Documente Academic
Documente Profesional
Documente Cultură
Liner de Produccion 7
TY
Liner de Produccion 7
Psi
Psi
500
600
800
960
1200
1440
1800
2160
10
2400
2880
100
80
70
120
160
40
80
Time (min)
120
160
60
80
Time (min)
50
40
40
10
20
30
Q in
Q out
Efficiency
90
Efficiency (%)
Circulation Efficiency
At 11755 ft
5
Volume ( )
10
Liner de Produccion 7
ft
0
deg
100
deg/100ft
40
Deviation
1
DLS
15000
10000
5000
Fluid Sequence
Pipe Standoff
Deviation
Dogleg Severity
Liner de Produccion 7
Liner de Produccion 7
Liner de Produccion 7
Liner de Produccion 7
Liner de Produccion 7
Original fluid
Displacement Volume
Drill Pipe Volume
Total Volume
TOC
Name
Acido
Agua
MUDPUSH II
Lavador
Solucion silicato
Lavador
ScavengerPlus
Lead Slurry
Tail
Agua
Mud
Mud
k : 1.06E-2 lbf.s^n/ft2
240.8 bbl
202.1 bbl
434.8 bbl
10035.9 ft
Volume
(bbl)
20.0
3.0
40.0
20.0
30.0
15.0
20.0
15.0
31.0
50.0
190.8
Ann. Len
(ft)
456.4
68.5
913.4
454.0
645.5
322.7
430.3
435.8
852.9
9.50 lb/gal
n : 0.629
Top
(ft)
7175.5
7631.9
7700.4
8613.7
9067.8
9713.2
10035.9
10466.2
10902.1
8827.1
0.0
Frac
Pore
Collapse
Burst
Csg.Pump out
Check Valve Diff Press
Density
(lb/gal)
8.40
8.32
12.50
8.37
10.27
8.37
13.50
15.80
17.00
8.32
9.50
2607 psi
872 psi
4160 psi
7240 psi
109 ton
735 psi
Ty : 2.50 lbf/100ft2
Rheology
k:4.83E-5 lbf.s^n/ft2
viscosity:1.000 cP
k:3.48E-2 lbf.s^n/ft2
viscosity:3.913 cP
k:1.82E-4 lbf.s^n/ft2
viscosity:3.913 cP
k:3.80E-2 lbf.s^n/ft2
k:3.80E-2 lbf.s^n/ft2
k:4.95E-2 lbf.s^n/ft2
viscosity:1.000 cP
k:1.06E-2 lbf.s^n/ft2
at 11755.0 ft
at 10890.0 ft
at 11700.0 ft
at 11700.0 ft
n:0.992
Ty:0.69 lbf/100ft2
n:0.522
Ty:7.31 lbf/100ft2
n:0.813
Ty:0.66 lbf/100ft2
n:0.689
n:0.540
n:0.639
Ty:7.40 lbf/100ft2
Ty:6.89 lbf/100ft2
Ty:10.31 lbf/100ft2
n:0.629
Ty:2.50 lbf/100ft2
Liner de Produccion 7
Name
Flow Rate
(bbl/min)
Acido
Agua
MUDPUSH II
Lavador
Solucion silicato
Lavador
ScavengerPlus
Lead Slurry
Tail
Agua
Mud
Mud
Mud
Mud
Mud
Frac
Pore
Collapse
Burst
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
4.0
8.5
8.5
6.0
3.0
4.0
3.0
1209 psi
563 psi
4160 psi
5729 psi
Volume
(bbl)
Stage Time
(min)
20.0
3.0
40.0
20.0
30.0
15.0
20.0
15.0
31.0
50.0
100.0
40.0
12.0
25.0
13.8
4.0
0.6
8.0
4.0
6.0
3.0
4.0
3.0
7.8
5.9
11.8
6.7
4.0
6.3
4.6
Total
01:19
hr:mn
at 11755.0 ft
at 10890.0 ft
at 11700.0 ft
at 10690.0 ft
Cum.Vol
(bbl).
20.0
3.0
40.0
20.0
30.0
15.0
20.0
15.0
31.0
50.0
100.0
140.0
152.0
177.0
190.8
434.8 bbl
Inj.
Temp.
(degF)
80
80
80
80
80
80
80
80
80
80
80
80
80
80
80
Comments
Liner de Produccion 7
Top of centralization
Bottom Cent. MD
Casing Shoe
NB of Cent. Used
NB of Floating Cent.
:10712.5 ft
:11735.0 ft
:11755.0 ft
:21
:21
Bottom MD
(ft)
10915.0
11755.0
Cent. /
Joint
0/0
1/1
Nbr.
0
21
Cent. Name
Code
CENTEK
CT-S
Casing
OD
(in)
7
Cent. Name
CENTEK
Max.
OD
(in)
8.500
Code
CT-S
Min. OD Rigid
(in)
7.780
No
Min. STO
(%)
0.0
43.0
Origin
Hole Size
(in)
CENTEK
8.500
Running
Force
(lbf)
0.00
@ Depth
(ft)
10929.6
11755.0
Restoring
Force
(lbf)
2650.00
Liner de Produccion 7
10
14
15
16
Depth = 11755 ft
Frac
Pore
Hydrostatic
Dynamic
10
20
30
40
50
Time (min)
60
70
80
90
Liner de Produccion 7
Liner de Produccion 7
Liner de Produccion 7
Liner de Produccion 7
Liner de Produccion 7