Sunteți pe pagina 1din 151

Huawei RAN

Features & Parameters


Node B Products of Huawei

www.huawei.co
m

Apr. 2006

HUAWEI TECHNOLOGIES CO., LTD.

Packet Scheduling
Power Control
Load Control
Mobility
HSDPA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 2

Overview of Packet Scheduling


Purpose:
Scheduling the limited resources between NRT users
Optimize the utilization of system resources
Improve the throughput of the system

Methods:
RAB to RB mapping
Bit rate switching (DCCC, DCH only)
TVM (Traffic Volume Measurement) based bit rate switching
Coverage based bit rate switching
Load based bit rate reduction
RRC state switching
Packet scheduling of HSDPA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 3

RAB-to-RB Mapping
TVM based Bit Rate Switching
Coverage based Bit Rate Switching
RRC State Switching

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 4

Objective of RAB-to-RB Mapping

Objective:
RB parameters configuration according to QoS of the requested RAB

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 5

RB Mapping Criteria and Contents


Criteria:
UE capabilities complied
Efficiently make use of the limited radio resources
Guarantee QoS requirement
Contents:
Channel type selection
RB parameter configuration

Background

RB on CCH

Interactive
Streaming

Mapping

Conversational

HUAWEI TECHNOLOGIES Co., Ltd.

RB on DCH
RB on HS-DSCH

HUAWEI Confidential

Page 6

Channel Type Mapping


Mapping principle:
Domain
Signaling
CS

PS

Traffic Class

Transport Channel
DCH or CCH

Conversational

DCH

Streaming
Conversational

DCH

Streaming

DCH or HS-DSCH

Interactive

DCH or CCH or HS-DSCH

Background

Main parameters:
MML command

Parameter name

Parameter ID

Default value

SET

DL BE traffic DCH decision threshold

DlBeTraffDecThs

8 kbps

UFRCCHLTYPEPARA

UL BE traffic DCH decision threshold

UlBeTraffDecThs

SET

DL BE traffic threshold on HSDPA

DlBeTraffThsOnHsdpa

64kbps

DL streaming threshold on HSDPA

DlStrThsonHsdpa

64kbps

UFRCCHLTYPEPARA
SET
UFRCCHLTYPEPARA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 7

RAB-to-RB mapping
TVM based Bit Rate Switching
Coverage based Bit Rate Switching
RRC State Switching

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 8

Traffic Volume Measurement (TVM)


Transport channel
traffic volume

Traffic Volume:
RLC Buffer Occupancy: the amount of
data in number of bytes that is available
for transmission and retransmission

Taffic Volume < Th

TVM 4B
THRESHOLD

Algorithm parameters:

Threshold
Time
Event 4b

TRAFFIC MEASUREMENT EVENT THRESHOLD


Indicates the threshold to trigger Event 4A/4B.
Default value: 1024/64 byte (4A/4B)

Timer to Trigger

Event 4b

ADD TYPRABDCCCMC

Transport channel
traffic volume

Taffic Volume > Th

TVM 4A

Timer to Trigger:
Indicates the period of time during which the event
condition has to be satisfied, before sending a
Measurement Report
Default value: 240/5000 ms (4A/4B)

Threshold

THRESHOLD

Time

Event 4a

Event 4a
Pending time after triggered

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Pending time after trigger:


Indicates the period of time during which it is
forbidden to send any new measurement reports
Default value: 4000/4000 ms (4A/4B)

Page 9

Bit Rate Switching based on TVM Report (Uplink)


Uplink
Rate

SET DCCC
Uplink Bit rate threshold for DCCC

The highest rate

Range: 8 ~ 384kbps
Allocated rate

Adjust
level =3

Uplink mid bitrate

Default value: 64 kbps


Uplink Rate adjust level
Range: 2 or 3
Default value: 2

Adjust
level =2
Uplink bitrate threshold for DCCC

Time

Event 4b

Event 4b

Bit rate down-switch

HUAWEI TECHNOLOGIES Co., Ltd.

Event 4a

Event 4a

Bit rate up-switch

HUAWEI Confidential

Page 10

Bit Rate Switching based on TVM Report (Downlink)

Downlink
Maximum bit rate

Rate

SET DCCC
The highest rate

Downlink Bit rate threshold for


Adjust
level =3

Allocated rate

Range: 8 ~ 384kbps

Downlink mid bitrate threshold

Default value: 64 kbps

Adjust
level =2

Downlink Rate adjust level

Downlink bitrate threshold for DCCC

Range: 2 or 3
Time

Event 4b

Event 4b

DCCC

Event 4a

Bit rate down-switch

HUAWEI TECHNOLOGIES Co., Ltd.

Default value: 2

Event 4a

Bit rate up-switch

HUAWEI Confidential

Page 11

Summary: TVM based Bit Rate Switching


Improve

Rate

the utilization of:

Base station transmission Power

Channelization codes

Iub transmission resources

Source Rate
Dynamic Channel
Configuration

Time
without bit rate switching
with bit bit rate switching
Traffic Volume

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 12

RAB-to-RB mapping
TVM based Bit Rate Switching
Coverage based Bit Rate Switching
RRC State Switching

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 13

Coverage based Bit Rate Switching


Object:
-

Avoid call drop due to power limitation

Guarantee QoS perceived by user

Indicator of Coverage:
-

Downlink Transmitted Code Power

RLC data retransmission


transmit rate

data of 384kbps
data of 144kbps
data of 64 kbps
voice

distance
BS
BS

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 14

Transmitted Code Power Measurement


Measurement:

Power

T1=Measurement Hysteresis Time

Event Triggered (Ea/Eb/Fa/Fb)

Periodic reported after Ea is triggered

Measurement
Threshold 1

T1

T1

T1

Measurement
Threshold 2

Algorithm parameters:
SET UDCCC

Time
Ea

Eb

Periodic
reports

Ea

Event Ea relative threshold


Event E reporting period
Event Eb relative threshold

Power

T1= Measurement Hysteresis Time

EVENT E HYSTERESIS TIME


Event F reporting power margin
Measurement
Threshold 2

T1
T1

T1

Measurement
Threshold 1

Time
Fa

Periodic
reports

Fb

HUAWEI TECHNOLOGIES Co., Ltd.

Fa

EVENT F HYSTERESIS TIME


Event F reporting period
Note:
Absolute threshold of Event E=
maximum DL Power - comparative threshold +
PO3

HUAWEI Confidential

Page 15

RLC Retransmission Monitor


Measurement:
-

RLC PDU retransmission rate is calculated through ACK and NACK feedback

Event A triggered when the retransmission number > threshold

Reported from Layer 2 to Layer 3 within RNC

Algorithm parameters:
ADD TYPRABRLC

RLC Retransmission rate

Event A threshold
RE-TX monitor period
RE-TX MEASURE FILTER COEF
EVENT A TIME TO TRIGGER

Event A threshold

EVENT A PENDING TIME AFTER TRIGGER

Time

SET CORRMALGOSWITCH
RLC_RETRANS_MEASURE_SWITCH

Reporting event A
Time-to-trigger
Time-to-trigger

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Perding time after trigger


Page 16

Bit Rate Switching based on Coverage


Rate

The highest rate

Allocated rate
Downlink mid bitrate threshold

Downlink BE guarantee bitrate

Time

Event Ea
and Event A

Event Ea
and Event A

If RLC retransmission measurement is switched on:


- Rate down switching is performed only when both Event Ea AND Event A are
fulfilled

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 17

RAB-to-RB mapping
TVM based Bit Rate Switching
Coverage based Bit Rate Switching
RRC State Switching

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 18

DCCC - Channel Transition


Channel Transition
SET UESTATETRANS
URA_PCH

CELL_DCH

Event
Event 4b/Timer
4b/Timer

Event
Event 4a
4a

CELL_FAC
H

Paging/Data

Cell
Cell reselection
reselection
Timer/COUNTER
Timer/COUNTER

Event 4b/Timer
Paging/Data
Paging/Data

CELL_PCH

BE DCH to FACH to PCH 4B thd


BE DCH to FACH 4B time to trigger
BE DCH to FACH 4B Pending Time
DCH to FACH transition timer
BE FACH TO DCH 4A threshold
FACH to PCH 4B time to trigger
FACH to PCH 4B Pending Time
FACH to PCH transition timer
CELL RESELECTION TIMER
CELL RESELECTION COUNTER

UE activity
Traffic Volume Report from UE, Event 4a and Event 4b
- Event 4a: Traffic volume is above a threshold -> High active
- Event 4b: Traffic volumes is below a threshold during a configurable time -> Low active
Cell re-selection:
- If number of cell reselections exceeds pre-define counters within the cell reselection timer, the UE is
considered to be in the state of frequent cell reselection
Paging/Data:
- There is data to be transferred

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 19

Summary - Packet Scheduling


Action

Trigger

CELL-DCH to/from CELL-FACH


UE activity (TVM)
Channel Transition

CELL-FACH to/from CELL-PCH


CELL-PCH to/from URA-PCH

UE activity (Cell Reselection)

Downlink rate up-switch

UE downlink activity (TVM)

Downlink rate down-switch

Downlink Quality

Rate Switching
Uplink rate up-switch
Uplink rate down-switch

UE uplink activity (TVM)

Optimize available resources for Best Effort Service


Allocation resources dynamically to increase resource utilisation
Prevent from call drop for users with high data rate service on the cell boarder

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 20

Packet Scheduling - Parameters Structure


RNC

DCH to FACH transition timer

Cell reselection counter

BE HS-DSCH to FACH transition timer

BE FACH to DCH 4A threshold

Realtime Traff DCH to FACH transition timer

BE FACH to HS-DSCH 4A threshold

FACH to PCH transition timer

Realtime Traff DCH to FACH 4B threshold

RadioClass

UESTATETRANS.Class

GlobalParaClass

RAB&SRBClass

TYPRABBASIC.Class

DCCC.Class

TYPRABDCCCMC.Class

DCCC.Class

DCCC strategy

Event F hysteresis time

Uplink bitrate threshold for DCCC

Reporting period unit for event F

Uplink mid bite rate calculate method

Event F reporting period[ms]

Uplink mid bitrate threshold

Event F reporting period[min]

Uplink Rate adjust level

Event Ea relative threshold

Downlink bitrate threshold for DCCC

Event Eb relative threshold

Downlink mid bite rate calculate method

Event E hysteresis time

Downlink mid bitrate threshold

Reporting period unit for event E

Downlink Rate adjust level

Event E reporting period[ms]

Downlink BE guarantee bitrate

Event E reporting period[min]

CELLDCCC.Class

TYPRABRLC.Class
RAB&SRBClass

TYPRABBASIC.Class

Direction

GlobalParaClass

CellClass

UESTATETRANS.Class

TYPRABDCCCMC.Class

Cell reselection timer

TYPRABRLC.Class

4B measurement report monitor time

CellClass

Traffic Measurement Event 4B threshold


Traffic Measurement Event 4A threshold

re-TX monitor period

Time to trigger 4B

re-TX measure filter coef

Time to trigger 4A

Event A threshold

Pending time after trigger 4B

Event A time to trigger

Pending time after trigger 4A

Event A pending time after trigger

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

CELLDCCC.Class

Event F reporting period[ms]


Reporting period unit for event E

Event F reporting period[min]

Downlink BE guarantee bitrate

Event E hysteresis time

Event F hysteresis time

Event E reporting period[ms]

Reporting period unit for event F

Event E reporting period[min]

Page 21

Packet Scheduling
Power Control
Load Control
Mobility
HSDPA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 22

Power Control Overview


Purpose

Action
UL Open-loop Power Control
Open-loop Power Control
DL Open-loop Power Control

UL Inner-loop Power Control


Inner-loop Power Control
DL Inner-loop Power Control

UL Outer-loop Power Control


Outer-loop Power Control
DL Outer-loop Power Control

Fast closed-loop power control to


control the transmit power
according to the RX SIR of the
peer end, to compensate the
fading of radio links

Maintain the communication


quality at the level required by the
service bearer through
adjustment of the SIR target

Reduce the power drift between


links during the soft handover

Downlink Power Balance

HUAWEI TECHNOLOGIES Co., Ltd.

Make a rough estimation of path


loss by means of a downlink
signal, and then to provide a
coarse initial power setting

HUAWEI Confidential

Page 23

Open Loop Power Control


Inner Loop Power Control
Outer Loop Power Control
Downlink Power Balancing

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 24

Open Loop Power Control


Objective
For each UE, before accessing the network, and for each base station when
RL is set up, estimate the initial UL / DL transmit power based on the
downlink path loss calculation

Content
Uplink Open Loop Power Control for PARCH
Uplink Open Loop Power Control for UL DPCCH
Downlink Open Loop Power Control for DL DPCCH

BCH: CPICH channel power


UL interference level

DCH
DCH

PRACH
Node B

HUAWEI TECHNOLOGIES Co., Ltd.

RACH measurement report

UE

CPICH
Ec/Io

Node B

HUAWEI Confidential

UE

Page 25

Uplink Open-loop Power Control on PRACH


PRACHBASIC.
Class

BCH :
CPICH channel power
UL interference level

PRACHUUPARAS.Class
Power increase step

RACH

Max preamble retransmission

Constant value for calculating initial TX power


Measure CPICH_RSCP
Determine the initial transmitted power

RACH.Clsass

Max allowed
UE UL TX
power

Max preamble loop

AICH ACK

Power increase step

Random back-off lower


limit

Data Part

Random back-off upper limit

Power offset

Control Part
Pini

Preambles
HUAWEI TECHNOLOGIES Co., Ltd.

Message
HUAWEI Confidential

Page 26

Uplink Open-loop Power Control on DPCCH


TYPSRB.Class
TYPSRBBASIC.Class

DPCCH Power Offset


Reference BetaC
Reference BetaD

CPICH RSCP

Node B
UE
DPCCH_Initial_Power =
DPCCH_Power_Offset CPICH_RSCP

Various power differences between DPDCH and


DPCCH are defined through gain factors, called
c for DPCCH and d for DPDCH

DPCCH_Power_Offset = PCPICH TRANSMIT


POWER + UL interference + CONSTANT VALUE
CONFIGURED BY DEFAULT
No data on DPDCH

PC Preamble
HUAWEI TECHNOLOGIES Co., Ltd.

SRB Delay
HUAWEI Confidential

Page 27

DPDCH

Open Loop Power Control


Inner Loop Power Control
Outer Loop Power Control
Downlink Power Balancing

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 28

Uplink Inner-loop Power Control

SIR estimation and


compare with SIR target

FRC.Class

TPC

Power control algorithm selection

1500 Hz

SIR target

UL closed loop power control step size

NodeB

UE

UL Inner-loop Power Control


Power control algorithm selection

PCA1: UE adjusts uplink transmit power for each slot; the step
of PCA1 should be 1dB or 2dB by UL CLOSED LOOP POWER
CONTROL STEP SIZE parameter.

-- ALGORITHM1, ALGORITHM2
UL closed loop power control step size
-- 1 or 2 dB

PCA2: The UE adjusts the uplink transmit power for each 5-slot
cycle and the step is 1 dB fixedly.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 29

Downlink Inner-loop Power Control


FRC.Class

TPC

SIR estimation and


compare with SIR target

DL power control mode


FDD DL power control step size

1500 Hz
SIR target
NodeB

UE

DL Inner-loop Power Control


DPC_MODE = 0
The UE sends a unique TPC command in each slot and the TPC
command generated is transmitted in the first available TPC field in the
uplink DPCCH.
DPC_MODE = 1
The UE repeats the same TPC command over 3 slots and the new
TPC command is transmitted such that there is a new command at the
beginning of the frame .

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 30

Open Loop Power Control


Inner Loop Power Control
Outer Loop Power Control
Downlink Power Balancing

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 31

Outer-loop Power Control


TYPRABOLPC.Class

Objective:

TYPSRBOLPC.Class

Keep the quality of communication at the


required level by setting the SIR target for the
fast power control

BLER target value


SIR adjustment step
Maximum SIR increase step
Maximum SIR decrease step

BLER measurement

Maximum SIR target


Minimum SIR target

SIR measurement
and comparing

Comparing

Outer-loop

Inner-loop

BLERtarget setting

SIR target setting


RNC

HUAWEI TECHNOLOGIES Co., Ltd.

Sent TPC command


Node B

HUAWEI Confidential

UE

Page 32

Mechanism of OLPC
N

N1

N2
N: TTI number of SIR adjustment period
N1 TTI number of non DTX period
N2 TTI number of DTX period
N N1 N2

Mechanism:
- Single RAB
> OLPC based on BLER
> OLPC based on DPCCH BER (N1=0, N20)

- Multiple RABs
> SIR target decrease only when all TrCHs request to decrease its SIRtar
If any one of the services requires to increase the SIR target, the maximum value is used for the
adjustment.
If all the services require to reduce the SIR target, the minimum value is used for the adjustment.
> Signaling DCH is involved in OLPC
> Guarantee QoS of all TrCHs

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 33

Open Loop Power Control


Inner Loop Power Control
Outer Loop Power Control
Downlink Power Balancing

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 34

Downlink Power Balance


Objective:
To reduce the power drift between links of different NodeB.
DPB.Class

Node B
DPB measurement report period
DPB measurement filter coefficient

SRNC

DPB triggering threshold

UE

DPB stop threshold


Ratio for max power
DPB adjustment ratio
DPB adjustment period

Pref = (RATIO FOR MAX POWER) / 100 * (Pmax-Pcpich)


+ (1- RATIO FOR MAX POWER / 100) * (Pmin Pcpich)
After starting power balancing, the RNC calculates the UE DL
reference power Pref and sends the Pref to the NodeB by the
DOWNLINK POWER CONTROL REQUEST message

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Max DPB adjustment step

Page 35

Packet Scheduling
Power Control
Load Control
Mobility
HSDPA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 36

Overview
Intelligent Admission Control
Intelligent Congestion Control

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 37

Load Control exists in all phases


Load Control is used to keep system stable, maximize system capacity while
ensuring the coverage and QoS.
Different load control algorithms according to different phases provided:
- Before UE access: Potential User Control (PUC)
- During UE access: Call Admission Check (CAC) and Intelligent Access Control (IAC)
- After UE access: Load Reshuffling (LDR), and Overload Control (OLC)

PUC

LDR
OLC

CAC
IAC

1. Before UE access 2. During UE access

3. After UE access
Time

PUC: Potential User Control


IAC: Intelligent Admission Control
OLC: Overload Control

HUAWEI TECHNOLOGIES Co., Ltd.

CAC: Call Admission Control


LDR: Load Reshuffling

HUAWEI Confidential

Page 38

Load Control for different load level


Tx power
Uplink noise
Icons for different load levels

Cell load (number of subscribers)

Overload congestion occurs


OLC starts: to reduce the cell load
CAC: to prevent new calls into cells with heavy load
ICAC: to increase the access success rate
Load control is
unneeded

Basic congestion occurs


PUC starts: to enable UEs in idle mode to camp on cells with light load
LDR starts: to check and release basic congestion in cells

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 39

Priority Definition in Huawei Implementation


Priority
Consideration

Traffic
Class

Conversational -> Streaming -> Interactive ->


Background

ARP

ARP1 -> ARP2 -> ARP3 ->


ARP14

THP

THP1 -> THP2 -> THP3 ->


THP14
HS-DSCH or
DCH

Bear Type

THP is provided in
RAN6.0.

RAB Integrate Priority Strategy: TC top-priority or ARP top-priority


-For the same TC and ARP
For Interactive with the same ARP, priority is determined by THP.
-Indicator of Carrier Type Priority to control the priority between R99
and HSDPA.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 40

Priority Definition - Example


ARP is the top-priority, and HSDPA over DCH

Services with different ARP/TC/THP/Bear


RAB ID

ARP

Traffic Class

THP Bear Type

Interactive

DCH

Interactive

HSDPA

Conversational

DCH

Background

DCH

Background

HSDPA

Streaming

DCH

HUAWEI TECHNOLOGIES Co., Ltd.

RANK

ARP

Traffic Class

THP Bear Type

Interactive

HSDPA

Interactive

DCH

Conversational

DCH

Streaming

DCH

Background

HSDPA

Background

DCH

TC is the top-priority, and HSDPA over DCH


RANK

Traffic Class

Conversational

DCH

Streaming

DCH

Interactive

HSDPA

Interactive

DCH

Background

HSDPA

Background

DCH

HUAWEI Confidential

Page 41

ARP THP

Bear Type

Priority Definition in Huawei Implementation


User Integrate Priority:
- For multiple-RAB users, determined by the service with the highest
RAB Integrate Priority.

User Priority:
Gold (1)
User Silver (2)
Priority Bronze (3)
Typical Mapping of ARP and User Priority
ARP

10

11

12

13

14

User
Priority

ERROR

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 42

GBR Configuration in Huawei Implementation


For R99 I/B services

Uplink BE Guarantee Bitrate and Downlink BE Guarantee Bitrate are configurable


respectively per cell.

Uplink BE Guarantee Bitrate is used in BE downsizing due to uplink cell basic


congestion.
Downlink BE Guarantee Bitrate is used in BE downsizing due to downlink coverage and
downlink cell basic congestion.

For R99 and HSDPA RT services

GBR is in accordance with the requested guaranteed bit rate in RAB parameters.

For HSDPA I/B services

Different GBRs are configured for Gold/Silver/Copper user.

Gold

Silver

Copper

Uplink

64kbps

64kbps

64kbps

Downlink

64kbps

64kbps

64kbps

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 43

Scheduling Priority used in HSDPA


Traffic class

ARP

Streaming

Interactive

Background

HUAWEI TECHNOLOGIES Co., Ltd.

THP

SPI

14

13

12

10

3~15

3~15

3~15

HUAWEI Confidential

Page 44

Overview

Intelligent Admission Control


Intelligent Congestion Control

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 45

Overview
Resource Admission Check
Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 46

Intelligent Admission Control Overview


RRC connection processing
RRC connection
request

Admission
algorithm

Failed

Failed

DRD

Redirection

Succeeded Succeeded

Iu Qos Negotiation
algorithm switch
UE capability

Scenario
RAB establishment
RAB modification
Inbound relocation
Rate
reconfiguration
hard handover
DCCC
algorithm switch
Cell load
information list LIT
LDM

CRM

RAB processing
Rate
negotiation

Admission
algorithm

PS domain:
maximum rate
negotiation

Load admission

PS and CS
domains:
initial rate
negotiation
PS domain BE
service:
target rate
negotiation

Succe
eded

Code resource
admission
Failed

Iub resource
admission

Failed
Preemption
Succeeded
Succeeded

Credit resource
admission

Failed or not
supported
Queuing
Succeeded

Failed or not
supported
DRD
Succeeded

Others
Service request
denied

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 47

Service request
admitted

Failed

Resource Admission Check Overview


Admission request

Affected users
Procedure

Yes

Users in connected mode


Make decision whether to admit
new users or service upgrade
according to the available system

1. DL Channelization Code

check

2. Radio Resource: Power /

No

Yes
Power resource
based admission?

resources.
Resources to

Code resource
based admission?

No

Yes

Interference

Credit resource
based admission?

3. Credit: Resource
4. Iub transmission bandwidth

No

Yes

For

Maximum user number per Cell /

HSDPA/HSUPA

NodeB

Iub resource
based admission?

No

Yes
Resource admission passed

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 48

Resource admission denied

Overview
Resource Admission Check

Radio Resource

Code Resource

Iub Bandwidth

NodeB CE

Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 49

Admission Check of Radio Resource


Request initiation

UL and DL independently
On the basis of TCP / RTWP

Uplink call
admission desicion

On the basis of equivalent user number


Admitted?

No

Yes
Downlink call
admission desicion

Admitted?

No

Yes
Request admitted

Request rejected

End

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 50

Admission Algorithm Selection


Algorithm 1: based on TCP/RTWP measurement and load increment estimation

Downlink:
Load level definition: TCP (Transmitted Carrier Power)

Uplink:
Load level definition: load factor

UL 1

PN
RTWP

Load increment of the new request is taken into consideration.


Algorithm 2: based on static Equivalent Number of Users calculation

Standard user: 12.2kbps AMR with active factor 100%.


Algorithm 3: based on current TCP/RTWP measurement

Based on TCP/RTWP measurement;


Load increment of the new request is not taken into consideration

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 51

Uplink Admission Algorithm 1 & 3


Uplink admission control request

Get measured RTWP and calculate


the current uplink load factor.

Calculate the increment of the


uplink load due to the request.

UL 1 PN
RTWP
Fun ( Ec / No )

UL, predicted UL U L

Get the predicted uplink load


factor.

Compare the predicted value with


admission threshold

! Increment is always
equal to ZERO when
algorithm 3 is applied

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 52

Downlink Admission Algorithm 1&3


Downlink admission control request

Get measured current TCP

Calculate the increment of the


downlink power due to the request.

Get the predicted downlink total


power

TCP

P Fun ( Ec / No, CPICH _ Ec / No)

Ppredicted TCP P

! Increment is always
Compare the predicted power with
admission threshold

P( N 1)

Ec / N 0 N 1

1
Ec / N 0N 1

HUAWEI TECHNOLOGIES Co., Ltd.

equal to ZERO when


algorithm 3 is applied

PCPICH
(1 ) P ( N )
(CPICH _ Ec / N 0 ) N 1

HUAWEI Confidential

Page 53

UL & DL Admission Algorithm 2


Based on ENU (Equivalent Number of User s calculation)
Standard user:
-12.2kbps AMR with activity factor 100%
-EUN for standard user: 1

ENU for non standard user:


-Uplink

1
k N 1

Ec / N o s tan dard

-Downlink

k N 1

HUAWEI TECHNOLOGIES Co., Ltd.

1
Ec / N o N 1

Ec

Ec

N 0 N 1

N 0 s tan dard

HUAWEI Confidential

Page 54

Priority Handling of Admission Check


Threshold for uplink radio resource admission check
Parameters

Default value

UL Handover access threshold

80

UL threshold of Conv AMR service

75

UL threshold of Conv non_AMR service

75

UL threshold of other services

60

Threshold for downlink radio resource admission check


Parameters

Default value

DL Handover access threshold

85

DL threshold of Conv AMR service

80

DL threshold of Conv non_AMR service

80

DL threshold of other services

75

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 55

Overview
Resource Admission Check

Radio Resource

Code Resource

Iub Bandwidth

NodeB CE

Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 56

Code Management
Code management is used to manage the code resource between all the
physical channels, including common channel (CCH) e.g. PCPICH and
PCCPCH, dedicated channel (DPCH), and shared channel (HSDPA).

Code for DPCH:


- Dynamically allocated

Code for common channel:


- Reserved

Code for HSDPA:


- Shared with R99 (Refer to HSDPA part)

SF=16

CCH

SF=8

SF=
4

HSDPA

DPCH

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 57

Code Allocation Mechanism


On the basis of maximum free sub-tree

Less code
fragments
are left

Reserve the codes


with smallest SF to
improve utilization
rate of whole code
tree.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 58

Overview
Resource Admission Check

Radio Resource

Code Resource

Iub Bandwidth

NodeB CE

Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 59

Admission Check of Iub Bandwidth


DPCH Service
MBR * Active factor

Configurable
per service
type

HSDPA Service
Bandwidth consumption:
GBR * Active factor

HUAWEI TECHNOLOGIES Co., Ltd.

Active
Factor

Traffic Class

Bandwidth consumption:

Common Channels

0.7

SRB

0.5

Telephony (AMR&VOIP)

0.7

R99 Conversational (VP)

R99 Streaming

R99 Interactive

0.5

R99 Background

0.5

HSDPA Streaming

HSDPA Interactive

HSDPA Background

HUAWEI Confidential

Page 60

Scope

NodeB

Overview
Resource Admission Check

Radio Resource

Code Resource

Iub Bandwidth

NodeB CE

Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 61

Admission Check of NodeB Credit


Admission Check:
Credits of local cell
Credits of local cell group
Credits of NodeB

Credit Consumption
Law:
Reported from NodeB
In terms of SF
HSDPA is not involved

HUAWEI TECHNOLOGIES Co., Ltd.

Traffic
Class

Direction

SF

Number of CEs
Consumed

Corresponding
Credits Consumed

3.4 kbps
SRB

DL

256

UL

256

13.6
kbps
SRB

DL

128

UL

64

12.2
kbps
AMR

DL

128

UL

64

64 kbps
VP

DL

32

UL

16

32 kbps
PS

DL

64

UL

32

1.5

64 kbps
PS

DL

32

UL

16

128
kbps PS

DL

16

UL

10

384
kbps PS

DL

UL

10

20

HUAWEI Confidential

Page 62

Overview
Resource Admission Check
Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 63

Rate Negotiation in IAC


UE capabilities
Physical layer capability

384kbps
Maximum allowed bit rate
256kbps

Transport channel capability


RLC capability

128kbps
Initial data rate / Target data rate
64kbps

System load
Channelization codes
32kbps

Iub transmission resources


Radio resources

Scenarios: RAB setup RAB modify, reconfiguration

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 64

Overview
Resource Admission Check
Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 65

Pre-emption and Queuing


High
Priority

Priority based
Pre-empt

Integrate Priority considered:


Low
Priority

- Traffic Class
- Allocation/Retention Priority
- Bear Type (R99/HSDPA)

Pre-emption

- THP (Traffic Handling Priority)

Queuing

Pqueue = Tmax Telapsed


- Telapsed: the time which the service request has queued.
- Tmax: the maximum time which the service request can be
in the queue.

Weight based queuing


Periodically retry

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 66

Overview
Resource Admission Check
Rate Negotiation
Pre-emption / Queuing
Direct Retry / Re-direction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 67

RRC Direct Retry & Re-direction


RRC Connection

RRC DRD is used when UE initiates RRC CONNECTION REQUEST procedure

Direct Retry

but is refused by the original cell.

RRC Connection

RRC Redirection is used to indicate UE to reselect an inter-frequency or GSM

Re-direction

cell if RRC DRD failed.

Cell2
Freq2

Resource
apply

Cell2

Freq2

2 Initially camping

Resource
apply

on cell 1

Cell2

Freq1

Initially camping
on cell 1

RRC Re-Direct to Inter3 Freq or inter-RAT cell

RRC Direct Retry


successfully on cell2

Inter-Freq Cell1

Freq1

1 RRC CONNECTION REQUEST


2 RRC CONNECTION SETUP
3 RRC CONNETION SETUP COMPLETE

HUAWEI TECHNOLOGIES Co., Ltd.

1 RRC CONNECTION REQUEST


2 RRC CONNECTION
REJECT(Redirection info )
3 Cell reselection: Inter-freq access
Or 3 Cell reselection: Inter-RAT access

HUAWEI Confidential

Page 68

Inter-RAT Cell1

RAB Direct Retry


RAB Direct

RAB DRD is used when UE initiates RAB ASSIGNMENT procedure but is refused

Retry

by the original cell and may retry to other cells.

RNC

CN

RNC

Cell2

Freq2

Cell2

3
Inter-RAT Cell1

Inter-Freq Cell1

Freq1
1 RAB Assignment (from CN)
2 SRNS relocation (to CN)
3 Handover from UTRAN
4 Handover Complete
HUAWEI TECHNOLOGIES Co., Ltd.

1 RAB Assignment (from CN)


2 RB SETUP (Freq1)
3 RB SETUP COMPLETE
4 RAB Assignment Resp
HUAWEI Confidential

Page 69

Parameters: Intelligent Admission Control


Pre-emption

1.User priority based pre-emption for R99

Rate

1.PS maximum rate negotiation

2.RAB priority based pre-emption for

Negotiatio

2.PS & CS initial rate negotiation

HSDPA

3.PS target rate negotiation

Max Queuing Time Length

DRD Switch

Queue

1.RAB priority based queuing.

DRD

1.RRC connection direct retry


2.RRC connection redirection
3.RAB direct retry

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 70

Overview
Intelligent Admission Control

Intelligent Congestion Control

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 71

Overview
Load Reshuffling
Overload Control

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 72

State of Cell Load (Radio Resource)


Load%

Overload Congestion
Trigger OLC (overload
control) to quickly decrease
system load

100%
THOLC

THCAC
THLDR

Make system stable


Basic Congestion
Trigger LDR (load
reshuffling) to make room
for more users to access
system, especial for users
with higher priority

Avoid load congestion


Normal
Time

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 73

Intelligent Congestion Control


Iub Transmission Resources

Power Resources

Load Reshuffling (LDR)


Service Quality
Unchanged

Service Quality
Downgraded

Handover

Call Drop

RAN-CN
Renegotiation

Downsizing

AMRC
IF
HO

Overload Control (OLC)

BE rate
reduction

IRAT
HO

For
PS
Streaming

Drop off calls

Fast
TFC
Control

! Integrate priority is used in LDR and OLC.


! Load reshuffling for HSDPA is not available in RAN 5.1.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 74

Drop PS

PS

Drop CS

CS

Overview
Load Reshuffling
Overload Control

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 75

Triggers of LDR
Power Resource:

Check the load of the


serving periodically

Load level > LDR trigger threshold

Iub Bandwidth:
Available Iub bandwidth < predefined threshold

No

Is the load higher than


basic congestion trigger
threshold
Yes

Yes

Take congestion
release measures

MML command

Parameter name

Is the load lower than


basic congestion release
threshold

End load adjustment

Parameter ID

Default value

ADD/MOD UCELLLDM

UL/DL LDR trigger threshold

ULLDRTRIGTHD
DLLDRTRIGTHD

55%
70%

ADD/MOD
TRMLOADTH

Forward congestion remain bandwidth


Backward congestion remain bandwidth

FWDCONGBW
BWDCONGBW

5%
5%

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 76

No

Inter-Frequency Handover in LDR


Candidate target cell:
LDR trigger threshold in target cell current load level in target cell >
Predefined threshold in target cell

Candidate users:

Load: high

Cell 1

Users with the lowest Integrated Priority


Bit rate smaller than the predefined maximum bandwidth

Action:

Load: low

Cell 2

Blind handover
MML command

Parameter name

Parameter ID

ADD/LST/MOD

UL/DL Inter-freq cell load

ULINTERFREQHOCELLLOAD

UCELLLDR

handover load space threshold

SPACETHD

Default
value
20 (%)

DLINTERFREQHOCELLLOAD
SPACETHD

UL/DL Inter-freq cell load

ULINTERFREQHOBWTHD/DL

handover maximum bandwidth

INTERFREQHOBWTHD

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 77

200 (kbps)

BE Rate Reduction in LDR


Candidate Users:

Bit rate

Users with the lowest integrated priority

384kbps

Only BE services are involved.

128kbps

Action:
Reconfiguration

64k

GBR

High

Highest

MML command

Parameter name
UL/DL LDR-BE rate

ULLDRBERATEREDUCTIONR

CELLLDR

reduction RAB number

ABNUM
DLLDRBERATEREDUCTIONR
ABNUM

HUAWEI TECHNOLOGIES Co., Ltd.

Lowest

Parameter ID

ADD/LST/MOD

HUAWEI Confidential

Page 78

64k

Default
value
1

64k

Priority

AMR Rate Reduction in LDR


Candidate service:
AMR service with the lowest integrated priority
Action:
Downlink: Rate control over Iu interface
Uplink: TFC control over Uu interface.

MML command

Parameter name

Parameter ID

ADD/LST/MOD

UL/DL LDR-AMR rate

ULLDRAMRRATEREDUCTIONRA

CELLLDR

reduction RAB number

BNUM
DLLDRAMRRATEREDUCTIONRA
BNUM

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 79

Default
value
3

RT Service QoS Renegotiation in LDR


Candidate service:
PS streaming

Action:
QoS renegotiation over Iu
1) RNC: RAB modification request (Iu)
2) CN: RAB assignment (Iu)
3) RNC: reconfiguration (Iub/Uu)

MML command

Parameter name

Parameter ID

ADD/LST/MOD

UL/DL LDR un-ctrl RT

ULLDRPSRTQOSRENEGRAB

CELLLDR

Qos re-nego RAB num

NUM
DLLDRPSRTQOSRENEGRAB
NUM

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 80

Default
value
1

Inter-RAT Handover of LDR


Candidate target cell:
2G cells with same/bigger coverage as serving 3G cell
Candidate users:

Load: high

User with lowest Integrated Priority

WCDMA

Actions:
PS service inter-RAT handover

GSM CELL

CS service inter-RAT handover

MML command

Parameter name

Parameter ID

ADD/LST/MOD

UL/DL LDR PS inter-

ULLDRPSINTERRATHOUSERNUM

CELLLDR

rat ho user number

DLLDRPSINTERRATHOUSERNUM

UL/DL LDR CS inter-

ULLDRCSINTERRATHOUSERNUM

rat ho user number

DLLDRCSINTERRATHOUSERNUM

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 81

Default
value
1

Summary: Load Reshuffling


Affected users

Users in Connected mode

Procedure

Up to 6 service oriented strategies to use when cell enters basic congestion state.

Related
Parameters

CELLLDR.Class
UL/DL Inter-freq cell load handover load space threshold

1st-6th LDR action sequence

UL/DL Inter-freq cell load handover maximum bound width

UL/DL BE guarantee bit rate

UL/DL LDR-BE rate reduction RAB number


UL/DL LDR un-ctrl RT Qos re-nego RAB num
UL/DL LDR CS inter-rat ho user number
UL/DL LDR PS inter-rat ho user number
UL/DL LDR-AMR rate reduction RAB number

Actions

Inter-frequency load handover

Users in CELL_DCH

BE service rate reduction

Users with BE service

AMR reduction

Users with AMR speech

Inter-RAT load handover in CS domain

Users with CS service

Inter-RAT load handover in PS domain

Users with PS service

Iu Qos renegotiation

Users with Streaming service

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 82

Overview
Load Reshuffling
Overload Control

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 83

Overload Control (OLC)


Actions supported:
TFC Control of R99 BE service
Drop of low priority UEs

Sequence of OLC actions:


Fast TFC control -> Call drop of UEs

Check the load of the


serving periodically

Is the load higher than


overload congestion trigger
threshold

No

Is the load lower than


overload congestion release
threshold

Yes

Yes

Take actions to release


congestion

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

End load adjustment

Page 84

No

Fast TFC Control in OLC


Downlink TFC Control
Performed within MAC-d/RNC

Uplink TFC Control

Monitor Cell Load

RNC -> UE: TFC control


If Cell load >
Congestion threshold

Congestion Detected
and inform MAC
MAC decrease the
max TF number

Congestion Relieved
and infrom MAC

Kill the Adjust Timer

expires
Start a Adjust Timer

MAC increase the


max TF number

expires
Start a Recover Timer

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 85

Parameters of Overload Control


MML command
ADD/LST/MOD

Parameter name
UL/DL OLC trigger threshold

CELLLDM

ADD/LST/MOD

Parameter ID
ULOLCTRIGTHD

Default value
95%

DLOLCTRIGTHD
UL/DL OLC Release threshold

ULOLCRELTHD DLOLCRELTHD

90%

UL/DL OLC fast TF restrict RAB number

ULOLCFTFRSTRCTRABNUM

CELLOLC

DLOLCFTFRSTRCTRABNUM
Data rate restrict coefficient

RATERSTRCTCOEF

68%

DL OLC fast TF restrict data rate restrict

RATERSTRCTTIMERLEN

3S

RATERECOVERTIMERLEN

5S

ULOLCTRAFFRELRABNUM

timer length
DL OLC fast TF restrict data rate recover
timer length
UL/DL OLC traff release RAB number

DLOLCTRAFFRELRABNUM

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 86

Summary: Load Control Parameter Classification


RNC

CELLCAC.Class

CELLOLC.Class

UL threshold of Conv AMR service

UL/DL OLC fast TF restrict times

UL threshold of Conv non_AMR service

UL/DL OLC fast TF restrict RAB number

UL threshold of other services

Data rate restrict coefficient


UL/DL OLC traff release RAB number

RadioClass

GlobalParaClass

CellClass

USERPRIORITY.Class

CELLPUC.Class

UL Handover access threshold

LDM.Class

CELLCAC.Class

DL threshold of Conv AMR service

CORRMALGOSWITCH .Class

CELLLDM.Class

DL threshold of Conv non_AMR service

FRC.Class

CELLLDR.Class

DL threshold of other services

UL/DL LDR trigger threshold

QUEUEPREEMPT.Class

CELLOLC.Class

DL Handover access threshold

UL/DL LDR release threshold

DL total nonhsdpa equivalent user number

UL/DL OLC Trigger threshold

Maximum HSDPA user number

UL/DL OLC Release threshold

CELLLDM.Class

USERPRIORITY.Class

LDM.Class

Integrate Priority Configured Reference

UL/DL basic meas rprt cycle, Unit:10ms

Indicator of Carrier Type Priority

UL/DL basic meas rprt cycle, Unit:min

CORRMALGOSWITCH .Class

FRC .Class

CELLLDR.Class
UL/DL Inter-freq cell load handover load space threshold
UL/DL Inter-freq cell load handover maximum bound width

Switcher for IU QoS Negotiation

Uplink initial access rates

RAB Downsizing Switch

Downlink initial access rates

QUEUEPREEMPT.Class

CELLPUC.Class

UL/DL LDR-BE rate reduction RAB number


UL/DL LDR un-ctrl RT Qos re-nego RAB num
UL/DL LDR CS inter-rat ho user number

Preempt algorithm switch

Load level division threshold 1

UL/DL LDR PS inter-rat ho user number

Queue algorithm switch

Load level division threshold 2

UL/DL LDR-AMR rate reduction RAB number

Poll timer length

Load level division hysteresis

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 87

Load Control Enhancement


Call Admission Check
Intelligent Access Control
Load Reshuffling
Service Differentiation Enhancement

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 88

Power Resource Admission Check


Type

Algorithm

DCH

UL/DL algorithm1

Based on power or interference


(prediction)

UL/DL algorithm2

Based on the equivalent number of users

UL/DL algorithm3

Based on power or interference (without


prediction)

User number check

Control the user number mapped on HSDSCH

PBR admission check

Check the aggregated BE traffic provided


bit rate

Power usage check

Check the power usage for HSDPA BE

User number check

Control the user number mapped on HSDSCH

Check the aggregated Streaming traffic


provided bit rate

Power usage check

Check the power usage for HSDPA


Streaming

User number check

Control the user number mapped on EDCH

UL algorithm2

Based on the equivalent number of users

DL algorithm1

Based on power (prediction)

HSDPA

BE

Streaming

Remark

PBR admission check

HSUPA

MBMS

Support downgrading
power for admission

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 89

RAN6.0

HSUPA Admission Check Procedure


User number admission check
ENU admission check

ADD NODEBALGOPARA

Iub transmission resource admission check


NodeB credit resource admission check

NodeB Max Hsupa User Number

ADD CELLCAC
Maximum HSUPA user number
UL threshold of Conv AMR service

HSUPA access request

UL threshold of Conv non_AMR service


UL threshold of other services

Get the total ENU of all


existing users.

ENU total

Calculate the increment of the


new incoming HSUPA user

ENU new

Forecast the ENU load

Compare the forecast ENU


load with the theshold

HUAWEI TECHNOLOGIES Co., Ltd.

UL Handover access threshold


ENUi

all _ exist _ user

Dl HSUPA reserved factor

E-DPCCH Ec/No and E-DPDCH


Ec/No are calculated based on
DPCCH Ec/No

ENUtotal ENU new


ENU max

( Ec / N 0 ) HSUPA

HUAWEI Confidential

ec2 ed2
2
( Ec / N 0 ) DPCH
2
c d
Page 90

MBMS Admission Check Procedure


Power resource admission check
Code resource admission check
Iub transmission resource admission check
NodeB credit resource admission check
Mechanism of downgrading power for MBMS
admission:
For a high priority MBMS service, the needed power is the maximum
transmit power of FACH. DL threshold of other services is used
for comparison.
ADD CELLLDR

Pnon HSPA Pmbms ,max Thd other Pmax

MBMS descend power RAB priority


threshold

For a low priority MBMS service, the needed power is the maximum
transmit power of FACH. LDR threshold is used for comparison.
If the admission check fails, the needed power is reduced to the
minimum power of FACH.

Pnon HSPA Pmbms ,max Thd ldr Pmax


Pnon HSPA Pmbms ,min Thd ldr Pmax
HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 91

Intelligent Access Control


RRC connection processing
RRC connection
request

Admission
algorithm

Failed

Failed

DRD

Redirection

Succeeded Succeeded

Iu Qos Negotiation
algorithm switch
UE capability

Scenario
RAB establishment
RAB modification
Inbound relocation
Rate
reconfiguration
hard handover
DCCC
algorithm switch
Cell load
information list LIT
LDM

CRM

RAB processing
Rate
negotiation

Admission
algorithm

PS domain:
maximum rate
negotiation

Load admission

PS and CS
domains:
initial rate
negotiation

Succe
eded

Failed

Code resource
admission
Failed

Iub resource
admission

PS domain BE
service:
target rate
negotiation

Preemption
Succeeded
Succeeded

Failed or not
supported
Queuing
Succeeded

Failed or not
supported
DRD

Credit resource
admission

Succeeded

Failed

Others
Service request
denied

Service request
admitted

Iu QoS Negotiation

RAB Downsizing

Preemption

Queuing

DRD

DCH service

HSDPA service

HSUPA service

MBMS service
Triggered by admission
check failure due to the
limitation of EUN, user
number and Iub
transmission

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Triggered by admission
check failure due to the
limitation of power, code and
credit resource
Page 92

Load Reshuffling
Power
Resources

Iub Transmission
Resources

NodeB Credit
Resources

Code Resources

EUN
Monitoring load, trigger
the actions
corresponding to basic
congestion

Load Reshuffling (LDR)


Service Quality
Unchange

Service Quality
Downgrade

RAN-CN
Renegotiation

Downsizing

Handover

CS

AMRC
IF
HO

Code
Reshuffling

IRAT
HO
DCCC

For
PS Streaming

PS

MBMS
Power Downgrading

! Code reshuffling only due to code limitation is supported in RAN6.0.


! MBMS power downgrading only due to power limitation is supported in
RAN6.0.
HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 93

Available Reshuffling Actions And Objects


LDR Actions
Resource

UL/DL

InterFreq HO

BE Rate
Reduction

InterRAT
CS HO

InterRAT PS
HO

AMR
Reduction

Iu QoS
Renegotiation

Code
Reshuffling

MBMS Power
Downgrading

Power
Resource

UL

N.A.

DL

Code
Resource

UL

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

N.A.

DL

UL

DL

UL

DL

UL

N.A.

DL

NodeB Credit

Iub Transport
Resource
ENU

LDR Actions
Object

InterFreq HO

BE Rate
Reduction

InterRAT CS
HO

InterRAT PS
HO

AMR
Reduction

Iu QoS
Renegotiation

Code
Reshuffling

MBMS Power
Downgrading

DCH

N.A.

HSDPA

N.A.

HSUPA

N.A.

MBMS

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 94

Load Reshuffling Due To Power Limitation


Uplink
RTWP based UL LDR

RTWP PN
Thrldr _ trig
RTWP

Downlink
Power based DL LDR

( Pnon hspa min(GBPGBR Ph sup a _ res , Pmax hspa )) Pmax Thrtotal ldr

Reserved power for HSUPA


related DL channels (The
power of downlink control
channels (E-AGCH/ERGCH/E-HICH) )

ADD CELLCAC
Dl HSUPA reserved factor

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 95

Load Reshuffling Due To Code Limitation


Trigger condition
Minimum available SF > reserved SF_Thd

Actions
Code reshuffling
BE rate reduction

ADD CELLLDR
Cell SF reserve threshold
Max user number of code adjust

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 96

Load Reshuffling Due To NodeB Credit Limitation


Trigger condition
UL/DL separate

C NodeB ,UL C NodeB ,current ,UL ThrLdr _ UL


C NodeB , DL C NodeB ,current , DL ThrLdr _ DL

Actions
Inter-RAT PS/CS HO
BE rate reduction

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 97

Load Reshuffling Due To ENU Limitation


Uplink
ENU based UL LDR
K UL

Thrldr _ trig
K Max
UL
UL
UL
K UL K HSUPA
K HUL BE K HUL Stream K DCH
K CCH

Downlink
For R99 cell
N DL N DCH N CCH _ res

N DCH N CCH _ res N max Thrdch ldr


For HSDPA cell
If ENU based DL LDR is enabled, HSDPA users shall not be
selected to perform load reshuffling actions.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 98

Service Differentiation Enhancement


THP consideration

For interactive services, differentiate the priority through THP in the case of same ARP.

Applied to determine the integrate priority

The values of RAB Integrate Priority are set according to the Integrate Priority Configured Reference parameter as follows:
If the value of the parameter is set to Traffic Class, the integrate priority abides by the following rules:
- Classes of services: conversational -> streaming -> interactive -> background
- Services of the same class: priority based on Allocation/Retention Priority (ARP) values
- Only for the interactive service of the same ARP value: priority based on THP
- Services of the same class and priority: HSDPA or DCH service preferred on the basis of the value of the
Indicator of Carrier Type Priority parameter
If the value of the parameter is set to ARP, the integrate priority abides by the following rules:
- ARP1 -> ARP2 -> ARP3 -> ARP14
- Same ARP value: conversational -> streaming -> interactive -> background
- Only for the interactive service of the same ARP: priority based on THP
- Services of the same ARP, class and THP (only for interactive service ): HSDPA or DCH service preferred
on the basis of the value of the Indicator of Carrier Type Priority parameter

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 99

Packet Scheduling
Power Control
Load Control
Mobility
HSDPA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 100

Mobility Management Overview


-Provide the subscribers the continuous communication services
-Load balancing and resources sharing
-Improve the utilization of system resources
Classification
Intra-frequency Soft / Softer / Hard Handover
Functionality

Inter-frequency Handover
Inter-RAT Handover
Coverage Based Handover
Load Based Handover

Motive

UE Speed Based Handover (HCS)


Service Based Handover

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 101

Handover Scenarios
Intra-frequency Handover
Soft / Softer Handover
Hard handover
Based on Coverage

Inter-RAT Handover
Based on

Based on
Based on

Coverage

Load/

Based on

UE Speed

Coverage

WCDMA Freq. 1

Inter-frequency

Load/Service

Handover

GSM/GPRS/EDGE
HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

WCDMA Freq. 2

Page 102

Intra-Frequency Handover
UE Performs IF

RNC Makes Decision

RNC Performs Handover

> 1A Add Cell to AS

> Apply for Resource

MEASUREMENT CONTROL

> 1B Remove Cell in AS

(Admission)

message

> 1C Replace a Cell in AS

> Signaling Procedure

> Measurement Quantity

> 1D Indicate Best cell

Execution

Measurement

> Event Parameters

- Add 1D cell to AS or

> Neighbor cell list, etc.

do replacement
- May do Hard HO

If criteria is matched, UE sends


measurement report.

> Update Parameters to UE

Do Hard HO if conditions are


met.

Measurement
Phase

HUAWEI TECHNOLOGIES Co., Ltd.

Decision
Phase

HUAWEI Confidential

Execution
Handover

Page 103

Intra-Frequency Handover Key Parameters


Event Parameters

> Intra-freq Measure Quantity

Event 1A
> CS/PS service 1A event relative threshold
> 1A hysteresis
> 1A event trigger delay time
Event 1B
> CS/PS service 1B event relative threshold
> 1B hysteresis
> 1B event trigger delay time
Event 1C
> 1C hysteresis
> 1C event trigger delay time
Event 1D
> 1D hysteresis
> 1D event trigger delay time

> Cell offset

Measurement
Phase

HUAWEI TECHNOLOGIES Co., Ltd.

> Max number of cell in active set

Decision
Phase

HUAWEI Confidential

Page 104

Inter-Frequency Handover
HO Triggers
1. Based on Coverage
> UE Event 2D/2F Report

Measurement
1. CM measurement
needed
> Periodical Meas.

2. Based on Load
> LDR Module Report

3. Based on UE Speed
> HCS UE Speed Estimation

> Event Reporting

2D start CM
2F stop CM
2B coverage based
handover
2C load based
handover

2. No Meas. needed

IF HO will be triggered
1. Coverage based
Periodically Reporting:
> Signal Quality of target cell
meet requirement
> Keep Time to Trigger

Event Reporting:
> Received 2B Event

2. LDR choose UE and


target cell to Blind HO

> Blind HO

3. Use blind HO or 2C
Event Reporting

Handover
Trigger

Measurement
Phase

HUAWEI TECHNOLOGIES Co., Ltd.

RNC Perform Handover


1. Apply for Resource
Admission
2. Signaling Procedure
Execution
3. Update Parameters to
UE

3. Blind HO or 2C Event
Report

Decision
Phase

HUAWEI Confidential

Page 105

Execution
Handover

Inter-Frequency Handover Key Parameters


Event 2D

Event 2B

> Inter-frequency measure report mode

> Inter-freq CS/PS measure

> Inter-freq CS/PS

Inter-frequency measure quantity

start Ec/No THD

Target/Used frequency
trigger Ec/No THD

Event 2F

> Inter-frequency measure periodical rpt period (for


periodical reporting mode)

*Thresholds also for RSCP

> Inter-freq CS/PS measure

For Periodical reporting mode

stop Ec/No THD

Event 2C

* Thresholds also for RSCP

> Inter-freq measure target

> Inter-freq CS/PS target frequency trigger Ec/No THD


(thresholds also for RSCP)

> 2D/2F hysteresis

frequency trigger Ec/No

> Inter-freq handover min access Ec/No RSCP THD

> 2D/2F event trigger delay

THD

> HHO hysteresis

time

> 2B/2C hysteresis


> 2B/2C event trigger
delay time

Handover
Trigger

Measurement
Phase

HUAWEI TECHNOLOGIES Co., Ltd.

Decision
Phase

HUAWEI Confidential

Page 106

Inter-RAT Handover
HO Triggers

Measurement

Inter-RAT HO triggered

1. Based on Coverage

1. CM measurement

1. Coverage based

needed

3A Event Reporting:

> UE Event 2D/2F Report

> Event Reporting


2. Based on Load
> LDR Module Report

2D start CM
2F stop CM
3A based on

3. Based on Service
> When a service is

> Periodical Meas.

2/3. Use 3C Event


Reporting.

Handover
Trigger

Periodically Reporting:
> Signal quality of target cell
meet requirement
> Keep Time to Trigger

Reporting

established
> Service HO properties

> Received 3A Event

Measurement
Phase

HUAWEI TECHNOLOGIES Co., Ltd.

The RNC initiates a


handover procedure.

2/3. HO to cells in 3C
Event Report By UE

Decision
Phase

HUAWEI Confidential

Page 107

Execution
Handover

Inter-RAT Handover Key Parameters


Event 2D

Event 3A

> Inter-RAT report mode

> Inter-RAT CS/PS measure

> Inter-RAT CS/PS Used

> 3A Measure Quantity

start Ec/No THD


Event 2F
> Inter-RAT CS/PS measure

frequency trigger Ec/No

> Inter-RAT period report interval

THD (or RSCP)

> BSIC verify switch

> Inter-RAT CS/PS


handover decision THD

stop Ec/No THD


* Thresholds also for RSCP

> 2D/2F hysteresis


> 2D/2F event trigger delay
time

For Periodical reporting mode


> Time to trigger for verified GSM cell

Event 3C

> Time to trigger for non-verified GSM cell

> Inter-RAT CS/PS


handover decision THD

> Inter-RAT CS/PS handover decision THD


> Inter-RAT hysteresis

> 3A/3C hysteresis


> 3A/3C event trigger
delay time

Handover
Trigger

Measurement
Phase

HUAWEI TECHNOLOGIES Co., Ltd.

Decision
Phase

HUAWEI Confidential

Page 108

Packet Scheduling
Power Control
Load Control
Mobility
HSDPA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 109

Overview
Channel Type Mapping and Switching
Power and Code Management
Admission Control
Scheduling
Flow Control
Mobility Management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 110

HSDPA Key Techniques - Overview

AMC

SF16, 2ms and CDM/TDM

HUAWEI TECHNOLOGIES Co., Ltd.

HARQ Hybrid ARQ

16QAM

HUAWEI Confidential

Fast Scheduling

3 New Physical Channels

Page 111

Overview
Channel Type Mapping and Switching
Power and Code Management
Admission Control
Scheduling
Flow Control
Mobility Management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 112

HSDPA Channel Mapping


Interactive, Background and Streaming service could be mapped onto HS-DSCH.
The bit rate thresholds are used.
RABs with maximum bit rate higher than or equal to the threshold will be mapped
onto HS-DSCH.
The bit rate thresholds (DL streaming threshold on HSDPA , DL BE traffic threshold
on HSDPA) are OM configurable.

One switch (PS_STREAMING_ON_HSDPA_SWITCH) is available for operator to


disable the mapping of streaming service onto HS-DSCH.

RB on FACH

Interactive
Background

mapping

RB on DCH

Streaming

HUAWEI TECHNOLOGIES Co., Ltd.

RB on HS-DSCH

HUAWEI Confidential

Page 113

HSDPA Channel Switching


Channel type switching and state transition
CELL_DCH (with HS-DSCH) CELL_FACH based on user
activity
CELL_DCH (with HS-DSCH) CELL_DCH (without HS-DSCH)
SET COIFTIMER
H Retry TimerLength
-- Length of retry timer for periodical
attempts to map the service onto the

SET UESTATETRANS

HS-DSCH.

BE HS-DSCH to FACH 4B threshold

Trigged by mobility
Triggered by TVM
Triggered by timer

BE HS-DSCH to FACH 4B time to trigger


BE HS-DSCH to FACH 4B Pending Time

CELL_DCH(HS-DSCH))

BE HS-DSCH to FACH transition timer


-- This parameter is used to detect the stability of
a UE in low activity state in CELL_DCH (with
HS-DSCH) state.

CELL_DCH

Based on user activity (TVM)

CELL_PCH

CELL_FACH
URA_PCH

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 114

Overview
Channel Type Mapping and Switching
Power and Code Management
Admission Control
Scheduling
Flow Control
Mobility Management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 115

HSDPA Power Allocation


Dynamic power allocation

SET MACHSPARA
Power Margin

DPCHs have the preferential right to


occupy the power
Node B can use all the remaining
power for HSDPA
The minimum available part for HSDPA

Power margin for


DCH power control

can be guaranteed
A configurable margin is used to keep
the system in stable status

Total Power
Allowed power for HSDPA

Time
Higher
power
utility
efficiency

DPCH
Power for CCH
Time

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 116

HSDPA Channel Power Control HS-DPCCH


Power

ADD CELLHSDPCCH
ACKPO1, ACKPO2, ACKPO3

ACK / NACK

ACK / NACK

CQI

NACKPO1, NACKPO2, NACKPO3


CQIPO

CQI
Time

Power

ACKPO1FORSHO, ACKPO2FORSHO,
ACKPO3FORSHO
NACKPO1FORSHO, NACKPO2FORSHO,
NACKPO3FORSHO
CQIPOFORSHO

Uplink DPCCH
Time

Set power offsets between HS-DPCCH and


associated DPCCH for ACK, NACK and CQI
Different PO values are set according to
minimum inter-TTI interval
Different PO values are used for soft handover

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 117

HSDPA Channel Power Control HS-SCCH/HS-PDSCH


ADD MACHSPARA

HS-SCCH Power Control

HS-SCCH Power Control Method

Fixed power control


Based on CQI

HS-SCCH Power
HS-SCCH FER

- CQI reported by UE

Initial HS-SCCH Transmission Power

- DTX detected by Node B

Maximum/Minimum HS-SCCH

- Target FER of HS-SCCH

Transmission Power
HS-SCCH Power Control Adjustment
Period
Step of Power Adjustment

ADD MACHSPARA

HS-PDSCH Power Control

Max Power per H user

Allocated by scheduler
HSDPA power limitation per user

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 118

HSDPA Code Allocation (1)


Static Code Allocation
Simple but robust
The code allocation for HSSCCHs and HS-PDSCHs is
static. It is configurable
Low code utilization efficiency

ADD CELLHSDPA
HS-PDSCH Code Num
--- This parameter sets the number of
HS-PDSCH codes available in a cell.

SF=8
0
SF=4
0

1
2

HUAWEI TECHNOLOGIES Co., Ltd.

SF=256
SF=128 C(256,0): PCPICH
0
SF=64
C(256,1): PCCPCH
0

C(256,2): AICH

1
SF=32
C(256,3): PICH
0
SF=16
C(64,1):SCCPCH 1
0

C(64,2):SCCPCH 2

C(128,6):HS-SCCH 1

3
1

C(128,7):HS-SCCH 2

SF=16
C(16,14):HS-PDSCH 2

C(16,15):HS-PDSCH 1

HUAWEI Confidential

Page 119

CCH
HSDPA
DCH

HSDPA Code Allocation (2)


RNC-Controlled Dynamic Allocation
RNC will continuously monitor the usage of
OVSF codes for DPCH channels
Via RNC reconfiguration procedure
Better code utilization efficiency
0

Codes
for CCH
and HSSCCH

Shared codes
4

Reserved codes for DPCH

10

11

12

13

14

15

Minimum reserved codes for HSDPA


Maximum available codes for HSDPA

ADD CELLHSDPA
Maximum Number of HSPDSCH Codes
-- The maximum number of
HS-PDSCH codes available

SF=16

SF=16

Re-allocated to HSDPA if the codes .used by the established


DPCHs are much less than the codes available

in a cell
Minimum Number of HSPDSCH Codes
-- The minimum number of

SF=16
It will be called back by DPCHs through reconfiguring
the codes for HSDPA if the codes are almost used up by
DPCH channels

HS-PDSCH codes available


in a cell

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 120

HSDPA Code Allocation (3)


NodeB-controlled Dynamic Code Allocation
The minimum number of codes for HSDPA is configurable
Reconfiguration procedure is not needed
Making full use of the whole code tree
0

Codes for
CCH and
HS-SCCH

Available codes for DPCH

10

11

12

13

14

15

SF=16

Reserved codes for HSDPA


SF=16

Node B enlarges the allocated


codes for HSDPA temporally due
.
to HSDPA data transmission if the adjacent code is free
SF=16

ADD CELLHSDPA

Node B will release the code temporally occupied by HSDPA


when it is allocated to DPCH by RNC

Code Number for HS-PDSCH

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 121

Overview
Channel Type Mapping and Switching
Power and Code Management
Admission Control
Scheduling
Flow Control
Mobility Management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 122

Intelligent Access Control Procedure


RRC connection processing
RRC connection
request

Admission
algorithm

Failed

Failed

DRD

Redirection

Succeeded Succeeded

Iu Qos Negotiation
algorithm switch
UE capability

Scenario
RAB establishment
RAB modification
Inbound relocation
Rate
reconfiguration
hard handover
DCCC
algorithm switch
Cell load
information list LIT
LDM

CRM

RAB processing
Rate
negotiation

Admission
algorithm

PS domain:
maximum rate
negotiation

Load admission

PS and CS
domains:
initial rate
negotiation

Succe
eded

Failed

Code resource
admission
Failed

Iub resource
admission

PS domain BE
service:
target rate
negotiation

Preemption
Succeeded
Succeeded

Failed or not
supported
Queuing
Succeeded

Failed or not
supported
DRD

Credit resource
admission

Succeeded

Failed

Others
Service request
denied

Service request
admitted

Iu QoS Negotiation

RAB Downsizing

Preemption

Queuing

DRD

DCH service

HSDPA service

Triggered by admission
check failure due to the
limitation of user number,
power and Iub transmission

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 123

Downlink Power Admission Control of HSDPA cell


New Measurements for HSDPA cell
- Transmitted Carrier Power of all codes not used for HS-DSCH transmission:
Pnon-hspa

- HS-DSCH GBR required Power: GBP

Load estimation of new HSDPA service


- Predicted HS-DSCH required power increase for Steaming service:
Ppre-strm

- Predicted HS-DSCH required power increase for BE service: Ppre-BE


Power resource admission check of HSDPA service in HSDPA cell
Power resource admission check of R99 service in HSDPA cell

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 124

Dynamic Power Management - Overview


P Max

P max Thrtotal cac

GBP

P max hsdpa

P max Thrnon hspa cac


P non-hspda

Relative Parameters
Admission threshold for R99 power (Thrnon-hspa-cac)
Admission threshold for cell total load(Thr total-cac)
Admission threshold for HSDPA maximum power (Pmax-hspa)

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 125

GBR Consideration in Power Admission Check - DCH


DCH service access:
A

B
C

(A and B) or (A and C) is true, then CAC is OK.

Pnon hspa Ppre Pmax Thrnon hspa cac


Ptotal Ppre Pmax Thrtotal cac
( Pnon hspa min(GBPBE GBPstrm , Pmax hspa ) Ppre ) Pmax Thrtotal cac

P Max

P max Thrtotal cac


P max hsdpa

GBP

P non-hspda

HUAWEI TECHNOLOGIES Co., Ltd.

P max Thrnon hspa cac

HUAWEI Confidential

Page 126

Example DCH Access - Accept


Suppose that:
Pmax=Pmax-hspa; Thrtotal-cac=90%; Thrnon-hspa-cac= 80%
Ptotal=90%, low HSDPA load (GBP=30%), low R99 load (30%)
P Max

P max Thrtotal cac

P max Thrnon hspa cac


P (10%)

HSDPA
(Currently consumed power =60%, GBP=30%)

R99
(Currently consumed power =30%)

TRUE
!

False !

TRUE
!

Pnon hspa Ppre Pmax Thrnon hspa cac


30%

80%

Ptotal Ppre Pmax Thrtotal cac

30%
C

10%

60%

10%

90%

( Pnon hspa min(GBPBE GBPstrm , Pmax hspa ) Ppre ) Pmax Thrtotal cac
30%

HUAWEI TECHNOLOGIES Co., Ltd.

30%

HUAWEI Confidential

90%

10%
Page 127

Example DCH Access - Reject


Suppose that:
Pmax=Pmax-hspa; Thrtotal-cac=90%; Thrnon-hspa-cac=80%
Low R99 load (30%), high H GBR load (55%), new R99 call accesses
P Max

P max Thrtotal cac

P (10%)

P max Thrnon hspa cac

HSDPA
(Currently consumed power =60%,
GBP=55%)
R99
(Currently consumed power = 30%)

TRUE
!

30%
B

False !
False !

Pnon hspa Ppre Pmax Thrnon hspa cac


80%

Ptotal Ppre Pmax Thrtotal cac


30%

10%

60%

10%

90%

( Pnon hspa min(GBPBE GBPstrm , Pmax hspa ) Ppre ) Pmax Thrtotal cac
30%

HUAWEI TECHNOLOGIES Co., Ltd.

55%

HUAWEI Confidential

90%

10%
Page 128

Example DCH Access Accept or Reject ?


Suppose that:
Pmax=Pmax-hspa; Thrtotal-cac=90%; Thrnon-hspa-cac=80%
High R99 load (75% or 60%), low H GBR load (15%), new R99 call accesses
P Max

P max Thrtotal cac

P (10%)

P max Thrnon hspa cac

HSDPA GBP = 15%

R99

Pnon hspa Ppre Pmax Thrnon hspa cac


60%

80%

60%

15%

10%

Pnon hspa Ppre Pmax Thrnon hspa cac


75%

Ptotal Ppre Pmax Thrtotal cac

10%

10%

90%

( Pnon hspa min(GBPBE GBPstrm , Pmax hspa ) Ppre ) Pmax Thrtotal cac
60%

15%

HUAWEI TECHNOLOGIES Co., Ltd.

100%

10%

HUAWEI Confidential

90%

Page 129

80%

GBR Consideration in Power Admission Check - HSDPA


HSDPA service access:

(A and B) or (A and C) is true, then CAC is OK.

GBPstrm GBPBE Ppre Pmax hspa

Ptotal Ppre Pmax Thrtotal cac

( Pnon hspa GBPstrm GBPBE Ppre ) Pmax Thrtotal cac

P Max

P max Thrtotal cac


P max hsdpa

GBP

P max Thrnon hspa cac

P non-hspda

** B is not applied to BE service in RAN 5.1.


HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 130

Example HSDPA Access Accept


Suppose that:
Pmax=Pmax-hspa; Thrtotal-cac=90%; Thrnon-hspa-cac=80%
Low H load (30%), low R99 load (30%), new H call accesses
P Max
P max Thrtotal cac

P max Thrnon hspa cac

P (15%)
HSDPA
Currently consumed power = 30%,
GBP=20%
R99
Currently consumed power = 30%

(A and B) or (A and C) is
true

TRUE
!
TRUE
!
TRUE
!

GBPstrm GBPBE Ppre Pmax hspa


20%

100%

Ptotal Ppre Pmax Thrtotal cac


30%

15%

30%

15%

90%

( Pnon hspa GBPstrm GBPBE Ppre strm ) Pmax Thrtotal cac


30%

HUAWEI TECHNOLOGIES Co., Ltd.

20%

90%

15%

HUAWEI Confidential

Page 131

Example HSDPA Access Reject (1)


Suppose that:
Pmax=Pmax-hspa; Thrtotal-cac=90%; Thrnon-hspa-cac=80%
Low R99 load (30%), high H GBR load (55%), new H call accesses
P Max

P max Thrtotal cac

P
(15%)

P max Thrnon hspa cac


HSDPA
Currently consumed power = 60%,
GBP=55%

R99
Currently consumed power = 30%

A is true, but B or C is
false

TRUE
!
False !
False !

GBPstrm GBPBE Ppre Pmax hspa


55%

100%

Ptotal Ppre Pmax Thrtotal cac


60%

15%

30%

15%

90%

( Pnon hspa GBPstrm GBPBE Ppre strm ) Pmax Thrtotal cac


30%

HUAWEI TECHNOLOGIES Co., Ltd.

55%

90%

15%

HUAWEI Confidential

Page 132

Example HSDPA Access Reject (2)


Suppose that:
Pmax=Pmax-hspa; Thrtotal-cac=90%; Thrnon-hspa-cac=80%
High R99 load (70%), low H GBR load (15%), new H call accesses
P Max

P max Thrtotal cac

P max Thrnon hspa cac

P
(15%)

H GBR

R99

A is true, but B or C is
false
TRUE
!
False !

GBPstrm GBPBE Ppre Pmax hspa


15%

100%

Ptotal Ppre Pmax Thrtotal cac


15%

False !

15%

70%

15%

90%

( Pnon hspa GBPstrm GBPBE Ppre strm ) Pmax Thrtotal cac


70%

HUAWEI TECHNOLOGIES Co., Ltd.

15%

90%

15%

HUAWEI Confidential

Page 133

Conclusions Downlink Power Admission for HSDPA Cell


GBR is introduced to HSDPA I/B services.
ARP is considered when setting GBR.
Power is shared between HSDPA and R99.
Maximum power limitation is available for R99 and HSPDA
respectively.
HSDPA power is guaranteed for the pre-defined GBR.

HSDPA is not
best effort !

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 134

Overview
Channel Type Mapping and Switching
Power and Code Management
Admission Control
Scheduling
Flow Control
Mobility Management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 135

HSDPA EPF Scheduling Algorithm


500ms

To guarantee the GBR

scheduling algorithm
period

For the users whose GBR is not


satisfied in
X phase
scheduling
algorithm

period

For all the users considering


fairness
scheduling

algorithm period

time

Segmented into three parts

GBR service scheduled with


PF X%

For GBR service:


GBR+PF

HUAWEI TECHNOLOGIES Co., Ltd.

GBR service forcibly


scheduled (Y%)

All service scheduled


with PF(Z%)

For all service:


PF + SPI

For GBR service:


GBR+SPI

HUAWEI Confidential

Page 136

Fast Scheduling Procedure

user

Scheduling
the users with
GBR

Scheduling
the users
whose GBR is
not satisfied
in X phase
Schedulin
g all the
users

GBR
user
All
user

GBR service scheduled with


PF X%

GBR service forcibly GBR


scheduled (Y%)
500ms

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 137

All service
scheduled with
PF(Z%)

X, Y, and Z Time Segments in Scheduling Algorithm Period

X time segment: GBR service:

Pr iority

Ri _ max (t )
ri (t )

(traditional PF algorithm)

Y time segment: GBR services not meeting the GBR requirements Pr iority SPI
Larger SPI indicates higher priority.
GBR services with the same SPI can use the RR, MAXC/I, or PF algorithm.
Z time segment: all services including GBR ones that meet GBR requirementsPr iority

Ri _ max (t )
ri (t )

SPI

(PF*algorithm)
Note*: SPI
1.
2.

priority proportion coefficient that corresponds to SPI value

In X time segment, cell throughput is enhanced, which requires a larger segment size.
When some GBR services cannot meet the GBR requirements, you must reduce the size
of X time segment to enlarge Y segment, thus ensuring GBR services.
The sizes of the X, Y, and Z time segments can be dynamically changed to increase cell
throughput with guaranteed GBR.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 138

Power Resource Limiting Ratio in Scheduling


Purpose
To settle the issue: The throughput of non GBR services is quite low due to power resources overoccupied by GBR services when the channel conditions are bad, and the power resource efficiency
becomes lower.

Example
1. There are three users accessing the HSDPA BE service and two users accessing the HSDPA
streaming service at 90 kbps. The CQIs of the five users are 18, 15, 6, 12, and 10.
2. During congestion, each HSDPA user uses 12% power at most.

In this situation, the data rate of the third user can be increased from 20 kbps to (40 to
50) kbps at most. Otherwise, the impact on the cell throughput and the experience of the
other users in the cell will be large.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 139

CQI Correction
Factors affecting accuracy of CQI:
Channel environment
Measurement accuracy of UE

SET MACHSPARA
Initial BLER
-- [1,50]percent

CQI correction
Node B corrects the CQI according to the target initial
BLER and actual data transmission

Improvement of throughput and downlink load

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 140

Overview
Channel Type Mapping and Switching
Power and Code Management
Admission Control
Scheduling
Flow Control
Mobility Management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 141

HSDPA Flow Control Overview


Why ?
Balance the data flow between Iub and Uu
Achieve high bandwidth utilization efficiency, maximize the cell
throughput
Decrease data transmission delay, avoid data discard and
retransmission due to congestion

Functions
Response to a HS-DSCH Capacity Request, to indicate the number of
MAC-d PDUs that the RNC is allowed to transmit for each CmCH-PI of
each UE in the specified interval.
Modify the capacity and control the user data flow according to the MAChs queue buffer size.
Uu

Node B

HUAWEI TECHNOLOGIES Co., Ltd.

Iub

HUAWEI Confidential

RNC

CN

Page 142

HSDPA Flow Control Procedure over Iub


Queue based flow control
- Avoid overflow in queue buffer
- Quick data transmission over Iub

Iub utilization based flow control


- Allocate capacity considering available Iub
bandwidth
- Avoid data loss over Iub

RNC

NodeB
ATM Subsystem

HSDPA

queue

AAL2
Entity

MAC-d Entity

ATM
Mux.
HSDPA

queue

AAL2
Entity

Iub bandwidth

MAC-d Entity

Capacity allocation
HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 143

MAC_hs Flow Control Step1: Available Iub Bandwidth for HSDPA


In RAN5.1, available Iub bandwidth for HSDPA is calculated in NodeB :
BW_H =Min { (BW_Total - BW

R99

), BW_H_AAL2Path }

BWR99 is the R99 Radio Bearer admitted transmission bandwidth CAC Iub bandwidth.

BW

Scenario 2:
R99 service throughput >
R99 CAC admitted BW

Total AAL2 BW T

BWHSDPA
RL SET/RL RECONFIG

BWR99

Scenario 1:
R99 service throughput <
R99 CAC admitted BW

time

Scenario 1 (larger R99 AF): Waste Iub bandwidth


Scenario 2 (Samll R99 AF): Overbook bandwidth, Iub will be congest

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 144

MAC_hs Flow Control Step 2 Allocate the H Iub bandwidth


among HSDPA users
1. HSDPA scheduler calculates each users air throughput and air capacity*

2. Based on each users air throughput, MAC_hs buffer occupation, RLC buffer
occupation, MAC_hs calculates each users requirement for Iub bandwidth

3. Allocate the Iub bandwidth to each HSDPA user


If Iub is limited, bandwidth for each user will scale down with same ratio after each users
guaranteed.

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 145

GBR is

Available Iub Bandwidth for HSDPA


Available Iub bandwidth for HSDPA at Iub interface level:

BW_Avlb HSDPA Min


{ T - BWR 99i
, ( H _ RT _ PATH HSDPA H _ NRT _ PATH HSDPA )}
i

BWR99i is the R99 Radio Bearer admitted transmission bandwidth.

BW

BWHSDPA

BWR99

Scenario 1:
R99 throughput < CAC
admitted BW

Total AAL2 BW T

Scenario 2:
R99 throughput >
CAC admitted BW

time

Scenario 1: Waste Iub bandwidth.


Scenario 2: Overbook bandwidth.
To avoid Iub congestion, HSDPA flow maps to lower priority PATH, and overbook function be enabled to
avoid congestion.
HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 146

Adaptive Adjustment of Available Iub bandwidth for HSDPA


Detect Iub congestion state based on packet transmission delay (FrameDiscard
RateThreshold ) and packet loss (DlTrDelayJitterThldBase).
None congestion: Increase HSDPA available BW.
Congestion: Decrease HSDPA available BW.

Start

Transmission Delay
and Packet Loss
Detection

Delay Increasing
Or Packet loss

N
Increase the
bandwidth of HSDPA

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 147

Decrease the
bandwidth of HSDPA

Overview
Channel Type Mapping and Switching
Power and Code Management
Admission Control
Scheduling
Flow Control
Mobility Management

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 148

HSDPA Mobility Management (1)


Handover between HSDPA and R99 cells
Cell 1(HSDPA)

Cell 2(R99)

Cell 1(HSDPA)

Cell 2(R99)

Cell 1(HSDPA)

Cell 2(R99)

before handover
before handover

Cell 2(R99)

before handover

Cell 2(R99)

after handover

after handover

Soft handover
The 1b (remove) is triggered
by HSDPA cell

Cell 1(HSDPA)

Cell 1(HSDPA)

Inter-frequency handover
2B is triggered by R99 cell

Cell 1(HSDPA)

Cell 2(R99)

Cell 1(HSDPA)

before handover

after handover

Inter-frequency handover
The 2B event is triggered by
HSDPA cell

Soft handover
HSDPA cell is added into active set
The 1d event is triggered by HSDPA cell

HUAWEI TECHNOLOGIES Co., Ltd.

Cell 2(R99)

HUAWEI Confidential

Page 149

Cell 1(HSDPA)

after handover

Cell 2(R99)

HSDPA Mobility Management (2)


Handover between HSDPA cell and HSDPA cell
Cell 1(HSDPA)

Cell 2(HSDPA)

Cell 1(HSDPA)

SET HOCOMM

Cell 2(HSDPA)

HSDPA hysteresis timer length


-- After event 1D triggers HSDPA handover, this
timer is started. Then, event 1D will not trigger
HSDPA handover any more before expiry of this
before handover

timer.

after handover

The 1d event is triggered by


cell 2

Cell 1(HSDPA)

Cell 2(HSDPA)

before handover

Cell 1(HSDPA)

Cell 2(HSDPA)

Cell 1(HSDPA) Cell 2(HSDPA)

before handover

after handover

Inter-frequency handover
2B is triggered by HSDPA cell
(cell2)

HUAWEI TECHNOLOGIES Co., Ltd.

Cell 1(HSDPA)

after handover

HSDPA serving cell is deleted


and the remaining cell supports
HSDPA

HUAWEI Confidential

Page 150

Cell 2(HSDPA)

HSDPA Mobility Management (3)


Handover between HSDPA cell and GSM/GPRS cell
Coverage based
Service based

Direct Retry

HSDPS request is initiated in the R99 cell


Traffic volume increases
Timer
Access to the original HSDPA cell is rejected
Cell a(f1,HSDPA)

Cell a(f1,HSDPA)

Cell b(f2, R99)

Cell b(f2, R99)

UE initiates
HSDPA service
request from cell b
After DRD, UE
HSDPA service
are set on cell a

HUAWEI TECHNOLOGIES Co., Ltd.

HUAWEI Confidential

Page 151

S-ar putea să vă placă și