Sunteți pe pagina 1din 4

ANNEXURE - I

TECHNICAL DATA SHEET FOR LINEAR SCREEN FOR 10 MTPA EXPANSION OF GUA ORE MINES CRUSHING, BENEFICIATION AND PELLET PLANT
Doc. No. O14060-M-GMS-003
Equipment No. GSB01, GSB51
Requirement as per TPD

Page 1 of 4

A.
1
2
3
4
5
6
7
8
9
10

GENERAL DATA
APPLICATION
INSTALLATION
OPERATION
OPERATING HOUR PER DAY
OPERATING DAY PER YEAR
AVAILABILITY
MATERIAL HANDLED
QUANTITY
OPERATING TEMPERATURE
SITE CONDITION

B.
1
2
3

FEED AND DISCHARGE ARRANGEMENT

C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

FEED MATERIAL AND OPERATING PARAMETERS


FRESH SOLID FEED (NOMINAL)
TPH
FRESH SOLID FEED (MAX)
TPH
% SOLID IN FEED SLURRY (NOMINAL)
% w/w
% SOLID IN FEED SLURRY (MAX)
% w/w

D.
1
2
3
4
5
6
7

UTILITY REQUIREMENT
WASH WATER QUANTITY
WASH WATER PRESSURE
WASH WATER QUALITY
INSTRUMENT AIR QUANTITY
INSTRUMENT AIR PRESSURE
COMPRESSED AIR QUANTITY
COMPRESSED AIR PRESSURE

UNIT

Hr/Day
days
%
No(s)
Deg C

OVERFLOW TO
UNDERFLOW TO

SG OF SOLIDS
WATER FLOW RATE (MAX)
SLURRY FLOW RATE (NOMINAL)
SLURRY FLOW RATE (MAX)
SLURRY DENSITY
FEED SLURRY PRESUURE
FEED PARTICLE SIZE
SEPARATION SIZE (NOTE 1)
FEED SLURRY TEMPERATURE

m3/hr
m3/hr
m3/hr
m3/hr
t/m3
bar
micron
micron
Deg C

SLURRY pH
DESIGN FACTOR (NOTE 2)

Trash removal before HGMS


Indoor
Continuous
24
320
>95
Iron Ore Slurry
2
Ambient
Refer clause 3.0.0 of GCS

LIMS, Via pipe/launder


Trash bin, via chute
Storage sump, via pipe/launder

FEED FROM

WATER FLOW RATE (NOMINAL)

BIDDER's Response

m3/hr
mwc
Nm3/hr
bar(G)
Nm3/hr
bar(G)

211.0
240.0
30.0
30.0
4.0
492.3
560.0
545.1
620.0
1.29
Atm (gravity flow)
Refer Annexure-IA
710
Ambient
~7-8
10%

By
By
By
By
By
By
By

Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder

Prepared by: SRM


Checked by: MBA
Approved by: MBA

Date: 07.05.2015
Date: 11.05.2015
Date: 11.05.2015

ANNEXURE - I

TECHNICAL DATA SHEET FOR LINEAR SCREEN FOR 10 MTPA EXPANSION OF GUA ORE MINES CRUSHING, BENEFICIATION AND PELLET PLANT
Doc. No. O14060-M-GMS-003
Equipment No. GSB01, GSB51
Requirement as per TPD

er
rt
we

Page 2 of 4

BIDDER's Response

123
222
27306

Prepared by: SRM


Checked by: MBA
Approved by: MBA

Date: 07.05.2015
Date: 11.05.2015
Date: 11.05.2015

ANNEXURE - I

TECHNICAL DATA SHEET FOR LINEAR SCREEN FOR 10 MTPA EXPANSION OF GUA ORE MINES CRUSHING, BENEFICIATION AND PELLET PLANT
Doc. No. O14060-M-GMS-003
Equipment No. GSB01, GSB51
Requirement as per TPD

F.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
G.
1
2
3
4
5
6
7

Page 3 of 4

MATERIAL OF CONSTRUCTION
SCREEN FRAME
FEED BOX
LINER FOR FEED BOX
DISTRIBUTION PLATES
LINER FOR DISTRIBUTION
PLATE
OVERFLOW DISCHARGE CHUTE
LINER FOR OVERFLOW
DISCHARGE CHUTE
UNDER PAN
LINER FOR UNDERPAN
CLUTCH
DRIP TRAY
HEAD PULLEY
TAIL PULLEY
TENSIONING PULLEY
BEND PULLEY
CLOTH ROLLER
RETURN ROLLER
SHAFTS
SCREEN CLOTH
CLUTCH TENSIONER
SPRAY BAR
SPRAY NOZZLE
SPILLAGE LAUNDER
LINER FOR SPILLAGE LAUNDER
GEAR
DRIVE BASE FRAME
FASTENERS
ELECTRICAL AND INSTRUMENTATION
DRIVE MOTOR TYPE/MAKE
FRAME SIZE
DRIVE MOTOR SPEED
RPM
DRIVE MOTOR RATED POWER
kW
DRIVE MOTOR CONSUMED
kW
POWER
POWER CONSUMPTION AT
kW
DRIVE COUPLING (MAX)
DRIVE MOTOR PROTECTION

By
By
By
By
By
By

BIDDER's Response

Bidder
Bidder
Bidder
Bidder
Bidder
Bidder

By Bidder
By
By
By
By
By
By
By
By
By
By
By
By
By
By
By
By
By
By
By
By

Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder
Bidder

By
By
By
By
By

Bidder
Bidder
Bidder
Bidder
Bidder

By Bidder
By Bidder
Prepared by: SRM
Checked by: MBA
Approved by: MBA

Date: 07.05.2015
Date: 11.05.2015
Date: 11.05.2015

ANNEXURE - I

TECHNICAL DATA SHEET FOR LINEAR SCREEN FOR 10 MTPA EXPANSION OF GUA ORE MINES CRUSHING, BENEFICIATION AND PELLET PLANT
Doc. No. O14060-M-GMS-003
Equipment No. GSB01, GSB51
Requirement as per TPD
8
9
10
11

12

DRIVE MOTOR INSULATION


LOAD GD^2 VALUE AT MOTOR
SHAFT
NO LOAD GD^2 VALUE AT
MOTOR SHAFT
DIRECTION OF ROTATION OF
MOTOR (VIEWED FROM
COUPLING TO MOTOR)
UPS POWER REQUIREMENT
FOR INSTRUMENTATION

H.
1
2

WEIGHT DATA
TOTAL
WEIGHT
OF THEPART
EQUIPM
WEIGHT
OF HEAVIEST
OF
THE EQUIPMENT FOR
MAINTENANCE

I.
1

OTHERS
LIST OF MAKES FOR ALL
BOUGHT OUT ITEMS
ENCLOSED

BIDDER's Response

By Bidder
kgf-m2

By Bidder

kgf-m2

By Bidder
Clockwise/ Counter clockwise

VA

By Bidder

Kg

By Bidder

Kg

By Bidder

Yes / No

By Bidder

NOTE:1) Bidder to size the screen area suitably to accommodate 500 microns separation size.
2) Bidder to consider suitable design factor to ensure smooth operation at rated capacity.

Page 4 of 4

Prepared by: SRM


Checked by: MBA
Approved by: MBA

Date: 07.05.2015
Date: 11.05.2015
Date: 11.05.2015

S-ar putea să vă placă și