Documente Academic
Documente Profesional
Documente Cultură
MONOLINEAR
ENPHASE
M 250
PROJECT:
ARRAY 1
SMART RESIDENTIAL
BIMODAL SYSYEM
PROPERTY OF:
POWER SYSTEM
EVOLUTION
JUNCTION
BOX-1
ADDRESS:
SOLAR-AC
DISCONNECT
PREPA
C1 H9 HILLSIDE SAN
JUAN, P.R.
SHEET TITLE:
PV SYSTEM MONOLINEAR
SCALE:
ENPHASE
M 250
JUNCTION
BOX-2
ARRAY 2
5
ARRAY 3
TRINA SOLAR
TSM-PA05
PANELS 29 OF 250 W
TOTAL 7.25 KW
TRINA SOLAR TSM - PA05 250W
1,2,3
1
2
THWN #8
3
4
ENPHASE BRANCH 16
ELECTRICAL PANEL A
SOLAR-AC DISCONNECT BOX 3 BREAKER 20 A/2POLE
ELECTRICAL PANEL B
SOLAR-AC COMBINER, 50 A/2POLE
SOLAR-AC
COMBINER BOX
50 AMP/2 POLE
ELECTRICAL
PANEL A
AUTOMATIC
SWITCH
"SECONDARY PANEL"
SHEET NO:
4-9
SOLAR-AC
PROTECTION BOX
3 BREAKER-20 AMP/2POLE
JUNCTION
BOX-3
LEGEND
DATE:
ENPHASE
M 250
NOT SCALE
DRAWING BY:
DRAWING NO:
E-3
Important notes
ELECTRICAL
PANEL B
DESIGNER'S CERTIFICATION
1. I certify that I am a licensed engineer or archited member of the collage of my profession and
authorized by this project's owner to present these construction plans to PREPA.
2. In compliance with Law No. 7 of July 19, 1985, as amended, known as
Certification Law, I certify that I prepared the electric design of this project following all codes,
standards, norms and regulation approved by PREPA. Puerto Rico Planning Board and Permits and
Regulation.
DATE:
__________________
__________ ___________________________
LIC. NO: __________________
DESIGNER'S SIGNATURE
__________________________________________________________________________________
PUERTO RICO ELECTRIC POWER AUTHORITY
ENDORSEMENT
PROJECT NAME: SMART RESIDENTIAL BIMODAL SYSTEM
PROJECT NUMBER: _________________________
DATE: _______________________
1. PREPA endorses the electric design shown in these construction plans based on the certification
presented by the designer in compliance with Law No. 7 of July 19, 1985 as emended.
2. PREPA does not assume responsibility over the certified design. PREPA's endorsement does not
relieve the designer from the professional responsibility assumed with the certification on these
project's plans. This endorsement receives neither the builder nor private inspector from compliance
with standing dispositions from National Electric Code; National Electric Safety Code, construction
standards, norms and regulation from PREPA and other government agencies as well as federal and
state laws ruling by the time construction begin.
3. This endorsement is valid for one year. If electrical works have begun during this year, with prior
notification to PREPA, the endorsement will still be valid until work's completion. In case there is not
certified electrical work during a twelve month period, this endorsement will lose its validity.
__________________________________________________________________________________
OBSERVATIONS
1) RELOCATION OF EXISTING LINES AND WORK IN CONNECTION WITH ENERGIZED LINES
WILL BE DONE BY PREPA WITH THE SOLICITOR PAYING THE COST AS INCURRED WITH
PREVIOUS NOTIFICATION BY THE BUILDER, THE ABOVE MENTIONED WORK SHOULD BE
COMPLETED BEFORE COMMENCING THE WORK OF CONSTRUCTIONG THE PROJECT.
2) THE APPROVAL OF THESE PLANS BY THE AUTHORITY DOES NOT RELIVE THE BUILDER
OF COMPLYING WITH EACH AND ALL OF THE REQUISITES ESTABLISHED BY THE NATIONL
ELECTRIC CODE AND THE REGULATION OF THE PUERTO RICO ELECTRIC AUTHORITY.
3) THE APPROBAL OF THESE PLANS IS ON THE CONDITION THAT THE AUTHORITY BE
CONSULTED ON THE CONDITION OF THE ELECTRICAL SERVICE AT THE TIME OF
BEGINNING CONSTRUCTION.