Sunteți pe pagina 1din 1

Assignment-01

The attachment data is a ZIP file and when unzipped the following files will
be there1.
2.
3.
4.

Collar File (RCOLLAR.txt)


Assay File (RASSAY.txt)
Downhole Survey FIle (RSURVEY.txt)
Toposurface (It is a MS3D geometry file)

As part of assignment, students will have to1. Initialise a MS3D project (Start MS3D and Specify the project settings)
2. Intialize a MSCOMPASS project and initialize the necessary files- File 10,
PRJ file, File 11, File 12, and FIle 13 with proper MIN/MAX/PRECISION
3. Look through the drill hole data files and determine the items that may be
needed in File 11, File 12.
4. Load the information stored in the DH data files into file 11 and file 12.
Create necessary drill hole views to verify the number of drillholes, create a
strip and interval display of the "CU" grade item.
5. Grid the TOPOSurface that is provided into a File 13 (GSF-gridded surface
file)
They can work in group. I will expect from each group the project files and a
document on what was done.
They can email me the necessary files (10, PRJ, 11, 12, 13) zipped once
done.
For the PROJECT/MODEL intialization use the following limits can be speifiedMIN/ MAX Easting- 1000 / 4000
MIN/MAX Northing- 4000/ 6500
MIN/MAX Elevation- 1900/ 3000
The block size/ cell size for the project in the X/Y/Z : 20 x 20 x 10

S-ar putea să vă placă și