Data Field Guide

Amerisk Engineering Corp

2015 Edition

AMERISK ENGINEERING CORP


A.L. Suther, CEO
Reporting Guide for Technicians
August 29, 2015

Amerisk Infrared Analysis Reporting Guide

As an Amerisk Engineering field technician, you are an integral part of our team. Your
dedication to accuracy, timeliness, and attention to detail are critical to the success of your
position here at the company. Our clients rely on the data that you provide and our ability to
provide the best in the industry is dependent upon your careful attention to detail. This
Amerisk Guide is written in an eort to make sure that you understand the importance of your
position to our commitment to our valued clients. Please take the time to read this guide and
to confirm your adherence to these important standards.

001

Data Field Guide

Amerisk Engineering Corp

2015 Edition

AMERISK IS
DEDICATED TO
TO PROVIDING
SAFE WORKING
CONDITIONS
FOR AMERICAS
WORKERS. OUR
FIELD-TECHS
ARE THE
FRONTLINE.
Data Required for IR Reports: Field Technician Guide
1.
The first thing that should be provided in your IR reports is the identification of the location where you are
working and specific location within the project building or facility. For example: Electrical Room 1, Kitchen, Main
Electrical Room, Floor 1 Electrical Room, etc.
2.
The second piece of identifying information provided should be the panel or equipment that you are
taking images of. For example: Panel 1A, Transformer 1, etc. This is critical for reporting processes.
3.
The third piece of critical information is the type/nature of equipment/parts that you have imaged with
your FLIR imaging device. This could include wiring, fuses, transformers, switch gear, or other energized
equipment. It is required that you provide specifics on the equipment you have imaged. This is what our clients
rely on in terms of repairs, OSHA compliance, warnings, labeling, and risk management. If you do not provide the
above three (3) items, we are not able to successfully assist our clients in providing a safe and legal work
environment. Our primary purpose for being in business is to provide accurate information to our clients so that
they can provide a safe and legal workplace.
4.
The fourth set of data relates to amperage and voltage. Where appropriate, you shall also provide load
information. It is critical that we report the amperage and voltage to our clients since this data is related to safety
warnings that may have to be provided to workers at our clients site. See, Example of Report Above.
5.
You must relate/correlate 1 through 4, above, to the IMAGE NUMBER indicated on each photo that you
take with Amerisks FLIR device. For example, if Image No. 001 was taken at Panel 1, Main Electrical Room, of
the Fuse Assembly, Amerisk expects that you show which image relates to the physical area in which you took the
photo. If you do not provide that information to us, we cannot report accurate data to our clients.
6.
You are required to use the Excel Spreadsheet Template provided to you for inventorying information
provided through IR/Thermographic inspection of client electrical distribution systems. This information must be
uploaded at the end of each work day, without exception. You will have been provided with a sample of the
Infrared Inspection Report provided to our clients. It is your duty to provide accurate reporting information. If you
have not been provided with what you need to do your work, it is your duty to inform us in writing immediately.
7.
All data is to be uploaded to the ShareFile link provided to you by our oce. You will receive an e-mail
with the information about the link at the beginning of each project and, where possible, on a daily basis during the
project. If you do not receive this information, you need to inform us right away and we will get you that link.
Folders are contained at ameriskengineering.sharefile.com.
002

JOE'S&HOTEL,&123&Main&Street,&Anywhere,&USA&12345
Data Field Guide
IMAGE&#
ER&or&LOCATION
CABINET/&SWBD
14567-68
MAIN%E.R.
SWBD
GFI
14569-70
D/C
14571-72
D/C
14573-74
D/C
14559-60
D/C
14557-58
D/C
14561-62
D/C
14563-64
D/C
14583-84
D/C
GFR
14555-56
MAIN
14551-52
14575-76
XFMR
14537-38
14541-42
14543-44
14547-48
14549-50
14581-82
14577-78
XFMR
14579-80
14587-88
XFMR
14585-86
ATS
PUMP%ROOM
ATS
D/C
CONTACT

14707-08
14709-10
no%pic
same
same
same

2nd%flr
painted%and%caulked
would%cause%damage%to
remove%this%is%conf.
area%very%nice
1ST%FLOOR

14509-10
14511-12
14513-14
14515-16
14505-508
14503-04

xfmr

PANEL/&EQUIP
A1%MAIN
A1A
A1B%PNL-HAF
A1C%PNL-WTA
A2%PNL-BR
A2A%PNL-HAC
A2B%PNL-WTR
A2C%PNL-NDP1
A2D%PNL-2DP
A3%PNL-HAB
A3A
A3B
A3C%PNL-HAR
A4T
A4A%PNL-WTC
A4B%PNL-W/HEATER
A4C%PNL-KC
A4D%PNL-KA
A4E%PNL-8DP
A05%PNL-EM
A06
A07%U/M
A08
A09%U/M
A10
A11%PNL-FP
A12%PNL-PCD
A13%PNL-HAB
A14%PNL-2DP
A15%PNL-V
A16%PNL-2F
A17%PNL-2D
A18%PNL-2C
A19%PNL-2B
A20%PNL-2A
A21%PNL%2E
A22%PNL-NP3
A23%PNL-NLP1
A24%PNL-NP2
A25%PNL-NP1
A26%PNL-NDP1
A26A

BANQUET%OFFICE
14621-22
14655-56
14653-54

CONTACTOR

A27%PNL-HAC
A28%EF3
A29%U/M

CONTACT:&RALPH&SMITH&(555)&123D4567
Amerisk Engineering Corp
Comments
3000A%SUPPLY%2000A%SECTION%277/480%%1OF%4%SECTIONS
LOW%PEAK%BUSS%LPJ50SP
de-ion%set@7-high-high%800a%w/house%
FED%PACIFIC%600A/600V%3POLE
22A%120/208%225A%MAIN%FEEDS%PNL%HR
600A/600V%FED%PACIFIC%FUSEMATIC
700A%TRI%PACK%W/HOUSE%SET%H/H/H
SECTION%2%OF%4%OF%MAIN%600A%480/277%3PH%4%WIRE%FEEDS%XFMR%NDP1A
600A%MAX%250A%FUSEMATIC
800A%TRI%PAC%W/HOUSE
SECTION%3%OF%4%MAIN%SWBD
800V%TRIPACK%W/HOUSE
A4%XFMR%30KVA
800A%TRIPACK%W/HOUSE%SET%H/H/H%SECT.%4%OF%4%MAIN%SWBD

LOAD&A

LOAD&B

2015 Edition
LOAD&C mV&A mV&B

mV&C

18.6

22.2

24.7

30

48.6 U/R

A6%XFMR%75KVA

33.9

28

29.7

11.1

19.5

18

A8%XFMR%75KVA

39

31

38

19

18

21

45.3

25.6

21

17.9

13.5

16.7

250A%D/C%600V%3POLE%FUSEMATIC
250A%D/C%600V%3POLE%FUSEMATIC%FEEDS%PNL-KB%200'%#2al
200A%3POLE%600V%FUSEMATIC

Transducer
225A120/208%PH3%4%WIRE%to%load
same
same
same
same
same
WINDSOR%STORAGE
type%prl1a%208y/120%100a%%100a%main
100a%480/277%3ph%4wire%==to%load
208/120%225a%main
225a%main%125a%main%feeds%ef-1/2/3%%208/120%3ph%4%wire
type%prl4b%480/277%600a%ph3%4wire
PANEL%LIGHTING
600A%480V%3PH%3WIRE%FED%FROM%D/C%A2A%PNL%HAC%MAIN%ER
CUTLER%HAMMER%NEMA%SIZE%0%18A%#A10B-1
SAME
003

Page%1%of%17

VIERA Loss Control Report 2015

Data Field Guide

Amerisk Engineering Corp

Date: 8/29/2015
2015
Edition
Client: Burbank
IHOP

Vibration / Infrared Electrical Risk Assessment

LOCATION
Power Main

ENCLOSURE/EQUIPMENT
Utility Feed Section

APPARATUS/DEVICE
Connections to Bus

SEVERITY
ACT NOW

DATA ANALYSIS:

Ph A
Ph B
Ph C

Amps
-------

99.9 F

D t2 :3 .6

mV
-------

D t1 :1 0 .6 M k

Sp1 :9 3 .0

A r1 :1 0 3 .7

98

96

Sp2 :9 3 .9

REPAIR ESTIMATES:

Phase 1:
Time: $75x
Parts: $
Phase 2:
Time: $75x
Parts: $

=$
=$

Amerisk Engineering Corp

Ar2 Max. Temperature

100.1 F

Ar1 Max. Temperature


Sp1 Temperature
Sp2 Temperature
Dt1
Dt2
File name

103.7 F
93.0 F
93.9 F
10.6 F
3.6 F
IR_2015-0829_0197.jpg

REPAIR BENEFITS:
Fire Avoidance:
Interruption avoidance:
Utility Reduction:

NEC/CODES:

This is a single phase system or split phase and optimally should


be gutted out and updated to 3 phase. Otherwise have qualified
electrician check before calling in BWP check for condition
evaluation or willingness to upgrade if deemed needed.

877-606-RISK

94

92.6

Low
High
3%

RECOMMENDATIONS:

A r2 :1 0 0 .1
Li1 :1 0 3 .3

COMMENTS:

1. While utilities feed (Burbank Water & Power) is


3ph 4W the facility is single phase. This set up
is highly antiquated and delivery of electrical is
not efficient and therefore more costly. Note the
overloading of the hot phase compared to the
return or neutral.
2. Apparent overload of HOT phase.

NASA-grade
T-640 FLIR Systems AB
004

Page 1 / 21

Data Field Guide

VIERA Loss Control Report 2015


Amerisk Engineering Corp

Date: 8/29/2015
2015
Edition
Client: Burbank
IHOP

Vibration / Infrared Electrical Risk Assessment

Report Summary
Page Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Amerisk Engineering Corp

Equipment
Utility Feed Section
Utility Feed Section
Main Disconnect
Lighting Main Bus
Lighting Main Switch
Lighting Sub Bucket
Lighting Main Switch
Utility Feed
Utility Feed
Panel K, CB # 3
Panel K, CB # 12
Panel K
Panel B, CB # 5
Panel B, CB # 13
Panel B, CB # 36
Panel B, CB # 38
Panel B
Panel A, CB # 26
Panel A, CB # 20
Panel A

877-606-RISK

Severity
ACT NOW
ACT NOW
ACT NOW
REFERENCE
ACT NOW
REFERENCE
ACT LATER
ACT NOW
REFERENCE
ACT LATER
ACT NOW
ACT NOW
ACT LATER
ACT NOW
ACT NOW
ACT NOW
REFERENCE
ACT NOW
ACT NOW
ACT NOW

NASA-grade
T-640 FLIR Systems AB
005

Dt1
5.9 C
3.6 C
0.3 C
0.1 C
12.5 C
4.2 C
7.1 C
0.0 C
0.7 C
4.8 C
17.4 C
12.5 C
7.4 C
15.1 C
13.5 C
12.5 C
-2.1 C
10.6 C
11.6 C
36.1 C

Dt2
2.0 C
2.1 C
0.6 C
0.6 C
3.2 C
0.6 C
2.7 C
2.2 C
0.5 C
0.4 C
6.9 C
13.6 C
3.5 C
9.0 C
8.9 C
4.9 C
0.9 C
9.2 C
9.2 C
32.3 C