Sunteți pe pagina 1din 3
‘The salient data of the project is as follows: een 4 Hydrology (Indus River at site) Catchment 110,500 Sq. miles Maximum Recorded Flood (1929) 1,200,000 f3/s, Average Annual Flow g14 MAF Reservoir Storage Capacity Gross 79 MAF Live 61 MAF Retention Level ‘Maximum 27883 mas! Minimum 251.46 mas! DAM Type: Zoned Fill Embankment with Clay Core Maximum Height Above River Bed 7925 m Total Length 3353 m Total Fil Volume 60mill Cu Yard Spillway Overflow Spilway Capacity 30302 mis Orifice Spillway Capacity 27154 mais, Power Facilities Unit Size = 30 mw Penstock 712. No. Turbine Francis Type Turbine Design Head 5182 m Powerhouse Indoor Type Installed Capacity Initial = 2400 uw components: RESERVOIR + Length km * Maximum depth mi, + Live Storage Mm . Dead Storage M m Maximum Storage Mm Maximum Elevation masl TWO EARTHFILL DAMS + CrestElevation = 477 masi 1 MAIN EMBANKMENT DAM Maximum height 143 m Crest length m 2 AUXILIARY DAM No.1 Maximum height m Crest length m 3 AUXILIARY DAM No.2 * Maximum height m + Crest length m SERVICE SPILLWAY © Maximum capacity = 17,400 mils + Number of Gates radial type (15.2* 18.6 m) AUXILIARY SPILLWAY © Maximum capacity =22,600 mils * Number of Gates radial type (15.2* 18.6 m) RIGHT TUNNEL © Number * Purpose Diversion/power * Construction ‘Concrete lined and steel lined * Inner Diameter + Tunnel 23 =133 m Nbr oF Gates =o TRONS TS RIGHT TUNNEL Number Purpose Construction Inner Diameter Tumel 1, 2,3 Tumel 4 Length GANDAF IRRIGATION TUNNEL. First Stage only length with gate shaft, intake and undergrcund stiling basin = 509 m LEFT BANK TUNNEL Length Construction Inner Diemeter Main Gates POWERHOUSE ‘Number of Units Rated capacity Rated capacity TURBINES ‘Type : Francis 120.1 m Concrete up to gate shaft and stee! lined ds gate shaft 3.7/1 m = two on each 47 * 14.2 m 79 Hydropower General [75 MW each first 10 units. = 42 MW each additional 4 units. Up to 1984 the cost of the Tarbela Project, including resettlement costs has amounted to

S-ar putea să vă placă și