Sunteți pe pagina 1din 17

SCHLUMBERGER WELL SERVICES ECUADOR

Liner de Produccion 7

TY

Liner de Produccion 7

Caudal Presin Presin + 20%


bpm

Psi

Psi

500

600

800

960

1200

1440

1800

2160

10

2400

2880

100
80
70
120

160

40

80
Time (min)

120

160

60

80
Time (min)

50

40

40

10

20

30

Q in
Q out

Mud Flow Rate (bbl/min)


12
4
8

Efficiency

90

Mud Cement Head Pressure

Efficiency (%)

Mud Surf. Press. (psi) (x 1000)


0
3
1
2

Circulation Efficiency
At 11755 ft

5
Volume ( )

10

Liner de Produccion 7

ft
0

deg
100

deg/100ft
40

Deviation

1
DLS

15000

10000

5000

Betw een Cent.


At Cent.

Fluid Sequence

Pipe Standoff

Deviation

Dogleg Severity

Liner de Produccion 7

Liner de Produccion 7

Liner de Produccion 7

Liner de Produccion 7

Liner de Produccion 7

Original fluid
Displacement Volume
Drill Pipe Volume
Total Volume
TOC

Name
Acido
Agua
MUDPUSH II
Lavador
Solucion silicato
Lavador
ScavengerPlus
Lead Slurry
Tail
Agua
Mud

Mud
k : 1.06E-2 lbf.s^n/ft2
240.8 bbl
202.1 bbl
434.8 bbl
10035.9 ft

Volume
(bbl)
20.0
3.0
40.0
20.0
30.0
15.0
20.0
15.0
31.0
50.0
190.8

Ann. Len
(ft)
456.4
68.5
913.4
454.0
645.5
322.7
430.3
435.8
852.9

9.50 lb/gal
n : 0.629

Top
(ft)
7175.5
7631.9
7700.4
8613.7
9067.8
9713.2
10035.9
10466.2
10902.1
8827.1
0.0

Frac
Pore
Collapse
Burst
Csg.Pump out
Check Valve Diff Press

Density
(lb/gal)
8.40
8.32
12.50
8.37
10.27
8.37
13.50
15.80
17.00
8.32
9.50

2607 psi
872 psi
4160 psi
7240 psi
109 ton
735 psi

Ty : 2.50 lbf/100ft2

Rheology
k:4.83E-5 lbf.s^n/ft2
viscosity:1.000 cP
k:3.48E-2 lbf.s^n/ft2
viscosity:3.913 cP
k:1.82E-4 lbf.s^n/ft2
viscosity:3.913 cP
k:3.80E-2 lbf.s^n/ft2
k:3.80E-2 lbf.s^n/ft2
k:4.95E-2 lbf.s^n/ft2
viscosity:1.000 cP
k:1.06E-2 lbf.s^n/ft2

at 11755.0 ft
at 10890.0 ft
at 11700.0 ft
at 11700.0 ft

n:0.992

Ty:0.69 lbf/100ft2

n:0.522

Ty:7.31 lbf/100ft2

n:0.813

Ty:0.66 lbf/100ft2

n:0.689
n:0.540
n:0.639

Ty:7.40 lbf/100ft2
Ty:6.89 lbf/100ft2
Ty:10.31 lbf/100ft2

n:0.629

Ty:2.50 lbf/100ft2

Liner de Produccion 7

Name

Flow Rate
(bbl/min)

Acido
Agua
MUDPUSH II
Lavador
Solucion silicato
Lavador
ScavengerPlus
Lead Slurry
Tail
Agua
Mud
Mud
Mud
Mud
Mud

Frac
Pore
Collapse
Burst

5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
4.0
8.5
8.5
6.0
3.0
4.0
3.0

1209 psi
563 psi
4160 psi
5729 psi

Volume
(bbl)

Stage Time
(min)

20.0
3.0
40.0
20.0
30.0
15.0
20.0
15.0
31.0
50.0
100.0
40.0
12.0
25.0
13.8

4.0
0.6
8.0
4.0
6.0
3.0
4.0
3.0
7.8
5.9
11.8
6.7
4.0
6.3
4.6

Total

01:19
hr:mn

at 11755.0 ft
at 10890.0 ft
at 11700.0 ft
at 10690.0 ft

Cum.Vol
(bbl).
20.0
3.0
40.0
20.0
30.0
15.0
20.0
15.0
31.0
50.0
100.0
140.0
152.0
177.0
190.8
434.8 bbl

Inj.
Temp.
(degF)
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80

Comments

Liner de Produccion 7

Top of centralization
Bottom Cent. MD
Casing Shoe
NB of Cent. Used
NB of Floating Cent.

:10712.5 ft
:11735.0 ft
:11755.0 ft
:21
:21

Bottom MD
(ft)
10915.0
11755.0

Cent. /
Joint
0/0
1/1

Nbr.
0
21

Cent. Name

Code

CENTEK

CT-S

Casing
OD
(in)
7

Cent. Name

CENTEK

Max.
OD
(in)
8.500

Code

CT-S

Min. OD Rigid
(in)
7.780

No

Min. STO
(%)
0.0
43.0

Origin

Hole Size
(in)

CENTEK

8.500

Running
Force
(lbf)
0.00

@ Depth
(ft)
10929.6
11755.0

Restoring
Force
(lbf)
2650.00

Liner de Produccion 7

10

Ann. Pressure (lb/gal)


11
12
13

14

15

16

Depth = 11755 ft
Frac
Pore
Hydrostatic
Dynamic

10

20

30

40
50
Time (min)

60

70

80

90

Liner de Produccion 7

Liner de Produccion 7

Liner de Produccion 7

Liner de Produccion 7

Liner de Produccion 7

S-ar putea să vă placă și