RESULT

DERIVATION POINTS NOTED

DATA REQUIRED

BLOCKWORK CALCULATION
SOLID BLOCK SIZE

LENGTH
400 MM

CEMENT MORTAR PROPORTION

CEMENT
1

CEMENT MORTAR THICKNESS

10 MM

QUANTITY ANALYSED

4.87 SQM

UNIT WEIGHT OF CEMENT

1440 KG/CUM

ONE BAG CAPACITY OF CEMENT

50 KG

WIDTH
200 MM

SAND
4

UNIT WEIGHT OF SAND


UNIT WEIGHT OF BLOCK
TOTAL VOLUME OF SOLID BLOCK
TOTAL NO OF SOLID BLOCK
TOTAL VOLUME OF WET MORTAR
DRY MORTAR %
TOTAL VOLUME OF DRY MORTAR
TOTAL VOLUME OF MORTAR PER SQM
REQUIRED SAND PER SQM
REQUIRED CEMENT PER SQM
REQUIRED CEMENT IN KG
REQUIRED CEMENT IN BAG
TOTAL NO OF SOLID BLOCKS WITH MORTAR
TOTAL NO OF SOLID BLOCKS WITHOUT MORTAR

0.973 CUM
56 NOS
0.077 CUM
3%
0.080 CUM
0.016 CUM
0.016 CUM
0.004 CUM
5.900 KG
0.118 BAG
11.51 NOS
12.50 NOS

92%

HEIGHT
200 MM

200 MM BLOCK WORK

CONSIDER

0.010

0.010

0.400

0.010

0.400

0.010

0.400

0.010

0.400

0.010

0.010
0.200
0.010
0.200
0.010
0.200
0.010
0.200
0.010
0.200
0.010
0.200
0.010

0.400

2.880 METRE

TOTAL LENGTH WITH MORTOR

TOTAL LENGTH WITH MORTOR


1.690 METRE

TOTAL LENGTH WITH MORT

0.200
0.010
0.200
0.010

TOTAL NOS WITH MORTOR

4
7 NOS

4.87

TOTAL NOS WITH MORTOR 8 NOS

0.010

0.400

0.010

0.400

CONSIDER
SQM

2.880 METRE

6
7
56

TOTAL NOS WITH MORTO

rate analysis for block work


labour charges
cement
sand

140
250 bag
51.69 cuft

rate per sqm


sand
Cement

0.016 m3
0.004 m3

1 bag

0.0347 m3
0.004 m3
0.1152737752 bags

250 per bag

sand
1cft
m3
0.016
labour
cemnt
sand
total
scaffol
oht
blocks

51.69
1783.8219
28.5411504
140
29
28.54
197.54
199.5154
209.49117
547.375
756.86617

RATE ANALYSIS FOR PLASTERING


LABOUR CHARGES
100
Cm
1:06
cement
0.185714 m3
for 15 mm thick
0.002786 m3
no of bags
0.08028 20.06999
sand
1.114286 m3
for 15 mm thick plast 0.016714
29.81531 rs
28.81844 rs

total

149.8853
150
scaffolding'
165
oht
189.75
Total Rate

190

PLASTERING
for 15 mm thick

rs