P

DWG NO. 1136

V/F

CMR

6"-SV-A1-2509E

TO HP FLARE

I
SOV

0403E

6"-SV-A1-2516E

V/F

ZIC
0401E

UCP

6"-FL-A1-2408E

ZIO
0401E

UCP

3. ALL THESE INDICATIONS SHALL BE AVAILABLE ON

TO DISCHARGE

UCP

DISTRIBUTION CODE:

Page(s)
37131404

16

15

12

13

14

10

11

GLYCOL FLASH DRUN

1-F-311C/D

1-V-311B

DES. TEMPERATURE C: 75

DES. PRESSURE kPa(g):700

DES. PRESSURE kPa(g): 700

1.

DIMENSION-864 O/DIA x 1522 T/T

DIMENSION-230 I/DIA x 1235 T/F.F

DES. TEMPERATURE C: 75

NOTE:

GLYCOL CHARCOAL FILTER

GLYCOL CARTRIDGE FILTER

DIMENSION 1300 I/DIA x 3900 T/T

1-F-312B

TO

BE

LOCATED

CLOSE

TO

PCV-1010B

DES. TEMPERATURE C: 75

DES. PRESSURE kPa(g): 700


TO LP PLARE

4"-FL-A1-2414B-IS

1009B

2"

2"-P-A1-1080B
2"x1"

3/4"

FO

1"

1010B

2"x1"

2"x1"

1001B

2"x1 1/2"

PSV

1"X1"

1004B

700

2"

2"x1"

3/4"
2"

DWG NO. 1110

XV-0903B

PT

PI

PSHH

PSLL

1009B

1010B

1011B

1022B

2"

2"x3/4"

I
LSHH

LI
1011B

LAL

LT

1011B

SG
LSLL
1010B

CLOSE XV-0903B

LG

LT
1001B

LALL
0101B

TI
1009B

PSV

1"X1"

1003B

700

2"

2"

2"

1"

2"

2"x1"

BTL

FROM

BTL

mm

FROM

BTL

350

mm

FROM

BTL

LAH-1001B

550

mm

FROM

BTL

LAL-1001B

450

mm

FROM

BTL

PAH-1009B

400 kPa (g)


300 kPa (g)

CSO

PDI-1007B(MAX.)
PDI-1008B(MAX.)

2"x1 1/2"

PI

3/4"

G
2"x3/4"

CSO

PI
1016C

2"x1"

1-F-312B

3/4"

2"

2"

2"x3/4"

2"

2"x1"

2"

1-F-311C

1"
2"x1"

NO

NO

2"

1"

2"-GL-A2-8257B-IH

2"x1"

1"
2"x1"

2"-DV-A1-2341B

FROM

mm

650

LAL-1011B

FB

H 50mm

mm

350

LAH-1011B

1013B

CLOSE XV-0903B

1002B

650

LALL-1010B

FB

2"

LAHH

3"

3"x2"

NC

2"x1"

1003B

1 1/2" F 2"

1005B

1-F-311D

2"x1"

2"x3/4"

1003B

700

PSV

1"

1-V-311B

LAH

2"
NC

H 50mm

2"x3/4"

2"-GL-A2-8248A-IS

2"-GL-A2-8220B-IH

I
CLOSE

2"-GL-A2-8245B-IH

CONDENSER

I
CLOSE
XV-0903B

2"-P-A1-1116B-IS

FROM OVER HEAD

PALL
1022B

2"-GL-A2-8251B-IS

PAL

2"-P-A1-1117B-IS
2"

PAHH
1011B

H 50mm

PAH

POINT

LAHH-1003B

PAL-1009B

NC

2"-GL-A2-8246B-IH

PI
1009B

H 50mm

LC

2"

2"-GL-A2-8252B-IS

2"-GL-A2-8249B-IS

2"-P-A1-1118B-IS

FB

3/4"

3"-GL-A2-8254B-IS

2"x1 1/2"

SET

500 kPa(g)
200 kPa(g)

PALL-1022B

DWG NO. 1510

1016D

2"-GL-A2-8250B-IH

2"

FB

NO.

PAHH-1011B

ACCUMULATOR

2"x1"

2"

2"

2"-GL-A2-8253B-IS

CSO

3/4"

4"x2"

PI

3/4"

TO LV 1001B
DWG NO. 1110

H 50mm

FB

GAS SYSTEM

NOTE-1

FB

700

LO
LO

2"x1"

DWG NO. 1110

LAL

PSV

4"

1"

2"-FG-A1-6377B-IH

TO GLYCOL

4"x2 1/2"

2"-FL-A1-2414B-IS

1 1/2" G 2 1/2"
1002B

4"x2 1/2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

FB

LAH

LIC
1001B

FC

TAG.
LO

4"-SV-A1-2528B-IS

700

4"

4"-SV-A1-2527B-IS

FROM LP FUEL

2"

PSV

SET @345 kPa(g)

PCV

2"-FG-A1-6374B-IH

1 1/2" G 2 1/2"

DWG NO. 1110

SET @355 kPa(g)

PCV

1"

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

PDI

PDI

1007B

1008B

TO LEAN/RICH
GLYCOL HEAT

DWG NO. 1110

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

EXCHANGER

2"-GL-A2-8231B-IH

EIL

ISH

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

2"-GL-A2-8216B-IH

3/4"

Worley

Basic Engineering:

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

B
FROM GLYCOL

TO

REGENERATOR

DRAIN SYSTEM

2"-DH-A1-2237B
DWG NO. 1110

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

DWG NO. 1510

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:


TP8

DWG NO. 1137

2"-DW-A1-2236B

Document title:

GAS DEHYDRATION UNIT TRAIN-"B"

Company's document No.:


Path\File name\Initials:

16

Rev.

Path\File name\Initials:

TO CDH

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131410

16

15

12

13

14

ITEM NAME

DESIGN TEMP.

NOTES:

1. QUICK CLOSING VALVE AT SKID EDGE.

VENDOR
VENDOR

2. PIPES ARE ACID CLEANED.

VENDOR

130C

FILTER-COALESCER

1.73 MMKJ/HR (481 KW)


10.8 kPa (g)

DESIGN PRESS.

FSA-901E

LUBE OIL COOLER

DUTY

10

11

1-LC-252E (HX901-1)

ITEM NO.

3. USE HOSE AND PNEUMATIC TRANSFER PUMP


TO COLLECT LUBE OIL IN DRUMS.

VENT TO
SAFE LOCATION

TAG NO.

SET POINT

VAHH-5601E

V/F

PDI

3/4"-VG-A1-2645E

*
3.0

901E

RO
5601E

PDI-903E(MAX)

FA-901E
FLA

903E

V/F

8"-VG-A1-2638E

A1

RT

33

34

149291

149291

SHT 6

SHT 6

FROM D-R
149291
SHT 6

149291

149770

SHT 6

SHT 2
149770

586E

H
DWG NO. 1134

3"-FG-B1-6334-IE

FE-930E

NOTE-2

INTERFACE

B149370

20

317-962
SHT 1

PT

V/F

586E

DWG NO. 1403

CENTRIFUGAL

TURBINE

(TR586)

TO 1-K-253E UCP

FG. FILOT VENT

SEAL VENT

SEAL VENT

2"-VG-A1-2642E

Z3

(TPO586)

2"-VG-A1-2641E

T3

586E

TO 1-K-253E UCP

2"-VG-A1-2646E

W3

COMPRESSOR

317-962
SHT 2

2"-VG-A1-2640E

V3

PDT

V/F

SHT 3

V/F

SHT 2

HP COMPRESSOR TRAIN- 'E'

NOTE-1

FUEL GAS

SEAL VENT

DUCT

PACKACE

EXHAUST

AIR/GAS VENT

AIR
INTAKE
DUCT

SEAL VENT

8"-VG-A1-2638E

LUBE OIL VENT

5601E

(RT586)

2"-VG-A1-2647E

U3

DWG NO. 1403

2"-VG-A1-2648E

AA3
AE3

INST. AIR
DWG NO. 1140

1"x1/2"

1"-A1-A3-5116E

K3

317-962

B149370

SHT-1

SHT 3

1"-VG-A1-2649E

30

REFER SOLAR P&ID's:


49901-B149370 SHT 1-3. (FUEL GAS SYSTEM)
49901-149291 SHT 1-6. (LUBE OIL SYSTEM)
49901-B149770 SHT 1-2. (MECH. DRIVE ENGINE DRAIN)
49901-B147471 SHT 1-3. (ELECTRO HYDRAULIC SYSTEM)
49901-149746 SHT 1-12. (MECHANICAL INSTALLATION)

SEAL GAS
317-962
SHT-1

REFER DRESSER-RAND P&ID's:

126

164

3/4"x1"

B149471

SHT 2

SHT 3

22

65

3/4"x1"

G3

3/4"x1"

B149770

B149770

SHT 2

SHT 2

D1

F1

A1

A1

1"

WATER

1"-DW-A1-2256E

HP. CASING DRAIN

LP. CASING DRAIN

2"-DH-A1-2268E

RESERVOIR DRAIN

CONN.

HYDRAULIC STARTER

AIR INLET DUCT DRAIN

LUBE OIL DRAIN

LUBE OIL DRAIN

1"-DH-A1-2266E

1"-DH-A1-2265E

1/4"
1"-DH-A1-2264E

LUBE OIL FILTER DRAIN

SEAL GAS HEATER

CONDENSATE DRAIN

SHT 6

V/F

2"

2"

VENDOR FURNISHED

126
VENDOR

26

19/1

21

H3

WASH

ODD

LEGEND:

2"

NOTE-3

COOLER

VENDOR

(SOLAR)

(SOLAR)

FURNISHED

2"

2"-DW-A1-2351E
ODD

64

3/4"x1"

1/4"x3/4"

B149770

SHT 6
54

126

B149291

149291

126

317-962 SHT 1-3. (GAS SEAL SYSTEM)

AG3

V/F

1"-C-A3-8138E (EXTENDED)

98

2"-DW-A1-2316E

CO2 SYSTEM

SHT 5

COMBUSTOR DRAINS

J3

1.5"-C-A3-8137E (MAIN)

97
149746

EXHAUST COLLECTOR &

1"-P-E1-1160E

1"-DW-A1-2267E

DWG NO. 1056

2"

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

VF

FSA-901E

6"x4"

VSHH

VAHH
5601E

4"-LO-A10-9501E

6"x4"

LUBE OIL TANK VENT

4"-LO-A10-9501E

4"-VG-A1-2639E

MOTOR S/D

V/F

A10 NOTE-2

1-LC-252E

AIR/GAS VENT

NOTE-2

LUBE OIL
TANK DRAIN

14.3.97

AS - BUILT

18.10.96

REVISRD AS MARKED

20.3.96

APPROVED FOR CONSTRUCTION

Rev.

Date

Company;
ODD

ODD

SDH

SA

Description of revision

DD-MM-YY

ISH

MSP

AC

PH

JUY

EIL

EIL

WORLEY

SHI

LOC

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

ODD

ODD

Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

TO CDH

2"-DH-A1-2269E

Worley

Basic Engineering:

DWG NO. 1137

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

SCALE

Type of document

CCP-WT/95

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

Rev.

Path\File name\Initials:
A

Document title:

HP COMPRESSOR TRAIN-E INTERFACES

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131456

16

15

12

13

14

10

11

GLYCOL ACCUMULATOR

1-P-311C/D

1-V-312B

REFER

TO

NOTE

41-0111

DES. TEMPERATURE C 150

FOR

DUTY kw 10.5 (INSTALLED)

DWG NO. 1110

3
4

3"-GL-A2-8244B-IH

OF

2.

PORTABLE

FROM GLYCOL

"

2"

4"x2"

2"

STORAGE TANK

2"

2"-GL-A2-8222B

DWG NO. 1116

(BALANCE LINE)

TP10

S 50mm

PUMP

1-V-312B

TI

LG

LT

1008B

1004B

1013B

LALL

1007B

1007B

LAH

LI

NO.

SET

POINT

LALL-1007B

200

PAH-0908B/10B
PALL-0907B/09B

13200 kPa(g)
11000 kPa(g)

mm

FROM

BTL

TAHH-0908B

65 C

FAL-0901B

2805 kg/HR

LAH-1013B

450

mm

FROM

BTL

LAL-1013B

250

mm

FROM

BTL

50 C

1013B

LAL

TRIP PUMPS

FROM FILTER

1-P-311C/D

RELIEF VALES

4"-GL-A2-8253B-IS

DWG NO. 1410

TI

FROM LEAN/RICH

1004B

GLYCOL

1
2

2"-GL-A2-8242B-IS

"x1"

2"

A2

F2
PSV

1400

2"

2"x1"

0903B

CSO

2"-GL-A2-8213B-IS

FB

1
2

"x1"

A2

F2

14000

2"

2"x1"

PSV

2"x1/2"

CSO

0904B

2"-GL-F2-8255B-IS

PI

TI

0904B

0905B

H
F2

2"-GL-F2-8207B-IS

2"

1-P-311B

CSO

2"

PI
0905B

PSLL

2"

TAH

3/4"

CSO
NC

LOW POINT

2"

PALL

0909B

VSHH

0909B

TRIP PUMPS

0901B

1005

3/4"-AI-A3-5139B

M
F2

F2

XI

TSHH 0908B

1"-C-A1-8108B

PSLL 0907B

1"

1"

NOTE-1

TY

XI

0906B

0903B
I

A2

XI
0902B

3"

1"

PB

3"

3"

1"

LSLL 1007B
A2

"

0901B

1-P-311D

A2

0901B

TRIP FROM

A1

1
2

0908B

3"x2"

3"x2"

1-P-311C

STOP

2"x1

0903B

NC

1006

2"-GL-E2-8208B-IS

PB

0910B

TAHH

STOP

VAHH

DAMPNER

"

PULSATION

1
2

PUMPS

TI

PB

FAN

DAMPNER

PAH

DAMPNER

PULSATION

2"x1
1"

TRIP

1-P-311C/D

1007

TRIP

0908B

I
FROM

TRIP PUMPS
1-P-311D

PULSATION

DAMPNER

PAH

TSHH

VSHH-0901B

PULSATION
0908B

0901B

PSH

1-P-311C

TIC
0906B

G
TT
0908B

PSLL

0907B

0908B

TT
0906B

0906B

2"-GL-F2-8209B

PSH

TE
0906B

PI

PALL

0907B

NOTE-2

E2

2"x1/2"
2"-GL-F2-8256B-IS

3"-GL-A2-8219B-IS

FB

SPARE

This drawing and the design it covers are the property of ENGINEERS INDIA LIMITED. They are nerely loaned and on the borrower's express agreement that they

POINT.

2"-GL-A2-8214B-IS

LSLL

will not be reproduced, copied, loaned, exhibited nor used except in the limited way and private use permitted by any written consent given by tender to the borrower.

NO.3713-00-02-

INJECTION

VAHH-0901B

DWG NO. 1110

P&ID

CHEMICAL

CONNECTION

TAH-0906B

HEAT EXCHANGER

LEGEND

OF

DUTY kw 100

TAG.

-44

DETAILS

DES. PRESSURE kPa(g) 14000

DIFFERENTIAL TEMPERATURE 12750 kPa

DES. PRESSURE kPa(g) FULL VACUUM/350

NOTES:
1.

FLOW 3300 kg/hr

DES. TEMPERATURE C 150

LEAN GLYCOL COOLER

GLYCOL CIRCULATION PUMPS

DIMENSION 915 I/DIA X 2200 T/T

1-AC-311B

3"

STOP

PSLL 0909B

FAL
0901B

3"-GL-A2-8212B-IS

FT

FE

0901B

0901B

TP2

LEAN GLYCOL TO
GLYCOL CONTACTOR
DWG NO. 1109

14.3.97

AS - BUILT

20.11.96

REVISRD AS MARKED

SA

SDH

20.3.96

APPROVED FOR CONSTRUCTION

MSP

AC

PH

JUY

LOC

7.2.96

APPROVED BY COMPANY FOR ENGG.

MSP

GRR

PH

JUY

LOC

10.1.96

APPROVED FOR ENGG.

MSP

GRR

03.11.95

ISSUED FOR COMPANY'S APPROVAL

GRR

SS

15.10.95

ISSUED FOR CLIENT'S APPROVAL

GRR

SS

25.9.95

ISSUED FOR PRELIMINARY HAZOPS

NL/SS

AC

11.9.95

TITLE BLK REV. FOR COMMENTS

GB/NL SS/AC

31.8.95

ISSUED FOR KICK OFF MEETING

WORLEY

SHI

Rev.

Date

Description of revision

DD-MM-YY

Company;

TP9

DWG NO. 1410

EIL

COMPANY

PETECHIM/VIETSOPETRO

VIETSOVPETRO

2"-DH-A1-2237B

GLYCOL DRAIN

TP6

EIL

ISH

CONSORTIUM

Contractor:

BOUYSUES OFFSHORE + SAMSUNG HEAVY INDUSTRIES

TP3
Detailed Engineering:

ENGINEERS INDIA LIMITED


NEW DELHI - INDIA

1"x3/4"
B

CENTRAL COMPRESSION PLATFORM


WHITE TIGER FIELD

Company's contract No.:

1"-AI-A3-5117B

CONTAINER

CHEMICAL

SCALE

Type of document

CCP-WT/95

ACCESS FOR

2"-GL-A2-8217B

AMTL. FOAM

DWG NO. 1149

Limited

PETROVIETNAM GAS UTILISATION PROJECT

Project name:

INST. AIR
DWG NO. 1140

Worley

Basic Engineering:

PIPING & INSTRUMENTATION DIAGRAM

Contractor's document identification:

1"-C-A1-8108B

Rev.

Path\File name\Initials:
A

Document title:

GAS DEHYDRATION UNIT TRAIN-"B"

Company's document No.:


Path\File name\Initials:

16

15

14

13

12

11

10

DISTRIBUTION CODE:

Page(s)
37131510

PIPING AND INSTRUMENTATION DIAGRAM

CENTRAL COMPRESSOR PLATFORM

Flow Sheet & Instrument Legend Sheet1

17. Slop Caisson System

Flow Sheet & Instrument Legend Sheet2

18. Closed Drain Header System

1. Gas inlet 211A/B

19. White Condensate System

2. HP Compressor Suction Manifold

20. Inlet Metering

3. Train A

21. Export and Gaslift Metering

4. Train B

22. White and Black Condensate Metering

5. Train C

23. Fuel Gas Export Metering

6. Train D

24. Utility Air / Instrument Air System

7. Train E

25. Inert Gas System

8. HP Compressor Discharge Manifold

26. Service Water System

9. LP COMPRESSOR

27. Fire Water Pump System-Pump A

10. Glycol Regeneration Skid Train A

28. Fire Water Pump System-Pump B

11. Glycol Regeneration Skid Train B

29. Diesel Storage System

12. Flare System

30. Glycol Storage & Transfer Pumps

13. HP/LP Flare Scrubbers

31. Corrosion Inhibitor System

14. Fuel Gas Booster Compressor

32. Antifoam Chemical Storage and INJ.Pumps

15. Fuel Gas Skid

33. Methanol Storage and INJ.Pumps

16. Oily Water Separator

24.12.2009

S-ar putea să vă placă și