API Recommended Practice 575, Inspection of Atmospheric and LowPressure Storage Tanks, Third Edition, April 2014
API Recommended Practice 577 Welding Inspection and Metallurgy,
Second Edition, December 2013
API Standard 650, Welded Tanks for Oil Storage, Twelfth Edition, March
2013 with Addendum 1 (September 2014), Errata 1 (July 2013), and
Errata 2 (December 2014).
API Recommended Practice 651, Cathodic Protection of Aboveground
Petroleum Storage Tanks, Fourth Edition, September 2014.
API Recommended Practice 652, Lining of Aboveground Petroleum
Storage Tank Bottoms, Fourth Edition, September 2014
API Standard 653, Tank Inspection, Repair, Alteration, and
Reconstruction, Fifth Edition, November 2014.
http://www.yumpu.com/zh/browse/user/charliechong
http://issuu.com/charlieccchong
http://greekhouseoffonts.com/
Section 1
Introduction
tmin = 2.6(H-1)DG/SE
tmin = 0.82151
120
48
1
21000
.85
Q2. Find the corrosion rate of an AST given the following information.
Original thickness = .875
Measured thickness = .625
Years since last thickness measurement = 11
Corrosion Rate N = (.875-.625)/11 = 0.0227/year
Q3. Using the corrosion rate determined in problem number 2, what would the
remaining life expectancy of this tank be if the minimum required thickness is
0.436?
Remaining life = (.625-.436)/0.0227 = 8.325 years
Q6. Find the throat of a right angle fillet weld with a weld leg length of .4375
inches.
Throat = 0.707 x .4375 = 0.309
Q7. Using the following information, what is the maximum vertical length (also
known as critical length), in inches, over which hoop stresses are assumed to
average out around local discontinuities? Diameter of the tank is 136 feet,
the least thickness in an area of corrosion, exclusive of pits, is determined to
be .563
L = 3.7(Dt2) = 32.376
Q8. A 6 inch nozzle is to be placed in the tank shell of an AST. The shell
course where the nozzle will be installed is .875 thick. What is the required
area of reinforcement?
Area removed = D x t = 6 3/4 x .875 = 5.91 in.2
If a shell plate thicker than required is used for the product and hydrostatic
loading (see 5.6), the excess shell-plate thickness, within a vertical distance
both above and below the centerline of the hole in the tank shell plate equal
to the vertical dimension of the hole in the tank shell plate, may be considered
as reinforcement, and the thickness T of the nozzle reinforcing plate may be
decreased accordingly. In such cases, the reinforcement and the attachment
welding shall conform to the design limits for reinforcement of shell openings
specified in 5.7.2.
Charlie Chong/ Fion Zhang
Q13: Problem #3
Find D when H, E, S, G, and tmin are known where: H=45, E=.90, S=22500,
G= .7 and tmin =.9375
D = tmin(SE)/ (2.6(H-1)G) = 237
Q14: Problem #4
Find St when E, Ht, D, G, and tmin are know where: E = .80, Ht = 54, D= 70,
G = 1 and tmin =.4325
St = 2.6(H-1)D/ tminE = 27878psi
Q15: Problem #5
Find C when D and H are know where D = 60, H = 54
C = 0.14D2H = 27216 Barrels
Post Test:
Q1. What is the required hydrostatic test height (Ht) of an AST given the
following data?
Maximum allowable hydrostatic stress (St)= 21350
Diameter of the tank = 110 feet
Hydrostatic test shell thickness (tmin) is .625
Shell joint efficiency = 70%
Use API-653 2.3.3.1 formula for tanks to be hydrostatically tested.
ANS:
Ht = tminStE/2.6D + 1 = 33.66
Q2. What is the area of a tank bottom that is 121 feet in diameter?
ANS:
22/7 x 60.52 = 11503 feet 2
Q5. What is the required area of reinforcement for a 14 NPS nozzle installed
in a shell course that is 1.0625 thick. Use API 650 Paragraph 3.7.2.1
ANS:
14 1/8 x 1.0625 = 15 in.2
Q6. A bulge is noted in a tank bottom, what is the maximum height of the
bulge permitted if the radius of the inscribed circle is 10.8 feet? Use API-653
Appendix B 3.3
ANS:
BB = 0.37R = 0.37(10.8) = 4
Q7. If the throat of a fillet weld is .309, what is the leg length of the weld?
ANS:
.309/.707 = 0.437
Q8. An AST is 175 feet in diameter. How many tank settlement survey points
are required? Use API-653 paragraph 10.5.1.2.
ANS: D/10 = 18
Section 1 - Introduction
Q1. API-653 covers which of the following types of tanks?
a) Carbon and low alloy steel tanks built to ASME Section VIII, Div.1
b) Carbon and low alloy steel tanks built to ASME Section X
c) Carbon and low alloy steel tanks built to API - 650 and 12C
d) Carbon and low alloy steel tanks built to API - 510
ANS: C
Q2. API-653 provides the requirements for construction of which of the
following?
a) Process pressure vessels
b) Aboveground petroleum storage tanks
c) LNG Storage spheres
d) This standard does not provide construction requirements
ANS: D
Q3. API-653 provides for all but which of the following with regard to
aboveground storage tanks?
a) Repair
b) Operation
c) Relocation
d) Alteration
ANS: b
Q4. The scope of API-653 is limited to all of the following except?
a) Tank foundation
b) Tank Bottom
c) Tank roof
d) Tank mixing motor
ANS: d
Q5. The API-653 standards states that many of the requirements for design,
welding, and materials of API-650 and API-12C can be applied with regard to
_____.
a) Repair, inspection, rating, and alteration.
b) Repair, personnel assignment, maintenance, and inspection.
c) Inspection, product in storage, rating, and alteration.
d) Alteration, refinery equipment, electrical controls, and repair.
ANS: a
Q6. In the application of the requirements for welding, design, and materials
of API-650 or API-12C to in-service aboveground storage tanks (AST), which
of the following code or standard takes precedence?
a) ASME Section VIII, Pressure Vessels
b) API-12C
c) API-653
d) API-650
ANS: c
Q9. When design and construction details are not given and not available in
the original construction standard, then details that will provide a level of
integrity equal to the current edition of what Code or Standard must be used?
a) ASME Section VIII, Division 1, Pressure Vessels
b) ASME Section VIII Division 2, Alternative Rules for Pressure Vessels
c) API- 650, Welded Steel Tanks for Oil Storage
d) API-12C Steel Storage Tanks for Oil Storage
ANS: C
Q10. Ultimate responsibility for compliance with this standard rests with ____?
a) The Owner/Operator
b) The Owner/Operators Inspector
c) The repair organization of the Owner/Operator
d) The manufacturer of the AST
ANS:A
Section 2
Suitability for Service
Q1. When must an evaluation, to determine the suitability for continued use,
be conducted?
a) Evaluations shall be conducted when a tank inspection reveals a
change has occurred from the original physical condition of the tank.
b) Evaluations shall be conducted at least annually
c) Evaluations shall be conducted at an interval not to exceed the
calculated tank inspection frequency.
d) Evaluations shall be conducted once each ten years of service
ANS: a
Q2. What factors are required for consideration when performing an
evaluation for continued use of an AST?
a) Only those listed in API-653
b) The recommended list of considerations provided in API-510 can be
modified to suit this purpose
c) Engineering analysis and judgement required for each situation
d) Only those items requested by the Certified Aboveground Storage
Tank Inspector
ANS: c
Charlie Chong/ Fion Zhang
Q3. Roof plates corroded to an average thickness of less that ____ inch in
any ___ square inch area shall be repaired of replaced.
a) 0.9 inch in any 100 square inch area
b) 0.09 inch in any 10 square inch area
c) 0.09 inch in any 144 square inch area (1 square foot)
d) 0.09 inch in any 100 square inch area
ANS: d
Q4. The method of inspecting roof support members shall be acceptable to
whom?
a) The manufacturer of the AST
b) The responsible inspector
c) The Owner/Operators design engineering department
d) The operations manager
ANS: b
Q5. During the inspection of fixed roof support members, particular attention
must be given to .
a) Severe external corrosion of the roof plate where support structures
are attached
b) Severe internal corrosion of pipe columns
c) Severe internal corrosion of the roof plate where support structures are
attached
d) Deterioration of wind girders at the point of attachment
ANS: b
Q6. Inspection of floating roofs is limited to roof plates and pontoons.
a) True
b) False
ANS: b
Q9. Above what operating temperature shall API Standard 650, Appendix M,
be considered before changing the service of a tank?
a) 500F
b) 400F
c) 300F
d) 200F
ANS: d
Q10. Under what conditions may a tank be operated at a temperature lower
than the original design?
a) When the requirements for impact testing of ASME Section VIII,
Division 1 have been met
b) When the requirements of the applicable standard or API Standard 650
have been met
c) When the requirements of ASTM Specification A-370 have been met
d) When the requirements of ASTM Specification A-20 have been met
ANS: b
Q11. Flaws, deterioration, or other conditions that might adversely affect the
performance or structural integrity of the shell of an existing tank must be
evaluated. Personnel experienced in tank design shall conduct the evaluation.
This analysis shall take into account any of the following except
a) Fluid static head
b) Internal and external pressure
c) Organization that manufactured the tank
d) Seismic loads
ANS: c
Q12. Of the following, which is not an option available to the owner/operator if
it is not possible to satisfy the requirements for minimum thickness
calculations for a welded tank?
a) Repair damaged areas
b) Reduce allowable liquid level
c) Retire the tank
d) Reduce the fill rate so the tank fills slower and applies pressure
gradually
ANS: d
Charlie Chong/ Fion Zhang
Q13. Out-of-roundness, buckled areas, flat spots, and peaking and banding of
welded joints are all examples of _____.
a) Shell Distortions
b) Flaws
c) Discontinuities
d) Severe damage
ANS: a
Q14. Shell distortions require the tank to be immediately removed from
service and inspected.
a) True
b) False
ANS: b
Q17. Internal pitting and pitting rates in the anticipated service, corrosion of
weld joints (weld and heat affected zone), weld joint cracking history, and
stresses placed on the bottom plates by roof support loads and shell
settlement are all examples of causes of what type of failure?
a) Annular ring failure
b) Shell plate failure at first shell course
c) Bottom failure
d) Fatigue failure due to repeated jacking of floor plates
ANS: c
Q19. Of the following what has historically not been a cause of bottom failures?
a) Non-homogeneous fill under the tank bottom
b) Rock or gravel foundation pads with inadequately filled-in surface voids
c) Inadequate inspection frequency
d) Inadequately supported sumps
ANS: c
Q20. Where would you look to find the basis for cathodic protection systems
for the underside of tank bottoms?
a) API Recommended Practice 651
b) API Recommended Practice 652
c) API Standard 2015
d) API Standard 2207
ANS: a
Q21. Where would you look to find procedures and practices for protecting
tank bottoms with internal lining?
a) API Recommended Practice 651
b) API Recommended Practice 652
c) API Standard 2015
d) API Standard 2207
ANS: b
Q22. What two methods may be used in quantifying the remaining thickness
of tank bottoms?
a) Drilling and actual measurement
b) Ultrasonic and radiography
c) Deterministic and probabilistic
d) Detailed stress analysis and plate deformation measurement
ANS: c
Q24. When repairing internal pitting for the extension of in-service operating
period, the repair shall be by any of the following methods except.
a) Pit welding
b) Brazing
c) Overlay welding
d) Lap Patching
ANS: b
Q25. The thickness of the bottom plate projection beyond the shell, measured
at the toe of the weld of the outside bottom-to-shell fillet weld shall be not less
than?
a) 0.25 inch
b) 0.01 inch
c) 0.50 inch
d) 0.10 inch
ANS: d
Q26. The projection of the bottom plate beyond the toe of the shell-to-bottom
weld shall be at least?
a) 0.125 inch
b) 0.250 inch
c) 0.375 inch (3/8)
d) 0.500 inch
ANS: c
Section 3
Brittle Fracture Considerations
Q1. Incidents of tank failure due to brittle fracture have occurred shortly after
erection during hydrostatic testing or in all but which of the following incidents?
a) On the first filling in cold weather
b) After a change to a higher temperature service
c) After a change to a lower temperature service
d) After a repair or alteration
ANS: b
Q2. The risk of tank failure due to brittle fracture is considered minimal after
what condition(s)?
a) The tank has demonstrated its ability to withstand the combined effects
of maximum liquid level (highest stresses) and highest operating
temperature
b) The tank has demonstrated its ability to withstand the combined effects
of intermediate liquid level (highest stresses) and lowest operating
temperature
c) The tank has demonstrated its ability to withstand the combined effects
of maximum liquid level (highest stresses) and lowest operating
temperature
d) The tank has demonstrated its ability to withstand the combined effects
of maximum liquid level (highest stresses) and intermediate operating
temperature
ANS: c
Q5. No known tank failures attributed to brittle fracture have occurred at shell
metal temperatures of _____F and above.
a) -20
b) 20
c) 40
d) 60
ANS: d
Q6. According to industry experience and laboratory tests, what membrane
stress is required to caused failure due to brittle fracture?
a) 6 ksi
b) 7 ksi
c) 10 ksi
d) 12 ksi
ANS: b
Q7. What is the lowest temperature that a tank, constructed of carbon steel of
unknown toughness, may be used? The maximum thickness of the shell
is .625
a) 40F
b) 45F
c) 50F
d) 55F
ANS: A
Q8. What is the purpose of Figure 3-1 of API-653?
a) Provides a procedure to be used in the evaluation of the remaining life
of tank bottom plates
b) Provides a procedure to be used in the evaluation of the likelihood of
floating roof pontoon failure
c) Provides an assessment procedure for evaluating aboveground
storage tanks operating at 15 psi
d) Provides an assessment procedure for evaluating atmospheric
aboveground storage tanks
ANS: D
Charlie Chong/ Fion Zhang
Section 4
Inspection
Q6. External ultrasonic thickness measurements of the shell, while the tank is
in service, can be a means of determining rate of uniform corrosion. The
extent of UT measurements shall be determined by the owner/operator. What
is maximum interval of such thickness measurements when the corrosion rate
is not known?
a) Five years
b) Three years
c) One year
d) Every three months until the corrosion rate is established
ANS: a
Q7. The minimum thickness of a tank was established at 0.585 inch. The
shell was fabricated from 3/4 inch plate and included a 0.125 inch corrosion
allowance. The tank has been in service for eight years and current ultrasonic
thickness measurements reveal an average thickness of 0.712 inch. Based
on this information determine when the next ultrasonic thickness
measurements will be required.
a) Fifteen years
b) Thirteen years
c) Eleven years
d) Nine years
ANS: corrosion rate = 0.75-0.712/8 = 0.00475/year.
Interval = (0.712- 0.71)/(2x0.00475) = 0.21years
Interval = (0.712-0.585)/(2x0.00475) = 13.36 years (b)
Q8. Internal inspections are primarily required to do all but which of the
following?
a) Ensure the internal surfaces of the tank are thoroughly cleaned
periodically
b) Identify and evaluate any tank bottom settlement
c) Ensure that the bottom is not severely corroded and leaking
d) Gather data necessary for the minimum bottom and shell thickness
assessments
ANS: a
Q9. When can the required internal inspection be performed by some method
other than visual inspection?
a) Substitution of the visual inspection is never permitted
b) If the internal inspection is required solely for determining the condition
and integrity of the tank bottom
c) If the internal inspection is required solely for determining the condition
and integrity of the tank critical zone
d) If the internal inspection is required solely for determining the condition
and integrity of the tank roof support structure
ANS: b
Q10. According to API-653, all tanks shall have a formal internal inspection
conducted at intervals defined by this standard. Who is required to conduct
the visual inspection?
a) The corrosion engineer
b) The person designated by the Authorized Inspector
c) The authorized Inspector
d) The person designated by the owner user
ANS: c
Charlie Chong/ Fion Zhang
Q13. In cases where corrosion rates are not known and similar service
experience is not available, the bottom plate actual thickness shall be
determined by inspection(s) within how many years?
a) 25 years
b) 20 years
c) 15 years
d) 10 years
ANS: d
Q14. Which of the following is a recognized alternative to internal inspection
interval described in API-653?
a) Risk-based Inspection procedures (RBI)
b) Hydrostatically testing the tank every five years
c) Performing complete calculations for minimum required thickness of
the tank shell and bottom
d) API-653 does not permit any alternatives to the internal inspection intervals
ANS: a
Q15. Of the following, which would not be a factor to be considered in a Riskbased assessment of a tank?
a) Availability and effectiveness of inspection methods and quality of data
collected
b) The methods used for determining the thickness of the shell and
bottom plates
c) Effectiveness of corrosion mitigation methods
d) Names of all operators since the initial start-up of the tank
ANS: d
Q16. The owner/operator is required to maintain complete record file
consisting of three types of records. Which of the following is not one of the
three types of records.
a) Repair/alteration history
b) Fill cycles
c) Construction
d) Inspection
ANS: b
Breaks
http://www.rebeccasaw.com/breakfast-kompleks-niaga-limbongan-best-roti-canai-chicken-rice-ball-curry-laksa/comment-page-1/
Breaks
http://www.goodfood.com.au/good-food/cook/cooking-asian-in-a-flash-20131007-2v3gi.html
Section 5
Materials
Q1. All new materials used for repair, alteration, and reconstruction shall
conform to which of the following?
a) The existing material code at the time of original construction
b) The latest NFPA Code
c) The current applicable tank standards
d) Any ASME Code specification for P-1 material
ANS: c
Q2. All shell plates and bottom plates welded to the shell shall be identified.
Material identified by any of the following except _____ does not require
further identification?
a) Original contract drawings
b) API name plates
c) Suitable documentation
d) Owner/operator's experience with similar tanks in similar service
constructed of similar material
ANS: c
Q3. Each individual plate for which adequate identification can not be made;
the plate shall be _______.
a) Subjected to chemical analysis and mechanical tests as required in
ASTM A6 and A370 including Charpy V-Notch
b) Subjected to chemical analysis and mechanical tests as required in
ASTM A20 and A333 including Charpy V-Notch
c) Subjected to Brinell hardness analysis and mechanical tests as
required in ASTM A6 and A370 including Charpy V-Notch
d) Subjected to Brinell hardness analysis and mechanical tests as
required in ASTM A20 and A333 including Charpy V-Notch
ANS: a
Q4. Under what condition does API-653 require two tension specimens shall
be taken at right angles to each other from a corner of each plate? One of
those specimens must meet the specification requirements.
a) When the direction of rolling is not definitely known
b) When the welding will be conducted at a temperature less than 32F
c) When the plate is not a full size plate and may be installed with the
grain running vertical
d) When the material is not a P-1 material
ANS: a
Q5. Even when a material is identified, all shell plates and bottom plates
welded to the shell shall meet what minimum requirements?
a) The chemistry and mechanical properties of material specified for the
application with regard to thickness and design temperature given in
ASME Section II, Part A
b) The chemistry and mechanical properties of material specified for the
application with regard to thickness and design temperature given in API
Standard 650
c) The chemistry and mechanical properties of material specified for the
application with regard to thickness and design temperature given in the
owner/operator's engineering design
d) The chemistry and mechanical properties of material specified for the
application with regard to thickness and design temperature given in the
contract for the tank repair, alteration, or reconstruction
ANS: b
:
Q8. Fasteners shall meet the material specifications of the current applicable
standard.
a) True
b) False
ANS: b
Q9. If existing plates are to be used to reconstruct the tank, they shall be
checked for which of the following?
a) Chemical compatibility with other plates used in the reconstruction
b) Excessive corrosion and pitting
c) Mechanical strength including impact properties
d) Inadequately reinforced openings
ANS: b
7.3.2 Structural
Existing rolled structural shapes that are to be reused shall meet the
requirement of ASTM
7.3.2 Structural
Existing rolled structural shapes that are to be reused shall meet the
requirement of ASTM A7 as a minimum. New structural material shall meet
the requirements of ASTM A36 or ASTM A992 as a minimum.
NOTE ASTM A7 was a steel specification that was discontinued in the Fourth
Edition of API 650, 1970.
http://www.v2rocket.com/start/start.html
7.3.2 Structural
Existing rolled structural shapes that are to be reused shall meet the
requirement of ASTM A7 as a minimum. New structural material shall meet
the requirements of ASTM A36 or ASTM A992 as a minimum.
NOTE ASTM A7 was a steel specification that was discontinued in the Fourth
Edition of API 650, 1970.
http://www.v2rocket.com/start/start.html
http://www.v2rocket.com/start/start.html
standard.
Section 6
Design Considerations of Reconstructed
Tank
Q3. The thickness to be used for each shell course when checking tank
design shall be based on:
a) Measurements taken within 30 days prior to relocation
b) Measurements taken within 60 days prior to relocation
c) Measurements taken within 120 days prior to relocation
d) Measurements taken within 180 days prior to relocation
ANS: d
Q4. The maximum liquid level for hydrostatic test shall be determined by
using which of the following?
a) The nominal thickness of each shell course at the time of original
construction
b) The actual thickness measured for each shell course
c) The anticipated thickness for each shell course at the time of next
thickness measurements
d) Twice the anticipated thickness for each shell course at the time of
next thickness measurements
ANS: b
Q5. The joint efficiency and allowable stress levels for existing welded joints
that are not to be removed and replaced shall be based on which of the
following?
a) Original construction standard
b) Original degree and type of inspection
c) Current construction standard
d) Current degree and type of inspection
ANS: b
Q6. Replacement and new penetrations shall be designed, detailed, welded,
and examined to meet what requirements?
a) The current applicable standard
b) The original standard of construction
c) The requirements of the Authorized Inspector
d) The requirements of the owner/operator
ANS: a
Section 7
Tank Repairs & Alterations
Q1. The basis for repairs and alterations shall be equivalent to which of the
following?
a) API-653
b) API-650
c) API-510
d) API-570
ANS: b
Q2. The minimum dimension for a replacement shall plate shall be _____
inches or ____ times the thickness of the replacement plate whichever is
______.
a) 12, 12, greater
b) 12, 12, lesser
c) 18, 18, greater
d) 18, 18, lesser
ANS:a
Q3. Unless an entire shell plate is replaced, the replacement plate may be
circular, oblong, square or rectangular provide the corners are
a) Provided with a radius of at least 1 inch (2?)
b) Provided with a radius of at least 3% of the short dimension of the plate
c) Provided with a radius of at least 3 inches
d) Provided with rounded corners
ANS: D
Q4. Prior to welding the new vertical joints, the existing horizontal joints shall
be cut for a minimum distance of _____ inches beyond the new vertical joints.
a) Six
b) Eight
c) Twelve
d) Sixteen
ANS: c
9.3.1.4 The shape of the repair plate may be circular, oblong, square, or
rectangular. All corners, except at the shell to bottom joint, shall be rounded
to a minimum radius of 2 in. The nozzle reinforcing plate shapes of API 650,
Figure 5-8, are also acceptable.
Charlie Chong/ Fion Zhang
Q7. For existing shell plates thick and less, the outer edge of the butt weld,
attaching the replacement shell plate may be reduced to _____ inches from
the outer edge of vertical joints or _____ inches from the outer edge of
horizontal joints.
a) 10, 8 b) 9, 6
c) 6, 9 d) 6, 3
ANS: d
Q8. For existing shell plates over thick, the outer edge of the butt weld,
attaching the replacement shell plate shall be at least _____ times the weld
size or _____ inches, whichever is greater, from the edge (toe) of the fillet
weld attaching the bottom shell course to the bottom. This rule does not apply
if the replacement shell plate extends to and intersects with the bottom-toshell joint at approximately _____ degrees.
a) 8, 10, 45 b) 8, 10, 90
c) 8, 10, 60 d) There are no exceptions
ANS: b
Q9. The edge of any vertical weld joint attaching a replacement plate shall be
at least how far from the edge of the weld joint in the annular plate ring or
sketch plate?
a) Eight inches
b) Ten inches
c) Twelve inches
d) Six inches
ANS: 3 or 5t? (dimension C?)
Q10. Lapped patch shell repairs are an acceptable form of repair for buttwelded, lap-welded, and riveted tank shell only when specified by:
a) The Authorized Inspector
b) Repair organization
c) The insurance company
d) The owner/operator
ANS: d
Q11. Lapped patch shell repairs are not permitted on shell courses exceeding
what thickness?
a) inch
b) inch
c) 1 inch
d) 1 inch
ANS: a
Q12. When a lapped patch shell repair is used, what is the minimum
thickness permitted for the repair plate?
a) Not less than .25 inch
b) Not less than .1875 inch (3/16)
c) Not less than .50 inch
d) Not less than .375 inch
ANS: b
Q13. Repair plates for lapped patch repairs may square or rectangular in
shape. These plates must be provided with a corner radius of at least what
dimension?
a) They shall be rounded to a minimum radius of 1 inch
b) They shall be rounded to a minimum radius of 2 inches
c) They shall be rounded to a minimum radius of 3 inches
d) They shall be rounded to a minimum radius of 4 inches
ANS: b
Q14. The maximum dimension of the lapped patch repair plate vertically and
horizontally shall not exceed:
a) 24 inches vertically and 36 inches horizontally
b) 36 inches vertically and 48 inches horizontally
c) 48 inches vertically and 72 inches horizontally
d) There are no maximum dimensions
ANS: c
Q15. The minimum lapped patch repair plate dimension is what length?
a) 6 inches
b) 8 inches
c) 10 inches
d) 12 inches
ANS: 4?
API653: 9.3.1.7 The maximum vertical and horizontal dimension of the repair
plate is 48 in. and 72 in., respectively. The minimum repair plate dimension is
4 in. The repair plate shall be formed to the shell radius.
Q16. Is it permissible to install a shell opening and its reinforcement within a
properly designed lapped patch shell repair?
a) Yes
b) No
ANS: b
Q17. When a lapped patch repair plate is used to reinforce the thickness of a
shell, which of the following is correct?
a) The repair plate thickness shall be based on the latest edition of API650 and 653 using a joint efficiency not exceeding 0.35
b) The repair plate thickness shall be based on the applicable standard of
construction and API Standard 653 using a joint efficiency not exceeding
0.35
c) The repair plate thickness shall be based on the latest edition of API650 and 653 using a joint efficiency not exceeding 0.70
d) The repair plate thickness shall be based on the applicable standard of
construction and API Standard 650 using a joint efficiency not exceeding
0.70
ANS: b
Q18. With regard to the thickness of the repair plate at the perimeter of the
repair plate, when a lapped patch repair plate is used to reinforce the
thickness of a shell, which of the following is correct?
a) The repair plate shall not exceed the thickness of the shell plate by
more than 1/4th but no more than 1/8th inch. The maximum repair plate
thickness is 1/2inch.
b) The repair plate shall not exceed the thickness of the shell plate by
more than 1/3rd but no more than 1/4th inch. The maximum repair plate
thickness is 1/2inch.
c) The repair plate shall not exceed the thickness of the shell plate by
more than 1/3rd but no more than 1/8th inch. The maximum repair plate
thickness is 1/2inch.
d) The repair plate shall not exceed the thickness of the shell plate by
more than 1/4th but no more than 1/3rd inch. The maximum repair plate
thickness is 1/2inch.
ANS: c
Q19. Lapped patch repair plates may be used to repair small leaks or
minimize the potential of leaks from isolated pitting. The requirements for
thickness and design are the same as for reinforcement of shell thickness.
This type of repair may not be used to repair small leaks if what condition(s)
exists?
a) The leak is located anywhere in the first shell course within 12 inches
of a vertical joint
b) The leak of pit is in an area of the shell where there is a product to
atmosphere interface
c) There is a possibility of severe environmental impact should the repair
fail
d) If exposure of the fillet weld to the product would produce crevice
corrosion or if a corrosion cell is likely to occur between the shell plate
and the repair plate
ANS: d
Q20. An alteration to a tank shell by the addition of new plate material shall
be performed in accordance with what standard?
a) Current API 650 and latest addenda
b) API 650 edition and addenda applicable at the time of original tank
construction
c) Applicable standard
d) Tanks may not be altered by increasing height
ANS: c
Q21. Repairs to existing shell penetrations shall be in accordance with
a) API Standard 650
b) API Standard 653
c) API Standard 510
d) National Board Inspection Code
ANS: b
Q22. API 653 permits the addition of reinforcing plates to existing unreinforced nozzles. What requirement is necessary to add this reinforcement
to the inside of the tank?
a) The reinforcement plate may not be added to the inside of the plate
b) A telltale hole shall be drilled through the shell opposite the
reinforcement plate
c) The reinforcement plate is the same material as the nozzle and is
attached to the nozzle by full penetration weld
d) Sufficient nozzle projection exists
ANS: c
Q23. The addition or replacement of shell penetrations shall be in accordance
with
a) API-650
b) API-650 and API 653
c) API-650 and API 510
d) API-650 and AMSE Section VIII, Division 2
ANS: b
Q30. No welding or weld overlays are permitted within the Critical Zone
except for welding of widely scattered pits, cracks in the bottom plates, the
shell-to-bottom weld, or where the bottom or annular plate is being replaced.
a) True
b) False
ANS: b
Q31. API Standard 653 defines the Critical Zone for repairs to tank bottoms
as what?
a) That portion of the bottom or annular plate within 3" from the inside
edge of the shell, measured radially inward
b) Within the annular plate ring, within 12 inches of the shell, or within 12
inches of the inside edge of the annular plate ring
c) That portion of the bottom or annular plate within 6" from the inside
edge of the shell, measured radially inward
d) Within the annular plate ring, within 3" of the shell, or within 12 inches
of the inside edge of the annular plate ring
ANS: a
Q32. If more extensive repairs are required within the Critical Zone than
those listed in 7.10.1.2, what must be done with the bottom plate?
a) As long as the repairs do not involve the bottom plate, nothing needs to
be done
b) The bottom plate welded to the shell shall be cut out and a new plate
installed
c) The bottom plate shall be subjected to suitable nondestructive
examination to ensure it has not be adversely affected by the repair
d) The bottom plate and the bottom shell course shall be replaced as an
assembly
ANS: b
Q33. When it is necessary to install a new bottom plate over an existing
bottom plate, a suitable ______ material cushion such as sand, gravel or
concrete shall be used between the old bottom and the new bottom.
a) Drainage b) Compacted
c) Non-corrosive d) Non-conductive
ANS: c
Q34. When a new tank bottom has been installed in a floating roof tank, what
consideration must given to the floating roof level?
a) The floating roof will find its own level
b) The support legs can be jacked up or shortened by the same amount
as the thickness of the cushion and new bottom plate
c) The support legs can be jacked up or shortened by the same amount
as the thickness of the cushion
d) The support legs can be jacked up or shortened by the same amount
as the thickness of the new bottom plate
ANS: b
Q35. Which of the following is not acceptable when removing an existing tank
bottom, with regard to the separation of the shell from the tank bottom?
a) Cutting the shell parallel to the tank bottom a minimum of above the
bottom to shell weld
b) Removing the entire shell to bottom attachment weld including
penetration and heat affect zone
c) Removing the entire shell to bottom attachment weld by arc gouging
and/or grinding
d) Cutting the shell parallel to the tank bottom a minimum of above the
bottom to shell weld
ANS: d
9.10.2.3 When removing an existing tank bottom, the tank shell shall be
separated from tank bottom either by:
a) cutting the shell parallel to the tank bottom a minimum of 1/2 in. above the
bottom-to-shell weld (cut line B-B as shown in Figure 10.1), or
Q36. For installation of a new tank bottom in a tank with shell plates of
unknown toughness, not exempted in Table 10-1 of API-653, new welds in
the bottom or annular ring shall be spaced at least the greater of _____
inches or ____t from existing vertical weld joints in the bottom shell course. (t
is the thickness of the bottom shell course)
a) three, five
b) six, five
c) five, three
d) five, six
ANS: a
Q37.What is the minimum thickness of new roof plates for supported cone
roofs?
a) 7/16
b) 5/16
c) 3/16
d) 1/16
ANS: c
Q38. The nominal thickness of new roof plates for self-supporting roofs shall
be equal to or greater than _____ inch not to exceed _____ inch.
a) 1/4th, 5/8th
b) 5/16th, 1/2
c) 3/16th, 5/16th
d) 3/16th, 1/2
ANS: c
Q39. Repairs to internal floating roofs shall be made in accordance with the
original construction drawings. To what requirements shall repairs be made if
the original construction drawings are not available?
a) The original construction standard
b) Appendix H of API Standard 650 (internal floating roof)
c) Appendix G of API Standard 650 (supported Al doom roof)
d) Appendix C of API Standard 650 (external floating roof)
ANS: b
Q42. With regard to installation of primary and secondary seals, what must be
done if the roof rim thickness is less than 0.10 inch.
a) The roof rim shall be thoroughly inspected for damage and corrosion, if
it is satisfactory then nothing further needs to be done
b) It shall be replaced. The new roof rim shall be 3/16 inch thickness
minimum
c) It shall be replaced. The new roof rim shall be 1/4 inch thickness
minimum
d) The tank must be condemned and dismantled
ANS: b
Q43. What is the maximum hot tap connection permitted in an in-service tank
with a minimum shell thickness of 3/8 inch? The material is of recognized
toughness.
a) NPS 6 b) NPS 8
c) NPS 14 d) NPS 18
ANS: c
Q46. It is permissible to perform hot taps on the roof of a tank or within the
gas/vapor space.
a) True
b) False
ANS: b
Q47. The owner/operator requires an NPS 3 nozzle to be installed in an inservice tank. The tank is 110 feet in diameter, 60 feet maximum fill height,
shell thickness at the point of hot tap is .75, and the material is of unknown
toughness with a minimum design metal temperature of 38F. This nozzle is
to be installed adjacent to an existing nozzle. What is the minimum spacing
between these nozzles?
a) Minimum distance is 22.24
b) Minimum distance is 9.08
c) Minimum distance is 19.08
d) Minimum distance is 2.24
ANS: (RT) = 22.25 A
9.14.3 Preparatory Work
9.14.3.1 Minimum spacing in any direction (toe-to-toe of welds) between the
hot tap and adjacent nozzles shall be equivalent to the square root of RT
where R is the tank shell radius, in inches, and T is the shell plate thickness,
in inches.
Q48. When installing a pipe nozzle into an in-service tank, how shall the pipe
nozzle be prepared?
a) The pipe nozzle must be cut to the contour of the tank and prepared for
full fillet welding
b) The pipe nozzle shall be cut to the contour of the tank and beveled to a
depth of not more than 1/3 the nozzle thickness to ensure partial
penetration groove welding
c) The pipe nozzle shall be cut to the contour of the tank and beveled to a
depth of not less than 1/3 the nozzle thickness to ensure partial
penetration groove welding
d) The pipe nozzle shall be cut to the contour of the tank and beveled
from the outside for a full penetration weld
ANS: d
Q49. After the reinforcing pad is installed, the pad shall be subjected to a
pneumatic test.
a) True
b) False
ANS: a
Charlie Chong/ Fion Zhang
Q50. After the valve has been installed on the flange, a pressure test of at
least ______ shall be performed on the nozzle prior to mounting the hot tap
machine.
a) The same pressure as the pneumatic test of the reinforcing pad
b) 1.25 times the hydrostatic head
c) 1.5 times the hydrostatic head
d) 2.0 times the hydrostatic head (to account for the added stress of the
machine)
ANS: c
Section 8
Dismantling & Reconstruction
3. API-653 requires that new vertical joints in adjacent shell courses not be in
alignment. What is the minimum offset dimension of these joints?
a) Vertical joints shall be offset a minimum of 5 inches or 5t which ever is
greater
b) Vertical joints shall be offset a minimum of 5t where t is the plate
thickness of the thicker course at the point of offset
c) Vertical joints shall be offset a minimum of 5t where t is the plate
thickness of the thinner course at the point of offset
d) Vertical joints shall be offset a minimum of 5 inches or 5t which ever is
less
Reference: API-653, Paragraph 8.4.2.1
4. Roof plates shall be cut by de-seaming of lap-welds or by cutting alongside
of the remaining welds at a minimum of _______ away from existing welds.
a) One inch
b) Two inches
c) Four inches
d) Six inches
ANS: ANS:
Charlie Chong/ Fion Zhang
9. What is the maximum permissible undercut of the base metal for vertical
joints?
a) 1/64
b) 1/32
c) 1/19
d) 1/16
10. What is the maximum permissible undercut of the base metal for
horizontal joints?
a) 1/64
b) 1/32
c) 1/19
d) 1/16
ANS: ANS:
Section 8
Dismantling & Reconstruction
Q1. Bottom plates that will be reused shall be cut by de-seaming of lap-welds
or by cutting alongside of the remaining welds at a minimum of _______
away from existing welds.
a) One inch
b) Two inches
c) Four inches
d) Six inches (shell ring)
ANS: b
Q2. Shell plates may be cut by any of the following methods except
a) Shell rings thick or thinner can be dismantled by cutting through the
weld without removing the heat affected zone
b) Cuts made a minimum of 6 away from existing welds except where
cuts cross existing welds
c) Cuts made a minimum of 2 away from existing welds except where
cuts cross existing welds (bottom plate)
d) Any shell ring may be dismantled by cutting out existing weld seams
and the heat affected zone of the weld
ANS: C
Charlie Chong/ Fion Zhang
AST Tanks
AST Tanks
Q3. API-653 requires that new vertical joints in adjacent shell courses not be
in alignment. What is the minimum offset dimension of these joints?
a) Vertical joints shall be offset a minimum of 5 inches or 5t which ever is
greater
b) Vertical joints shall be offset a minimum of 5t where t is the plate
thickness of the thicker course at the point of offset
c) Vertical joints shall be offset a minimum of 5t where t is the plate
thickness of the thinner course at the point of offset
d) Vertical joints shall be offset a minimum of 5 inches or 5t which ever is
less
ANS: b
10.4.2 Welding
10.4.2.1 Provisions shall be made during the reconstruction of a tank to
ensure that weld spacing requirements of Figure 9.1 are maintained. New
vertical joints in adjacent shell courses, made in accordance with 10.3.3.1,
shall not be aligned but shall be offset from each other a minimum distance of
5t, where t is the plate thickness of the thicker course at the point of the offset.
Charlie Chong/ Fion Zhang
6
2
Q9. What is the maximum permissible undercut of the base metal for vertical
joints?
a) 1/64
b) 1/32
c) 1/19
d) 1/16
ANS: a
Q10. What is the maximum permissible undercut of the base metal for
horizontal joints?
a) 1/64
b) 1/32
c) 1/19
d) 1/16
ANS: b
Q13. What are the requirements for making tack welds according API-653?
a) If the tack weld is to be removed, it must be made using qualified weld
procedure and qualified welder
b) If the tack weld is to remain in place, it must be made using qualified
weld procedure and qualified welder
c) If the tack weld is to remain in place, it may be made using any weld
procedure acceptable to the owner/operator
d) If the tack weld is to be removed, it may be made by any welder
wishing to gain experience provided the process is the SMAW process
ANS: B
Q14. All coatings must be removed from the weld area prior to welding except
weldable primer coatings. What must done if these primer coatings are used?
a) Weldable primer coatings must also be removed
b) If the coating is applied by brush it may remain provided the application
is performed to a written procedure
c) They shall be included in welding procedure qualification tests for
brand, formulation, and maximum thickness of primer applied
d) They shall be included in welding procedure qualification tests for the
method of application either by brushing or by spraying or a combination
of the two.
ANS: C
Q15. When welding tank bottoms, when should the shell-to-bottom weld be
completed?
a) This joint (except for door sheets) can be welded as soon as the
bottom plates are laid out and welded
b) This joint (except for door sheets) shall be welded as soon as the first
bottom weld joint is completed to prevent distortion
c) This joint (except for door sheets) shall be welded as work progresses
around the tank bottom
d) This joint (except for door sheets) shall be completed before the
welding of bottom joints
ANS: D
Q16. What is the maximum permissible misalignment of vertical joints in shell
plates that are .9375 thick?
a) .125
b) .09375
c) .009375
d) .0125
ANS: a
Charlie Chong/ Fion Zhang
Q27. The top of the concrete ringwall of a reconstructed tank, that is 115 feet
in diameter, must be level within 1/8 in any 30 feet of circumference. What
is the tolerance measured from the average elevation?
a) 1/8
b) 3/16
c) 1/2
d) 1/4
ANS: d
Q28. Where concrete ringwalls are not provided, the foundation under the
shell shall be level to within what tolerances?
a) 1/8 in any 30 of the circumference and 1/2 in the total
circumference measured from the average elevation
b) 1/8 in any 10 of the circumference and 1/2 in the total
circumference measured from the average elevation
c) 1/8 in any 10 of the circumference and 1/4 in the total
circumference measured from the average elevation
d) 1/8 in any 30 of the circumference and 1/4 in the total
circumference measured from the average elevation
ANS: b
Section 9
Welding
Q5. At what intervals must the welder and welding operators identification be
stamped adjacent to the completed welds?
a) Identification shall be at intervals not to exceed 9 feet
b) Identification shall be at intervals not to exceed 7.5 feet
c) Identification shall be at intervals not to exceed 6 feet
d) Identification shall be at intervals not to exceed 3 feet
ANS: d
Q6. In lieu of stamping, a record may be kept that identifies the welder or
welding operator for each welded joint.
a) True
b) False
ANS: a
Section 10
Examination & Testing
Q5. How and when does API Standard 653 require the examination of welds
of completed stress relieved assemblies?
a) Completed welds of stress relieved assemblies shall be examined
visually only after stress relief and hydrostatic test
b) Completed welds of stress relieved assemblies shall be examined
visually as well as by ultrasonic methods after stress relief but before
hydrostatic test
c) Completed welds of stress relieved assemblies shall be examined
visually as well as by magnetic particle or liquid penetrant methods after
stress relief but before hydrostatic test
d) Completed welds of stress relieved assemblies shall be examined
visually or by radiography after stress relief but before hydrostatic test
ANS: c
12.1.2.4 Completed welds of stress-relieved assemblies shall be examined by
the magnetic particle or liquid penetrant methods after stress relief, but before
hydrostatic testing.
Q6. Completed butt welds between insert plates and the shell require what
type and extent of examination?
a) Complete radiography
b) Spot Radiography
c) Random Radiography
d) Random Spot Radiography
ANS: a
12.2.1.8 For penetrations installed using insert plates as described in 9.8.6,
the completed butt welds between the
insert plate and the shell plate shall be fully radiographed.
Q7. In repairing butt weld flaws, what type and extent of examination is
required by API-653?
a) Random examination by radiography or ultrasonic methods of the full
length of repair
b) Examined full length of the repair by liquid penetrant or magnetic
particle methods
c) Examined at three foot intervals by radiography or ultrasonic methods
d) Examined full length of the repair by radiography or ultrasonic methods
ANS: d
Q8. Completed repairs of fillet welds shall be examined over their full length
by the appropriate nondestructive method listed in API-653.
a) True
b) False
ANS: a
Q9. With regards to new welds attaching shell plate to shell plate, what
method(s) of examination is/are required on the completed weld?
a) Visual
b) Visual and Radiography
c) Visual and magnetic particle or liquid penetrant
d) Visual and ultrasonic
ANS: b
Q10. With regards to new welds attaching shell plate to shell plate for plate
thickness greater than one inch, what additional extent and method of
examination is required by API-653?
a) The back gouged surface of the root and final pass (each side) shall be
examined for its complete length by the Inspector
b) The back gouged surface of the root and final pass (each side) shall be
examined for its complete length visually
c) The back gouged surface of the root and final pass (each side) shall be
examined for its complete length by magnetic particle or liquid penetrant
d) The back gouged surface of the root and final pass (each side) shall be
examined for its complete length by ultrasonic
ANS: c
Charlie Chong/ Fion Zhang
Q11. New welding on the shell-to-bottom joint shall be inspected for its entire
length by _____ and _______ or ________.
a) Visual examination, liquid penetrant , magnetic particle
b) Right-angle vacuum box and solution film, light diesel oil
c) Visual examination, ultrasonic, eddy current
d) Visual examination, wet fluorescent magnetic particle, helium tracer
gas
ANS: a
Q12. In applying light diesel oil to the opposite side of the first pass of new
shell-to-bottom joints, how long must the oil remain on the weld and what is
the weld inspected for?
a) The oil shall be allowed to stand at least four hours and the weld
inspected for wicking action
b) The oil shall be allowed to stand at least three hours and the weld
inspected for wicking action
c) The oil shall be allowed to stand at least two hours and the weld
inspected for wicking action
d) The oil shall be allowed to stand at least one hour and the weld
inspected for wicking action
ANS: a
Q13. The existing weld at the shell-to-bottom joint shall be examined visually
and magnetic particle or liquid penetrant methods, for the full length under a
welded-on patch plate. How much additional shell-to-bottom joint must be
examined?
a) Three inches on each side of the patch plate
b) Six inches on each side of the patch plate
c) nine inches on each side of the patch plate
d) twelve inches on each side of the patch plate
ANS: d
Q14. How and to what extent are newly welded bottom joints tested?
a) Newly welded bottom joints shall be tested their entire length using
liquid penetrant
b) Newly welded bottom joints shall be tested their entire length using a
vacuum box and a solution film, or a tracer gas and detector
c) Newly welded bottom joints shall be tested their entire length using
visual and ultrasonic examination
d) Newly welded bottom joints shall be tested their entire length using wet
fluorescent magnetic particle examination
ANS: b
Charlie Chong/ Fion Zhang
Q26. Major repair and major alteration is defined by API-653 by which of the
following?
a) Cutting, addition, removal and/or replacement of the annular plate ring
only if the plate is less than 1/2" thick
b) Cutting, addition, removal an/or replacement of the annular plate ring,
the shell-to-bottom weld, or a sizeable portion of the shell
c) Cutting, addition, removal an/or replacement of the annular plate ring,
the shell-to-bottom weld, or a 100 square inch portion of the shell
d) Cutting, addition, removal an/or replacement of the annular plate ring,
the shell-to-bottom weld, or a sizeable portion of the shell in shell material
greater than 3/4" thick
ANS: b
Q27. Of the following, which would not be considered a major repair or
alteration?
a) The installation of a shell penetration NPS 12 above the design liquid
level
b) The installation of a shell penetration NPS 12 below the design liquid
level
c) Jacking of a tank shell
d) The complete of partial removal and replacement of more than 12
Q28. A full hydrostatic test of the tank is not required for major repairs and
alterations when certain conditions are met. Where would you look for these
conditions?
a) API-650 Paragraph 5.3.6
b) API-RP-575 Paragraph 7.5
c) API-510 Paragraph 6.4
d) API-653 Paragraph 10.3.2
ANS: d
Q29. Hydrostatic testing is not required for shell repairs when all but which of
the following are complied with?
a) Impact test requirements shall follow appropriate portions of API-650
and must be specified in the repair procedure
b) New vertical and horizontal shell butt-welds must have complete
penetration and fusion
c) New materials shall meet the current edition of ASME Section II Part A
d) Finished weld must be examined by radiography
ANS: c
Q32. The tank settlement shall initially be surveyed with the tank empty. What
is the minimum number of settlement measurement points for a tank which is
110 feet in diameter?
a) Minimum number of settlement points is 11
b) Minimum number of settlement points is 32
c) Minimum number of settlement points is 8
d) Minimum number of settlement points is 12
ANS: d
Q33. The tank settlement shall initially be surveyed with the tank empty. What
is the minimum number of settlement measurement points for a tank which is
60 feet in diameter?
a) Minimum number of settlement points is 12
b) Minimum number of settlement points is 6
c) Minimum number of settlement points is 8
d) Minimum number of settlement points is 4
ANS: c
Section 11
Marking
Q2. Where should the new nameplate be attached and what should be done
with the existing nameplate
a) The new nameplate shall be attached to the tank shell adjacent to the
existing nameplate. The existing nameplate shall be cleaned or suitably
reconditioned
b) The new nameplate shall be attached to the tank shell adjacent to the
existing nameplate. The existing nameplate shall be left attached to the tank
c) The new nameplate shall be attached to the tank shell adjacent to the
existing nameplate. The existing nameplate shall be removed and placed in
the tank record file
d) The new nameplate shall be attached to the tank shell adjacent to the
existing nameplate. The existing nameplate shall then be discarded
ANS: b
Q3. All but which of the following information shall be made part of the
owner/operator's records for aboveground storage tanks?
a) Names of all operators of the tank
b) Calculations
c) Construction and repair drawings
d) Additional supporting data
ANS: a
Section 12
Appendix B Evaluation of Tank Bottom
Settlement
Q3. Internal measurement for tank bottom settlement taken across the
diameter of the tank must be taken at what maximum spacing?
a) 10 feet
b) 24 feet
c) 32 feet
d) 4 feet
ANS: a
Q4. Which of the following is not listed as settlement component?
a) Uniform settlement
b) Rigid body tilting of a tank (planar tilt)
c) Out-of-plane settlement (differential settlement)
d) Soil undermining (total tank sinking)
ANS: d
Q7. What is the maximum depth of a local depression in a tank bottom if the
radius of an inscribed circle is equal to 7.5 feet?
a) BB = .2775 inches
b) BB = 2.775 inches
c) BB = 27.75 inches
d) BB = .02775 inches
ANS: BB = 0.37R = B
Good Luck!