Design Workshop
Presented
By
Barry Clayton
Paul Adu
4 November 2009
#
1
Fidic Yellow book Design Workshop
Content
1. Particulars Conditions of Contract 5.1, 5.4, 5.8
4.
5. Review Timetable
2
Fidic Yellow book Design Workshop
1.Particular Conditions
of Contract
3
Fidic Yellow book Design Workshop
Design-Build Contract
Particular Conditions
Clause 5.1
4
Fidic Yellow book Design Workshop
5
Fidic Yellow book Design Workshop
6
Fidic Yellow book Design Workshop
7
Fidic Yellow book Design Workshop
5.4
Technical Standards and Regulations
(Continued)
(b)
8
Fidic Yellow book Design Workshop
5.8
Design Errors
9
Fidic Yellow book Design Workshop
2. CL-JV Obligations
Under Addendum 8
10
Fidic Yellow book Design Workshop
11
Fidic Yellow book Design Workshop
Design Meetings
Engineer's Design Team shall:
12
Fidic Yellow book Design Workshop
Interim design
Detailed design
13
Fidic Yellow book Design Workshop
14
Fidic Yellow book Design Workshop
Such review does not relieve the Contractor in any way from the
design responsibility or the adequacy of any measures being
proposed.
Drawings
The Engineer shall review the key and critical Contractor's Drawings:
design,
construction,
workshop,
installation,
fabrication and
shop drawings
Prepared by the Contractor that are required for execution of the
Works. The drawings will be checked against Client's Requirements
as described in the Contract Documents.
16
Fidic Yellow book Design Workshop
Calculations
17
Fidic Yellow book Design Workshop
Specifications
Review the Contractors' specifications* that are required for
execution of the Works.
The specifications will be assessed against Employer's
Requirements as specified in the contract documents as well as best
practice in the region.
18
Fidic Yellow book Design Workshop
19
Fidic Yellow book Design Workshop
Under the FIDIC Yellow Book Form of Contract the relevant work
discipline responsible from the Engineer's Design Team will
participate in project hand-over meetings with Contractors and
Contractors' designers and will assist in answering queries related
to the tender designs and ensure that the design is adhered to by
the Contractors and their designers [ Chaired by the Engineer or his
assistants]
20
Fidic Yellow book Design Workshop
3. GENERAL CONTRACT
REQUIREMENTS
21
Fidic Yellow book Design Workshop
22
Fidic Yellow book Design Workshop
The Contractors scope of work shall include, but not be limited to, the
following:
23
Fidic Yellow book Design Workshop
Contractor's Acceptance of
Employer's Design
The Contractor shall:
24
25
Fidic Yellow book Design Workshop
Code "A" -
Code "B" -
Code "C" -
26
Fidic Yellow book Design Workshop
4. CL-JV/ Contractor
Design Review
Procedure
27
Fidic Yellow book Design Workshop
Objective
Scope
Design Deliverables
CL-JV Contractor
CL-JV Contractor
Reporting
CL-JV Contractor
Standard Checklists
CL-JV Contractor
28
Fidic Yellow book Design Workshop
CL-JV Contractor
CL-JV Contractor
Site plans
All elevations
Key sections
Drawings: These are typically presented at the smallest scale that can clearly
illustrate the concept, for larger buildings and 1:100 or 1:50 for smaller
buildings and interiors.
29
Fidic Yellow book Design Workshop
Mock-ups
Equipment layouts
30
Fidic Yellow book Design Workshop
31
Fidic Yellow book Design Workshop
5. Review Timetable
32
Fidic Yellow book Design Workshop
*Note
CL-JV Green Team Discipline Leads shall facilitate
with (where appropriate) ADPi & Stakeholders in
attendance.
The objective of the Pre-submittal Review Meetings is
to ensure that when a final submittal package is made,
no major issues should remain.
The Contractor has to verify during the pre-review
process that his proposed submission satisfies the
Employer's Requirements
** The Contractor provides notice that the submission
complies with the Contract.
33
Fidic Yellow book Design Workshop
Should the
submission be
rejected by the
Engineer/Submitt
als Committee,
The Contractor
shall then have 7
days to revise and
resubmit the
submission.
If Revision is
necessary The
Contractor shall
allow a further 14
days for the
Engineer/Submitta
ls Committee to
review and
comment.
34