BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N5125
DEC-T-FQP-BOILER-001

Description

B-74

Area

BOILER

Joint No.

Type of
Joint

Welder No.

FILLET

SW-01

Surface
Condition

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/01
Job No.:

B-74

Area / Location :

ESP-1

Unit No:

Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

Date:
Final Run Clearance with Date
Results
PMPL

BGRESL

TPCIL

Remarks

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N5128
DEC-T-FQP-BOILER-001

Description

B-20

Area

BOILER

Joint No.

Type of
Joint

Welder No.

FILLUP
&GRINDING

SW-02

Surface
Condition

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/02
Job No.:

B-20

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

02.05.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N5134
DEC-T-FQP-BOILER-001

Description

B-104

Area

BOILER

Joint No.

Type of
Joint

Welder No.

FILLET

SW-02

Surface
Condition

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/03
Job No.:

B-104

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

18.05.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N5133
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

COLUMN RIB PLATE(C7)

BOILER

FILLET

SW-10

AS WELDED

COLUMN RIB PLATE(C8)

BOILER

FILLET

SW-01

AS WELDED

COLUMN RIB PLATE(C9)

BOILER

FILLET

SW-02

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/04
Job No.:

C-7,C-8,C-9

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

20.07.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N5133
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

COLUMN RIB PLATE(C12)

BOILER

FILLET

SW-02

AS WELDED

COLUMN RIB PLATE(C13)

BOILER

FILLET

SW-02

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/05
Job No.:

C-12,C-13

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

25.07.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N541
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

HOOK 1

BOILER

FILLET

SW-02

AS WELDED

HOOK 2

BOILER

FILLET

SW-01

AS WELDED

HOOK 3

BOILER

FILLET

SW-02

AS WELDED

HOOK 4

BOILER

FILLET

SW-01

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/06
Job No.:

B-2(CELING GIRDER TOP)

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

26.07.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N541
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

COLUMN RIB PLATE(C16)

BOILER

FILLET

SW-02

AS WELDED

COLUMN RIB PLATE(C17)

BOILER

FILLET

SW-02

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/07
Job No.:

C16,C17

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

30.07.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N541
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

HOOK 1

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

HOOK 2

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

HOOK 3

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

HOOK 4

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/08
Job No.:

B-3 GIRDER TOP

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

02.08.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N541
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

HOOK 1

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

HOOK 2

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

HOOK 3

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

HOOK 4

BOILER

FILLET+
GROOVE

SW-02

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/09
Job No.:

B-4 GIRDER TOP

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

04.08.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N541
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

COLUMN RIB PLATE(C20)

BOILER

FILLET

SW-02

AS WELDED

COLUMN RIB PLATE(C21)

BOILER

FILLET

SW-01

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/10
Job No.:

C20,C21

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

16.08.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N541
DEC-T-FQP-BOILER-001

Description

COLUMN RIB PLATE(C25)

Area

BOILER

Joint No.

Type of
Joint

Welder No.

FILLET

SW-02

Surface
Condition

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/11
Job No.:

C25

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

07.09.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

114N541
DEC-T-FQP-BOILER-001

Description

Area

Joint No.

Type of
Joint

Welder No.

Surface
Condition

COLUMN RIB PLATE(C24)

BOILER

FILLET

SW-01

AS WELDED

COLUMN RIB PLATE(C26)

BOILER

FILLET

SW-01

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/12
Job No.:

C24,C26

Area / Location :
Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

BOILER
STEEL STRUCTURE

Unit No:

Date:

10.09.12

Results

Remarks

Final Run Clearance with Date


PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORA

PROJECT : 2 X 660 MW, Supercritical Power Proj


Field Quality Record

LIQUID PENETRANT EXAMINATION R


Contractor Name:

PMPL

Drawing & Rev. No.:


FQAP & Rev. No.:

S.No.

DEC-T-FQP-BOILER-001

Description

Area

ESP-1

Joint No.

Type of
Joint

Welder No.

SW-

Surface
Condition

AS WELDED

Root Run / Back Gougin


with Date
PMPL

Batch No. &

Manufacturer / Brand
Cleaner

CHECKMATE

Cl-C-0

Penetrant

CHECKMATE

0211

Developer

CHECKMATE

0211

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

HERMAL POWERTECH CORPORATION INDIA LTD

60 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

UID PENETRANT EXAMINATION REPORT


Report No: TPCIL/BGRESL/PMPL/LP/01
Job No.:
Area / Location :

ESP-1

Unit No:

Package:
Root Run / Back Gouging Clearance
with Date
BGRESL

TPCIL

Date:
Final Run Clearance with Date
Results
PMPL

BGRESL

TPCIL

Remarks

Batch No. & Expiary Date

Surface Temperature:

25

Dwell Time: 5-10

minutes.

Cl-C-07-11-220
0211-73-P-94
0211-71-D-92

DEC

TPCIL

BGR ENERGY SYSTEMS

Customer: THERMAL POWERTECH CORP

PROJECT : 2 X 660 MW, Supercritical Power

Field Quality Record

DRY PENETRANT TEST R


Contractor Name: PMPL
Drawing & Rev. No.:

S.No.

Description

BOTTOM BEAM
( 1 to 9 FIELDS)

Cleaner

Area

Type of Joint

ESP-2
(PASS-B)

BUTT

Surface
Condition

100% Weld visual Clearance


PMPL

BGRESL

DEC

AS WELDED

Manufacturer / Brand

Batch No. & Expiary Date

CHECKMATE

Cl-C-07-11-220

Penetrant

CHECKMATE

0211-73-P-94

Developer

CHECKMATE

0211-71-D-92

PMPL

BGRESL

BGR ENERGY SYSTEMS LTD

ERMAL POWERTECH CORPORATION INDIA LTD

0 MW, Supercritical Power Project, Krishnapatnam


Field Quality Record

DRY PENETRANT TEST REPORT


Report No: 73
Unit No: 2
Area / Location :

Weld visual Clearance

ESP

Date:

10% DPT Clearance


TPCIL

PMPL

BGRESL

DEC

Results
TPCIL

Batch No. & Expiary Date


Surface Temperature: 25

Cl-C-07-11-220
0211-73-P-94
Dwell Time: 5-10 minutes.
0211-71-D-92

/04/2013
Remarks

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION IN

PROJECT : 2 X 660 MW, Supercritical Power Project, Kris


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N2141,114N2142,114N2143/REV.0

FQA & Rev. No.:

DEC-T-FQP-BOILER-002/REV.0

S.No.

Description

Area

ELEVATION(MM)

Type of Joint

Surface
Condition

WEL
RESULT

FRONT ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

REAR ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

RIGHT ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

LEFT ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

PMPL

BGRESL

GY SYSTEMS LTD

ERTECH CORPORATION INDIA LTD

ritical Power Project, Krishnapatnam

uality Record

AL& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/01
Job No.:

FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)

Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

19-9-13

DPT(10%)
Remarks

PMPL

BGRESL

TPCIL

RESULT

ACCEPTED

ACCEPTED

ACCEPTED

ACCEPTED

PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015

Dwell Time: 5-10

minutes.

CL-D-06-253/JUN-2015

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION IN

PROJECT : 2 X 660 MW, Supercritical Power Project, Kris


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N1111,114N1112/REV.0

FQA & Rev. No.:

DEC-T-FQP-BOILER-002/REV.0

S.No.

Description

Area

ELEVATION(MM)

Type of Joint

Surface
Condition

WE
RESULT

FRONT WATER WALL

WATER WALL

77300-55126.2

FILLET &BUTT AS WELDED

ACCEPTED

LEFT WATER WALL

WATER WALL

77300-55126.2

FILLET &BUTT AS WELDED

ACCEPTED

RIGHT WATER WALL

WATER WALL

77300-55126.2

FILLET &BUTT AS WELDED

ACCEPTED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

PMPL

BGRESL

Y SYSTEMS LTD

RTECH CORPORATION INDIA LTD

tical Power Project, Krishnapatnam

ality Record

L& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/02
Job No.:

FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)

Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

20-9-13

DPT(10%)
Remarks

PMPL

BGRESL

TPCIL

RESULT

ACCEPTED

ACCEPTED

ACCEPTED

PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015

Dwell Time: 5-10

minutes.

CL-D-06-253/JUN-2015

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION IN

PROJECT : 2 X 660 MW, Supercritical Power Project, Kris


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N1131,114N1132,114N1134,114N1133,114N112/REV.0

FQA & Rev. No.:

DEC-T-FQP-BOILER-002/REV.0

S.No.

Description

Area

ELEVATION(MM)

Type of Joint

Surface
Condition

WE
RESULT

FRONT MIDDLE& LOWERWATER


WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

REAR MIDDLE& LOWERWATER WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

RIGHT MIDDLE& LOWERWATER


WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

LEFT MIDDLE& LOWERWATER WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

PMPL

BGRESL

Y SYSTEMS LTD

RTECH CORPORATION INDIA LTD

tical Power Project, Krishnapatnam

ality Record

L& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/03
Job No.:

FIN TO FIN AND FIN TO TUBE WELD(OUT SIDE)

Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

20-9-13

DPT(10%)
Remarks

PMPL

BGRESL

TPCIL

RESULT

ACCEPTED

ACCEPTED

ACCEPTED

ACCEPTED

PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015

Dwell Time: 5-10

minutes.

CL-D-06-253/JUN-2015

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION IN

PROJECT : 2 X 660 MW, Supercritical Power Project, Kris


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N2141,114N2142,114N2143/REV.0

FQA & Rev. No.:

DEC-T-FQP-BOILER-002/REV.0

S.No.

Description

Area

ELEVATION(MM)

Type of Joint

Surface
Condition

WEL
RESULT

FRONT ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

REAR ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

RIGHT ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

LEFT ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

ACCEPTED

MIDDLE ENCLOSURE WALL

BACK PASS

77300-56400

FILLET &BUTT AS WELDED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

PMPL

BGRESL

ACCEPTED

GY SYSTEMS LTD

ERTECH CORPORATION INDIA LTD

ritical Power Project, Krishnapatnam

uality Record

AL& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/04
Job No.:

FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)

Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

20-4-14

DPT(10%)
Remarks

PMPL

BGRESL

TPCIL

RESULT

ACCEPTED

ACCEPTED

ACCEPTED

ACCEPTED

PMPL

BGRESL

TPCIL

ACCEPTED
Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015

Dwell Time: 5-10

minutes.

CL-D-06-253/JUN-2015

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION IN

PROJECT : 2 X 660 MW, Supercritical Power Project, Kris


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N1111,114N1112/REV.0

FQA & Rev. No.:

DEC-T-FQP-BOILER-002/REV.0

S.No.

Description

Area

ELEVATION(MM)

Type of Joint

Surface
Condition

WE
RESULT

FRONT WATER WALL

WATER WALL

77300-55126.2

FILLET &BUTT AS WELDED

ACCEPTED

LEFT WATER WALL

WATER WALL

77300-55126.2

FILLET &BUTT AS WELDED

ACCEPTED

RIGHT WATER WALL

WATER WALL

77300-55126.2

FILLET &BUTT AS WELDED

ACCEPTED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

PMPL

BGRESL

Y SYSTEMS LTD

RTECH CORPORATION INDIA LTD

tical Power Project, Krishnapatnam

ality Record

L& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/05
Job No.:

FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)

Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

20-5-14

DPT(10%)
Remarks

PMPL

BGRESL

TPCIL

RESULT

ACCEPTED

ACCEPTED

ACCEPTED

PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015

Dwell Time: 5-10

minutes.

CL-D-06-253/JUN-2015

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION IN

PROJECT : 2 X 660 MW, Supercritical Power Project, Kris


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N1131,114N1132,114N1134,114N1133,114N112/REV.0

FQA & Rev. No.:

DEC-T-FQP-BOILER-002/REV.0

S.No.

Description

Area

ELEVATION(MM)

Type of Joint

Surface
Condition

WE
RESULT

FRONT MIDDLE& LOWERWATER


WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

REAR MIDDLE& LOWERWATER WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

RIGHT MIDDLE& LOWERWATER


WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

LEFT MIDDLE& LOWERWATER WALL

WATER WALL

55126.2-10300

FILLET &BUTT AS WELDED

ACCEPTED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

PMPL

BGRESL

Y SYSTEMS LTD

RTECH CORPORATION INDIA LTD

tical Power Project, Krishnapatnam

ality Record

L& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/06
Job No.:

FIN TO FIN AND FIN TO TUBE WELD(IN SIDE)

Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

20-5-14

DPT(10%)
Remarks

PMPL

BGRESL

TPCIL

RESULT

ACCEPTED

ACCEPTED

ACCEPTED

ACCEPTED

PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015

Dwell Time: 5-10

minutes.

CL-D-06-253/JUN-2015

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORATION IN

PROJECT : 2 X 660 MW, Supercritical Power Project, Kris


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N541-2,114N541-3,114N541-4/REV.0

FQA & Rev. No.:

DEC-T-FQP-BOILER-001/REV.0

S.No.

Description

Area

QUANTITY

Type of Joint

Surface
Condition

WE
RESULT

CELING GIRDER ANGLES

B2 GIRDER

102

FILLET

AS WELDED

ACCEPTED

CELING GIRDER ANGLES

B3 GIRDER

84

FILLET

AS WELDED

ACCEPTED

CELING GIRDER ANGLES

B4 GIRDER

80

FILLET

AS WELDED

ACCEPTED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

PMPL

BGRESL

Y SYSTEMS LTD

TECH CORPORATION INDIA LTD

ical Power Project, Krishnapatnam

ality Record

L& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/13
Job No.:
Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

10/12/2013

DPT(10%)
Remarks

PMPL

BGRESL

TPCIL

RESULT

ACCEPTED

ACCEPTED

ACCEPTED

PMPL

BGRESL

TPCIL

Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015

Dwell Time: 5-10

minutes.

CL-D-06-253/JUN-2015

DEC

TPCIL

BGR ENERGY SYSTEMS LTD

Customer: THERMAL POWERTECH CORPORAT

PROJECT : 2 X 660 MW, Supercritical Power Proje


Field Quality Record
WELD VISUAL& DPT REPORT
Contractor Name:

PMPL

Drawing & Rev. No.:

114N1111

FQA & Rev. No.:

DEC-T-FQP-BOILER-002/REV.0

S.No.

Description

Area

DEC PUNCH POINT UPDATED ON 283-15 IN S.NO-19

FRONT WATER WALL DAMGED TUBE


BELOW BURNER NO-3(ELE 21 MTR)

ELEVATION(
Type of Joint
MM)

21 MTR

Surface
Condition

FILLET &BUTT AS WELDED

Manufacturer / Brand
Cleaner

CHECKMATE

Penetrant

CHECKMATE

Developer

CHECKMATE

GY SYSTEMS LTD

ERTECH CORPORATION INDIA LTD

ritical Power Project, Krishnapatnam

uality Record

AL& DPT REPORT


Report No: TPCIL/BGRESL/PMPL/DPT/07
Job No.:

FRONT WATER WALL

Area / Location :
Package:
WELD VISUAL

BOILER

Unit No:

BTG

Date:

30-3-15

DPT(10%)
Remarks

RESULT

ACCEPTED

PMPL

DEC

TPCIL

RESULT

ACCEPTED

PMPL

DEC

TPCIL

Batch No. & Expiary Date

Surface Temperature:

30-400C

CL-C-06-251/MAY-2015
CL-P-01-246/MAY-2015
CL-D-06-253/JUN-2015

Dwell Time: 5-10

minutes.