Sunteți pe pagina 1din 5

PROJECT TITLE / LOCATION

Republic of the Philippines

SHEET CONTENTS

SURVEYED

CHECKED

SUBMITTED

REVIEWED

RECOMMENDING APPROVAL

APPROVED

SHEET No.

JAMES LAURENCE L. REYES


ENGINEER II

CEBU 2ND DISTRICT


ENGINEERING OFFICE
LAWAAN TALISAY CITY, CEBU

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD


WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)
ALONG SIBONGA-DUMANJUG ROAD

11

DESIGNED

LEONARD B. ABAO
ENGINEER II

HELEN GRACE B. YAP

NICOMEDES S. LEONOR, JR.

NONATO M. PAYLADO

JUBY B. CORDON, CEO

ADOR G. CANLAS, CESO IV

CHIEF, PLANNING AND DESIGN DIVISION

DISTRICT ENGINEER

OIC, PLANNING AND DESIGN DIVISION

ASSISTANT REGIONAL DIRECTOR

OFFICER-IN-CHARGE
OFFICE OF THE REGIONAL DIRECTOR

19

0.50m
0.50m

0.50m
0.05

0.50m
0.30m

0.10
EPOXY RESIN
BONDING MORTAR

0.30m

RING BAR

RECEIVING HOLES
SHALL BE 20mm
LARGER THAN DOWELS

CONCRETE SHEET PILE SECTION

NTS

0.03

S12

DRIVEN
PILE

CONCRETE SHEET PILE SCHEDULE

LONG'L REINF

SECTION

ELEVATION

LENGTH (m)

SIZE (mm)

SPAN (m)

BAR SIZE

SHEET PILE

S12

NOT

TO

25

67

5.00 m

S12 2

400 X 500

DRIVE PILE SPLICE DETAIL

3
BALANCE @100 PITCH

10 PCS @ 0.05m
THE REST @ 0.10m

0.20

0.40

DOWELS

DIAMETER AND LENGTH OF REINF.


STEEL DOWELS TO BE AS RECOMMENDED BY MANUFACTURER OF
EPOXY RESIN IN ORDER TO DEVELOP REQUIRED PILE JOINT STRENGTH
(SEE NOTE 5b)

0.08
PILE CUT-OFF LENGTH

5@ 0.05 PITCH0.05

0.10

0.30m

SCALE

A. IN DRIVING OF CONCRETE SHEET PILES WITH THE TOTAL LENGTH OF 8.00 m,


THE PENETRATING DEPTH OF PILES SHOULD BE 6.00 m AND 2.00 m MUST BE EXPOSED.

0.005
0.003
0.30m

ESTIMATED PILE LENGTH

20x20 CHAMFER
TYPICAL
0.003

1.00

0.30m

0.05 CLR (FRESH WATER TYPE)


0.075CLR (SALT WATER TYPE)

NOTES

SECTION

1. CONCRETE :
CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF CLASS AA CONCRETE.
WITH 27.6 MPa CYLINDER STRENGTH AND 19.0mm MAXIMUM AGGREGATE SIZE.
2. REINFORCENMENT :
A. ALL REINFORCING STEEL SHALL BE DEFORMED BARS COMFORMING TO ASSHTO
M31 (ASTM A615) GRADE 40.
B. SPLICES OF ADJACENT LONGITUDINAL STEEL SHALL BE STAGGERRED 100 BAR

0.12
WELD LENGTH

C. SPIRAL-TIES SHALL BE WELDED AT SPLICES.

5@ 0.05 PITCH
0.05

0.05 CLR (FRESH WATER TYPE)


0.075 CLR (SALT WATER TYPE)

SECTION

3
S12

A. PILE HEADS SHALL BE PROTECTED FROM DIRECT IMPACT OF THE HAMMER BY


CUSHION BLOCKS CONSISTING OF SEVERAL BLOCKS OF WOOD OR OF OTHER
APPROVED MATERIALS.
B. PILES SHALL BE DRIVEN TO A DEPTH THAT WILL PRODUCE THE REQUIRED ALLOWABLE
BEARING CAPACITY.

150
LAP LENGTH

NTS

ELEVATION

DRIVE PILE ELEVATION

S12

NOT

TO

S12

0.30L

NOT

TO

S12

NOT

TO

SCALE

0.70L

6. ALLOWABLE PILE BEARING CAPACITY :

500 kN PER PILE

7. MINIMUM HAMMER ENERGY RATING =

55 kN-m

8. BASIS FOR COMPUTING ALLOWABLE PILE BEARING CAPACITY:


DRIVE PILE SCHEDULE

FULL WELD

TYPE

SIZE
(mm)
QTY.

Pall=

167 eh Eh
S + 2.54

LENGTH
(m)

WHERE:
Pall = ALLOWABLE PILE BEARING CAPACITY ( kN)
eh = HAMMER EFFICIENCY
Eh = HAMMER ENERGY RATING (kN-m)
Wr = WEIGHT OF RAM (kN)
Wp = WEIGHT OF PILE AND OTHER DRIVEN WEIGHTS (kN)
S = AVERAGE PENETRATION PER BLOW FOR THE LAST
150mm OF DRIVING (mm)

BAR SIZE

1-POINT PICK-UP
B

300 x 300

28

22

300 x 300

28

15

5@ 0.05 PITCH

ANCHOR BARS
0.58L

0.21L

0.05

FULL WELD

0.15

9. TEST PILES

S12

NOT

TO

10. PICK-UP POINTS :


PICK-UP POINTS SHALL BE MARKED ON ALL PILES AND ALL LIFTING SHALL BE
DONE AT THESE POINTS.

2-POINT PICK-UP

DRIVE PILE TIP FOR HARD DRIVING


8

TEST PILES SHALL BE DRIVEN WITH THE SAME HAMMER USED FOR DRIVING REGULAR
PILES AND MAY BE PART OF FOUNDATION IF APPROVED BY THE ENGINEER.

L
BENT PL
100X100X12X300 LONG

Wr + 0.16 Wp
Wr + Wp
3.00m

LONGITUDINAL REINF

0.21L

SCALE

5. PILE SPLICE :
A. PILES MAY BE SPLICED ONLY IF STRICTLY NECESSARY AND APPROVED BY THE ENGINEER.
PILE SPLICES SHALL BE LOCATED AT LEAST 10m BELOW THE EXISTING GROUND LEVEL.
B. PILE SPLICE SHALL DEVELOP 100% AXIAL, AND 50% BENDING OF THE CAPACITY OF
THE PILE SECTION WHERE THE SPLICE IS LOCATED.

WELDED SPIRALTIE SPLICE DETAIL

SCALE

CONCRETE SHEET PILE ELEVATION

4. PILE FOUNDATION DESIGN:


A. IN PILE-BENT PIERS, PILE LENGTHS SHALL BE DETERMINED BY THE ENGINEER/
CONSULTANT BASED ON THE ALLOWABLE PILE BEARING CAPACITY SPECIFIED BELOW.
B. IN COLUMN-BENT PIERS, THE NUMBER, LOCATION AND LENGTH OF PILES SHALL BE
DETERMINED BY THE ENGINEER/CONSULTANT BASED ON THE LOADING INFORMATION
GIVEN IN THE PIER DETAILS.

0.20 x 0.20

0.40m x 0.50m

NOT

TO

SCALE

SCALE

SHEET CONTENTS

Republic of the Philippines

SURVEYED

CHECKED

SUBMITTED

REVIEWED

RECOMMENDING APPROVAL

APPROVED

SHEET No.

JAMES LAURENCE L. REYES


CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD

ENGINEERING OFFICE
LAWAAN, TALISAY CITY, CEBU

S12

THE USE OF SPECIAL EMBEDDED OR ATTACHED LIFTING DEVICES SHALL BE


SUBJECT TO THE APPROVAL OF THE ENGINEER.

PROJECT TITLE / LOCATION

CEBU 2ND DISTRICT

CONCRETE SHEET PILE TIP FOR HARD DRIVING

WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)


ALONG SIBONGA-DUMANJUG ROAD

TYPICAL PRECAST CONCRETE


DRIVE PILE AND SHEET PILE DETAILS

ENGINEER II

12

DESIGNED

LEONARD B. ABAO
ENGINEER II

HELEN GRACE B. YAP

NICOMEDES S. LEONOR, JR.

NONATO M. PAYLADO

JUBY B. CORDON, CEO

ADOR G. CANLAS, CESO IV

CHIEF, PLANNING AND DESIGN DIVISION

DISTRICT ENGINEER

OIC, PLANNING AND DESIGN DIVISION

ASSISTANT REGIONAL DIRECTOR

OFFICER-IN-CHARGE
OFFICE OF THE REGIONAL DIRECTOR

19

GENERAL

NOTES

( HIGHWAY COMPONENT )
1. CONSTRUCTION SPECIFICATIONS

8. ROAD CONNECTIONS AND PRIVATE ENTRANCES

ALL WORKS SHALL COMPLY WITH THE DPWH STANDARDS SPECIFICATIONS FOR HIGHWAYS, BRIDGES,
VOLUME II, 2004 EDITION; INCLUDING OTHER SPECIFICALLY PREPARED FOR THIS PROJECT.

ROAD CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE PLANS OR


AS DIRECTED BY THE ENGINEERS IN SUCH A MANNER AS TO INSURE PROPER CONNECTION AND RIDING
QUALITY.

2. PROJECT CONTROLS AND REFERENCES

9. DRAINAGE STRUCTURES

HORIZONTAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTIONS
ARE AS SHOWN ON THE PLANS.

EXACT LOCATIONS, OUTFALLS, SLOPES, INVERT ELEVATIONS AND LEVEL OF THE DRAINAGE STRUCTURES
SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE ENGINEER. MINOR ADJUSTMENTS MAYBE MADE AT
HIS DIRECTION TO SUIT ACTUAL FIELD CONDITIONS.

VERTICAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTION
ARE AS SHOWN ON THE SAME DRAWINGS.

10.DESIGN DATA / REFERENCES


3. DIMENSIONS

ENGINEERING / GEODETIC SURVEYS UNDERTAKEN BY THE DPWH - REGIONAL OFFICE NO. VII IN COORDINATION
WITH THE DPWH CEBU 2ND DISTRICT ENGINEERING OFFICE.

LINEAR MEASUREMENTS OF STRUCTURES IN DETAILED DRAWINGS ARE IN MILLIMETERS WHILE


DISTANCES AND ELEVATIONS ARE IN METERS.

1. ROAD ENGINEERING SURVEY WAS UNDERTAKEN ON OCTOBER 2012

4. STATIONING

2. GEOTECHNICAL INVESTIGATIONS AND REPORTS WAS UNDERTAKEN BY ADVANCED GEOTECHNICAL INC.


AND THE MQCHD OF THE DPWH 7TH REGIONAL OFFICE

11. ROAD SIGNAGES / PAVEMENTS MARKINGS


STATIONINGS ARE RECKONED FROM THE KILOMETERS POST ALONG THE EXISTING SIBONGA- DUMANJUG ROAD, SIBONGA, CEBU.
REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS TO BE USED IN THE PROJECT SHALL BE IN
ACCORDANCE WITH THE DPWH - DEPARTMENT ORDER NO. 202, SERIES OF 1992 BEARING THE SUBJECT "USE OF
REFLECTORIZED THERMOLPASTIC PAVEMENT MARKINGS."

5. ELEVATIONS AND GRADES


ELEVATIONS AND FINISHED GRADES AS DESCRIBED IN THE ROAD PROFILES ARE RECKONED ALONG
THE CENTERLINE.

12. MISCELLANEOUS STRUCTURE


PROVISIONS OF BATAS PAMBANSA BILANG 344 (ACCESSIBILITY LAW AND ITS IMPLEMENTING RULES AND
REGULATIONS) MUST BE OBSERVED WHENEVER NECESSARY.

6. HORIZONTAL TRANSITIONS
HORIZONTAL TRANSITIONS FOR ROADWAY TAPERINGS / WIDENINGS SHALL BE APPLIED AS SHOWN
ON THE PLANS.

13. STANDARD DRAWINGS


THE NECESSARY DRAWINGS CONTAINED IN THE DPWH STANDARD DRAWINGS FOR ROADS AND BRIDGES SHALL
BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND / OR PROVIDED
AND APPROVED.

7. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION


RESPECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE REMOVAL OF THEIR HOUSES,
FENCES, ELECTRICAL POLES AND OTHER UTILITIES.

PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC.
THAT MAY OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR
OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE
ANY PORTION OF THE EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF SHALL BE
ON THE ACCOUNT OF THE CONTRACTOR.

RELOCATION OF ANY GROUND UTILITY STRUCTURES SHALL BE SUCH THAT IT WILL NOT CAUSE OBSTRUCTION
NOR CONFLICT TO VEHICULAR AND PEDESTRIAN TRAFFIC MOVEMENT.

PROJECT TITLE / LOCATION

SHEET CONTENTS

Republic of the Philippines

SURVEYED

CHECKED

SUBMITTED

REVIEWED

RECOMMENDING APPROVAL

APPROVED

JAMES LAURENCE L. REYES


ENGINEER II

CEBU 2ND DISTRICT


ENGINEERING OFFICE
LAWAAN TALISAY CITY, CEBU

SHEET No.

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD


WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)
ALONG SIBONGA-DUMANJUG ROAD

GENERAL NOTES
( HIGHWAY COMPONENT )

14

DESIGNED

LEONARD B. ABAO
ENGINEER II

HELEN GRACE B. YAP

NICOMEDES S. LEONOR, JR.

NONATO M. PAYLADO

JUBY B. CORDON, CEO

ADOR G. CANLAS, CESO IV

CHIEF, PLANNING AND DESIGN DIVISION

DISTRICT ENGINEER

OIC, PLANNING AND DESIGN DIVISION

ASSISTANT REGIONAL DIRECTOR

OFFICER-IN-CHARGE
OFFICE OF THE REGIONAL DIRECTOR

19

GENERAL

NOTES

( HIGHWAY COMPONENT )
1. CONSTRUCTION SPECIFICATIONS

8. ROAD CONNECTIONS AND PRIVATE ENTRANCES

ALL WORKS SHALL COMPLY WITH THE DPWH STANDARDS SPECIFICATIONS FOR HIGHWAYS, BRIDGES,
VOLUME II, 2004 EDITION; INCLUDING OTHER SPECIFICALLY PREPARED FOR THIS PROJECT.

ROAD CONNECTIONS SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE PLANS OR


AS DIRECTED BY THE ENGINEERS IN SUCH A MANNER AS TO INSURE PROPER CONNECTION AND RIDING
QUALITY.

2. PROJECT CONTROLS AND REFERENCES

9. DRAINAGE STRUCTURES

HORIZONTAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTIONS
ARE AS SHOWN ON THE PLANS.

EXACT LOCATIONS, OUTFALLS, SLOPES, INVERT ELEVATIONS AND LEVEL OF THE DRAINAGE STRUCTURES
SHALL BE CHECKED AND VERIFIED IN THE FIELD BY THE ENGINEER. MINOR ADJUSTMENTS MAYBE MADE AT
HIS DIRECTION TO SUIT ACTUAL FIELD CONDITIONS.

VERTICAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTION
ARE AS SHOWN ON THE SAME DRAWINGS.

10.DESIGN DATA / REFERENCES


3. DIMENSIONS

ENGINEERING / GEODETIC SURVEYS UNDERTAKEN BY THE DPWH - REGIONAL OFFICE NO. VII IN COORDINATION
WITH THE DPWH CEBU 2ND DISTRICT ENGINEERING OFFICE.

LINEAR MEASUREMENTS OF STRUCTURES IN DETAILED DRAWINGS ARE IN MILLIMETERS WHILE


DISTANCES AND ELEVATIONS ARE IN METERS.

1. ROAD ENGINEERING SURVEY WAS UNDERTAKEN ON OCTOBER 2012

4. STATIONING

2. GEOTECHNICAL INVESTIGATIONS AND REPORTS WAS UNDERTAKEN BY ADVANCED GEOTECHNICAL INC.


AND THE MQCHD OF THE DPWH 7TH REGIONAL OFFICE

11. ROAD SIGNAGES / PAVEMENTS MARKINGS


STATIONINGS ARE RECKONED FROM THE KILOMETERS POST ALONG THE EXISTING SIBONGA- DUMANJUG ROAD, SIBONGA, CEBU.
REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS TO BE USED IN THE PROJECT SHALL BE IN
ACCORDANCE WITH THE DPWH - DEPARTMENT ORDER NO. 202, SERIES OF 1992 BEARING THE SUBJECT "USE OF
REFLECTORIZED THERMOLPASTIC PAVEMENT MARKINGS."

5. ELEVATIONS AND GRADES


ELEVATIONS AND FINISHED GRADES AS DESCRIBED IN THE ROAD PROFILES ARE RECKONED ALONG
THE CENTERLINE.

12. MISCELLANEOUS STRUCTURE


PROVISIONS OF BATAS PAMBANSA BILANG 344 (ACCESSIBILITY LAW AND ITS IMPLEMENTING RULES AND
REGULATIONS) MUST BE OBSERVED WHENEVER NECESSARY.

6. HORIZONTAL TRANSITIONS
HORIZONTAL TRANSITIONS FOR ROADWAY TAPERINGS / WIDENINGS SHALL BE APPLIED AS SHOWN
ON THE PLANS.

13. STANDARD DRAWINGS


THE NECESSARY DRAWINGS CONTAINED IN THE DPWH STANDARD DRAWINGS FOR ROADS AND BRIDGES SHALL
BE UTILIZED FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND / OR PROVIDED
AND APPROVED.

7. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION


RESPECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE REMOVAL OF THEIR HOUSES,
FENCES, ELECTRICAL POLES AND OTHER UTILITIES.

PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC.
THAT MAY OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR
OWNERS CONCERNED. EXTREME PRECAUTION SHALL BE EXERCISED BY THE CONTRACTOR NOT TO DAMAGE
ANY PORTION OF THE EXISTING PUBLIC UTILITIES DURING CONSTRUCTION. ANY DAMAGE THEREOF SHALL BE
ON THE ACCOUNT OF THE CONTRACTOR.

RELOCATION OF ANY GROUND UTILITY STRUCTURES SHALL BE SUCH THAT IT WILL NOT CAUSE OBSTRUCTION
NOR CONFLICT TO VEHICULAR AND PEDESTRIAN TRAFFIC MOVEMENT.

PROJECT TITLE / LOCATION

SHEET CONTENTS

Republic of the Philippines

SURVEYED

CHECKED

SUBMITTED

REVIEWED

RECOMMENDING APPROVAL

APPROVED

JAMES LAURENCE L. REYES


ENGINEER II

CEBU 2ND DISTRICT


ENGINEERING OFFICE
LAWAAN TALISAY CITY, CEBU

SHEET No.

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD


WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)
ALONG SIBONGA-DUMANJUG ROAD

GENERAL NOTES
( HIGHWAY COMPONENT )

14

DESIGNED

LEONARD B. ABAO
ENGINEER II

HELEN GRACE B. YAP

NICOMEDES S. LEONOR, JR.

NONATO M. PAYLADO

JUBY B. CORDON, CEO

ADOR G. CANLAS, CESO IV

CHIEF, PLANNING AND DESIGN DIVISION

DISTRICT ENGINEER

OIC, PLANNING AND DESIGN DIVISION

ASSISTANT REGIONAL DIRECTOR

OFFICER-IN-CHARGE
OFFICE OF THE REGIONAL DIRECTOR

19

PROJECT TITLE / LOCATION

SHEET CONTENTS

Republic of the Philippines


CEBU 2ND DISTRICT
ENGINEERING OFFICE
LAWAAN TALISAY CITY, CEBU

SURVEYED

CHECKED

SUBMITTED

REVIEWED

RECOMMENDING APPROVAL

APPROVED

SHEET No.

JAMES LAURENCE L. REYES


CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROAD
WIDENING OF PERMANENT BRIDGE AT LAMACAN BRIDGE (B00504 CB)
ALONG SIBONGA-DUMANJUG ROAD

TYPICAL ROADWAY SECTION


SLOPE PROTECTION AT ABUTMENT
AND DRAIN DETAIL

ENGINEER II

15

DESIGNED

LEONARD B. ABAO
ENGINEER II

HELEN GRACE B. YAP

NICOMEDES S. LEONOR, JR.

NONATO M. PAYLADO

JUBY B. CORDON, CEO

ADOR G. CANLAS, CESO IV

CHIEF, PLANNING AND DESIGN DIVISION

DISTRICT ENGINEER

OIC, PLANNING AND DESIGN DIVISION

ASSISTANT REGIONAL DIRECTOR

OFFICER-IN-CHARGE
OFFICE OF THE REGIONAL DIRECTOR

19

S-ar putea să vă placă și