Sunteți pe pagina 1din 31
ISSHIN SHIN SPECIFICATION OF PUMPS CUSTOMER HYUNDAI HEAVY INDUSTRIES CO., LTD. HULL NO. van) STATUS FINAL PAINTING COLOR : RAL 6019 807-102 2007.5.23 FINAL ORAWING | HR. PARK No DATE DESCRIPTION PREPARED BY CHECKED BY | APPROVED BY § SHIN SHIN MACHINERY CO., LTD HEAD OFFICE : 940-19 YERIN-F /AN-MYON, GUAN! :300~04, Fax httosd/vnae mo.com WARNING 1, Health & Safety Act Compliance. Before working on this equipment personnel should be made aware of, and ensure compliance with, the Health & Safety Regulations appropriate to this class of work. 2. Before lifting, installing or operating the unit, the instructions detailed below, and also the accompanying manual, must be read. Ensure that all equipment used for lifting the units adequate for the weight. The weight is normally stenciled on the unit and/or stamped on the machine nameplate. 4. The handling points are indicated on the unit and these must be used. The hooks of slings must not be fitted directly to lifting eyebolts or lugs, shackles must be used. 5. Before running the unit, check if the rotating direction of pump and motor is same. 6. The unit must not be run unless all protective guards supplied with the equipment are in position. 7. Ensure that coupling cover must be installed. 8. Keep away hand, clothes and body away from rotating part. 9. Before proceeding with maintenance on the unit, or making adjustments to its connections and fittings, it must be stopped and isvlaled electrically and mechanically and visible warning notices displayed. Some units are on automatic standby duty, or isolators are remote from the unit, and extra care is then necessary to be sure that isolation is complete. 10.Before commencing repair or overhaul a preliminary check of available spares must be made, e.g. replacement set of o-rings, joints or jointing material. 11. Only adequately qualified personnel familiar with this type of equipment should make adjustments or undertake maintenance. 12.Pumps handle various liquids, sometimes not those for which the pump was initially supplied. Know the properties of the liquids that have been pumped, and actions necessary to make handling safe and in the event of an emergency. 13. Before commencing work on a pump, close the suction and discharge valves in the system pipelines and remove the casing drain plug to ensure that the pump interior is at atmospheric pressure. Wessrs. HYUNDAI SAMHO HEAVY INDUSTRIES CO., LTD. = /HYUNOAL HEAVY INDUSTRIES CO., LTD. HULL NO. S279/280, 1710/11, 1768-71, 1826-29 | NOZZLE SIZE ‘ No. ‘SERVICE NAME | Woe. (suo.x ois.) | _ WOTOR | Q'TY | REMARK T VE 125 125A x eae 37 Ki 1 ser | vows pup 1 [EMERGENCY FIRE PUMP ‘SHIN SHIN MACHINERY CO., LTD. —_— Messrs. ‘avuNot ‘SAMHO HEAVY INDUSTRIES CO. GAUGE LIST THYUNDAL HEAVY INDUSTRIES CO., LTD. HULL NO. $279/280, 1710/11, 1768-71, 1826-29 NO.) SERVICE NAME WOOEL | Q'TY| SUC. GAUGE | DIS. GAUGE | _REWARK ra fee | 075 01 EVERGENCY FIRE PUP ‘ve 125 1 SET) 760 ooHG - 6 ke/at| O- 15 kelew EIA | TYPE ‘SHIN SHIN MACHINERY CO., LTD. HYUNDAI SANHO HEAVY INDUSTRIES CO., LTD. Se JHYUNDAL HEAVY INDUSTRIES CO poe eee eee = eee ___8279/280, 1710/11, 1768-71, 1 VERTICAL PUMP ‘nem vam crue ) [HORIZONTAL PUMP Bil (5) "| \E_ Be (7) mee weston om DE Bln 1) 8° Sea, fof ie er cor. oe) Bl = On > LXE > Et Yej> jt ! tt at, FSS" os a I 6 { vurstewer sute(os) | wyérawer sine) en ra rah) WHEN GAUGE BOARD IS FITTED ON HULL |S ‘OMS 118 MUSTLE TOTAL BO OFTHE THIN, BOX 7. BO) A ARE BRA (GBD) At THE SE ET, 2, FORTHE WED (©) EL, TH FSITION CN OT BE ALAND TO THE, TEE RETIN 2. ARI, POSITION Aa No.| SERVICE NANE opel. T L os | TP | Gp | PP | 1 EMERGENCY FIRE PUMP | ve 125 tine) cl vacuum we | SHIN SHIN MACHINERY CO., LTD. PUMP CASING MACHINERY CO., LTD ARRANGEMENT DRAWING 6 [BITE TYPE UNION | BC6x1/4*x98 | 2EA 5 _|SOCKET BC6x3/8"x1/44 2EA| 11 [NAME PLATE(FOR SERVICE) | STS304 1EA 4 [SCREW SS41xM4xL6 _[12EA] 10 [NAME PLATE(FOR DIS.) | STS304 TEA ‘3 [GAUGE BOARD $S41x12.3 | 1EA] 9 [NAME PLATE(FOR SUC. ) | STS304 TEA | 2 [PRESSURE GAUGE tea] 8 [SOCKET BC6x1/4*x3/B4 2EA 1_[COMPOUND_GAUGE EA] 7 [NEEDLE VALVE BC6x1/4 "x98 | 2FA NO NAME, MAT'L & SIZE ]Q'TY NAME, MAT'L & SIZE [Q'1y| SHIN SHIN GAUGE VERTICAL TYPE 120 ir (eh FIG.2 FeEeeeEe /—-X \ \ \ \MOTOR \MOTOR FRAME : SVS : VERTICAL CENTRIFUGAL At GEAR PUNP EXCEPT SVS ND FRAME. \\moTor \MoTOR @ Stes eee Stee iH L40x40 He el] see exave 127-1] eestor ai 1 ‘STEEL PLATE ‘SS41 12.0 - © ue Tama sm |e mam SHIN SHIN GAUGE MACHINERY CO., LTD ARRANGEMENT DRAWING CENTRIFUGAL PUMP DATA SHEET SHEET NO. | O1 lease! HYUNDAI SAMO HEAVY INDUSTRIES CO. LTD. THYUNOAL HEAVY INDUSTRIES CO., LTO. HULL NO. 279/280, 1710/11, 1768-71, 1826-29 SERVICE EMERGENCY FIRE PUMP REQ. NO. PER HULL «1 SET CLASSIFICATION By 1. SPECIFICATIONS OF PUNP MODEL : VF 125 CAPACITY 72 at /He ROTATION TOTAL HEAD 9 u CLOCKWISE VIEWING FROM COUPLING SUCTION HEAD 5 u HYDRAULIC TEST 10 kalet PUNPING LIQUID sw FLANGE SIZE 125 x 125 Liguio Tew. 2 °C RATING Ks x 10K 2. MATERIALS CASING © sronze | SHAFT “STAINLESS STEEL IWEELLER STAINLESS STEEL(SCS14) 3.ACCESSORIES PER PUMP OIL FILLED PRESS. GAUGE 1 set | vacuum PUMP’ 1 Ser OIL FILLED CONP. GAUGE 1 ser GAUGE ROOT VALVE 2EA GAUGE BOARD 1 ser 4 .MOTOR ourPuT 37 xi SYN. SPEED 3600 RPM \VOLT/PHASE/HZ 440V 3PH 60 HZ — | INSU. CLASS: F START METHOD : AUTO-TR (85%TAP) ‘SHIN SHIN MACHINERY CO., LTD. [ie We: Tea = : Date ot Test] | Tiosorei-28 | 2006-08006 PUMP TEST RECORD 1006-72-20 Pe Customer Tr Witngis By [Approv. By | Type of Test anesae | L IF Field Shor Project name [73 ~ ae By Service Name EMERGENCY FIRE PUMP Hee — five of Wer) ESR Type of Pump (VFI25 Ws Xk} 185 ated Conditions | 120m in [Tia. Spee iz Tested Conditions = fin ‘Lia. Test a Motor Spec. | 2 itor No. | SM642F22-007 Measuring Points i 2 Ts | 3 Level (at) The Weir mm) 0.000 | 45.000 eee Capacity im Tmin a ation (hetfem= Pis'Head Head om See 4 indication (ara) Tr o |Suct. Heag 1nd _ 3 | eauge Hane Tas Velocity Head ™ a Sl Totsi Head m Theoretical Power kw] 0000) 76.068 Voitage [Indication = De= 3 Cat Ver w 4 p [Amperes indication part [Dee 1 | Cal. Amperes: (ay ~ iPower taput Indication 18.100) 783500 : vo [X--2 1) Cal. input (kW) 38.200 | 39.000 _ © [Power Factor % i ' |Motor Efficiency 93.00% | ee Reducer Efficiency * i i Speed : tom Brake Horse Power ew |. Pump Efficiency 138 170; 127 100] 115 %0 103 80 ot 70 80 60 80 50 40 30 44 20 34 10 24 (m) Cc) | __ LT | ft} iiist sae Bete 23 ooze rai 188 (RPM) (T HEAD) (EFF) SE (BHP) SE (Capacity) (m* /min) te) Ux} tm) me 70 kale : | pial ee 27 /& i SHIN S\ HIN MACHINERY C Pepa loé 2 [INNER COVER | BRONZE [eee 1 [89 [MOTOR COUPLING ‘DUCTILE CAST iROW| 1 fo ene NBR TI [er |woror cour. ine waren ——|sreeu sao 13 | CASE WEAR RING ‘BRONZE acs | 2 | 280 [BLIND COVER ‘BRONZE ec 1 3 ereaar Tas eos cE —— He = Hea PATE woe eat al Pe Staines sree [stssoe | 1 Feccer ec ‘O__ IMPELLER RETAINING WASHER | STAINLESS STEEL | STS304 1 ie 7 oot | ‘S| LOCK WASHER WONEL 1 a T 3[ ro nesicte setae wat sina eRe i [ss [neeen ner stameess sree [stsoe [1] i Shao par sar SESS TEESE [1 7 {2 [courting gor co.wo siesx [soma | 6 a a ee . +, ‘| IG) SHIN SHIN wens “ H : DRAW. NO. 0712751BMM E DIMENSIONS IN MILLIMETRES ZQUK. HEAD worar Revove | space I pe fd, i L | | T bis uC. FLANGE | FoR é | REMOVAL Uis 3K) DIS. LANGE (lis: 10K) TOM MWORTHY | [B) SHIN | DRAW. NO Selene Tota ele ast ast ov [sce moo, | 280 Ke 2a x6 [557 x TnooeL | 2 CONSTRUCTION OF COUPLING 60.1 The coupling (851.2) shown ia the ve come UKE one (889.1) a5 stom ional drving his droning awe oF Pat TATE Ts 1h ie BEARING USING BLARING CVE BLARING COR EN 281.1 [aa one.7 [PL IMG UO We ‘nb. [FELLER KY SHIN SHIN MACHINERY CO. LTD. MODEL DRAW No SNv i vsTANes Hi | ene? [| cou - 7 wre suo. vac : (ao Lc th = AUR SEPARATOR TN (aimee Pun ae 11N SHIN : MODEL 7 MACHINERY CO., LTD. DRANG eeeeanais | 1 | BEARING BUSH 1 a 7 | RGN 1 EA leeresy | a 7 oar | SPARES | Mover |vri25 [DWG.NO. | Hwci2saRo PAGE a1 SERVICE NAME TTEM NO. EMERGENCY FIRE PUMP BOX NO. | SUPPLY DRAWING ™, NAME SKETCH | MATERIAL [wR | 1, Pant | REMARKS reo | Re | Sane 1, . | he | waxer 2 fueountas se 138 lelg a f or 3 [onmeine sort § 5 lets sa is - esas 1 |orosioy pate at wi sono 0. SLLIg al [ova ss) some \ 5 [eae Beanne F08 woos ss) ean a | BEARING NO, SLs pre jana. 6 | FRICTION LINING 1 ser(s) a L 1 eA 378.1 NOTE : SUPPLY SCOPE OF BALL BEARING FOR MOTOR * 279/280 : SHIN SHIN SUPPLY * H1710/11, 1768-71, 1826-29 : YARD SUPPLY MANUFACTURES NAME AND a0 n0_PARS. pe 50 ‘ADDRESS | [BB SHIN SHIN MACHINERY CO., LTD. 40-13 YERIVEI CHONGCHAN,KIJANG, PUSAN, 619-731, KOREA. wore aE mn [BBs eons gee HYUNDAI HEAVY INDUSTRIES CO.,LTD. =n S assim Wise r = (41821) ARRE = Bi a2! THIS DRAWING IS PROPRIETARY TO HEF™) NO PART OF THIS DRAWING NAYBE REPRODUCED WITHOUT THE P’ JON OF HHI, + a. é 7 ~ = 4 UsE | EMERGENCY FIRE PUMP FACE ee aver} oP : in sur. | 1 NESS. | No |S=f/e. ‘oof be?) 18-4 j otarion | eee ered 178 J22.5* 8-019 TAP 16N9 ] M16X22_ el 4 “S\KEY16X10X80_ : peer ee { Frame | output BEARING NO. | amps | weight NO. | kw) [POLES Looe] ™ | w | te ~e00L | 33 2 _|631322c3)621122C3| 3560 | 51.7 287 2oo,_| 37 2 lesszzca|eziizzca| 3560 | 571 | 287 _| aooL_| 4 | 2 lenvazzcajezrizzcal-ase0 | 68.8 | 910 - i Jere Eee COMMON SPEC. MAN | Fibrey 3 eo came |} See — PROTECTION _ P44 Ee | vous 440 case |_MAIN | Bra | stantina meTHoD | A-TR (boe Tp) | | GLAND [etn | | Id HZ © space neater | 7@, EV, B79) _ | INSULATION F CLASS (now HEATING) TEMP. RISE ieee RATNG CONT | - BI | = EEE Rev| DATE | CONTENTS _| Revo ay|cuxn By|apPD By 7 7 ae Te asa ear “ —| sums en FRLNO, 200L(2P) FLANGE} [lou Ee: Pt HEH SCALE | NONE T peer ee fal cHKO BY [KOS.H PROEGN | 92h (Grd Angle) —_| TITLE OUTLINE A en

S-ar putea să vă placă și