Sunteți pe pagina 1din 1

S.

1 San Piling
Contract No.: 03
Sr.
Description of the variation
No.
1
2
3
4
5
6
7
8
9
10

Dewatering in Existing Slab area

2
3
4
5
6
7
8
9
10

Total Value of Variations


Anticipated Final Contract Sum

###
###

Dewatering in Existing Slab area

NIL

Remarks

Ongoing Materials by AVIC. Maintenance


agreed to be done free by San Piling

###
6,584,483.05
9,000,000.00

Total Value of Variations


Anticipated Final Contract Sum

###
###

Total Value of Variations


Anticipated Final Contract Sum

Ongoing
Ongoing New 308 Secant Piles agd without addl cost.
To start Value to be agreed

Basement Excavation
Contract Sum: LKR 9,000,000.00
Proposed value
Approx
Status
Agreed Value

New 750mm & 900mm dia Piles


Repalce Coniguous Piles by Secant
Piles
Construction of Capping Beam
Basement Excavation

Omit 150mm perimeter wall


demolition
Omit 200mm thk slab demolition
Demolish peremeter wall to 600mm
Demolish 250~300 mm thk slab
Unused Material cost of steel on
anchoring

Remarks

Ongoing Materials by AVIC. Maintenance


agreed to be done free by San Piling

###
6,584,483.05
9,000,000.00

S.3 Sanken Construction Pvt Ltd


Contract No.: 04
Sr.
Description of the variation
No.
1
2
3
4
5
6
7
8

NIL

New 750mm & 900mm dia Piles


Repalce Coniguous Piles by Secant
Piles
Construction of Capping Beam
Basement Excavation

S.2 San Piling


Contract No.: 05
Sr.
Description of the variation
No.
1

Piling Work
Contract Sum:LKR 990,000,000.00
Proposed value
Approx
Status
Agreed Value

Ongoing
Ongoing New 308 Secant Piles agd without addl cost.
To start Value to be agreed

Demolition and Anchoring Work of the Existing Structure in Zone A


Contract Sum LKR 13,822,025.00
Proposed value
Approx
Status
Remarks
Agreed Value
(95,000)
(152,000)
650,000.00
350,000.00
40,000.00

(95,000)
(152,000)
615,524.00
207,407.00

793,000.00
###

575,931.00
###

S-ar putea să vă placă și