Documente Academic
Documente Profesional
Documente Cultură
DBN-10
S2-2015
Prepared By :- Yogesh Patil
Analyzed By :-
www.huawei.com
Report Content
Methodology
KPI Overview
Coverage Overview
Sample Count Graphs
Poor Coverage Analysis
Abnormal Event Chart
Abnormal Event Analysis
Methodology
Cluster drive Methodology.
UE1 locked on 2G : Short call sequence (90 Sec Call Duration, 20 Sec Wait)
UE2 locked on 2G : Idle Mode
DBN-10
2G Call Performance KPIs
(UE Dedicated mode- 2G Locked; 90 Sec Call Duration, 20 Sec Wait)
2G KPI Description
Unit
Raw KPIs
Corrected KPIs
Total attempts
Setup Failures
Dropped calls
Completed Calls
CSSR
DCR
#
#
#
#
%
%
175
2
0
173
98.857%
0.0%
0
#DIV/0!
#DIV/0!
DBN-10
Rx Level IDLE
DBN-10
Rx Level Dedicated
DBN-10
Rx Quality
DBN-10
Rx Quality - Zoom View & Patches
Spot #1
DBN-10
DBN-10
OBSERVATION : Handover delayed from DXB16653 to DXB16651, causing call dragging and degraded quality.
ACTION: HO margins to be adjusted to speedup handover.
Abnormal Events
Abnormal Events
CF10.1
CF10.2
KPI Chart
2G - Call Statistics
CALL Attempts
CALL Setup Success
CALL Released (Normal)
CALL Drop
CSSR (%)
DCR (%)
Q2-2014
S2-2014
S1-2015
S2-2015
200
158
185
175
200
158
185
173
200
156
185
173
0
0
0
0
100.000% 100.000% 100.000% 98.857%
0.000% 0.000% 0.000% 0.000%
OBSERVATION : Call setup failure on DXB27681. Radio conditions found to be good. Call setup successful in 2 nd attempt. CSSR
and other KPIs also found to be normal.
ACTION: no actions required.
OBSERVATION : Call setup failure on DXB13972. Radio conditions found to be good. Call setup successful in 2 nd attempt. CSSR
and other KPIs also found to be normal.
ACTION: no actions required.
Summary
S/N Event
Observations / Actions
Call Setup
Failure
Call Setup
Failure
Bad Quality
patch
Current
Responsible
Last
(Optimization / Updated
Planning)
Optimization
Optimization
Optimization
Which Quarter it
5.
appeared the first
1. Call
2. Call 3. Poor 4. Poor
Special
time
Setup Fail Drop Quality Coverage
Issues
CF 1
CF 2
Spot # 1
S2-2015
S2-2015
S2-2015
Observation/
Action Taken/Planned
Observation: Call setup failure on DXB27681. Radio
conditions found to be good. Call setup successful in 2nd
attempt. CSSR and other KPIs also found to be normal
Action: no action required
Observation: Call setup failure on DXB13972. Radio
conditions found to be good. Call setup successful in 2nd
attempt. CSSR and other KPIs also found to be normal
Action: no action required
Observation: Handover delayed from DXB16653 to
DXB16651, causing call dragging and degraded quality.
Action: HO margins to be adjusted to speedup
handover.
Thank You