Safe Job Plan

Unit : DO MTO
WO #
1
Issued by : Ariel Cantero
Equipment ID : Others
Location : Shuiaba Port Berth 35
E. Start : 01.08.2010

Priority : Urgent
Date

01.08.2010

Equipment Name :
L. Finish :

Scope of Work

: Modification of Shut Down Console

Job Scope

: Replacing tiles and install switch and install terminal block, input module

Sr.
No.
1
2

Execution by
Unit Contact
Contracts

: DO MTO Dept
: PAC
: HDEC

Steps

Hazards

Apply and obtain


SWP

-NA

Opening of
existing shut
down console

- Opening of wrong panel


- Hand injury

Hazard Control
- Fill in the STAC
- Work to be carried out on the project
will be in accordance with the SWP.
- Coordinate to Equate Supervisor /
operator prior to opening the panel.

Replacement of
tiles

- Damage to existing
wirings, tiles, etc.

Installation of
switch, terminal
block and input
module.

- Electric shock

House keeping

- Sharp edges

- Wear hand gloves


- Check hand tools, screw drivers, etc for
any signs of damages and tear.
- Only authorized persons to do the job.
- Ensure that adjacent tiles/lamps will not
be damage.
- Check power supply, continuity, etc.
using multi tester.
- Wear proper hand protections.
- Double check the location for the new
switch slots.
- Use leather gloves

Closing of
Permit

- Trip hazards
- NA

- Maintain good housekeeping


- NA

- Damage to existing
shut down console.