2.
210 MW
250 MW
IMPULSE TURBINE
Maximum steam velocity( Impulse) is created at the
inlet of moving blade
Which means high Kinetic Energy
This energy is utilised for rotation of moving blade
Steam Velocity can be maximised by having
maximum pressure drop in the Nozzles.
Hence in 100% Impulse steam Turbine, whole
pressure drop will be in stationary blades or nozzles
To sustain high velocity impulse stage should be very
robust in construction.
REACTION TURBINE
Reaction is created due to action of change of
direction of steam through bucket.
This thrust or reaction causes the driving
force
This requires whole pressure drop in moving
blade
100% Impulse or Reaction stage is purely a
theoretical assumption not practically feasible
PRACTICAL SCENARIO
FOLLOWING COMBINATIONS FEASIBLE
1. NOZZLE CONTROL MACHINE WITH
FIRST IMPULSE STAGE AS CURTIS
WHEEL, REGULATING STAGE &
SUBSEQUENT STAGES WITH VARYING
DEGREE OF REACTION
2. THROTTLE CONTROL MACHINE WITH
ALL STAGES HAVING VARYING DEGEE
OF REACTION AROUND 50%
REACTION TURBINE
NO NOZZLE SEGMENTS
NO PRESSURE DROP
SIMULTANEOUS VALVE
OPENING
ThrottleControlled
Machine
NOZZLE
CONTROL
MACHINE
N
o
z
z
l
e
C
o
n
t
r
o
l
NO SPINNING RESERVE
CANNOT MEET THE GRID DEMAND
OF SUDDEN LOAD INCREASE
COMPLEX BOILER CONTROL
NO LOAD CONTROL ON TURBINE
GOVERNING
TURBINE CONTROL INEFFECTIVE
HP TURBINE
SINGLE FLOW
IPT
LP TURBINE
IMPROVEMENT IN TG PERFORMANCE
POSSIBLE THROUGH
IMPROVEMENT IN STEAM
TURBINE PERFORMANCE
POSSIBLE BY
STEAM TURBINE
SIGNIFICANT REDUCTION IN POLLUTION
ENVIRONMENT FRIENDLY
ADVANTAGE OF BETTER HEATRATE FOR
THE ENTIRE LIFE
TECHNO-ECONOMICAL
COST EFFECTIVE & QUICKLY RECOVERABLE
COMPACT DESIGN
EASE IN ERECTION & OVERHAULING
REDUCTION IN OVERHAULING DOWN TIME
MAJOR DEVELOPMENTS IN
210 MW SETS
VARIANT A
-- T2 PROFILE BLADING
MAJOR DEVELOPMENTS IN
210 MW SETS
VARIANT B
-- T4 PROFILE BLADING
-- BIGGER SIZED INLET VALVES
-- LP HEATER 1 EXTRACTION TAPPED
BEFORE PENULTIMATE STAGE OF LPT
-- WELL PROVEN & RELIABLE
UNCHAHAR TPS, RAICHUR-7, KOTA-6 & PARICHHA PROJECTS
MAJOR DEVELOPMENTS IN
210 MW SETS
VARIANT C
-----
MAJOR DEVELOPMENTS IN
250 MW SETS
VARIANT A NOZZLE CONTROLLED SET
HP TURBINE WITH REGULATING STAGE
PARTIAL ARC ADMISSION
SINGLE FLOW IP TURBINE
DOUBLE FLOW LP TURBINE
NOZZLE CUM THROTTLE GOVERNING
UNDER OPERATION IN DAHANU UNIT 1 & 2
EXCELLENT PERFORMANCE PROVED
OFFERED FOR SANTALDIH-5
MAJOR DEVELOPMENTS IN
250 MW SETS
VARIANT B THROTTLE CONTROL SET
SINGLE FLOW HP & IP TURBINE
MAJOR DEVELOPMENTS IN
250 MW SETS
VARIANT C -- ADVANCED REACTION DESIGN
MAJOR DEVELOPMENTS IN
250 MW SETS
VARIANT D -- REACTION DESIGN
HP & IP TURBINE WITH T4 BLADING
LP TURBINE WITH ADVANCED BLADING
IMPROVED HEATRATE
COST EFFECTIVE VARIANT
OFFERED IN NEW PARLI, PARAS & BHILAI
MAJOR DEVELOPMENTS IN
500 MW SETS
VARIANT-A :FIRST DESIGN (4 VALVES)
SMALLER HP & IP MODULES
OLD SHAFT SEALING ARRANGEMENT
T4 BLADING IN HP/IP/LP TURBINE
SMALLER VALVES
LARGE MARGINS
OPERATING AT SINGRAULI, KORBA,
RAMAGUNDAM, CHANDRAPUR & FARAKKA
MAJOR DEVELOPMENTS IN
500 MW SETS
VARIANT-B NEW DESIGN (2 VALVES)
LARGER HP & IP MODULES
MODIFIED SHAFT SEALING ARRANGEMENT
T4 BLADING IN HP/IP/LP TURBINE
LP TURBINE SAME AS VARIANT-A
LARGER VALVES WITH REDUCED PRESSURE DROP
OPTIMISED MARGINS
OPERATING AT CHANDRAPUR-7 & VINDHYACHAL-II
MAJOR IMPROVEMENTS IN
500 MW SETS
VARIANT-C ADVANCED LP DESIGN
MAJOR IMPROVEMENTS IN
500 MW SETS
VARIANT-D ADVANCED DESIGN
EFFICIENCY IMPROVEMENTS BY
ADVANCED STEAM CONDITION
SUPERCRITICAL PARAMETERS
==>INLET STEAM PARAMETERS MORE THAN
CRITICAL STATE
STEAM PRESSURE
APPLICATION
3DS BLADE
CONCLUSION
ADVANTAGEOUS TO OPT FOR MORE
EFFICIENT TURBINE
BENEFICIAL & TECHNO-ECONOMIC IN THE
LONG RUN
ECO-FRIENDLY, PROVIDING CLEAN AIR
MORE RELIABLE