OE.2.1.2.1
OE.2.1.2
m
0.15
1.80
2.90
1.60
2.50
3.90
3.00
3.00
4.00
2.00
2.00
2.00
2.00
2.00
Velim.=
Vexc.(1.1) -210.20
Vrell.(1.21)
35.50
Velim.=Vexc.(1.1)-Vrell.()1.21
0.15
0.15
0.15
0.15
Vexcav.-Vc
Vexcav.-Vc
Vexcav.-Vc
ELIMINACION DE
MATERIAL
PARALASZAPATAS
Z- 01
Z- 02
Z- 03
PARAVIGASDE
CIMENTACION
EJES 1entre A-B Y D-E
EJES1 y 3, entre EJES A
yB
EJES1 y 3, entre EJES B y
C
EJES1y 3, entre EJESC y
D
EJES1y 3, entre EJESD
yE
RELLENO
RELLENO CON
MATERIAL PROPIO
0.45
0.45
0.45
0.45
0.45
174.70
0.26
0.17
0.11
0.20
0.12
3.626
2.755
2.121
174.70
1.71
27.63
29.342
OE.2.3.2.3
EN EL EJE 1y 2
CIMENTACION
ACERO EN VIGAS DE
DESCRIPCION
5.00
5.00
1/2"
2.00
1/2"
5/8"
2.00
2.00
8.00
2.00
8.00
# BARRAS
# BARRAS POR
ELEMENTOS IGUALES
ELEMENTO
5/8"
8.92
9.00
24.30
24.60
LONG. DE
BARRA
TOTAL (Kg)
TOTAL (Kg) =
1395.89
0.58
0.25
TOTAL (m)
3/8"
1/4"
KG
190.13
186.40
89.20
97.20
1.02
1/2"
1.6
5/8"
1205.76
753.60
360.00
393.60
LONGITUDES
2.25
3/4"
4.04
1"