REINFORCING STEEL BARS

###

Kgs.

357.00
424.83
157.53
89.00
5.00

pcs.
pcs.
pcs.
kgs.
pcs.

45.54

cu.m.

490.87
28.17
56.34

bags
cu.m.
cu.m.

MASONRY WORKS, CHB Wal 141.33


V - 1. CHB Laying
A. Materials
Portland Cement
128.03
Washed Sand
10.67
4" x 8" x 16" CHB
387.63
6" x 8" x 16" CHB
1,379.00
10mm dia. x 6.0m RSB
105.00
#16 G.I. Tie Wire
6.00
Sub-Total

sq.m.

V - 2.Masonry Plaster
A. Materials
Portland Cement
Washed Sand
Sub-Total

126.08

sq.m.

48.41
4.03

bags
cu.m.

Wall Footing, Columns & Footings,


Floor Slab, Lintel Beams, Roof Beam
Tie Beam, Septic Tank

A. Materials
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
#16 G.I. Tie Wire
Hacksaw Blade
Sub-Total
CONCRETE WORKS

1,321.61
2,263.51
1,492.43

125.00
195.00
335.00
65.00
65.00

44,625.00
82,842.54
52,772.07
5,785.00
325.00
186,349.61

260.00
680.00
900.00

127,627.11
19,156.11
50,707.35
197,490.57

260.00
680.00
18.00

33,288.95
7,255.09
6,977.25

155.00
65.00

16,275.00
390.00
64,186.28

260.00
680.00

12,587.83
2,743.50
15,331.33

Wall Footing, Columns & Footings, Floor


Slab, Lintel Beam and Septic Tank

A. Materials
Portland Cement
Washed Sand
Washed Gravel
Sub-Total

bags
cu.m.
pcs.
pcs.
pcs.
kgs.

REINFORCING STEEL BARS


10mm dia. x 6.0m RSB
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB
#16 G.I. Tie Wire
Hacksaw Blade
#16 G.I. Tie Wire

COLUMN
357.00
424.83
157.53
89.00
5.00
89.00

Concrete
Portland Cement
Washed Sand
Washed Gravel

490.87
28.17
56.34

Masonry
Portland Cement
Washed Sand
4" x 8" x 16" CHB
6" x 8" x 16" CHB
10mm dia. x 6.0m RSB
GI

Masonry Plaster
Portland Cement
Washed Sand

48.41
4.03

128.03
10.67
387.63
1,379.00
105.00
6.00

10mm dia. x 6.0m RS


12mm dia. x 6.0m
16mm dia. x 6.0m
COLUMN FOOTING
10mm dia. x 6.0m
12mm dia. x 6.0m
16mm dia. x 6.0m
BEAM
10mm dia. x 6.0m
12mm dia. x 6.0m

RSB
RS
RSB
RS
RSB
RS
RS

16mm dia. x 6.0m RS


Wall Footing
10mm dia. x 6.0m RSB
12mm dia. x 6.0m RS
16mm dia. x 6.0m RSB

132.60

G.I

65.60
G.I
60

224.40
33.10

G.I

91.93
G.I
32.73

CHB Wall Masonry


105.00
10mm dia. x 6.0m RS
12mm dia. x 6.0m RSB
16mm dia. x 6.0m RSB

1 Way Slab
10mm dia. x 6.0m RSB
104.00
12mm dia. x 6.0m RS
16mm dia. x 6.0m RSB
2 Way Slab
10mm dia. x 6.0m RSB
195.00
12mm dia. x 6.0m RS
16mm dia. x 6.0m RSB

G.I

G.I

G.I

19

9.00

33

6.00

10.00

14.00

VI

STEELWORKS
Roof Frame
A. Materials
LC 50x50x1.20mm
LC 38x38x1.20mm
L 25x25x 6.0mm
50x100xGA. 14 C-PURLINS
Plain round Bar 10mm dia. x 6.0mm Sag ro
Steel Plate 1.20m x 2.40m x10mm
Anchor Bolt with Nuts and Washer, 10mm dia.
Welding Rod
Primer,Zinc Chromate
3/4" Thick Marine Plywood( Facia Board)
Sub-Total

1.00

lot

56.00
34.00
2.00
28.00
8.00
0.50
48.00
20.00
2.00
5.00

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
kgs.
gals.
pcs.

957.00
532.00
375.00
690.00
170.00
###
133.00
74.00
660.00
1,300.00

53,592.00
18,088.00
750.00
19,320.00
1,360.00
6,649.00
6,384.00
1,480.00
1,320.00
6,500.00
115,443.00

PROJECT QUANTITY TAKE


FOR PERSONAL USE OF KERWIN JAY
IVd - STEEL REINFORCEMENTS FOR WALL FOOTING
ITEM
MAIN REINF. BARS PER FOOTING
1. MAIN BARS
BY DIRECT COUNTING
WALL FOOTING 1
3.00
WALL FOOTING 2
4.00
WALL FOOTING 3
WALL FOOTING 4
WALL FOOTING 5
-

TOTAL NO. OF FOOTING


1.00
-

TOTAL

CROSS REINFORCEMENTS
ITEM
TOTAL NO. OF CUTS PER FOOTING
WALL FOOTING 1
WALL FOOTING 2
WALL FOOTING 3
WALL FOOTING 4
WALL FOOTING 5

223.50
1.00
1.00
1.00
1.00

TOTAL NO. OF CUTS REQUIRED


223.50
-

PROJECT QUANTITY TAKE-OFF

OR PERSONAL USE OF KERWIN JAY C. CONDOR

LENGTH OF FOOTING JOINT/SPLICE


44.50
-

LENGTH OF 1 CUT
0.25
(0.15)
(0.15)
(0.15)
(0.15)

0.30
0.30
0.30
0.30
0.30

NO. OF 6M RSB PER FOOTING LENGTH


ACTUAL
ROUND-OFF
7.81
-

NO. OF CUTS PER 6M RSB


ACTUAL
24.00
(40.00)
(40.00)
(40.00)
(40.00)
TOTAL

GRAND TOTAL

ROUND-OFF
24.00
(40.00)
(40.00)
(40.00)
(40.00)

7.00
-

TOTAL NO. OF 12MM x 6M RSB


9.31
9.31

32.73

TOTAL NO. OF MAIN REIF. BARS


23.42
23.42

G.I. TIE WIRE


3.7952830189
0
0
0
0
3.7952830189

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR
II - CONCRETE WORKS
ITEM
1. COLUMN FOOTINGS
FOOTING 1
FOOTING 2
FOOTING 3
FOOTING 4
FOOTING 5

LENGTH
1.50

WIDTH
###

DEPTH

VOLUME

0.30

0.68

TOTAL NO. OF ITEM


12.00

SUB-TOTAL (CU.M.)
2. WALL FOOTINGS
FOOTING 1
FOOTING 2
FOOTING 3
FOOTING 4
FOOTING 5

44.50
-

0.40
###
###
###

0.20

3.56

1.00

SUB-TOTAL (CU.M.)

3. COLUMNS
COLUMN 1
COLUMN 2
COLUMN 3
COLUMN 4
COLUMN 5

3.50

0.35

0.35

0.43

12.00

SUB-TOTAL (CU.M.)
4. BEAMS
BEAM 1
TIE BEAM 1
BEAM3
BEAM 4
BEAM 5
BEAM 6
BEAM 7
BEAM 8
BEAM 9
BEAM 10

5. CONCRETE SLAB
SLAB 1
SLAB 2
SLAB 3 (STAIRS)
SLAB 4 (STAIR TREADS)
SLAB 5 (SEPTIC TANK)
SLAB 6
SLAB 7
SLAB 8
SLAB 9
SLAB 10

3.00
32.00
3.50
-

0.25
0.20
0.25
###
###
###
###
###
###
###

0.35
0.20
0.35
-

0.26
1.28
0.31
-

9.00
1.00
8.00
SUB-TOTAL (CU.M.)

9.40

8.40

0.15

11.84

1.30
###
###
###
###
###

2.24
-

1.00
1.00
1.00
14.00
1.00
SUB-TOTAL (CU.M.)

TOTAL VOLUME(CU.M.)
USING CLASS "A" MIXTURE:
9
CEMENT (BAGS)
0.5
SAND (CU.M.)
1
GRAVEL (CU.M.)
6. SLAB ON FILL
SOF 1
SOF 2 (SEPTIC TANK)
SOF 3
SOF 4
SOF 5

9.00
-

8.00
1.30
###
###
###

0.15
0.15
-

10.80
-

1.00
1.00
TOTAL VOLUME(CU.M.)

USING CLASS "B" MIXTURE:


7.5
CEMENT (BAGS)
0.5
SAND (CU.M.)
1
GRAVEL (CU.M.)

TOTAL QUANTITY OF MATERIALS


CEMENT (BAGS)
SAND (CU.M.)
GRAVEL (CU.M.)
Total Volume

FF

C. CONDOR

TOTAL VOLUME PER ITEM


8.10
0.00
0.00

8.10

3.56
0.00
0.00
0.00
0.00
3.56
5.15
0.00
0.00
0.00
0.00
5.15

2.36
1.28
2.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.09

11.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.84

11.66

45.54

409.87
22.77
45.54

10.80
0.00
0.00
0.00
0.00
10.80

81.00
5.40
10.80

490.87
28.17
56.34
56.34

1.62

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR
III - MASONRY WORKS
ITEM
LENGTH HEIGHT WIDTH AREA OF OPENINGS WALL AREA (sq.m.)
1. EXTERIOR WALL 6" THK.
WALL 1
32.00
3.50
0.15
1.68
110.32
WALL 2
###
0.15
WALL 3
###
0.15
WALL 4
###
0.15
WALL 5
###
0.15
WALL 6
###
0.15
WALL 7
###
0.15
WALL 8
###
0.15
WALL 9
###
0.15
WALL 10
###
0.15
1.68
SUB-TOTAL
32.00
110.32
USING CLASS "B" MIXTURE:
7.5
0.5
12.5
2. INTERIOR WALL 4" THK.
WALL 1
10.00
WALL 2 (S.T.)
WALL 3 (ROOF DECK)
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL
10.00

3.50
2.00

0.10
0.10

###
###
###
###
###
###
###

0.10
0.10
0.10
0.10
0.10
0.10
0.10

CEMENT (BAGS)
SAND (CU.M.)
6" THK. CHB

3.99
3.99
-

7.98
USING CLASS "B" MIXTURE:
7.5
0.5
12.5

3. CHB FENCE 4" THK.


WALL 1
WALL 2
WALL 3
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL

###
###
###
###
###
###
###
###

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

111.75
9.31
1,379.00

31.01
31.01

CEMENT (BAGS)
SAND (CU.M.)
4" THK. CHB

16.28
1.36
387.63

USING CLASS "B" MIXTURE:


7.5
0.5
12.5
TOTAL

42.00

CEMENT (BAGS)
SAND (CU.M.)
4" THK. CHB
9.66

141.33

TOTAL QUANTITY OF MATERIALS

CEMENT (BAGS)
SAND (CU.M.)
6" CHB
4" CHB

128.03
10.67
1,379.00
387.63

1. EXTERIOR WALL 6" THK. Length

Height
Width
Area of Opening
Wall Area

2. INTERIOR WALL 4" THK.

Length
Height
Width
Area of Opening
Wall Area

128.03
10.67

32.00
3.50
0.15
1.68
110.32

CEMENT (BAGS) 155.77 x 1.013


SAND (CU.M.)
155.77 x 0.0844
6" THK. CHB
155.77 x 12.5

=
=
=

111.75
9.31
1,379.00

10.00
3.50
2.00
0.10
0.10
3.99
31.01
CEMENT (BAGS) 85.24 x 0.525
SAND (CU.M.)
85.24 x 0.0438
4" THK. CHB
85.24 x 12.5

=
=
=

16.28
1.36
387.63

202.55
16.88
1947.13
1065.5

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR
IIIa - MASONRY PLASTER
ITEM
LENGTH HEIGHT AREA OF OPENINGS
1. EXTERIOR WALL 6" THK.
WALL 1
32.00
WALL 2
WALL 3
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL
32.00

3.10
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)

1.68
-

3.10
###
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)

CEMENT (BAGS)
SAND (CU.M.)

3.99
-

3. CHB FENCE 4" THK.


WALL 1
WALL 2
WALL 3
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL

28.56
28.56

3.99
USING CLASS "B" MIXTURE:
12
1

(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)
(0.40)

CEMENT (BAGS)
SAND (CU.M.)

VOL. OF PLASTER (16MM THK.)


ONE FACE
TWO FACES

97.52
97.52

1.68
USING CLASS "B" MIXTURE:
12
1

2. INTERIOR WALL 4" THK.


WALL 1
10.50
WALL 2
WALL 3
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL
10.50

WALL AREA (SQ.M.)

3.12
3.12

37.45
3.12

0.91
0.91

10.97
0.91

USING CLASS "B" MIXTURE:


12
1
TOTAL

42.50

CEMENT (BAGS)
SAND (CU.M.)

5.67

126.08

4.03

48.41
4.03

TOTAL QUANTITY OF MATERIALS

CEMENT (BAGS)
SAND (CU.M.)

TOTAL
48.41
4.03

PR

FOR PERSON
IVc - STEEL REINFORCEMENTS FOR BEAM
ITEM
MAIN REINF. BARS PER BEAM
1. MAIN BARS
BY DIRECT COUNTING
BEAM 1
8.00
BEAM 2
8.00
TIE BEAM
3.00
TIE BEAM 2
3.00
BEAM 5
8.00
BEAM 6
8.00
BEAM 7
8.00
BEAM 8
BEAM 9
BEAM 10
-

TOTAL NO. OF BEAM

LENGTH OF BEAM

###
9.00
2.00
2.00

3.50
3.00
18.00
14.00

TOTAL

LATERAL TIES FOR BEAM


ITEM
AT 0.05
2. STIRRUPS
BEAM 1
BEAM 2
TIE BEAM
TIE BEAM 2
BEAM 5
BEAM 6
BEAM 7
BEAM 8
BEAM 9
BEAM 10

AT 0.075
1.00
5.00
5.00
5.00
5.00
5.00
5.00
-

NO. OF TIES AS INDICATED IN THE PLAN


AT 0.10
3.00
3.00
3.00
3.00
3.00
3.00
###
###
###

10.00
###
###
###
###
###
###
-

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR

JOINT/SPLICE

BENDING/HOOK

TOTAL LENGTH OF RSB

0.25
0.25
0.25
0.25
0.25
0.25
0.25
-

4.05
3.55
18.55
14.55
0.25
0.25
0.25
-

0.30
0.30
0.30
0.30
###
###

NO. OF 6M RSB PER BEAM LENGTH


0.72
0.63
3.09
2.43
0.04
0.04
0.04
Main Reinforcement
Tie Beam (12mm RSB)

CATED IN THE PLAN


AT 0.15

TOTAL NO. OF TIES PER BEAM


ACTUAL
-

4.67
4.83
54.83
41.50
(5.17)
(5.17)
(5.17)
-

AT 0.20
ROUND-OFF

5.00
5.00
55.00
42.00
(6.00)
(6.00)
(6.00)
-

32.00
32.00
132.00
106.00
10.00
10.00
10.00
-

TOTAL NO. OF MAIN REIF. BARS


46.29
45.64
18.55
14.55
91.93
33.10

TOTAL NO. OF TIES REQUIRED

LENGTH OF TIE

NO. OF TIES PER 6M RSB


ACTUAL

256.00
288.00
264.00
212.00
-

1.10
1.10
1.10
1.10
1.10
0.70
0.70
0.70
0.70
0.70

5.45
5.45
5.45
5.45
5.45
8.57
8.57
8.57
8.57
8.57
TOTAL

OF TIES PER 6M RSB

TOTAL NO. OF 10MM x 6M TIES

G.I. TIE WIRE

ROUND-OFF

5.00
5.00
5.00
5.00
5.00
8.00
8.00
8.00
8.00
8.00
10mm RSB

56.32
63.36
58.08
46.64
-

11.5924528302
13.041509434
4.4830188679
3.6
0
0
0
0
0
0

224.40

32.7169811321

IF DOUBLE STIRRUP
448.80

33

39.6

IVf - STEEL REINFORCEMENTS FOR SLAB (TWO WAY SLAB)


ITEM
LENGTH
WIDTH
SPACING OF MAIN REINF.
1. MAIN BARS
SLAB 1
3.50
3.00
0.10
SLAB 2
6.00
3.50
0.10
SLAB 3
0.10
SLAB 4
0.10
SLAB 5
0.10
SLAB 6
0.10
SLAB 7
0.10
SLAB 8
0.10
SLAB 9
0.10
SLAB 10
0.10

SPACING OF TEMP. BARS


0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

PROJEC

FOR PERSONAL US

LENGTH OF MAIN BAR CUT FROM 6M RSB LENGTH TOTAL NO. OF RSB FOR MAIN BARS
ACTUAL
ROUND-OFF
1.00
37.00
37.00
1.00
62.00
62.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00

LENGTH OF CUT BARS


0.95
1.57
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR

NO. OF CUT BARS IN 6M RSB TOTAL NO. OF RSB FOR CUT BARS
ACTUAL
ROUND-OFF
ACTUAL
ROUND-OFF
6.35
6.00
6.17
7.00
3.82
3.00
20.67
21.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00

NO. OF TEMP. BARS ACROSS END SPANS


4.00
4.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LENGTH OF TEMP. BAR CUT FROM 6M RSB LENGTH

TOTAL NO. OF TEMP. BARS

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

32.00
36.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
TOTAL

TOTAL NO. OF 12MM X 6M RSB REQUIRED

G.I. TIE WIRE (KGS)

76.00
119.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00

4.59
9.18
-

195.00

13.77

14.00

IVf - STEEL REINFORCEMENTS FOR SLAB (ONE WAY SLAB)


ITEM
LENGTH
WIDTH
SPACING OF MAIN REINF.
1. MAIN BARS
SLAB 1
9.00
3.50
0.15
SLAB 2
0.15
SLAB 3
0.15
SLAB 4
0.15
SLAB 5
0.10
SLAB 6
0.10
SLAB 7
0.10
SLAB 8
0.10
SLAB 9
0.10
SLAB 10
0.10

SPACING OF TEMP. BARS


0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

LENGTH OF MAIN BAR CUT FROM 6M RSB LENGTH TOTAL NO. OF RSB FOR MAIN BARS
ACTUAL
ROUND-OFF
1.00
61.00
61.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LENGTH OF CUT BARS


2.38
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR

NO. OF CUT BARS IN 6M RSB TOTAL NO. OF RSB FOR CUT BARS
ACTUAL
ROUND-OFF
ACTUAL
ROUND-OFF
2.53
2.00
30.00
30.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
48.00
-

NO. OF TEMP. BARS ACROSS CENTER SPAN


ACTUAL
ROUND-OFF
8.00
8.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

NO. OF TEMP. BARS ACROSS END SPANS


ACTUAL
ROUND-OFF
4.50
5.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LENGTH OF TEMP. BAR CUT FROM 6M RSB LENGTH


1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

TOTAL NO. OF TEMP. BARS


13.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
TOTAL

TOTAL NO. OF 12MM X 6M RSB REQUIRED

G.I. TIE WIRE (KGS)

104.00
3.00
3.00
3.00
-

9.17
-

104.00

9.17

10.00

PROJECT Q

FOR PERSONAL USE


IVe - STEEL REINFORCEMENTS FOR CHB WALL
ITEM
AREA OF WALL
1. MAIN BARS
WALL 1
WALL 2
WALL 3
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL

2. INTERIOR WALL 4" THK.


WALL 1
WALL 2 (S.T.)
WALL 3
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL

3. CHB FENCE 4" THK.


WALL 1
WALL 2
WALL 3
WALL 4
WALL 5
WALL 6
WALL 7
WALL 8
WALL 9
WALL 10
SUB-TOTAL

LENGTH OF VERTICAL REINF. AT .6O M SPACING


112.00
-

238.56
-

35.00
-

74.55
-

TOTAL

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF KERWIN JAY C. CONDOR

LENGTH OF HORIZ. REINF. BARS AT EVERY 3 LAYERS


240.80
-

TOTAL LENGTH OF BARS


479.36
-

TOTAL NO. OF 12MMx6M RSB


ACTUAL
79.89
-

TOTAL

75.25
-

149.80
-

24.97
-

TOTAL

TOTAL

GRAND TOTAL

OTAL NO. OF 12MMx6M RSB


ROUND-OFF
80.00
-

G.I. TIE WIRE (KGS)

80.00

3.58

25.00
-

1.12
-

25.00

1.12

3.58
-

4.00

105.00
6.00

2.00

105.00

10mm Steel Bar

6.00

PRO

FOR PERSONA
IVb - STEEL REINFORCEMENTS FOR COLUMN
ITEM
MAIN REINF. BARS PER COLUMN
1. MAIN BARS
BY DIRECT COUNTING
COLUMN 1
8.00
COLUMN 2
4.00
COLUMN 3
4.00
COLUMN 4
4.00
COLUMN 5
-

TOTAL NO. OF COLUMN


12.00
-

HEIGHT OF COLUMN
3.50
-

TOTAL

LATERAL TIES FOR MULTIPLE STOREY COLUMNS OR WITH CONCRETE SLAB ROOFING
ITEM
NO. OF TIES AS INDICATED IN THE PLAN
AT 0.05
AT 0.075
AT 0.10
2. LATERAL TIES
COLUMN 1
5.00
3.00
###
COLUMN 2
5.00
3.00
###
COLUMN 3
5.00
3.00
###
COLUMN 4 (FENCE)
5.00
3.00
###
COLUMN 5
###
-

LATERAL TIES FOR MULTIPLE STOREY COLUMNS OR WITH CONCRETE SLAB ROOFING
ITEM
NO. OF TIES AS INDICATED IN THE PLAN
AT 0.05
AT 0.075
AT 0.10
2. LATERAL TIES
COLUMN 1
###
COLUMN 2
###
COLUMN 3
###
COLUMN 4
###
COLUMN 5
###
-

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR

JOINT/SPLICE

BENDING/HOOK TOTAL LENGTH OF RSB NO. OF 6M RSB PER COLUMN LENGTH

0.30
-

0.30
0.30
0.30
0.30
-

CATED IN THE PLAN


AT 0.15

4.10
0.30
0.30
0.30
-

0.68
0.05
0.05
0.05
-

TOTAL NO. OF TIES PER COLUMN


AT 0.20
ROUND-OFF

ACTUAL
3.00
3.00
3.00
3.00
-

3.00
(6.13)
(6.13)
(6.13)
-

CATED IN THE PLAN


AT 0.15

3.00
(7.00)
(7.00)
(7.00)
-

34.00
14.00
14.00
7.00
-

TOTAL NO. OF TIES PER COLUMN


AT 0.20
ROUND-OFF

ACTUAL
-

8.75
-

9.00
-

18.00
-

TOTAL NO. OF MAIN REIF. BARS


65.60
65.60

TOTAL NO. OF TIES REQUIRED

LENGTH OF TIE

NO. OF TIES PER 6M RSB


ACTUAL

1.30
(0.10)
(0.10)
(0.10)
(0.10)

408.00
-

4.62
(60.00)
(60.00)
(60.00)
(60.00)
SUB-TOTAL

TOTAL NO. OF TIES REQUIRED

LENGTH OF TIE

NO. OF TIES PER 6M RSB


ACTUAL

216.00
-

1.30
(0.10)
(0.10)
(0.10)
(0.10)

4.62
(60.00)
(60.00)
(60.00)
(60.00)
SUB-TOTAL
TOTAL

OF TIES PER 6M RSB

TOTAL NO. OF 10MM x 6M TIES

G.I. TIE WIRE

ROUND-OFF

4.00
(60.00)
(60.00)
(60.00)
(60.00)

OF TIES PER 6M RSB

132.60
-

18.4754716981
0
0
0
0

132.60

18.4754716981

TOTAL NO. OF 10MM x 6M TIES

19

G.I. TIE WIRE

ROUND-OFF

4.00
(60.00)
(60.00)
(60.00)
(60.00)

18.4754716981

19

132.60

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR
IVa - STEEL REINFORCEMENTS FOR COLUMN FOOTING
ITEM
LENGTH COVER HOOK
LENGTH OF 1 PC.
NO. OF PCS. PER 6M RSB
ACTUAL
ROUND OFF
FOOTING 1 x-axis
1.00
0.15
0.20
1.05
5.71
5
FOOTING 1 y-axis
1.00
0.15
0.20
1.05
5.71
5
FOOTING 2 x-axis
0.15
0.20
0.05
120.00
120
FOOTING 2 y-axis
0.15
0.20
0.05
120.00
120
FOOTING 3 x-axis
0.15
0.20
0.05
120.00
120
FOOTING 3 y-axis
0.15
0.20
0.05
120.00
120
FOOTING 4 x-axis
0.15
0.20
0.05
120.00
120
FOOTING 4 y-axis
0.15
0.20
0.05
120.00
120
FOOTING 5 x-axis
0.15
0.20
0.05
120.00
120
FOOTING 5 y-axis
0.15
0.20
0.05
120.00
120

PCS.
PER
ITEM
5.00
5.00
5.00
5.00
4.00
5.00
-

TOTAL NO. OF
ITEM

30.00
30.00
TOTAL

GIVEN:
Dimension of Footing
x-width
=
1.00 m
y-length
=
1.00 m
Hook
=
0.2 m
Cover
=
0.15 m
Clear Length =
0.7 m

TOTAL NO. OF
RSB

G.I. TIE WIRE

30
30
0
0
0
0
0
0
0
0
60
12mm Steel Bar
G.I

4.25
4.25
8.49
9.00

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR
I - EXCAVATION WORKS
ITEM
1. COLUMN FOOTING
FOOTING 1
FOOTING 2
FOOTING 3
FOOTING 4
FOOTING 5

LENGTH

WIDTH

DEPTH

VOLUME

1.20

###

1.50

2.16

###
###

TOTAL NO. OF ITEM


12.00

SUB-TOTAL (CU.M.)

2. WALL FOOTING
FOOTING 1
FOOTING 2
FOOTING 3
FOOTING 4
FOOTING 5

3. SEPTIC TANK

42.00
-

0.40
0.40
###
###
###

0.60
0.60
-

1.20

3.30

10.08
-

1.00
1.00
SUB-TOTAL (CU.M.)
1.00
TOTAL VOLUME(CU.M.)

FF

C. CONDOR

TOTAL VOLUME PER ITEM


25.92

0
0
25.92

10.08
0
0
0
0
10.08
0
36

IVf - STEEL REINFORCEMENTS FOR SLAB (TWO WAY SLAB)


ITEM
LENGTH
WIDTH
SPACING OF MAIN REINF.
1. MAIN BARS
SLAB 1
0.10
SLAB 2
0.10
SLAB 3
0.10
SLAB 4
0.10
SLAB 5
0.10
SLAB 6
0.10
SLAB 7
0.10
SLAB 8
0.10
SLAB 9
0.10
SLAB 10
0.10

SPACING OF TEMP. BARS


0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

PROJEC

FOR PERSONAL US

LENGTH OF MAIN BAR CUT FROM 6M RSB LENGTH TOTAL NO. OF RSB FOR MAIN BARS
ACTUAL
ROUND-OFF
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00
1.00
2.00
2.00

LENGTH OF CUT BARS


0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR

NO. OF CUT BARS IN 6M RSB TOTAL NO. OF RSB FOR CUT BARS
ACTUAL
ROUND-OFF
ACTUAL
ROUND-OFF
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00
85.71
85.00
0.02
1.00

NO. OF TEMP. BARS ACROSS END SPANS


1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

LENGTH OF TEMP. BAR CUT FROM 6M RSB LENGTH

TOTAL NO. OF TEMP. BARS

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
8.00
TOTAL

TOTAL NO. OF 12MM X 6M RSB REQUIRED

G.I. TIE WIRE (KGS)

11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00
11.00

110.00

FOR

SCAFOLDING FOR COLUMNS


Height
No. of Column Length of wood
4
9
16
Height
4

No. of Column Length of wood


9
14

Height
4

No. of Column Length of wood


9
14

2x2
Total Height
36
2x3
Total Height
36
2x4
Total Height
36

Pieces

5.3333333333
Pieces

7
Pieces

9.3333333333

Vertical(bd.ft)
169.2
Vertical(bd.ft)
252
Vertical(bd.ft)
252

PROJECT QUANTITY TAKE-OFF


FOR PERSONAL USE OF ENGR. KERWIN JAY C. CONDOR

Horizontal(bd.ft)
666.225

Braces(bd.ft)
371.1825

No. of Pieces
31.725

Horizontal(bd.ft)
1140.12

Braces(bd.ft)
630

No. of Pieces
36

Horizontal(bd.ft)
855.09

Braces(bd.ft)
315.9

No. of Pieces
27

PROJECT TITLE
LOCATION
OWNER
PROJECT COST

:
:
:
:

TWO-STOREY RESIDENTIAL BUILDING


POBLACION, USON, MASBATE
DRA. ERLINDA V. SANCHEZ
Php 1,175,000.00

ITEM NO./MATERIALS
I. EARTHWORKS
Excavation (Labor only)
Earthfill

DETAILED ESTIMATES
QTTY
UNIT

UNIT COST

35.00
120

cu.m
cu.m

100.00
120.00

3,500.00
14,400.00
17,900.00

491
28
56
22
218
36
494
75

bags
cu.m
cu.m
cu.m
pcs.
pcs.
pcs.
kls.

145.00
400.00
450.00
400.00
270.00
155.00
95.00
40.00

71,176.66
11,268.30
25,353.68
8,800.00
58,732.71
5,580.00
46,904.69
3,000.00

25
400
300
25

pcs.
bd.ft
bd.ft
kls.

320.00
10.00
10.00
40.00

8,000.00
4,000.00
3,000.00
1,000.00
246,816.03

1,379
388
176
15
105
6

pcs.
pcs.
bags
cu.m
pcs.
kls.

10.00
8.00
145.00
400.00
95.00
40.00

13,790.00
3,101.00
25,585.12
5,881.52
9,975.00
240.00
58,572.65

10
26
88
45
10
7
654
40
150
240
140
72
360
126
80
30
5

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
bd.ft
bd.ft
bd.ft
bd.ft
bd.ft
bd.ft
bd.ft
bd.ft
pcs.
kls.
kls.

320.00
300.00
280.00
95.00
95.00
95.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
12.00
50.00
60.00

3,200.00
7,800.00
24,640.00
4,275.00
950.00
665.00
19,620.00
1,200.00
4,500.00
7,200.00
4,200.00
2,160.00
10,800.00
3,780.00
960.00
1,500.00
300.00

Sub total
II. CONCRETE WORKS
A. Building & Septic Tank
Portland Cement
Screened Sand
Gravel
Boulder
RSB 16mm x 6.0m
RSB 12mm x 6.0m
RSB 10mm x 6.0m
Ga. no. 16 G.I. Tie wire
B. Formworks
1/4" Thk. Marine Plywood
100-2"x2"x12' Coco lumber
50-2"x3"x12' Coco lumber
C.W. Nails
Sub total
III. MASONRY WORKS
A. Building & Septic Tank
6" Thk. CHB
4" Thk. CHB
Portland Cement
Screened & Pure Sand (Assorted)
RSB 10mm x 6.0m
Ga. no. 16 G.I. Tie wire
Sub total
IV. ROOFING WORKS
Ga. No. 26 x 12' G.I. Roofing Sheets
Ga. No. 26 x 10' G.I. Roofing Sheets
Ga. No. 26 x 8' G.I. Roofing Sheets
Prefabricated G.I. Gutter
Prefabricated G.I. End Flashing
Prefabricated G.I. Ridge roll
109-2"x3"x12' Wood Purlins
24-2"x2"x12'Wood Cleats
8-2"x8"x14' Wooden Beam
20-2"x6"x12' Bottom Chord (Full Truss1)
10-2"x6"x14' Top Chord (Full Truss1)
6-2"x6"x12' Web Members (Full Truss1)
30-2"x6"x12' Rafters
9-2"x6"x14' Rafters
5/8"Bolts with Nuts
Umbrella nails
Concrete nails

AMOUNT

CW Nails (Assorted)
Sub total
ITEM NO./MATERIALS
V. ARCHITECTURAL WORKS
A. Doors & Windows
1.0 x 2.10 Panel Door
.80 x 2.10 Panel Door
.80 x 2.10 Hollow Core Flush Type Door
.60 x 2.0 Flush Type Door
27-0.60 x 1.20 Steel Casement Window
2-0.60 x 0.60 Steel Casement Window
7-0.40 x 0.60 Steel Casement Window
20-0.60 x 1.20 Glass Jalousie Window
Pre-fabricated Wooden Door Jambs
4x4 Door Hinges
Lockset
B1. Wood Works (Ceiling)
1/4" Thk. Marine Plywood (Ceiling)
218-2"x2"x12' Ceiling Joists
22-2"x3"x12' Ceiling Hangers
Finishing nails
Concrete nails
CW Nails (Assorted)
B2. Wood Works (Flooring, Sidings & Stairs)
42-2"x6"x14' Floor Joists
24-2"x6"x12' Bridging
60-1"x8"x14' Wood Planks (Flooring)
200-1"x6"x10' Wood Planks (Siding)
1/4" Thk. Marine Plywood (Interior Wall)
250-2"x2"x10' Wall Studs
20-2"x10"x3' Wood Planks (Stair Steps)
3-2"x8"x18' Wood Stringer
CW Nails (Assorted)
VI. TILEWORKS
8" x 8" Ceramic Floor Tiles
8" x 8" Ceramic Wall Tiles
12" x 12" Ceramic Floor Tiles
Portland Cement
Pure Sand
ABC Grout

30

kls.

40.00

QTTY

UNIT

1
5
3
2
216
8
21
160
12
48
12

pc.
pcs.
pcs.
pcs.
sq.ft.
sq.ft.
sq.ft.
sq.ft.
pcs.
pcs.
pcs.

3,000.00
2,500.00
1,500.00
1,000.00
120.00
120.00
120.00
120.00
400.00
30.00
300.00

3,000.00
12,500.00
4,500.00
2,000.00
25,920.00
960.00
2,520.00
19,200.00
4,800.00
1,440.00
3,600.00

97
872
132
30
6
30

pcs.
bd.ft
bd.ft
kls.
kls.
kls.

320.00
30.00
30.00
45.00
60.00
40.00

31,040.00
26,160.00
3,960.00
1,350.00
360.00
1,200.00

872
288
560
1000
32
834
100
72
40

bd.ft
bd.ft
bd.ft
bd.ft
pcs.
bd.ft
bd.ft
bd.ft
kls.

30.00
30.00
30.00
30.00
320.00
30.00
30.00
30.00
40.00

26,160.00
8,640.00
16,800.00
30,000.00
10,240.00
25,020.00
3,000.00
2,160.00
1,600.00
268,130.00

146
560
1542
20
2.0
20

pcs.
pcs.
pcs.
bags
cu.m
kilos

12.00
12.00
20.00
145.00
450.00
50.00

1,752.00
6,720.00
30,840.00
2,900.00
900.00
1,000.00
44,112.00

2
2
2
2
3
1
3
2
12
15
5

pcs.
pcs.
pcs.
pcs.
pcs.
pc.
pcs.
pcs.
pcs.
pcs.
pcs.

2,500.00
600.00
120.00
90.00
120.00
1,500.00
200.00
50.00
280.00
220.00
35.00

5,000.00
1,200.00
240.00
180.00
360.00
1,500.00
600.00
100.00
3,360.00
3,300.00
175.00

UNIT COST

Sub total
VII. PLUMBING WORKS
Water Closet (Flush Type)
Lavatory (Wall-Hung Type)
Shower Head
Soap Holder
4"x4" Aluminum Floor Drain
Kitchen Sink (Double)
Faucet (Chrome Finish)
Faucet (Ordinary)
6" PVC pipe
4" PVC pipe
4" PVC 45 bend

1,200.00
98,950.00
AMOUNT

4" PVC wye


4" PVC clean out
3" PVC pipe
3" PVC 45 bend
ITEM NO./MATERIALS
4"x3" PVC wye reducer
3" PVC wye
3" PVC 90 bend
3" PVC clean out
3" PVC P-trap
1/2" Blue PVC pipe
1/2" Blue PVC tee
1/2" Blue PVC 90 bend
Solvent Cement
Teflon Tape

5
4
8
16
QTTY
5
5
5
2
4
5
3
8
30
30

pcs.
pcs.
pcs.
pcs.
UNIT
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
can
pcs.

35.00
35.00
190.00
35.00
UNIT COST
35.00
35.00
35.00
35.00
35.00
40.00
15.00
15.00
15.00
8.00

Sub total
VIII. ELECTRICAL WORKS
Panel Board (8 holes)
Flourescent Lamp 20 watts
Incandescent bulb 25 watts
One-gang Single Pole Switch
Duplex Convenience Outlet
Duplex Convenience Outlet (Waterproof)
Circuit Breaker 60 Amperes
Circuit Breaker 20 Amperes
Circuit Breaker 15 Amperes
TW Wire No. 12
TW Wire No. 8
20mm Orange Flexible Pipe
25mm Orange Flexible Pipe
Staple Wire
Electrical Tape (Big)
Junction Box
Utility Box
PVC Clip 3/4"

175.00
140.00
1,520.00
560.00
AMOUNT
175.00
175.00
175.00
70.00
140.00
200.00
45.00
120.00
450.00
240.00
20,200.00

1
13
8
21
14
2
1
3
4
4
0.5
12
1
4
20
15
27
200

pc.
sets
sets
pcs.
pcs.
pcs.
pc.
pcs.
pcs.
box
box
box
box
box
pcs.
pcs.
pcs.
pcs

1,000.00
120.00
15.00
45.00
55.00
100.00
120.00
95.00
95.00
1,000.00
1,500.00
160.00
180.00
20.00
15.00
12.00
12.00
1.00

1,000.00
1,560.00
120.00
945.00
770.00
200.00
120.00
285.00
380.00
4,000.00
750.00
1,920.00
180.00
80.00
300.00
180.00
324.00
200.00
13,314.00

IX. PAINTING WORKS


Latex Flat
Latex Semi-Gloss
Enamel Flat
Enamel Semi-Gloss
Metal Primer
Roof Paint
Paint thinner
Concrete Putty
Glazing Putty
Polytuff
Sand Paper (Assorted)
Masking Tape 1"
Roller Brush (Big)
Roller Brush (Small)
4" Brush
2" Brush
Cement Nutralizer

30
45
15
22
9
14
5
3
3
2
36
20
2
2
10
10
5

gal.
gal.
gal.
gal.
gal.
gal.
gal.
gal.
gal.
gal.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
gal.

280.00
320.00
280.00
320.00
280.00
380.00
110.00
380.00
380.00
550.00
10.00
18.00
40.00
32.00
40.00
12.00
110.00

8,400.00
14,400.00
4,200.00
7,040.00
2,520.00
5,320.00
550.00
1,140.00
1,140.00
1,100.00
360.00
360.00
80.00
64.00
400.00
120.00
550.00

Vulcaseal

gal.

1,100.00

1,100.00
48,844.00

SUMMARY OF ITEMS
I. EARTHWORKS
II. CONCRETE WORKS
III. MASONRY WORKS
IV. ROOFING WORKS
V. ARCHITECTURAL WORKS
VI. TILE WORKS
VII. PLUMBING WORKS
VIII. ELECTRICAL WORKS
IX. PAINTING WORKS

14,400.00
246,816.03
58,572.65
98,950.00
268,130.00
44,112.00
20,200.00
13,314.00
48,844.00

TOTAL COST OF MATERIALS


LABOR COST

813,338.68
271,046.85

TOTAL BUILDING COST

Prepared by:

ROBERTO S. LEYCO
Architect

1,084,385.53

Noted by:

ERLINDA V. SANCHEZ
Owner

PROJECT TITLE
LOCATION
OWNER

: PROPOSED THREE-BEDROOM RESIDENTIAL BUILDING


: COLTLAND SUBD., MASBATE CITY
: MR. PIO G. DIOLOLA, JR.

ITEM NO./MATERIALS

DETAILED ESTIMATES
QTTY
UNIT

I. EARTHWORKS
Excavation (Labor only)

36.00

UNIT COST

AMOUNT

cu.m

150.00

5,400.00
5,400.00

Sub total
II. CONCRETE WORKS
A. Column Footing (6 cu.m.)
Portland Cement
Screened Sand
Pea-sized Gravel
RSB 16mm x 6.0m
Ga. no. 16 G.I. Tie wire

54
3.5
7
38
4

bags
cu.m
cu.m
pcs.
kls.

198.00
400.00
500.00
279.00
40.00

10,692.00
1,400.00
3,500.00
10,602.00
160.00

B. Wall Footing (5.20 cu.m.)


Portland Cement
Screened Sand
Pea-sized Gravel
RSB 12mm x 6.0m
Ga. no. 16 G.I. Tie wire

47
2.5
5
47
6

bags
cu.m
cu.m
pcs.
kls.

198.00
400.00
500.00
158.00
40.00

9,306.00
1,000.00
2,500.00
7,426.00
240.00

C. Columns (5.50 cu.m.)


Portland Cement
Screened Sand
Pea-sized Gravel
RSB 16mm x 6.0m
RSB 10mm x 6.0m
Ga. no. 16 G.I. Tie wire

50
3
6
100
132
23

bags
cu.m
cu.m
pcs.
pcs.
kls.

198.00
400.00
500.00
279.00
110.00
40.00

9,900.00
1,200.00
3,000.00
27,900.00
14,520.00
920.00

D. Beams (5.50 cu.m.)


Portland Cement
Screened Sand
Pea-sized Gravel
RSB 16mm x 6.0m
RSB 10mm x 6.0m
Ga. no. 16 G.I. Tie wire

50
3
6
146
143
40

bags
cu.m
cu.m
pcs.
pcs.
kls.

198.00
400.00
500.00
279.00
110.00
40.00

9,900.00
1,200.00
3,000.00
40,734.00
15,730.00
1,600.00

50
800
1,200
60

pcs.
bd.ft
bd.ft
kls.

310.00
10.00
10.00
45.00

15,500.00
8,000.00
12,000.00
2,700.00
214,630.00

1,379
1,680
197

pcs.
pcs.
bags

11.00
9.00
198.00

15,169.00
15,120.00
39,006.00

B. Formworks
1/4" Thk. Marine Plywood
200-2"x2"x12' Coco lumber
200-2"x3"x12' Coco lumber
C.W. Nails
Sub total
III. MASONRY WORKS
A. Building & Concrete Fence
6" Thk. CHB
4" Thk. CHB
Portland Cement

Screened Sand
RSB 10mm x 6.0m
Ga. no. 16 G.I. Tie wire

16.5
186
9
Sub total

cu.m
pcs.
kls.

450.00
110.00
40.00

7,425.00
20,460.00
360.00
97,540.00

5.5
9
49.5

2.75