23-Jan-2015
Concepto
Anlisis: 009-C.02
Unidad
Costo
cantidad
Importe
Unidad: HA
JOR
$765.54
1.000000
$765.54
11.68%
$765.54
11.68%
EQUIPO Y HERRAMIENTA
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
3.000000
$1,320.06
20.15%
HOR
$832.64
5.300000
$4,412.99
67.35%
HERRAMIENTA MENOR
$765.54
0.050000
$38.28
0.58%
EQUIPO DE SEGURIDAD
$765.54
0.020000
$15.31
0.23%
$5,786.64
88.32%
$6,552.18
INDIRECTOS
10.4252%
SUBTOTAL 1
$683.08
$7,235.26
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$12.39
$7,247.65
UTILIDAD
6%
SUBTOTAL3
$434.86
$7,682.51
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* SIETE MIL SETECIENTOS VEINTE PESOS 92/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 3.6 Importe: 27795.31
$38.41
$7,720.92
Pgina: 2+0
23-Jan-2015
Concepto
Anlisis: 009-D.04
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$765.54
0.005100
$3.90
27.58%
$3.90
27.58%
EQUIPO Y HERRAMIENTA
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.003000
$1.32
9.34%
HOR
$662.79
0.008000
$5.30
37.48%
HOR
$570.31
0.006000
$3.42
24.19%
HERRAMIENTA MENOR
$3.90
0.030000
$0.12
0.85%
EQUIPO DE SEGURIDAD
$3.90
0.020000
$0.08
0.57%
$10.24
72.42%
$14.14
INDIRECTOS
10.4252%
SUBTOTAL 1
$1.47
$15.61
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.03
$15.64
UTILIDAD
6%
SUBTOTAL3
$0.94
$16.58
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DIECISEIS PESOS 66/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 18034 Importe: 300446.44
$0.08
$16.66
Pgina: 3+0
23-Jan-2015
Concepto
Anlisis: E.P.1a)
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$765.54
0.001000
$0.77
5.09%
$0.77
5.09%
EQUIPO Y HERRAMIENTA
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.009500
$4.18
27.63%
HOR
$662.79
0.011000
$7.29
48.18%
HOR
$570.31
0.005000
$2.85
18.84%
HERRAMIENTA MENOR
$0.77
0.030000
$0.02
0.13%
EQUIPO DE SEGURIDAD
$0.77
0.020000
$0.02
0.13%
$14.36
94.91%
Costo directo
$15.13
INDIRECTOS
10.4252%
SUBTOTAL 1
$1.58
$16.71
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.03
$16.74
UTILIDAD
6%
SUBTOTAL3
$1.00
$17.74
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DIECISIETE PESOS 83/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 216728 Importe: 3864260.24
$0.09
$17.83
Pgina: 4+0
23-Jan-2015
Concepto
Anlisis: 009-F.09
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$12.00
0.200000
$2.40
16.35%
M3-KM
$10.00
0.100000
$1.00
6.81%
AGUA ( MANEJO)
M3
$18.00
0.050000
$0.90
6.13%
PRESTAMO DE BANCO
M3
$4.50
0.500000
$2.25
15.33%
$6.55
44.62%
Subtotal: MATERIALES
EQUIPO Y HERRAMIENTA
CAMION PIPA DE 9 M3
HOR
$435.61
0.006000
$2.61
17.78%
VIBROCOMPACTADOR VAP 70
HOR
$400.83
0.007000
$2.81
19.14%
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.001000
$0.44
3.00%
HOR
$757.56
0.003000
$2.27
15.46%
$8.13
55.38%
$14.68
INDIRECTOS
10.4252%
SUBTOTAL 1
$1.53
$16.21
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.03
$16.24
UTILIDAD
6%
SUBTOTAL3
$0.97
$17.21
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DIECISIETE PESOS 30/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 8340 Importe: 144282
$0.09
$17.30
Pgina: 5+0
23-Jan-2015
Concepto
Anlisis: E.P.2
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$18.00
0.100000
$1.80
5.80%
PRESTAMO DE BANCO
M3
$4.50
1.200000
$5.40
17.41%
$7.20
23.21%
$2.88
9.28%
$2.88
9.28%
Subtotal: MATERIALES
MANO DE OBRA
CUARILLA No. 27 ( 1 TOPOGRAFO + 2 AY.ESP
JOR
$1,440.23
0.002000
HOR
$435.61
0.001000
$0.44
1.42%
EQUIPO DE TOPOGRAFIA
HOR
$26.42
0.002000
$0.05
0.16%
VIBROCOMPACTADOR VAP 70
HOR
$400.83
0.015000
$6.01
19.37%
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.010000
$4.40
14.18%
HOR
$757.56
0.012500
$9.47
30.53%
HOR
$570.31
0.001000
$0.57
1.84%
$20.94
67.50%
Costo directo
$31.02
INDIRECTOS
10.4252%
SUBTOTAL 1
$3.23
$34.25
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.06
$34.31
UTILIDAD
6%
SUBTOTAL3
$2.06
$36.37
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* TREINTA Y SEIS PESOS 55/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 21755 Importe: 795145.25
$0.18
$36.55
Pgina: 6+0
23-Jan-2015
Concepto
Anlisis: E.P.3
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$18.00
0.100000
$1.80
5.16%
PRESTAMO DE BANCO
M3
$4.50
1.050000
$4.73
13.55%
$6.53
18.71%
$1.58
4.53%
$1.58
4.53%
6.24%
Subtotal: MATERIALES
MANO DE OBRA
CUARILLA No. 27 ( 1 TOPOGRAFO + 2 AY.ESP
JOR
$1,440.23
0.001100
HOR
$435.61
0.005000
$2.18
EQUIPO DE TOPOGRAFIA
VIBROCOMPACTADOR VAP 70
HOR
$26.42
0.001000
$0.03
0.09%
HOR
$400.83
0.011000
$4.41
12.63%
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.012300
$5.41
15.50%
HOR
$757.56
0.011000
$8.33
23.86%
HOR
$570.31
0.011300
$6.44
18.45%
$26.80
76.77%
$34.91
INDIRECTOS
10.4252%
SUBTOTAL 1
$3.64
$38.55
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.07
$38.62
UTILIDAD
6%
SUBTOTAL3
$2.32
$40.94
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* CUARENTA Y UN PESOS 14/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 6468 Importe: 266093.52
$0.20
$41.14
Pgina: 7+0
23-Jan-2015
Concepto
Anlisis: 047-C.02
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$382.77
0.028000
$10.72
26.77%
$10.72
26.77%
EQUIPO Y HERRAMIENTA
RETROEXCAVADORA CAT. 446 B, 102 HP, 8890
HOR
$457.70
0.050000
$22.89
57.17%
HERRAMIENTA MENOR
$10.72
0.500000
$5.36
13.39%
EQUIPO DE SEGURIDAD
$10.72
0.100000
$1.07
2.67%
$29.32
73.23%
Costo directo
$40.04
INDIRECTOS
10.4252%
SUBTOTAL 1
$4.17
$44.21
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.08
$44.29
UTILIDAD
6%
SUBTOTAL3
$2.66
$46.95
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* CUARENTA Y SIETE PESOS 18/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 3441 Importe: 162346.38
$0.23
$47.18
Pgina: 8+0
23-Jan-2015
Concepto
Anlisis: 047-D.02
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$382.77
0.010000
$3.83
8.14%
$3.83
8.14%
$17.60
37.39%
EQUIPO Y HERRAMIENTA
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.040000
HOR
$570.31
0.010000
$5.70
12.11%
VIBROCOMPACTADOR VAP 70
HOR
$400.83
0.026500
$10.62
22.56%
HOR
$310.53
0.030000
$9.32
19.80%
$43.24
91.86%
Costo directo
$47.07
INDIRECTOS
10.4252%
SUBTOTAL 1
$4.91
$51.98
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.09
$52.07
UTILIDAD
6%
SUBTOTAL3
$3.12
$55.19
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* CINCUENTA Y CINCO PESOS 47/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 835 Importe: 46317.45
$0.28
$55.47
Pgina: 9+0
23-Jan-2015
Concepto
Anlisis: 047-G.11
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$95.00
1.000000
Subtotal: MATERIALES
$95.00
6.30%
$95.00
6.30%
$386.46
25.65%
$386.46
25.65%
7.69%
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$2,273.29
0.170000
$386.46
0.300000
$115.94
EQUIPO DE SEGURIDAD
$386.46
0.100000
$38.65
2.56%
$154.59
10.26%
M3
$946.60
0.750000
$709.95
47.11%
M2
$157.79
1.020000
$160.95
10.68%
$870.90
57.79%
Subtotal: BASICOS
Costo directo
$1,506.95
INDIRECTOS
10.4252%
SUBTOTAL 1
$157.10
$1,664.05
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$2.85
$1,666.90
UTILIDAD
6%
SUBTOTAL3
$100.01
$1,766.91
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* UN MIL SETECIENTOS SETENTA Y CINCO PESOS 74/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 2693 Importe: 4782067.82
$8.83
$1,775.74
Pgina: 10+0
23-Jan-2015
Concepto
Anlisis: 047-G.11.
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$150.00
0.630000
$94.50
AGUA ( MANEJO)
M3
$18.00
0.230000
$4.14
0.18%
CEMENTO GRIS
TON
$1,678.00
0.390000
$654.42
28.55%
$753.06
32.85%
$1,136.65
49.58%
$1,136.65
49.58%
Subtotal: MATERIALES
4.12%
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$2,273.29
0.500000
$1,136.65
0.300000
$341.00
14.87%
$68.76
0.900000
$61.88
2.70%
$402.88
17.57%
$2,292.59
INDIRECTOS
10.4252%
SUBTOTAL 1
$239.01
$2,531.60
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$4.33
$2,535.93
UTILIDAD
6%
SUBTOTAL3
$152.16
$2,688.09
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOS MIL SETECIENTOS UN PESOS 53/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 72 Importe: 194510.16
$13.44
$2,701.53
Pgina: 11+0
23-Jan-2015
Concepto
Anlisis: 047-L.02
Unidad
Costo
cantidad
Importe
Unidad: ML
$2,818.20
1.020000
Subtotal: MATERIALES
$2,874.56
94.62%
$2,874.56
94.62%
$80.86
2.66%
$80.86
2.66%
MANO DE OBRA
CUADRILLA No. 26 (1 TUBERO + 1 AY.)
JOR
$851.20
0.095000
HOR
$457.70
0.150000
$68.66
2.26%
HERRAMIENTA MENOR
EQUIPO DE SEGURIDAD
$80.86
0.006000
$0.49
0.02%
$80.86
0.001300
$0.11
0.00%
$69.26
2.28%
$13.18
0.43%
$13.18
0.43%
M3
$1,098.38
0.012000
Subtotal: BASICOS
Costo directo
$3,037.86
INDIRECTOS
10.4252%
SUBTOTAL 1
$316.70
$3,354.56
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$5.74
$3,360.30
UTILIDAD
6%
SUBTOTAL3
$201.62
$3,561.92
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* TRES MIL QUINIENTOS SETENTA Y NUEVE PESOS 73/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 252 Importe: 902091.96
$17.81
$3,579.73
Pgina: 12+0
23-Jan-2015
Concepto
Anlisis: E.P.6
Unidad
Costo
cantidad
Importe
Unidad: ML
M3
$150.00
0.500000
Subtotal: MATERIALES
$75.00
37.35%
$75.00
37.35%
$15.31
7.62%
$15.31
7.62%
$97.30
48.45%
MANO DE OBRA
CUADRILLA No 2 (2 PEONES)
JOR
$765.54
0.020000
$512.13
0.190000
CAMION DE VOLTEO DE 7 M3
$440.02
0.030000
HOR
$13.20
6.57%
$110.50
55.03%
$200.81
INDIRECTOS
10.4252%
SUBTOTAL 1
$20.93
$221.74
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.38
$222.12
UTILIDAD
6%
SUBTOTAL3
$13.33
$235.45
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOSCIENTOS TREINTA Y SEIS PESOS 63/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 1500 Importe: 354945
$1.18
$236.63
Pgina: 13+0
23-Jan-2015
Concepto
Anlisis: 047-H.02
Unidad
Costo
cantidad
Importe
Unidad: KG
9.5 MM
ALAMBRE RECOCIDO
KG
$10.20
1.200000
$12.24
56.69%
KG
$13.20
0.500000
$6.60
30.57%
$18.84
87.26%
$2.75
12.74%
$2.75
12.74%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$833.72
0.003300
$21.59
INDIRECTOS
10.4252%
SUBTOTAL 1
$2.25
$23.84
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.04
$23.88
UTILIDAD
6%
SUBTOTAL3
$1.43
$25.31
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* VEINTICINCO PESOS 44/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 8841 Importe: 224915.04
$0.13
$25.44
Pgina: 14+0
23-Jan-2015
Concepto
Anlisis: 047-Y.05.
Unidad
Costo
cantidad
Importe
Unidad: M3
PT
CEMENTO GRIS
TON
$70.00
6.000000
$420.00
24.15%
$1,678.00
0.220000
$369.16
ARENA
21.22%
M3
$180.00
0.650000
$117.00
6.73%
GRAVA
M3
$150.00
0.825000
$123.75
7.11%
AGUA ( MANEJO)
M3
$18.00
0.900000
Subtotal: MATERIALES
$16.20
0.93%
$1,046.11
60.14%
$575.14
33.07%
$575.14
33.07%
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$2,273.29
0.253000
$68.76
1.300000
$89.39
5.14%
HERRAMIENTA MENOR
$575.14
0.030000
$17.25
0.99%
EQUIPO DE SEGURIDAD
$575.14
0.020000
$11.50
0.66%
$118.14
6.79%
$1,739.39
INDIRECTOS
10.4252%
SUBTOTAL 1
$181.33
$1,920.72
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$3.29
$1,924.01
UTILIDAD
6%
SUBTOTAL3
$115.44
$2,039.45
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOS MIL CUARENTA Y NUEVE PESOS 65/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 799 Importe: 1637670.35
$10.20
$2,049.65
Pgina: 15+0
23-Jan-2015
Concepto
Anlisis: 047-Y.06
Unidad
Costo
cantidad
Importe
Unidad: M3
KG
$13.20
2.000000
$26.40
1.38%
ARENA
M3
$180.00
0.900000
$162.00
8.45%
GRAVA
M3
$150.00
0.700000
$105.00
5.48%
AGUA ( MANEJO)
M3
$18.00
0.100000
$1.80
0.09%
CEMENTO GRIS
TON
$1,678.00
0.080000
$134.24
7.00%
CLAVOS DE 2 A 4 "
KG
$16.80
2.000000
$33.60
1.75%
PT
$70.00
4.000000
$280.00
14.60%
DIESEL
LTO
$11.07
1.000000
Subtotal: MATERIALES
$11.07
0.58%
$754.11
39.32%
$1,022.98
53.34%
$1,022.98
53.34%
$110.02
5.74%
$30.69
1.60%
$140.71
7.34%
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$2,273.29
0.450000
$68.76
1.600000
$1,022.98
0.030000
$1,917.80
INDIRECTOS
10.4252%
SUBTOTAL 1
$199.93
$2,117.73
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$3.63
$2,121.36
UTILIDAD
6%
SUBTOTAL3
$127.28
$2,248.64
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOS MIL DOSCIENTOS CINCUENTA Y NUEVE PESOS 88/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 33 Importe: 74576.04
$11.24
$2,259.88
Pgina: 16+0
23-Jan-2015
Concepto
Anlisis: 047-Y.02
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$2,273.29
0.420000
$954.78
48.62%
$954.78
48.62%
$31.07
1.58%
BASICOS
Acero de refuerzo en estructura del No.
TON
$15,533.47
0.002000
M2
$61.24
0.200000
$12.25
0.62%
M3
$946.60
1.020000
$965.53
49.17%
Subtotal: BASICOS
$1,008.85
51.38%
Costo directo
$1,963.63
INDIRECTOS
10.4252%
SUBTOTAL 1
$204.71
$2,168.34
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$3.71
$2,172.05
UTILIDAD
6%
SUBTOTAL3
$130.32
$2,302.37
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOS MIL TRESCIENTOS TRECE PESOS 88/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 89 Importe: 205935.32
$11.51
$2,313.88
Pgina: 17+0
23-Jan-2015
Concepto
Anlisis: E.P.7
Unidad
Costo
cantidad
Importe
Unidad: M3
Base hidraulica P.U.OT. compactada al cien por ciento (100%) de su P.V.S.M. impregnada y
poreada con arena. Incluye acarreos
MATERIALES
AGUA ( MANEJO)
M3
$18.00
0.100000
Subtotal: MATERIALES
$1.80
0.77%
$1.80
0.77%
EQUIPO Y HERRAMIENTA
CARGADOR SOBRE LLANTAS CAT 920
HOR
$570.31
0.003000
$1.71
0.73%
CAMION PIPA DE 9 M3
HOR
$435.61
0.001000
$0.44
0.19%
BARREDORA AUTOPROPULSABLE
HOR
$570.31
0.002000
$1.14
0.49%
VIBROCOMPACTADOR VAP 70
HOR
$400.83
0.003500
$1.40
0.60%
HOR
$757.56
0.007000
$5.30
2.26%
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.003000
$1.32
0.56%
$11.31
4.83%
$221.12
94.40%
Subtotal: BASICOS
$221.12
94.40%
Costo directo
$234.23
INDIRECTOS
M3
$201.02
1.100000
10.4252%
SUBTOTAL 1
$24.42
$258.65
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.44
$259.09
UTILIDAD
6%
SUBTOTAL3
$15.55
$274.64
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOSCIENTOS SETENTA Y SEIS PESOS 01/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 5124 Importe: 1414275.24
$1.37
$276.01
Pgina: 18+0
23-Jan-2015
Concepto
Anlisis: E.P.8
Unidad
Costo
cantidad
Importe
Unidad: M3
TON
AGUA ( MANEJO)
M3
$10,928.22
0.100000
$1,092.82
43.74%
$18.00
1.000000
$18.00
ACARREO DE ASFALTO
TON/KM
0.72%
$6.20
1.500000
$9.30
0.37%
DIESEL
FLETE DE EMULSION PLANTA-TRAMO
LTO
$11.07
1.200000
$13.28
0.53%
M3
$5.00
0.500000
$2.50
0.10%
LT
$7.90
22.000000
$173.80
6.96%
$1,309.70
52.42%
$88.00
3.52%
Subtotal: MATERIALES
EQUIPO Y HERRAMIENTA
CAMION DE VOLTEO DE 7 M3
HOR
$440.02
0.200000
HOR
$570.31
0.150000
$85.55
3.42%
HOR
$494.27
0.220000
$108.74
4.35%
HOR
$745.59
0.200000
$149.12
5.97%
PLANTA DE SFALTOS
HOR
$770.99
0.150000
$115.65
4.63%
CAMION PIPA DE 9 M3
HOR
$435.61
0.100000
$43.56
1.74%
COMPACTADOR DE NEUMATICOS
HOR
$461.98
0.170000
$78.54
3.14%
$669.16
26.78%
$519.68
20.80%
$519.68
20.80%
BASICOS
SUMINISTRO DE MATERIAL PARA CARPETA
M3
$433.07
1.200000
Subtotal: BASICOS
Costo directo
$2,498.54
INDIRECTOS
10.4252%
SUBTOTAL 1
$260.48
$2,759.02
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$4.72
$2,763.74
UTILIDAD
6%
SUBTOTAL3
$165.82
$2,929.56
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOS MIL NOVECIENTOS CUARENTA Y CUATRO PESOS 21/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 1102 Importe: 3244519.42
$14.65
$2,944.21
Pgina: 19+0
23-Jan-2015
Concepto
Anlisis: 1
Unidad
Costo
cantidad
Importe
Unidad: PZA
Seales preventivas
MATERIALES
Seales preventivas de 71 X 71 cms., p.u
PZA
$710.00
1.000000
Subtotal: MATERIALES
$710.00
56.73%
$710.00
56.73%
$268.24
21.43%
$268.24
21.43%
MANO DE OBRA
CUADRILLA No 2 (2 PEONES)
JOR
$765.54
0.350392
$268.24
0.030000
$8.05
0.64%
EQUIPO DE SEGURIDAD
$268.24
0.020000
$5.36
0.43%
$13.41
1.07%
$259.80
20.76%
$259.80
20.76%
M3
$866.00
0.300000
Subtotal: BASICOS
Costo directo
$1,251.45
INDIRECTOS
10.4252%
SUBTOTAL 1
$130.47
$1,381.92
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$2.37
$1,384.29
UTILIDAD
6%
SUBTOTAL3
$83.06
$1,467.35
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* UN MIL CUATROCIENTOS SETENTA Y CUATRO PESOS 69/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 30 Importe: 44240.7
$7.34
$1,474.69
Pgina: 20+0
23-Jan-2015
Concepto
Anlisis: 2
Unidad
Costo
cantidad
Importe
Unidad: PZA
seales restrictivas
MATERIALES
Seales restrictivas de 71 X 71 cms
PZA
$710.00
1.000000
Subtotal: MATERIALES
$710.00
56.73%
$710.00
56.73%
$268.24
21.43%
$268.24
21.43%
MANO DE OBRA
CUADRILLA No 2 (2 PEONES)
JOR
$765.54
0.350392
$268.24
0.030000
$8.05
0.64%
EQUIPO DE SEGURIDAD
$268.24
0.020000
$5.36
0.43%
$13.41
1.07%
$259.80
20.76%
$259.80
20.76%
M3
$866.00
0.300000
Subtotal: BASICOS
Costo directo
$1,251.45
INDIRECTOS
10.4252%
SUBTOTAL 1
$130.47
$1,381.92
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$2.37
$1,384.29
UTILIDAD
6%
SUBTOTAL3
$83.06
$1,467.35
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* UN MIL CUATROCIENTOS SETENTA Y CUATRO PESOS 69/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 4 Importe: 5898.76
$7.34
$1,474.69
Pgina: 21+0
23-Jan-2015
Concepto
Anlisis: 3
Unidad
Costo
cantidad
Importe
Unidad: PZA
seales informativas
MATERIALES
Seal Informativa 30 x 76
PZA
$440.00
1.000000
Subtotal: MATERIALES
$440.00
35.57%
$440.00
35.57%
$428.43
34.63%
$428.43
34.63%
MANO DE OBRA
CUADRILLA No 2 (2 PEONES)
JOR
$765.54
0.559640
$428.43
0.030000
$12.85
1.04%
EQUIPO DE SEGURIDAD
$428.43
0.020000
$8.57
0.69%
$21.42
1.73%
$347.27
28.07%
$347.27
28.07%
M3
$866.00
0.401000
Subtotal: BASICOS
Costo directo
$1,237.12
INDIRECTOS
10.4252%
SUBTOTAL 1
$128.97
$1,366.09
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$2.34
$1,368.43
UTILIDAD
6%
SUBTOTAL3
$82.11
$1,450.54
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* UN MIL CUATROCIENTOS CINCUENTA Y SIETE PESOS 79/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 10 Importe: 14577.9
$7.25
$1,457.79
Pgina: 22+0
23-Jan-2015
Concepto
Anlisis: 4
Unidad
Costo
cantidad
Importe
Unidad: PZA
$710.00
1.000000
Subtotal: MATERIALES
$710.00
91.88%
$710.00
91.88%
$34.99
4.53%
$34.99
4.53%
MANO DE OBRA
CUADRILLA No 2 (2 PEONES)
JOR
$765.54
0.045708
$34.99
0.030000
$1.05
0.14%
EQUIPO DE SEGURIDAD
$34.99
0.020000
$0.70
0.09%
$1.75
0.23%
$25.98
3.36%
$25.98
3.36%
M3
$866.00
0.030000
Subtotal: BASICOS
Costo directo
$772.72
INDIRECTOS
10.4252%
SUBTOTAL 1
$80.56
$853.28
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$1.46
$854.74
UTILIDAD
6%
SUBTOTAL3
$51.28
$906.02
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* NOVECIENTOS DIEZ PESOS 55/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 56 Importe: 50990.8
$4.53
$910.55
Pgina: 23+0
23-Jan-2015
Concepto
Anlisis: E.P.10
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA
$200.00
1.000000
Subtotal: MATERIALES
$200.00
82.16%
$200.00
82.16%
$16.61
6.82%
$16.61
6.82%
MANO DE OBRA
CUADRILLA No 2 (2 PEONES)
JOR
$765.54
0.021703
$16.61
0.030000
$0.50
0.21%
EQUIPO DE SEGURIDAD
$16.61
0.020000
$0.33
0.14%
$0.83
0.34%
$25.98
10.67%
$25.98
10.67%
M3
$866.00
0.030000
Subtotal: BASICOS
Costo directo
$243.42
INDIRECTOS
10.4252%
SUBTOTAL 1
$25.38
$268.80
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.46
$269.26
UTILIDAD
6%
SUBTOTAL3
$16.16
$285.42
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* DOSCIENTOS OCHENTA Y SEIS PESOS 85/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 150 Importe: 43027.5
$1.43
$286.85
Pgina: 24+0
23-Jan-2015
Concepto
Anlisis: E.P.11
Unidad
Costo
cantidad
Importe
Unidad: ML
$567.20
0.700000
$397.04
54.54%
POSTE
$120.00
0.900000
$108.00
14.84%
$505.04
69.38%
$96.81
13.30%
$96.81
13.30%
PZA
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$833.72
0.116124
$96.81
0.030000
$2.90
0.40%
EQUIPO DE SEGURIDAD
$96.81
0.020000
$1.94
0.27%
$4.84
0.66%
$121.24
16.66%
Subtotal: BASICOS
$121.24
16.66%
Costo directo
$727.93
INDIRECTOS
M3
$866.00
0.140000
10.4252%
SUBTOTAL 1
$75.89
$803.82
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$1.38
$805.20
UTILIDAD
6%
SUBTOTAL3
$48.31
$853.51
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* OCHOCIENTOS CINCUENTA Y SIETE PESOS 78/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 350 Importe: 300223
$4.27
$857.78
Pgina: 25+0
23-Jan-2015
Concepto
Anlisis: E.P.12
Unidad
Costo
cantidad
Importe
Unidad: ML
LT
$76.30
0.065000
$4.96
MICROESFERA
KG
$60.00
0.003000
$0.18
2.55%
$5.14
72.91%
$1.53
21.70%
$1.53
21.70%
Subtotal: MATERIALES
70.35%
MANO DE OBRA
CUADRILLA No 2 (2 PEONES)
JOR
$765.54
0.002000
HOR
$43.57
0.007000
$0.30
4.26%
HERRAMIENTA MENOR
$1.53
0.030000
$0.05
0.71%
EQUIPO DE SEGURIDAD
$1.53
0.020000
$0.03
0.43%
$0.38
5.39%
Costo directo
$7.05
INDIRECTOS
10.4252%
SUBTOTAL 1
$0.73
$7.78
FINANCIAMIENTO
0.1712%
SUBTOTAL2
$0.01
$7.79
UTILIDAD
6%
SUBTOTAL3
$0.47
$8.26
CARGOS ADICIONALES
0.5%
PRECIO UNITARIO
(* OCHO PESOS 30/100 M.N. *)
Cantidad utilizada de este concepto en el presupuesto 10980 Importe: 91134
$0.04
$8.30