0.46 N/mm2
BT3
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
C35
1
-254.5
-1.4
0.5 G+Q *F
2
-200.3
-1.1
0.4 G+Q
3
-254.6
-1.5
0.4 G+QP1 *F
4
-229.4
-1.0
0.5 G+QP2 *F
5
-254.4
1.0
0.6 G+Q+Nx
6
-254.6
-3.8
0.4 G+Q-Nx
7
-254.1
-1.6
1.5 G+Q+Ny
8
-254.8
-1.2
-0.5 G+Q-Ny
Column:
C35
bx =
450.0 mm
by =
225.0 mm
Effects:
Critical Combination = 6 (G+Q-Nx)
N =
-254.6 kN
Mx =
3.8 kN.m
My =
0.4 kN.m
Footing Dimensions:
Lx =
1400.0 mm
Ly =
1400.0 mm
h =
325.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 159.582 kN/m2
S-min = 141.285 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.25) =
187.500 kN/m2
As-min (Both Dir's) =
546.00 mm2/m
Punching Check (At Column Face):
Vt =
279.6 kN
V-eff =
290.6 kN
v =
0.79 N/mm2
<
v-Rdmax =
4.05 N/mm2
Punching Check (At 'd'):
Vt =
206.0 kN
V-eff =
217.0 kN
v =
0.28 N/mm2
<
v-Rdc =
0.44 N/mm2
X Dir:
Footing Design:
M =
17.8 kN.m/m
K/K' =
0.04 < 1.0
As =
546.00 mm2/m
Y12-200
Shear Check (At Column Face):
v =
0.27 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.11 N/mm2
< v-Rdc =
0.44 N/mm2
Y Dir:
Footing Design:
M =
27.5 kN.m/m
K/K' =
0.07 < 1.0
As =
546.00 mm2/m
Y12-200
Shear Check (At Column Face):
v =
0.35 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.19 N/mm2
< v-Rdc =
0.44 N/mm2
BT4
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
C24
1
-385.5
-0.5
-1.3 G+Q *F
2
-302.6
-0.4
-1.0 G+Q
3
-375.6
-0.6
-1.3 G+QP1 *F
4
-351.6
-0.3
-0.8 G+QP2 *F
5
-386.6
0.2
-1.3 G+Q+Nx
6
-384.4
-1.2
-1.2 G+Q-Nx
7
-386.1
-0.5
-0.6 G+Q+Ny
8
-384.9
-0.5
-2.0 G+Q-Ny
C7
1
-348.5
0.3
2.6 G+Q *F
2
-272.2
0.2
2.1 G+Q
3
-342.0
0.3
2.6 G+QP1 *F
4
-305.9
0.3
2.3 G+QP2 *F
5
-348.7
0.7
2.6 G+Q+Nx
6
-348.2
-0.1
2.6 G+Q-Nx
7
-347.3
0.4
3.4 G+Q+Ny
8
-349.6
0.2
1.9 G+Q-Ny
C6
1
-403.1
-2.5
0.5 G+Q *F
2
-315.2
-1.9
0.4 G+Q
3
-374.1
-2.4
0.3 G+QP1 *F
4
-377.9
-2.1
0.6 G+QP2 *F
5
-403.2
-1.9
0.6 G+Q+Nx
6
-402.9
-3.2
0.4 G+Q-Nx
7
-403.1
-2.4
1.3 G+Q+Ny
8
-403.0
-2.6
-0.4 G+Q-Ny
C18
1
-341.7
0.2
0.2 G+Q *F
2
-266.3
0.2
0.2 G+Q
3
-318.3
0.2
0.3 G+QP1 *F
4
-312.6
0.2
0.0 G+QP2 *F
5
-340.7
0.6
0.3 G+Q+Nx
6
-342.6
-0.1
0.1 G+Q-Nx
7
-340.9
0.2
1.0 G+Q+Ny
8
-342.4
0.2
-0.6 G+Q-Ny
Columns:
C24, C7, C6, C18
bx =
225.0 mm
by =
225.0 mm
Effects:
Column = C6 - Critical Combination = 7 (G+Q+Ny)
N =
-403.1 kN
Mx =
2.4 kN.m
My =
1.3 kN.m
Footing Dimensions:
Lx =
1600.0 mm
Ly =
1600.0 mm
h =
400.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 185.480 kN/m2
S-min = 174.459 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.25) =
187.500 kN/m2
As-min (Both Dir's) =
696.00 mm2/m
Punching Check (At Column Face):
Vt =
451.6 kN
V-eff =
459.5 kN
v =
1.47 N/mm2
<
v-Rdmax =
4.05 N/mm2
Punching Check (At 'd'):
Vt =
347.6 kN
V-eff =
355.4 kN
v =
0.36 N/mm2
<
v-Rdc =
0.41 N/mm2
X Dir:
Footing Design:
M =
43.6 kN.m/m
K/K' =
0.07 < 1.0
As =
696.00 mm2/m
Y12-150
Shear Check (At Column Face):
v =
0.36 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.17 N/mm2
< v-Rdc =
0.41 N/mm2
Y Dir:
Footing Design:
M =
43.7 kN.m/m
K/K' =
0.07 < 1.0
As =
696.00 mm2/m
Y12-150
Shear Check (At Column Face):
v =
0.37 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.19 N/mm2
< v-Rdc =
0.41 N/mm2
BT5
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
C36
1
-484.2
4.1
2.0 G+Q *F
2
-379.1
3.2
1.6 G+Q
Project: Guzape_Project
C43
3
4
5
6
7
8
1
2
3
4
5
6
7
8
4.1
3.3
4.7
3.5
4.0
4.1
-1.5
-1.2
-0.8
-1.9
-1.0
-2.1
-1.6
-1.5
1.4
2.3
2.1
2.0
2.9
1.2
0.0
0.0
0.0
0.0
0.0
0.0
0.4
-0.4
G+QP1 *F
G+QP2 *F
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
G+Q *F
G+Q
G+QP1 *F
G+QP2 *F
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
Columns:
C36, C43
bx =
225.0 mm
by =
225.0 mm
Effects:
Column = C36 - Critical Combination = 7 (G+Q+Ny)
N =
-483.7 kN
Mx =
4.0 kN.m
My =
2.9 kN.m
Footing Dimensions:
Lx =
1800.0 mm
Ly =
1800.0 mm
h =
450.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 180.132 kN/m2
S-min = 165.969 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.25) =
187.500 kN/m2
As-min (Both Dir's) =
796.00 mm2/m
Punching Check (At Column Face):
Vt =
551.9 kN
V-eff =
564.9 kN
v =
1.58 N/mm2
<
v-Rdmax =
4.05 N/mm2
Punching Check (At 'd'):
Vt =
426.0 kN
V-eff =
439.0 kN
v =
0.35 N/mm2
<
v-Rdc =
0.39 N/mm2
X Dir:
Footing Design:
M =
55.5 kN.m/m
K/K' =
0.07 < 1.0
As =
796.00 mm2/m
Y12-125
Shear Check (At Column Face):
v =
0.35 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.17 N/mm2
< v-Rdc =
0.39 N/mm2
Y Dir:
Footing Design:
M =
55.6 kN.m/m
K/K' =
0.07 < 1.0
As =
796.00 mm2/m
Y12-125
Shear Check (At Column Face):
v =
0.36 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.18 N/mm2
< v-Rdc =
0.39 N/mm2
BT6
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
C11
1
-57.8
0.9
-2.9 G+Q *F
2
-45.8
0.7
-2.3 G+Q
3
-57.8
0.8
-3.0 G+QP1 *F
4
-54.3
0.8
-2.3 G+QP2 *F
5
-57.8
1.9
-3.4 G+Q+Nx
6
-57.8
-0.1
-2.3 G+Q-Nx
7
-57.8
1.0
3.5 G+Q+Ny
8
-57.8
0.7
-9.3 G+Q-Ny
C12
1
-38.9
0.9
-4.8 G+Q *F
2
-31.1
0.7
-3.7 G+Q
3
-38.9
0.8
-4.9 G+QP1 *F
4
-38.6
0.8
-4.0 G+QP2 *F
5
-38.9
1.9
-5.4 G+Q+Nx
6
-38.9
-0.2
-4.1 G+Q-Nx
7
-38.9
1.0
1.6 G+Q+Ny
8
-38.9
0.7
-11.2 G+Q-Ny
C13
1
-117.9
0.4
-0.7 G+Q *F
2
-92.4
0.3
-0.5 G+Q
3
-118.1
0.3
-0.7 G+QP1 *F
4
-103.8
0.4
-0.7 G+QP2 *F
5
-116.7
1.1
-0.7 G+Q+Nx
6
-119.1
-0.3
-0.7 G+Q-Nx
7
-117.8
0.5
-0.4 G+Q+Ny
8
-117.9
0.3
-1.0 G+Q-Ny
Columns:
C11, C12, C13
bx =
1912.4 mm
by =
600.0 mm
Effects:
Critical Combination = 7 (G+Q+Ny)
N =
-214.5 kN
Mx =
56.8 kN.m
My =
26.9 kN.m
Footing Dimensions:
Lx =
2512.4 mm
Ly =
1200.0 mm
h =
325.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 180.259 kN/m2
S-min =
1.004 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.25) =
187.500 kN/m2
As-min (Both Dir's) =
546.00 mm2/m
Punching Check (At Column Face):
Vt =
261.0 kN
V-eff =
406.6 kN
v =
0.90 N/mm2
<
v-Rdmax =
4.05 N/mm2
Punching Check (At 'd'):
Vt =
210.3 kN
V-eff =
355.9 kN
v =
0.42 N/mm2
<
v-Rdc =
0.44 N/mm2
X Dir:
Footing Design:
M =
8.0 kN.m/m
K/K' =
0.02 < 1.0
As =
546.00 mm2/m
Y12-200
Shear Check (At Column Face):
v =
0.19 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.01 N/mm2
< v-Rdc =
0.44 N/mm2
Y Dir:
Footing Design:
M =
7.8 kN.m/m
K/K' =
0.02 < 1.0
As =
546.00 mm2/m
Y12-200
Shear Check (At Column Face):
v =
0.20 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.02 N/mm2
< v-Rdc =
0.44 N/mm2
BT7
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
C5
1
-76.6
0.3
0.2 G+Q *F
2
-60.7
0.2
0.2 G+Q
3
-79.8
0.3
0.2 G+QP1 *F
4
-69.0
0.3
0.3 G+QP2 *F
5
-76.0
0.7
0.3 G+Q+Nx
6
-77.3
-0.1
0.2 G+Q-Nx
7
-76.4
0.4
0.8 G+Q+Ny
8
-76.8
0.2
-0.3 G+Q-Ny
C15
1
-98.3
7.3
0.7 G+Q *F
2
-77.9
5.7
0.6 G+Q
3
-98.3
6.6
0.6 G+QP1 *F
Project: Guzape_Project
6.9
16.7
-2.1
8.9
5.7
0.7
0.9
0.6
2.2
-0.8
G+QP2 *F
G+Q+Nx
G+Q-Nx
G+Q+Ny
G+Q-Ny
Columns:
C5, C15
bx =
675.0 mm
by =
1017.9 mm
Effects:
Critical Combination = 6 (G+Q-Nx)
N =
-175.6 kN
Mx =
19.5 kN.m
My =
7.6 kN.m
Footing Dimensions:
Lx =
1200.0 mm
Ly =
1517.9 mm
h =
300.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 185.694 kN/m2
S-min =
45.413 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.25) =
187.500 kN/m2
As-min (Both Dir's) =
496.00 mm2/m
Punching Check (At Column Face):
Vt =
204.6 kN
V-eff =
247.6 kN
v =
1.11 N/mm2
<
v-Rdmax =
4.05 N/mm2
Punching Check (At 'd'):
Vt =
166.9 kN
V-eff =
209.9 kN
v =
0.38 N/mm2
<
v-Rdc =
0.46 N/mm2
X Dir:
Footing Design:
M =
6.1 kN.m/m
K/K' =
0.02 < 1.0
As =
496.00 mm2/m
Y12-225
Shear Check (At Column Face):
v =
0.20 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.02 N/mm2
< v-Rdc =
0.46 N/mm2
Y Dir:
Footing Design:
M =
5.7 kN.m/m
K/K' =
0.02 < 1.0
As =
496.00 mm2/m
Y12-225
Shear Check (At Column Face):
v =
0.18 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.00 N/mm2
< v-Rdc =
0.46 N/mm2
BT8
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
C16
1
-109.3
5.4
0.7 G+Q *F
2
-86.2
4.2
0.6 G+Q
3
-109.3
4.8
0.6 G+QP1 *F
4
-99.8
5.2
0.7 G+QP2 *F
5
-109.3
14.5
0.9 G+Q+Nx
6
-109.3
-3.8
0.6 G+Q-Nx
7
-109.3
6.5
2.2 G+Q+Ny
8
-109.3
4.2
-0.8 G+Q-Ny
C17
1
-120.7
4.7
0.7 G+Q *F
2
-94.9
3.7
0.6 G+Q
3
-120.7
4.2
0.6 G+QP1 *F
4
-108.6
4.6
0.7 G+QP2 *F
5
-120.7
13.8
0.9 G+Q+Nx
6
-120.7
-4.3
0.6 G+Q-Nx
7
-120.7
5.7
2.2 G+Q+Ny
8
-120.7
3.7
-0.8 G+Q-Ny
Columns:
C16, C17
bx =
675.0 mm
by =
776.1 mm
Effects:
Critical Combination = 5 (G+Q+Nx)
N =
-230.0 kN
Mx =
28.3 kN.m
My =
1.4 kN.m
Footing Dimensions:
Lx =
1400.0 mm
Ly =
1700.0 mm
h =
300.0 mm
h-Tap =
0.0 mm
Soil Stresses:
S-max = 169.061 kN/m2
S-min =
63.233 kN/m2
Allowable Soil Stress will be amplified by the factor (x1.25) =
187.500 kN/m2
As-min (Both Dir's) =
496.00 mm2/m
Punching Check (At Column Face):
Vt =
258.8 kN
V-eff =
313.8 kN
v =
0.70 N/mm2
<
v-Rdmax =
4.05 N/mm2
Punching Check (At 'd'):
Vt =
198.9 kN
V-eff =
253.9 kN
v =
0.33 N/mm2
<
v-Rdc =
0.46 N/mm2
X Dir:
Footing Design:
M =
10.5 kN.m/m
K/K' =
0.03 < 1.0
As =
496.00 mm2/m
Y12-225
Shear Check (At Column Face):
v =
0.25 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.08 N/mm2
< v-Rdc =
0.46 N/mm2
Y Dir:
Footing Design:
M =
18.0 kN.m/m
K/K' =
0.05 < 1.0
As =
496.00 mm2/m
Y12-225
Shear Check (At Column Face):
v =
0.31 N/mm2
< v-Rdmax =
4.05 N/mm2
Shear Check (At 'd' from Column):
v =
0.14 N/mm2
< v-Rdc =
0.46 N/mm2
BT9
-------------------------------------------------------------------------------Columns/Loadings:
Column
Cmb
N
Mx
My
C41
1
-35.2
0.4
-1.1 G+Q *F
2
-27.9
0.3
-0.8 G+Q
3
-35.0
0.3
-1.1 G+QP1 *F
4
-33.9
0.4
-0.9 G+QP2 *F
5
-35.7
0.6
-1.2 G+Q+Nx
6
-34.6
0.2
-1.0 G+Q-Nx
7
-35.1
0.4
-0.8 G+Q+Ny
8
-35.3
0.4
-1.4 G+Q-Ny
C40
1
-144.0
2.7
-0.4 G+Q *F
2
-113.8
2.1
-0.3 G+Q
3
-143.5
2.7
-0.4 G+QP1 *F
4
-133.8
2.4
-0.4 G+QP2 *F
5
-144.3
3.3
-0.5 G+Q+Nx
6
-143.8
2.2
-0.4 G+Q-Nx
7
-143.9
2.7
-0.1 G+Q+Ny
8
-144.1
2.8
-0.7 G+Q-Ny
C42
1
-2.5
0.3
-0.1 G+Q *F
2
-2.0
0.2
-0.1 G+Q
3
-2.6
0.3
-0.1 G+QP1 *F
4
-2.7
0.3
-0.1 G+QP2 *F
5
-2.4
0.5
-0.2 G+Q+Nx
6
-2.5
0.1
-0.1 G+Q-Nx
7
-2.0
0.3
0.1 G+Q+Ny
8
-2.9
0.3
-0.3 G+Q-Ny
Columns:
C41, C40, C42
bx =
524.6 mm
by =
820.0 mm
Effects:
Critical Combination = 7 (G+Q+Ny)
N =
-181.0 kN
Mx =
12.7 kN.m
Project: Guzape_Project
Project: Guzape_Project
=
=
=
=
=
=
=
=
=
P1
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
110/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 186.56/314.16
7275.00
2325.00
0.0000
0.0
0.0000 186.56/314.16
0.0
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
P2
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
110/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 186.56/314.16
7275.00
5437.50
0.0000
0.0
0.0240 186.56/314.16
6.0
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
P5
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
3674.92
6600.17
0.0597
6.8
0.0447 203.52/314.16
5.1
1
120/150
4.950
1.500
1725.14
3187.50
0.0606
1.5
0.0456 203.52/314.16
1.1
1
110/150
4.950
1.500
5549.86
5437.50
0.0320
8.0
0.0240 186.56/314.16
6.0
1
120/150
4.950
1.500
2700.08
4762.50
0.0592
3.6
0.0442 203.52/314.16
2.7
1
120/150
4.950
1.500
4462.42
4762.50
0.0350
5.9
0.0267 203.52/314.16
4.5
1
120/150
4.950
1.500
4538.00
5175.00
0.0390
6.8
0.0296 203.52/314.16
5.1
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P5
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
3674.92
6600.17
0.0597
6.8
0.0447 203.52/314.16
5.1
1
120/150
4.950
1.500
1725.14
3412.67
0.0627
1.6
0.0477 203.52/314.16
1.2
1
120/150
4.950
1.500
2174.94
4837.67
0.0860
3.4
0.0860 203.52/314.16
3.4
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P12
TYPE
d/h
(mm)
(mm)
1
110/150
Project: Guzape_Project
g
q
(kN/m2)
(kN/m2)
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 186.56/314.16
5850.14
4049.83
0.0320
4.4
0.0240 186.56/314.16
3.3
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B2)
1
120/150
4.950
1.500
2174.94
2624.83
0.0423
1.7
0.0322 203.52/314.16
1.3
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P20
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
5625.00
7725.01
0.0489
13.1
0.0365 239.53/314.16
9.7
1
120/150
4.950
1.500
3187.50
5700.00
0.0596
5.1
0.0446 203.52/314.16
3.8
1
120/150
4.950
1.500
1387.50
4312.50
0.0630
1.0
0.0630 203.52/314.16
1.0
1
110/150
4.950
1.500
5962.86
4312.50
0.0320
5.0
0.0240 186.56/314.16
3.8
1
120/150
4.950
1.500
3787.85
4612.50
0.0427
5.2
0.0325 203.52/314.16
3.9
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P24
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
1612.50
2394.49
0.0525
1.2
0.0395 203.52/314.16
0.9
1
110/150
4.950
1.500
4575.00
4412.50
0.0320
5.3
0.0240 186.56/314.16
3.9
1
120/150
4.950
1.500
2325.17
3142.11
0.0481
2.2
0.0360 203.52/314.16
1.6
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P20
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
110/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 186.56/314.16
7725.01
5625.00
0.0320
8.5
0.0240 186.56/314.16
6.4
1
120/150
4.950
1.500
4049.83
5850.14
0.0513
7.1
0.0383 203.52/314.16
5.3
1
110/150
4.950
1.500
6600.17
3674.92
0.0320
3.6
0.0240 186.56/314.16
2.7
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
P26
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
1062.93
4575.00
0.0860
0.8
0.0860 203.52/314.16
0.8
1
120/150
4.950
1.500
4412.50
4575.00
0.0332
5.5
0.0255 203.52/314.16
4.2
1
110/150
4.950
1.500
4312.50
1387.50
0.0000
0.0
0.0000 186.56/314.16
0.0
1
120/150
4.950
1.500
1387.50
7350.36
0.0860
1.4
0.0860 203.52/314.16
1.4
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Slab
P8
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
1987.50
3374.92
0.0578
1.9
0.0432 203.52/314.16
1.4
1
120/150
4.950
1.500
5437.50
5549.86
0.0322
8.0
0.0248 203.52/314.16
6.2
1
120/150
4.950
1.500
2325.00
7275.00
0.0860
3.9
0.0860 203.52/314.16
3.9
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P18
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
4312.50
5962.86
0.0493
7.7
0.0367 203.52/314.16
5.8
1
120/150
4.950
1.500
2812.50
3712.42
0.0468
3.1
0.0354 203.52/314.16
2.4
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P11
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
120/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
1425.17
6375.43
0.1000
1.7
0.0860 203.52/314.16
1.5
1
110/150
4.950
1.500
4762.50
4462.42
0.0320
5.4
0.0240 186.56/314.16
4.0
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
P19
TYPE
d/h
(mm)
(mm)
g
q
(kN/m2)
(kN/m2)
1
110/150
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 186.56/314.16
4612.50
3787.85
0.0320
3.9
0.0240 186.56/314.16
2.9
1
120/150
4.950
1.500
1687.50
2663.00
0.0549
1.3
0.0412 203.52/314.16
1.0
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
P11
TYPE
d/h
(mm)
(mm)
1
120/150
g
q
(kN/m2)
(kN/m2)
4.950
1.500
L1
C-sup
C-span
As
L2
M-sup
M-span
Req/Prov
(mm)
(kN.m)
(kN.m)
(mm2)
(mm)
(kN.m)
(kN.m)
(mm2)
Support Mc = 0.0Support As = 203.52/314.16
1425.17
6375.43
0.1000
1.7
0.0860 203.52/314.16
1.5
1
110/150
4.950
1.500
5175.00
4538.00
0.0320
5.6
0.0240 186.56/314.16
4.2
Project: Guzape_Project
S T E E L
B A R S
Top:Y10-250(T1)
Bottom: Y10-250(B1)
Top:Y10-250(T1)
Bottom: Y10-250(B2)
Top:Y10-250(T1)
Guzape Project
BEAM DESIGN RESULTS
Axis: 1
Storey: 1
B48
L=792.8mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 80 x 150
G=1.11
Q=0.34
Loads
1.64
0.5
1.11
0.34
0.09
0.35
0.68
Shear
Force
(Env.)
-5.759
Moment
(Env.)
-1.133
Project: Guzape_Project
0.3
407.0
0.00
50.88
2.05
20.19
2.05
0.00
148.95
148.95
0.3
407.0
0.00
50.88
2.05
19.02
2.05
0.00
148.95
0.8
390.0
0.00
48.75
6.42
20.19
8.22
0.00
142.73
1.1
407.0
0.00
50.88
8.22
7.51
8.22
0.00
148.95
0.8
390.0
0.00
48.75
6.21
19.02
8.22
0.00
142.73
5.8
4.5
0.06
0.45
4.05
196.6
0.00
5.4
5.4
0.06
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 1
Storey: 1 (/ 2)
B49
L=551.1mm
HxBw (mm)
Flange BfxHf
450 x 225
---
Loads
UDL G=10.03 Q=0 kN/m
3.455
Shear
Force
(Env.)
-3.455
Moment
(Env.)
-0.476
Project: Guzape_Project
0.1
407.0
0.00
50.88
0.86
12.11
0.86
0.00
148.95
148.95
0.1
407.0
0.00
50.88
0.86
12.11
0.86
0.00
148.95
0.4
390.0
0.00
48.75
2.96
12.11
3.45
0.00
142.73
0.5
407.0
0.00
50.88
3.45
3.58
3.45
0.00
148.95
0.4
390.0
0.00
48.75
2.96
12.11
3.45
0.00
142.73
3.5
3.1
0.04
0.45
4.05
196.6
0.00
3.5
3.1
0.04
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 1
Storey: 1 (/ 3)
B51
L=4049.8mm
HxBw (mm)
Flange BfxHf
B50
L=1425.2mm
450 x 225
0 x 0 - 400 x 150
450 x 225
---
G=9.47
Q=2.87
Loads
0.11
2.02
3.94
46.343
1.211
Shear
Force
(Env.)
-18.569
-35.621
22.368
13.73
Moment
(Env.)
-37.066
Project: Guzape_Project
9.3
407.0
0.05
50.88
67.22
124.90
67.22
0.00
148.95
148.95
22.4
407.0
0.12
50.88
162.27
162.50
162.27
0.00
148.95
21.1
390.0
0.04
48.75
159.69
124.90
268.89
0.00
142.73
37.1
407.0
0.07
50.88
268.89
101.81
268.89
0.00
148.95
7.4
390.0
0.02
48.75
56.12
162.50
218.62
0.00
142.73
142.73
46.3
39.0
0.51
0.45
4.05
196.6
18.6
12.1
0.20
0.45
4.05
196.6
35.6
28.3
0.39
0.45
4.05
196.6
0.00
13.7
407.0
0.07
50.88
99.60
65.11
99.60
0.00
148.95
7.2
407.0
0.04
50.88
51.88
46.97
98.86
0.00
148.95
1.4
407.0
0.01
50.88
9.95
23.23
33.17
0.00
148.95
148.95
0.1
390.0
0.00
48.75
0.44
23.23
0.44
0.00
142.73
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
6.6
6.6
0.07
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 1
Storey: 1 (/ 4)
B52
L=2250mm
HxBw (mm)
Flange BfxHf
450 x 225
---
Loads
UDL G=10.03 Q=0 kN/m
14.106
Shear
Force
(Env.)
-14.107
Moment
(Env.)
-7.935
Project: Guzape_Project
2.0
407.0
0.01
50.88
14.39
49.46
14.39
0.00
148.95
148.95
2.0
407.0
0.01
50.88
14.39
49.46
14.39
0.00
148.95
4.8
390.0
0.03
48.75
36.16
49.46
57.56
0.00
142.73
7.9
407.0
0.04
50.88
57.56
22.26
57.56
0.00
148.95
4.8
390.0
0.03
48.75
36.16
49.46
57.56
0.00
142.73
14.1
7.6
0.15
0.45
4.05
196.6
0.00
14.1
7.6
0.15
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 1
Storey: 1 (/ 5)
B53
L=1425mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 180 x 150
G=2.23
Q=0.68
0.56
0.56
0.17
0.17
Loads
0.11
0.56
1.38
10.434
Shear
Force
(Env.)
-10.271
Moment
(Env.)
-3.838
Project: Guzape_Project
1.0
407.0
0.00
50.88
6.96
36.01
6.96
0.00
148.95
148.95
1.0
407.0
0.00
50.88
6.96
36.58
6.96
0.00
148.95
2.4
390.0
0.01
48.75
18.45
36.01
27.84
0.00
142.73
3.8
407.0
0.01
50.88
27.84
16.51
27.84
0.00
148.95
2.4
390.0
0.01
48.75
18.50
36.58
27.84
0.00
142.73
10.3
4.7
0.11
0.45
4.05
196.6
0.00
10.4
4.8
0.11
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 10
Storey: 1
B80
L=1062.9mm
HxBw (mm)
Flange BfxHf
B79
L=2387.5mm
450 x 225
80 x 150 - 80 x 150
Loads
0.11
B78
L=2025mm
450 x 225
220 x 150 - 220 x 150
G=4.15
Q=1.26
4.15
1.26
3.24
0.98
3.473.71
3.47
1.05
1.051.12
0.53
0.64
0.95
1.06
8.75
2.65
0.83
450 x 225
180 x 150 - 180 x 150
10.7
3.24
10.71
10.029.47 8.91
3.24
3.042.87 2.7
8.91
2.7
1.23
2.21
1.01
1.91
41.292
39.875
14.959
Shear
Force
(Env.)
-10.878
-33.659
41.711
38.421 34.688
4.385 4.767
Moment
(Env.)
Project: Guzape_Project
3.546
-1.356 1.328
7.8
407.0
0.04
50.88
56.48
120.65
177.13
0.00
0.00
0.00
24.6
407.0
0.13
50.88
178.29
132.50
278.71
0.00
148.95
148.95
34.4
34.4
0.38
0.45
4.05
205.2
0.00
38.4
407.0
0.20
50.88
278.71
144.79
278.71
0.00
148.95
34.7
407.0
0.18
50.88
251.64
118.02
251.64
0.00
148.95
15.9
407.0
0.08
50.88
115.23
88.30
203.53
0.00
148.95
4.4
407.0
0.02
50.88
31.81
52.45
84.26
0.00
148.95
4.9
407.0
0.03
50.88
35.64
38.14
73.78
0.00
148.95
21.7
407.0
0.11
50.88
157.14
109.04
266.18
0.00
148.95
41.7
407.0
0.22
50.88
302.59
139.81
302.59
0.00
148.95
142.73
142.73
1.4
407.0
0.00
50.88
9.82
88.30
9.82
0.00
148.95
1.0
390.0
0.00
48.75
7.32
52.45
9.82
0.00
142.73
142.73
148.95
142.73
41.3
36.7
0.45
0.45
4.05
196.6
33.7
27.3
0.37
0.45
4.05
196.6
15.0
7.0
0.16
0.45
4.05
196.6
10.9
10.5
0.12
0.45
4.05
196.6
0.00
205.1
0.1
3.6
0.0
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
0.00
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
39.9
31.9
0.44
0.45
4.05
196.6
Y10-250
0.0
Y10-250
--402.12
402.12
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 10
Storey: 1 ...
B77
L=4312.5mm
HxBw (mm)
Flange BfxHf
450 x 225
420 x 150 - 420 x 150
12.99
3.94
G=5.75
Q=1.74
Loads
0.11
5.75
1.74
0.69
2.16
3.62
4.2
Shear
Force
(Env.)
-64.505
48.507
Moment
(Env.)
-44.21
Project: Guzape_Project
48.5
407.0
0.25
50.88
351.88
226.18
351.88
0.00
148.95
0.3
407.0
0.00
50.88
2.04
148.06
150.10
0.00
148.95
11.1
407.0
0.06
50.88
80.18
148.29
80.18
0.00
148.95
1.1
390.0
0.00
48.75
8.02
226.18
234.19
0.00
142.73
44.2
407.0
0.05
50.88
320.71
148.06
320.71
0.00
148.95
26.5
390.0
0.03
48.75
200.86
148.29
320.71
0.00
142.73
64.5
56.3
0.70
0.45
4.05
196.6
0.00
42.3
34.1
0.46
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 11
Storey: 1
B83
L=5175mm
HxBw (mm)
Flange BfxHf
G=8.73 8.73
Q=2.64 2.64
Loads
B82
L=2250mm
450 x 225
510 x 150 - 510 x 150
0.11
0.99 1.35
6.136.13
1.861.86
1.88
12.62
3.82
14.67
12.6214.66
10.58
4.44 11.13
3.82 4.44
3.37
3.21
3.41
4.29
B81
L=2325mm
450 x 225
210 x 150 - 0 x 0
5.2
1.58
5.06
106.032
450 x 225
220 x 150 - 0 x 0
2.14
UDL G=10.03 Q=0 kN/m
0.11
1.16
2.21
19.151
Shear
Force
(Env.)
-19.812
-57.476
-65.13
78.489
65.829
2.627
Moment
(Env.)
-12.139
-89.262
Project: Guzape_Project
22.3
407.0
0.12
50.88
161.88
228.37
161.88
0.00
148.95
148.95
78.5
407.0
0.41
82.28
588.50
371.79
588.50
0.00
148.95
49.6
390.0
0.05
48.75
375.24
228.37
603.61
0.00
142.73
89.3
407.0
0.08
50.88
647.53
207.85
647.53
0.00
148.95
1.1
390.0
0.00
48.75
7.96
371.79
379.75
0.00
142.73
142.73
106.0
88.4
1.16
0.52
4.05
196.6
57.5
42.8
0.63
0.52
4.05
196.6
65.1
57.0
0.71
0.57
4.05
196.6
0.00
65.8
407.0
0.34
67.97
486.14
201.53
486.14
0.00
148.95
36.3
407.0
0.19
50.88
263.30
140.88
404.17
0.00
148.95
7.4
407.0
0.04
50.88
53.88
74.23
128.10
0.00
148.95
3.0
407.0
0.02
50.88
22.01
69.47
22.01
0.00
148.95
148.95
3.0
407.0
0.02
50.88
22.01
67.15
22.01
0.00
148.95
148.95
2.1
390.0
0.00
48.75
16.02
74.23
16.02
0.00
142.73
6.8
390.0
0.01
48.75
51.53
69.47
88.06
0.00
142.73
12.1
407.0
0.01
50.88
88.06
37.90
88.06
0.00
148.95
7.4
390.0
0.01
48.75
55.76
67.15
88.06
0.00
142.73
21.2
21.2
0.23
0.52
4.05
196.6
19.8
12.6
0.22
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
804.25
0.00
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
19.2
11.3
0.21
0.52
4.05
196.6
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
3Y16
3Y16
3Y16
4Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: 14
Storey: 1
B85
L=2044.6mm
HxBw (mm)
Flange BfxHf
Loads
B84
L=2025mm
450 x 225
200 x 150 - 0 x 0
0.05
G=5.2
Q=1.58
5.2
1.58
0.49
0.88
450 x 225
180 x 150 - 0 x 0
4.46
1.35
1.93
0.11
1.01
1.91
Shear
Force
(Env.)
-34.677
40.001 37.591
Moment
(Env.)
Project: Guzape_Project
-0.093
5.5
407.0
0.03
50.88
39.57
51.77
91.34
0.00
0.00
0.0
407.0
0.00
50.88
0.13
51.77
0.13
0.00
0.00
24.2
407.0
0.13
50.88
175.83
86.16
261.99
0.00
148.95
148.95
14.8
14.8
0.16
0.45
4.05
205.2
0.00
40.0
407.0
0.21
50.88
290.18
98.07
290.18
0.00
148.95
37.6
407.0
0.20
50.88
272.70
121.59
272.70
0.00
148.95
142.73
142.73
28.0
25.2
0.31
0.45
4.05
196.6
34.7
27.4
0.38
0.45
4.05
196.6
20.2
407.0
0.10
50.88
146.63
93.84
240.46
0.00
148.95
3.6
407.0
0.02
50.88
26.37
41.84
68.21
0.00
148.95
148.95
0.1
390.0
0.00
48.75
0.62
41.84
0.62
0.00
142.73
0.00
205.1
0.0
3.6
0.0
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
11.9
11.9
0.13
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 15
Storey: 1
B88
L=1425mm
HxBw (mm)
Flange BfxHf
B87
L=4050mm
450 x 225
0 x 0 - 120 x 150
G=6.25
Q=1.89
Loads
B86
L=4762.5mm
450 x 225
0 x 0 - 400 x 150
450 x 225
470 x 150 - 470 x 150
12.25
3.71
6.25
1.89
0.28
12.25
3.71
2.97
0.9
1.14
0.35
1.31
16.6116.61
5.03 5.03
2.74
3.34
3.94 0.11
1.35
2.23 2.53
3.41
4.65
20.67
Shear
Force
(Env.)
-7.626
-33.489
-83.423
68.225 70.086
Moment
(Env.)
11.975 19.396
-1.214
-25.648
-64.915
Project: Guzape_Project
0.3
407.0
0.00
50.88
2.08
26.74
28.82
0.00
148.95
5.0
407.0
0.03
50.88
36.05
50.94
86.87
0.00
148.95
1.2
390.0
0.00
48.75
9.11
26.74
9.11
0.00
142.73
1.1
407.0
0.00
50.88
8.33
50.94
9.11
0.00
148.95
7.6
7.6
0.08
0.52
4.05
196.6
0.00
12.0
407.0
0.06
50.88
86.87
72.48
86.87
0.00
148.95
19.4
407.0
0.10
50.88
140.71
117.42
140.71
0.00
148.95
0.4
407.0
0.00
50.88
3.17
207.38
210.55
0.00
148.95
142.73
3.4
390.0
0.01
48.75
25.93
117.42
143.35
0.00
142.73
25.6
407.0
0.05
50.88
186.06
207.38
186.06
0.00
148.95
20.7
12.6
0.23
0.52
4.05
196.6
33.5
27.0
0.37
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
603.19
603.19
70.1
407.0
0.36
72.73
520.18
292.51
520.18
0.00
148.95
0.4
407.0
0.00
50.88
3.26
198.08
201.35
0.00
148.95
16.2
407.0
0.08
50.88
117.73
190.26
117.73
0.00
148.95
142.73
2.3
390.0
0.00
48.75
17.63
292.51
310.14
0.00
142.73
64.9
407.0
0.07
50.88
470.91
198.08
470.91
0.00
148.95
36.5
390.0
0.04
48.75
276.51
190.26
466.77
0.00
142.73
75.3
68.0
0.82
0.52
4.05
196.6
83.4
75.3
0.91
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
68.2
407.0
0.35
70.64
505.26
264.09
505.26
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
54.3
46.9
0.59
0.52
4.05
196.6
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
3Y16
3Y16
3Y16
3Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: 19
Storey: 1
B89
L=5437.5mm
HxBw (mm)
Flange BfxHf
450 x 225
780 x 150 - 780 x 150
G=4.11
Q=1.25
Loads
0.11 0.53
8.19
2.48
1.35
16.15
4.89
2.16
16.15
4.89
12.06
3.66
2.72
3.54
6.4
5.574.46
1.94
1.691.35
6.96
6.4
2.11
1.94
4.2
5.33
126.804
Shear
Force
(Env.)
-87.744
Moment
(Env.)
-155.779
Project: Guzape_Project
38.9
407.0
0.20
50.88
282.52
307.66
282.52
0.00
148.95
148.95
38.9
407.0
0.20
50.88
282.52
444.62
282.52
0.00
148.95
71.8
390.0
0.05
48.75
543.38
307.66
851.04
0.00
142.73
155.8
405.0
0.10
50.63
1135.65
206.21
1135.65
0.00
148.22
103.5
390.0
0.07
48.75
783.89
444.62
1135.65
0.00
142.73
87.7
79.8
0.96
0.66
4.05
196.6
0.00
126.8
114.6
1.38
0.66
4.05
196.6
204.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
603.19
1256.64
3Y16
4Y20
603.19
1256.64
Guzape Project
BEAM DESIGN RESULTS
Axis: 2
Storey: 1
B54
L=2025mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 270 x 150
G=10
Q=3.03
0.54
0.16
Loads
1.91
UDL G=10.03 Q=0 kN/m
18.379
Shear
Force
(Env.)
-24.191
Moment
(Env.)
-10.834
Project: Guzape_Project
2.7
407.0
0.01
50.88
19.65
84.82
19.65
0.00
148.95
148.95
2.7
407.0
0.01
50.88
19.65
64.44
19.65
0.00
148.95
7.1
390.0
0.02
48.75
54.02
84.82
78.59
0.00
142.73
10.8
407.0
0.03
50.88
78.59
35.25
78.59
0.00
148.95
6.0
390.0
0.02
48.75
45.67
64.44
78.59
0.00
142.73
24.2
10.0
0.26
0.45
4.05
196.6
0.00
18.4
10.8
0.20
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 2
Storey: 1 (/ 2)
B55
L=2025mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 260 x 150
G=7.03
Q=2.13
Loads
9.91
3
9.91
3
0.58
2.02
29.663
Shear
Force
(Env.)
-28.511
Moment
(Env.)
-14.948
Project: Guzape_Project
3.7
407.0
0.02
50.88
27.11
99.97
27.11
0.00
148.95
148.95
3.7
407.0
0.02
50.88
27.11
104.01
27.11
0.00
148.95
9.0
390.0
0.02
48.75
68.12
99.97
108.44
0.00
142.73
14.9
407.0
0.04
50.88
108.44
46.91
108.44
0.00
148.95
9.2
390.0
0.02
48.75
69.33
104.01
108.44
0.00
142.73
28.5
14.6
0.31
0.45
4.05
196.6
0.00
29.7
14.4
0.32
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 21
Storey: 1
B90
L=825mm
HxBw (mm)
Flange BfxHf
450 x 225
90 x 150 - 0 x 0
2.57
0.78
2.57
0.78
0.53
0.83
G=0.52
Q=0.16
Loads
0.11
UDL G=10.03 Q=0 kN/m
6.726
Shear
Force
(Env.)
-6.015
Moment
(Env.)
-1.338
Project: Guzape_Project
0.3
407.0
0.00
50.88
2.43
21.09
2.43
0.00
148.95
148.95
0.3
407.0
0.00
50.88
2.43
23.58
2.43
0.00
148.95
0.9
390.0
0.00
48.75
7.18
21.09
9.71
0.00
142.73
1.3
407.0
0.00
50.88
9.71
8.73
9.71
0.00
148.95
1.0
390.0
0.00
48.75
7.61
23.58
9.71
0.00
142.73
6.0
5.5
0.07
0.45
4.05
196.6
0.00
6.7
6.0
0.07
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 22
Storey: 1
B91
L=1687.5mm
HxBw (mm)
Flange BfxHf
450 x 225
210 x 150 - 210 x 150
G=7.24
Q=2.19
Loads
0.11
0.84
1.58
15.092
Shear
Force
(Env.)
-15.092
Moment
(Env.)
-7.17
Project: Guzape_Project
1.8
407.0
0.01
50.88
13.00
52.92
13.00
0.00
148.95
148.95
1.8
407.0
0.01
50.88
13.00
52.92
13.00
0.00
148.95
4.3
390.0
0.01
48.75
32.26
52.92
52.02
0.00
142.73
7.2
407.0
0.01
50.88
52.02
27.87
52.02
0.00
148.95
4.3
390.0
0.01
48.75
32.26
52.92
52.02
0.00
142.73
15.1
7.1
0.16
0.45
4.05
196.6
0.00
15.1
7.1
0.16
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 23
Storey: 1
B92
L=5175mm
HxBw (mm)
Flange BfxHf
450 x 225
740 x 150 - 740 x 150
21.16
21.16 19.31
G=20.97
6.416.41 5.85
Q=6.36
2.04
0.62
Loads
0.11
2.23
2.91
4.65
5.06
82.60
Shear
Force
(Env.)
-81.552
Moment
(Env.)
-126.535
Project: Guzape_Project
31.6
407.0
0.16
50.88
229.48
285.95
229.48
0.00
148.95
148.95
31.6
407.0
0.16
50.88
229.48
289.62
229.48
0.00
148.95
63.6
390.0
0.05
48.75
481.53
285.95
767.48
0.00
142.73
126.5
405.0
0.09
50.63
922.46
180.55
922.46
0.00
148.22
63.1
390.0
0.05
48.75
477.57
289.62
767.19
0.00
142.73
81.6
73.5
0.89
0.60
4.05
196.6
0.00
82.6
69.9
0.90
0.60
4.05
196.6
204.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
942.48
2Y16
3Y20
402.12
942.48
Guzape Project
BEAM DESIGN RESULTS
Axis: 24
Storey: 1
B93
L=1762.5mm
HxBw (mm)
Flange BfxHf
450 x 225
230 x 150 - 0 x 0
G=8.17
Q=2.48
Loads
1.65
UDL G=10.03 Q=0 kN/m
14.634
Shear
Force
(Env.)
-18.951
Moment
(Env.)
-7.418
Project: Guzape_Project
1.9
407.0
0.01
50.88
13.45
66.45
13.45
0.00
148.95
148.95
1.9
407.0
0.01
50.88
13.45
51.31
13.45
0.00
148.95
5.0
390.0
0.01
48.75
37.59
66.45
53.82
0.00
142.73
7.4
407.0
0.02
50.88
53.82
27.25
53.82
0.00
148.95
4.2
390.0
0.01
48.75
32.12
51.31
53.82
0.00
142.73
19.0
6.4
0.21
0.45
4.05
196.6
0.00
14.6
7.4
0.16
0.45
4.05
196.6
205.1
0.1
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 24
Storey: 1 (/ 2)
B94
L=1425mm
HxBw (mm)
Flange BfxHf
450 x 225
170 x 150 - 0 x 0
G=6.5
Q=1.97
Loads
0.11
1.42
13.97
Shear
Force
(Env.)
-11.165
Moment
(Env.)
-4.483
Project: Guzape_Project
1.1
407.0
0.01
50.88
8.13
39.15
8.13
0.00
148.95
148.95
1.1
407.0
0.01
50.88
8.13
48.98
8.13
0.00
148.95
2.7
390.0
0.01
48.75
20.43
39.15
32.52
0.00
142.73
4.5
407.0
0.01
50.88
32.52
19.64
32.52
0.00
148.95
3.1
390.0
0.01
48.75
23.30
48.98
32.52
0.00
142.73
11.2
5.1
0.12
0.45
4.05
196.6
0.00
14.0
5.7
0.15
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 25
Storey: 1
B97
L=1687.5mm
HxBw (mm)
Flange BfxHf
B96
L=2624.8mm
450 x 225
150 x 150 - 0 x 0
B95
L=1425.2mm
450 x 225
---
450 x 225
120 x 150 - 0 x 0
G=3.62
Q=1.1
Loads
0.11
2.97
0.9
0.84
1.58
0.11
UDL G=10.03 Q=0 kN/m
15.612
Shear
Force
(Env.)
0.71
1.31
-10.812
11.083
-11.622
-20.477
9.074
4.686
1.56 2.241
Moment
(Env.)
-4.22
-4.415
-7.637
Project: Guzape_Project
1.1
407.0
0.01
50.88
7.65
37.91
7.65
0.00
148.95
2.9
390.0
0.01
48.75
21.65
37.91
30.61
0.00
142.73
148.95
4.7
407.0
0.02
50.88
33.99
54.74
33.99
0.00
148.95
9.1
407.0
0.05
50.88
65.82
71.80
65.82
0.00
148.95
0.0
407.0
0.00
50.88
0.09
40.47
40.56
0.00
148.95
1.9
407.0
0.01
50.88
13.85
49.53
13.85
0.00
148.95
2.2
407.0
0.01
50.88
16.26
40.75
16.26
0.00
148.95
148.95
1.1
407.0
0.01
50.88
8.01
38.86
8.01
0.00
148.95
4.2
407.0
0.01
50.88
30.61
31.71
30.61
0.00
148.95
0.8
390.0
0.00
48.75
6.33
54.74
30.61
0.00
142.73
0.2
390.0
0.00
48.75
1.86
71.80
55.40
0.00
142.73
7.6
407.0
0.04
50.88
55.40
40.47
55.40
0.00
148.95
5.9
390.0
0.03
48.75
45.03
49.53
55.40
0.00
142.73
3.2
390.0
0.01
48.75
24.25
40.75
32.03
0.00
142.73
4.4
407.0
0.01
50.88
32.03
21.61
32.03
0.00
148.95
2.7
390.0
0.01
48.75
20.25
38.86
32.03
0.00
142.73
15.6
8.4
0.17
0.45
4.05
196.6
20.5
14.0
0.22
0.45
4.05
196.6
14.1
7.6
0.15
0.45
4.05
196.6
11.6
5.6
0.13
0.45
4.05
196.6
10.8
3.6
0.12
0.45
4.05
196.6
0.00
0.00
205.1
0.1
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
0.00
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
11.1
6.3
0.12
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 25
Storey: 1 (/ 2)
B98
L=1425mm
HxBw (mm)
Flange BfxHf
450 x 225
---
Loads
UDL G=10.03 Q=0 kN/m
8.934
Shear
Force
(Env.)
-8.934
Moment
(Env.)
-3.183
Project: Guzape_Project
0.8
407.0
0.00
50.88
5.77
31.33
5.77
0.00
148.95
148.95
0.8
407.0
0.00
50.88
5.77
31.33
5.77
0.00
148.95
2.1
390.0
0.01
48.75
15.57
31.33
23.09
0.00
142.73
3.2
407.0
0.02
50.88
23.09
13.19
23.09
0.00
148.95
2.1
390.0
0.01
48.75
15.57
31.33
23.09
0.00
142.73
8.9
3.8
0.10
0.45
4.05
196.6
0.00
8.9
3.8
0.10
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 25a
Storey: 1
B99
L=5175mm
HxBw (mm)
Flange BfxHf
Loads
450 x 225
750 x 150 - 0 x 0
0.11
G=10.67
Q=3.23
10.67
3.23
2.27
2.91
5.06
57.859
Shear
Force
(Env.)
-57.859
Moment
(Env.)
-86.461
Project: Guzape_Project
21.6
407.0
0.11
50.88
156.80
202.87
156.80
0.00
148.95
148.95
21.6
407.0
0.11
50.88
156.80
202.88
156.80
0.00
148.95
44.0
390.0
0.06
48.75
333.21
202.87
536.09
0.00
142.73
86.5
407.0
0.10
50.88
627.21
120.50
627.21
0.00
148.95
44.0
390.0
0.06
48.75
333.21
202.88
536.08
0.00
142.73
57.9
50.6
0.63
0.57
4.05
196.6
0.00
57.9
50.6
0.63
0.57
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
603.19
804.25
3Y16
4Y16
603.19
804.25
Guzape Project
BEAM DESIGN RESULTS
Axis: 3
Storey: 1
B56
L=1843.6mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 240 x 150
G=8.54
Q=2.59
8.54
2.59
Loads
0.8
0.99 0.59
0.3 0.18
1.111.11
0.340.34
1.36 1.49
1.75
Shear
Force
(Env.)
-22.832
Moment
(Env.)
-9.62
Project: Guzape_Project
2.4
407.0
0.01
50.88
17.45
80.06
17.45
0.00
148.95
148.95
2.4
407.0
0.01
50.88
17.45
60.36
17.45
0.00
148.95
6.4
390.0
0.02
48.75
48.16
80.06
69.79
0.00
142.73
9.6
407.0
0.02
50.88
69.79
34.72
69.79
0.00
148.95
5.2
390.0
0.01
48.75
39.33
60.36
69.79
0.00
142.73
22.8
8.8
0.25
0.45
4.05
196.6
0.00
17.2
9.9
0.19
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 3
Storey: 1 (/ 2)
B57
L=1987.5mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 260 x 150
G=6.5
Q=1.97
Loads
8.54
2.59
8.54
2.59
0.41
1.99
26.874
Shear
Force
(Env.)
-26.257
Moment
(Env.)
-13.329
Project: Guzape_Project
3.3
407.0
0.02
50.88
24.17
92.06
24.17
0.00
148.95
148.95
3.3
407.0
0.02
50.88
24.17
94.23
24.17
0.00
148.95
8.1
390.0
0.02
48.75
61.39
92.06
96.69
0.00
142.73
13.3
407.0
0.03
50.88
96.69
42.03
96.69
0.00
148.95
8.2
390.0
0.02
48.75
61.85
94.23
96.69
0.00
142.73
26.3
12.9
0.29
0.45
4.05
196.6
0.00
26.9
12.8
0.29
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 4
Storey: 1
B61
L=3412.7mm
HxBw (mm)
Flange BfxHf
12.25
3.71
G=7.43
Q=2.25
Loads
B60
L=3187.5mm
450 x 225
330 x 150 - 330 x 150
0.11
0.86
12.25
3.71
1.84
2.55
B59
L=2250mm
450 x 225
310 x 150 - 310 x 150
8.54
8.54
8.54
2.59
2.59
2.59
3.3
63.506
12.25
3.71
0.86
12.25
3.71
450 x 225
0 x 0 - 210 x 150
7.43
2.25
1.35
2.33
5.01
1.52
3.08
0.11
1.13
2.14
Shear
Force
(Env.)
22.417
-15.967
-30.898
-58.685
41.355 40.903
-5.028
-16.576
-25.173
Project: Guzape_Project
11.998
6.738 4.612
Moment
(Env.)
6.3
407.0
0.03
50.88
45.65
108.34
45.65
0.00
148.95
0.5
407.0
0.00
50.88
3.79
126.86
130.65
0.00
148.95
15.7
390.0
0.02
48.75
118.67
108.34
182.62
0.00
142.73
25.2
407.0
0.03
50.88
182.62
126.86
182.62
0.00
148.95
30.9
22.8
0.34
0.45
4.05
196.6
0.00
41.4
407.0
0.21
50.88
300.00
222.67
300.00
0.00
148.95
40.9
407.0
0.21
50.88
296.72
205.77
296.72
0.00
148.95
3.3
407.0
0.02
50.88
23.96
116.55
140.51
0.00
148.95
6.7
407.0
0.03
50.88
48.88
102.40
48.88
0.00
148.95
4.6
407.0
0.02
50.88
33.46
55.99
33.46
0.00
148.95
1.5
407.0
0.01
50.88
10.62
47.59
58.21
0.00
148.95
12.0
407.0
0.06
50.88
87.04
78.60
87.04
0.00
148.95
142.73
142.73
16.6
407.0
0.02
50.88
120.25
116.55
120.25
0.00
148.95
8.1
390.0
0.01
48.75
61.14
102.40
120.25
0.00
142.73
2.3
390.0
0.00
48.75
17.70
55.99
36.48
0.00
142.73
5.0
407.0
0.01
50.88
36.48
47.59
36.48
0.00
148.95
0.0
390.0
0.00
48.75
0.16
78.60
36.48
0.00
142.73
63.5
48.6
0.69
0.45
4.05
196.6
58.7
43.9
0.64
0.45
4.05
196.6
29.2
21.2
0.32
0.45
4.05
196.6
16.0
8.7
0.17
0.45
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
0.00
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
22.4
15.2
0.24
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 4
Storey: 1 ...
B58
L=2325mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 220 x 150
G=5.2
Q=1.58
Loads
0.11
1.16
2.21
15.707
Shear
Force
(Env.)
-23.467
9.855
Moment
(Env.)
Project: Guzape_Project
-8.44
9.9
407.0
0.05
50.88
71.49
82.28
71.49
0.00
148.95
0.0
407.0
0.00
50.88
0.16
50.61
50.77
0.00
148.95
2.1
407.0
0.01
50.88
15.31
55.08
15.31
0.00
148.95
0.5
390.0
0.00
48.75
3.61
82.28
61.23
0.00
142.73
8.4
407.0
0.01
50.88
61.23
50.61
61.23
0.00
148.95
5.7
390.0
0.01
48.75
43.39
55.08
61.23
0.00
142.73
23.5
16.2
0.26
0.45
4.05
196.6
0.00
15.7
8.0
0.17
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 5
Storey: 1
B63
L=1634.6mm
HxBw (mm)
Flange BfxHf
Loads
B62
L=2025mm
450 x 225
0 x 0 - 150 x 150
0.05
G=3.43
Q=1.04
3.43
1.04
0.33
0.83
450 x 225
190 x 150 - 190 x 150
4.38
1.33
1.52
0.11
11.25
3.41
13.29
4.03
3.76
13.3113.76
4.17
4.034.17
0.81
1.22
1.91
18.436
Shear
Force
(Env.)
-44.878
35.111
23.42
Moment
(Env.)
Project: Guzape_Project
-4.80
3.0
407.0
0.02
50.88
21.62
40.47
62.09
0.00
0.00
0.7
390.0
0.00
48.75
5.13
40.47
5.13
0.00
0.00
13.9
407.0
0.07
50.88
100.92
62.63
163.54
0.00
148.95
148.95
11.5
11.5
0.13
0.45
4.05
196.6
0.00
23.4
407.0
0.12
50.88
169.90
71.77
169.90
0.00
148.95
35.1
407.0
0.18
50.88
254.70
157.36
254.70
0.00
148.95
12.9
407.0
0.07
50.88
93.50
114.79
208.29
0.00
148.95
1.2
407.0
0.01
50.88
8.63
64.64
73.27
0.00
148.95
142.73
142.73
4.8
407.0
0.01
50.88
34.52
114.79
34.52
0.00
148.95
4.4
390.0
0.01
48.75
33.51
64.64
34.52
0.00
142.73
20.5
17.7
0.22
0.45
4.05
196.6
44.9
33.9
0.49
0.45
4.05
196.6
0.00
205.1
0.1
3.6
0.0
205.1
0.1
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
18.4
6.3
0.20
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 5c
Storey: 1
B72
L=286.8mm
HxBw (mm)
Flange BfxHf
B64
L=2280.8mm
450 x 225
0 x 0 - 20 x 150
450 x 225
0 x 0 - 220 x 150
3.43
1.04
G=1.16
Q=0.35
Loads
0.05
0.14
0.24
0.27
14.878
1.95
2.23
Shear
Force
(Env.)
-6.739
4.079
Moment
(Env.)
-4.748
Project: Guzape_Project
0.6
407.0
0.00
50.88
4.34
49.08
13.13
0.00
0.00
0.00
1.8
407.0
0.01
50.88
13.13
49.56
29.59
0.00
148.95
148.95
14.0
0.0
0.15
0.45
4.05
205.2
0.00
4.1
407.0
0.02
50.88
29.59
52.17
29.59
0.00
148.95
1.2
407.0
0.01
50.88
8.61
23.63
8.61
0.00
148.95
148.95
1.2
407.0
0.01
50.88
8.61
28.72
8.61
0.00
148.95
142.73
2.5
390.0
0.01
48.75
18.75
23.63
34.44
0.00
142.73
4.7
407.0
0.01
50.88
34.44
14.05
34.44
0.00
148.95
3.3
390.0
0.01
48.75
24.71
28.72
34.44
0.00
142.73
14.9
0.0
0.16
0.45
4.05
196.6
6.7
4.5
0.07
0.45
4.05
196.6
0.00
205.1
0.0
3.6
0.0
205.1
0.6
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
8.2
4.3
0.09
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 5d
Storey: 1
B45
L=2005.4mm
HxBw (mm)
Flange BfxHf
450 x 225
290 x 150 - 0 x 0
5.2
1.58
G=2.59
Q=0.78
Loads
0.05
0.26
1.52
1.96
9.675
Shear
Force
(Env.)
-9.132
Moment
(Env.)
-5.306
Project: Guzape_Project
1.3
407.0
0.01
50.88
9.62
32.02
9.62
0.00
148.95
148.95
1.3
407.0
0.01
50.88
9.62
33.92
9.62
0.00
0.00
3.1
390.0
0.01
48.75
23.79
32.02
38.49
0.00
142.73
5.3
407.0
0.01
50.88
38.49
20.67
38.49
0.00
148.95
2.5
407.0
0.01
50.88
18.18
33.92
38.49
0.00
0.00
9.1
5.3
0.10
0.45
4.05
196.6
0.00
9.7
6.7
0.11
0.45
4.05
205.2
205.1
0.0
3.6
0.0
Y10-250
0.0
4.93 < 3990.77 OK
402.12
402.12
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 7
Storey: 1
B71
L=860.1mm
HxBw (mm)
Flange BfxHf
B70
L=2387.5mm
450 x 225
60 x 150 - 60 x 150
Loads
0.05
B69
L=2025mm
450 x 225
220 x 150 - 220 x 150
G=1.16
Q=0.35
1.79 2.19
0.54 0.66
0.98
0.3
1.211.44
1.21
0.37
0.370.44
0.14
0.27 0.33
0.75
0.86
450 x 225
180 x 150 - 180 x 150
8.26
2.5
10.7
3.24
10.71
10.029.47 8.91
3.24
3.042.87 2.7
8.91
2.7
6.87
2.08
1.09
1.58
2.21
0.81
1.22
46.129
26.917
Shear
Force
(Env.)
1.91
20.849
-7.179
-21.432
61.737
24.053 21.241
Moment
(Env.)
Project: Guzape_Project
3.786
-0.012
7.4
407.0
0.04
50.88
53.49
81.59
117.97
0.00
0.00
0.00
16.3
407.0
0.08
50.88
117.97
88.04
174.49
0.00
148.95
148.95
23.3
23.3
0.25
0.45
4.05
205.2
0.00
24.1
407.0
0.12
50.88
174.49
94.38
174.49
0.00
148.95
21.2
407.0
0.11
50.88
154.09
75.15
154.09
0.00
148.95
9.4
407.0
0.05
50.88
68.05
54.31
122.36
0.00
148.95
11.6
407.0
0.06
50.88
84.23
73.10
84.23
0.00
148.95
15.1
407.0
0.08
50.88
109.61
66.09
175.70
0.00
148.95
38.6
407.0
0.20
50.88
280.18
130.97
411.15
0.00
148.95
61.7
407.0
0.32
63.44
453.75
161.74
453.75
0.00
148.95
142.73
142.73
0.0
407.0
0.00
50.88
0.08
54.31
0.08
0.00
148.95
142.73
142.73
148.95
142.73
26.9
24.1
0.29
0.45
4.05
196.6
21.4
17.0
0.23
0.45
4.05
196.6
20.8
9.5
0.23
0.45
4.05
196.6
18.8
18.8
0.21
0.52
4.05
196.6
0.00
205.1
2.5
3.6
0.0
0.0
Y10-250
402.12
402.12
0.00
205.1
0.0
3.6
0.0
Y10-250
11.612 11.747
11.739
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
46.1
38.2
0.50
0.52
4.05
196.6
Y10-250
0.0
Y10-250
--402.12
402.12
603.19
603.19
603.19
603.19
2Y16
2Y16
3Y16
2Y16
2Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: 7
Storey: 1 ...
B68
L=5700mm
HxBw (mm)
Flange BfxHf
G=14.67
Q=4.44
Loads
B67
L=4049.8mm
450 x 225
570 x 150 - 570 x 150
0.11
1.59
20.7
20.7
6.27
6.27
14.67
4.44
2.81
4.11
B66
L=3412.7mm
450 x 225
400 x 150 - 400 x 150
5.590.11
94.06
9.65
2.92
11.88
3.6
11.88
3.6
1.09
1.54
2.03
450 x 225
330 x 150 - 330 x 150
7.06 5.94
2.14 1.8
5.94 4.83
4.83
4.83
1.8 1.46
1.46
1.46
8.54
2.59
8.54 7.43
2.59 2.25
2.51
3.71
0.86
2.33 2.55
3.3
Shear
Force
(Env.)
48.998
-33.867
-68.248
-91.174
75.355
83.933 75.855
60.92
32.571 27.632
Moment
(Env.)
7.328
-0.39
-25.787
-79.175
Project: Guzape_Project
75.4
407.0
0.39
78.69
562.85
319.69
562.85
0.00
148.95
148.95
83.9
407.0
0.44
88.58
633.60
329.81
633.60
0.00
148.95
3.8
390.0
0.00
48.75
28.65
319.69
348.33
0.00
142.73
79.2
407.0
0.07
50.88
574.36
208.29
574.36
0.00
148.95
91.2
83.3
1.00
0.57
4.05
196.6
0.00
75.9
407.0
0.39
79.26
566.92
239.30
566.92
0.00
148.95
16.1
407.0
0.08
50.88
116.98
164.92
281.89
0.00
148.95
32.6
407.0
0.17
50.88
236.28
198.60
236.28
0.00
148.95
1.9
390.0
0.00
48.75
14.69
329.81
344.50
0.00
142.73
142.73
25.8
407.0
0.03
50.88
187.07
164.92
187.07
0.00
148.95
94.1
86.1
1.03
0.57
4.05
196.6
68.2
60.1
0.75
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
804.25
804.25
23.6
407.0
0.12
50.88
171.27
112.91
284.18
0.00
148.95
60.9
407.0
0.32
62.54
447.33
171.80
447.33
0.00
148.95
3.9
390.0
0.00
48.75
29.86
198.60
187.07
0.00
142.73
142.73
0.4
407.0
0.00
50.88
2.83
112.91
2.83
0.00
148.95
142.73
56.6
45.3
0.62
0.52
4.05
196.6
33.9
22.3
0.37
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
27.6
407.0
0.14
50.88
200.45
118.75
200.45
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
49.0
40.9
0.54
0.52
4.05
196.6
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
4Y16
3Y16
3Y16
4Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: 7
Storey: 1 ...
B65
L=3187.5mm
HxBw (mm)
Flange BfxHf
450 x 225
310 x 150 - 310 x 150
G=1.59
Q=0.48
Loads
0.11
9.02
2.73
0.86
16.26
4.93
16.26
4.93
2.33
2.72
12.73
12.17
3.86
3.69
3.08
Shear
Force
(Env.)
-66.053
71.101
Moment
(Env.)
Project: Guzape_Project
-17.044
71.1
407.0
0.37
73.87
528.36
231.60
528.36
0.00
148.95
21.3
407.0
0.11
50.88
154.21
170.69
324.90
0.00
148.95
4.3
407.0
0.02
50.88
30.91
124.70
154.21
0.00
148.95
142.73
17.0
407.0
0.02
50.88
123.64
170.69
123.64
0.00
148.95
14.2
390.0
0.02
48.75
107.19
124.70
123.64
0.00
142.73
66.1
56.9
0.72
0.52
4.05
196.6
0.00
35.6
16.4
0.39
0.52
4.05
196.6
205.1
0.1
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
603.19
603.19
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: 8
Storey: 1
B75
L=2624.8mm
HxBw (mm)
Flange BfxHf
B74
L=2850.2mm
450 x 225
250 x 150 - 0 x 0
Loads
0.11
G=4.83
Q=1.46
4.83
1.46
1.09
1.54
B73
L=1987.5mm
450 x 225
270 x 150 - 0 x 0
2.51
0.11
450 x 225
180 x 150 - 180 x 150
4.83
1.46
4.83 4.83
1.46 1.46
1.09
2.85
8.728.72
2.642.64
0.9
1.88
27.989
11.382
Shear
Force
(Env.)
-17.307
-25.107
-32.278
17.085 18.434
14.887 14.883
Moment
(Env.)
-4.327
-5.564
-10.095
Project: Guzape_Project
2.5
407.0
0.01
50.88
18.31
60.68
18.31
0.00
148.95
0.0
407.0
0.00
50.88
0.35
61.48
61.83
0.00
148.95
6.7
390.0
0.02
48.75
50.75
60.68
73.23
0.00
142.73
10.1
407.0
0.02
50.88
73.23
61.48
73.23
0.00
148.95
17.3
10.1
0.19
0.45
4.05
196.6
0.00
14.9
407.0
0.08
50.88
108.00
98.14
108.00
0.00
148.95
14.9
407.0
0.08
50.88
107.96
88.03
107.96
0.00
148.95
0.1
407.0
0.00
50.88
0.99
50.49
51.48
0.00
148.95
142.73
142.73
5.6
407.0
0.01
50.88
40.36
50.49
40.36
0.00
148.95
28.0
20.7
0.31
0.45
4.05
196.6
25.1
17.9
0.27
0.45
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
402.12
402.12
18.4
407.0
0.10
50.88
133.73
113.18
133.73
0.00
148.95
3.9
407.0
0.02
50.88
28.30
70.01
98.30
0.00
148.95
1.1
407.0
0.01
50.88
7.85
39.91
28.30
0.00
148.95
142.73
142.73
4.3
407.0
0.01
50.88
31.39
70.01
31.39
0.00
148.95
3.3
390.0
0.01
48.75
25.17
39.91
31.39
0.00
142.73
30.4
19.6
0.33
0.45
4.05
196.6
32.3
20.8
0.35
0.45
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
17.1
407.0
0.09
50.88
123.94
106.46
123.94
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
11.4
3.4
0.12
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: 9
Storey: 1
B76
L=5700mm
HxBw (mm)
Flange BfxHf
450 x 225
820 x 150 - 820 x 150
G=5.75
Q=1.74
Loads
0.11
0.69
10.21
3.09
10.21
3.09
1.59
3.62
7.8
6.875.75
2.36
2.081.74
5.76
1.74
4.11
5.01
5.59
62.545
13.005
Shear
Force
(Env.)
-19.076
-53.476
11.134
-1.084
Moment
(Env.)
-5.058
-66.796
Project: Guzape_Project
16.7
407.0
0.09
50.88
121.14
187.50
121.14
0.00
148.95
6.2
407.0
0.03
50.88
44.86
211.40
121.14
0.00
148.95
16.7
407.0
0.09
50.88
121.14
219.30
121.14
0.00
148.95
42.4
390.0
0.03
48.75
321.21
187.50
484.56
0.00
142.73
66.8
407.0
0.04
50.88
484.56
211.40
484.56
0.00
148.95
4.8
390.0
0.00
48.75
36.02
219.30
255.32
0.00
142.73
53.5
45.6
0.58
0.52
4.05
196.6
0.00
62.5
62.5
0.68
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
603.19
2Y16
3Y16
402.12
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: A
Storey: 1
B46
L=4372.3mm
HxBw (mm)
Flange BfxHf
Loads
B47
L=895mm
450 x 225
450 x 150 - 0 x 0
450 x 225
80 x 150 - 0 x 0
2.07
0.63
G=1.16
Q=0.35
2.07
0.63
0.05
3.84
2.59
0.78
4.26
17.847
0.11
0.64
0.85
Shear
Force
(Env.)
-13.538
-14.342
10.757 10.659
Moment
(Env.)
-13.113
Project: Guzape_Project
3.3
407.0
0.02
50.88
23.78
47.47
23.78
0.00
148.95
8.2
390.0
0.02
48.75
61.98
47.47
95.13
0.00
142.73
148.95
10.8
407.0
0.06
50.88
78.03
62.58
78.03
0.00
148.95
10.7
407.0
0.06
50.88
77.33
50.29
77.33
0.00
148.95
6.4
407.0
0.03
50.88
46.75
45.38
77.33
0.00
148.95
1.9
407.0
0.01
50.88
13.77
38.85
46.75
0.00
0.00
13.1
407.0
0.02
50.88
95.13
36.17
95.13
0.00
148.95
1.4
390.0
0.00
48.75
10.75
62.58
73.33
0.00
142.73
142.73
148.95
0.00
17.8
15.0
0.19
0.45
4.05
196.6
14.3
12.0
0.16
0.45
4.05
196.6
13.5
10.2
0.15
0.45
4.05
196.6
0.00
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
11.1
11.1
0.12
0.45
4.05
205.2
0.0
2.2 < 168.36 OK
402.12
402.12
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: AB
Storey: 1
B10
L=1349.8mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 170 x 150
G=8.71
Q=2.64
2.59
0.78
Loads
1.24
UDL G=10.03 Q=0 kN/m
12.94
Shear
Force
(Env.)
-15.906
Moment
(Env.)
-4.938
Project: Guzape_Project
1.2
407.0
0.01
50.88
8.96
55.77
8.96
0.00
148.95
148.95
1.2
407.0
0.01
50.88
8.96
45.37
8.96
0.00
148.95
3.4
390.0
0.01
48.75
25.61
55.77
35.83
0.00
142.73
4.9
407.0
0.01
50.88
35.83
22.50
35.83
0.00
148.95
3.0
390.0
0.01
48.75
23.05
45.37
35.83
0.00
142.73
15.9
7.6
0.17
0.45
4.05
196.6
0.00
12.9
7.3
0.14
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: AB
Storey: 1 (/ 2)
B11
L=1725mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 240 x 150
10.49
3.18
G=4.64
Q=1.41
Loads
1.18
UDL G=10.03 Q=0 kN/m
7.8
2.36
1.73
23.774
Shear
Force
(Env.)
-21.56
Moment
(Env.)
-10.098
Project: Guzape_Project
2.5
407.0
0.01
50.88
18.31
75.60
18.31
0.00
148.95
148.95
2.5
407.0
0.01
50.88
18.31
83.36
18.31
0.00
148.95
6.0
390.0
0.02
48.75
45.58
75.60
73.25
0.00
142.73
10.1
407.0
0.03
50.88
73.25
37.09
73.25
0.00
148.95
6.5
390.0
0.02
48.75
48.85
83.36
73.25
0.00
142.73
21.6
9.8
0.24
0.45
4.05
196.6
0.00
23.8
9.2
0.26
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: AB
Storey: 1 (/ 3)
B12
L=750mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 80 x 150
G=3.16
Q=0.96
Loads
0.64
UDL G=10.03 Q=0 kN/m
5.188
Shear
Force
(Env.)
-5.931
Moment
(Env.)
-1.04
Project: Guzape_Project
0.3
407.0
0.00
50.88
1.89
20.80
1.89
0.00
148.95
148.95
0.3
407.0
0.00
50.88
1.89
18.19
1.89
0.00
148.95
0.8
390.0
0.00
48.75
6.14
20.80
7.54
0.00
142.73
1.0
407.0
0.00
50.88
7.54
7.20
7.54
0.00
148.95
0.8
390.0
0.00
48.75
5.73
18.19
7.54
0.00
142.73
5.9
4.3
0.06
0.45
4.05
196.6
0.00
5.2
5.2
0.06
0.45
4.05
196.6
205.1
0.4
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: AD
Storey: 1
B3
L=4125mm
HxBw (mm)
Flange BfxHf
B4
L=1725.1mm
450 x 225
0 x 0 - 400 x 150
450 x 225
160 x 150 - 160 x 150
8.54
2.59
G=1.64 0.99
Q=0.5 0.3
Loads
0.11
0.44
8.9
2.7
8.9
2.7
0.86
1.13
6.48 6.48
1.96 1.96
1.47
0.45
0.76
2.29
4.01
0.11
1.61 1.73
Shear
Force
(Env.)
-18.715
82.515
Moment
(Env.)
Project: Guzape_Project
-74.45
96.746
-12.339
3.1
407.0
0.02
50.88
22.38
65.62
88.00
0.00
148.95
26.2
407.0
0.14
50.88
190.20
147.96
338.16
0.00
148.95
9.7
390.0
0.02
48.75
73.49
65.62
89.51
0.00
142.73
12.3
407.0
0.02
50.88
89.51
147.96
89.51
0.00
148.95
18.7
11.5
0.20
0.52
4.05
196.6
0.00
82.5
407.0
0.43
86.93
621.78
210.03
621.78
0.00
148.95
96.7
407.0
0.50
103.81
742.49
261.05
742.49
0.00
148.95
142.73
142.73
59.9
52.5
0.65
0.57
4.05
196.6
74.4
65.5
0.81
0.57
4.05
196.6
60.5
407.0
0.31
62.04
443.77
229.87
673.65
0.00
148.95
16.0
407.0
0.08
50.88
116.02
163.32
279.34
0.00
0.00
148.95
0.1
407.0
0.00
50.88
0.61
163.32
0.61
0.00
0.00
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
804.25
603.19
46.6
46.6
0.51
0.57
4.05
205.2
0.0
4.24 < 8.26 OK
804.25
603.19
804.25
603.19
804.25
603.19
4Y16
4Y16
3Y16
3Y16
804.25
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: AD
Storey: 1 (/ 2)
B5
L=1350.3mm
HxBw (mm)
Flange BfxHf
450 x 225
0 x 0 - 160 x 150
G=2.39
Q=0.73
1.02 1.02
0.31 0.31
Loads
0.11
0.6
1.26 1.35
10.204
Shear
Force
(Env.)
-9.809
Moment
(Env.)
-3.515
Project: Guzape_Project
0.9
407.0
0.00
50.88
6.37
34.39
6.37
0.00
148.95
148.95
0.9
407.0
0.00
50.88
6.37
35.78
6.37
0.00
148.95
2.2
390.0
0.01
48.75
16.92
34.39
25.50
0.00
142.73
3.5
407.0
0.01
50.88
25.50
15.87
25.50
0.00
148.95
2.3
390.0
0.01
48.75
17.24
35.78
25.50
0.00
142.73
9.8
5.4
0.11
0.45
4.05
196.6
0.00
10.2
5.4
0.11
0.45
4.05
196.6
205.1
0.1
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: AD
Storey: 1 (/ 3)
B6
L=1050mm
HxBw (mm)
Flange BfxHf
450 x 225
---
Loads
UDL G=10.03 Q=0 kN/m
6.583
Shear
Force
(Env.)
-6.583
Moment
(Env.)
-1.728
Project: Guzape_Project
0.4
407.0
0.00
50.88
3.13
23.08
3.13
0.00
148.95
148.95
0.4
407.0
0.00
50.88
3.13
23.08
3.13
0.00
148.95
1.2
390.0
0.01
48.75
9.02
23.08
12.54
0.00
142.73
1.7
407.0
0.01
50.88
12.54
9.07
12.54
0.00
148.95
1.2
390.0
0.01
48.75
9.02
23.08
12.54
0.00
142.73
6.6
6.2
0.07
0.45
4.05
196.6
0.00
6.6
6.2
0.07
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: AD
Storey: 1 (/ 4)
B7
L=937.4mm
HxBw (mm)
Flange BfxHf
450 x 225
---
Loads
UDL G=10.03 Q=0 kN/m
5.877
Shear
Force
(Env.)
-5.877
Moment
(Env.)
-1.377
Project: Guzape_Project
0.3
407.0
0.00
50.88
2.50
20.61
2.50
0.00
148.95
148.95
0.3
407.0
0.00
50.88
2.50
20.61
2.50
0.00
148.95
1.0
390.0
0.01
48.75
7.39
20.61
9.99
0.00
142.73
1.4
407.0
0.01
50.88
9.99
7.83
9.99
0.00
148.95
1.0
390.0
0.01
48.75
7.39
20.61
9.99
0.00
142.73
5.9
4.8
0.06
0.45
4.05
196.6
0.00
5.9
5.9
0.06
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: AD
Storey: 1 (/ 5)
B8
L=3487.9mm
HxBw (mm)
Flange BfxHf
B9
L=1050.1mm
450 x 225
0 x 0 - 340 x 150
450 x 225
0 x 0 - 90 x 150
G=10.67
Q=3.23
4.64
1.41
Loads
0.11
2.27
3.49
0.94
Shear
Force
(Env.)
-18.497
-74.735
64.582 68.828
Moment
(Env.)
Project: Guzape_Project
-11.185
2.8
407.0
0.01
50.88
20.29
64.86
85.14
0.00
148.95
16.8
407.0
0.09
50.88
121.91
138.95
260.86
0.00
148.95
9.1
390.0
0.02
48.75
69.14
64.86
81.14
0.00
142.73
11.2
407.0
0.02
50.88
81.14
138.95
81.14
0.00
148.95
18.5
11.2
0.20
0.52
4.05
196.6
0.00
64.6
407.0
0.34
66.58
476.24
218.36
476.24
0.00
148.95
68.8
407.0
0.36
71.32
510.09
262.05
510.09
0.00
148.95
142.73
142.73
62.3
50.4
0.68
0.52
4.05
196.6
74.7
66.4
0.82
0.52
4.05
196.6
44.1
407.0
0.23
50.88
319.87
238.98
510.09
0.00
148.95
13.9
407.0
0.07
50.88
101.01
225.57
319.87
0.00
0.00
148.95
0.0
407.0
0.00
50.88
0.01
225.57
0.01
0.00
0.00
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
64.3
64.3
0.70
0.52
4.05
205.2
0.0
2.58 < 10.23 OK
603.19
603.19
603.19
603.19
603.19
603.19
3Y16
3Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: AF
Storey: 1
B2
L=7275mm
HxBw (mm)
Flange BfxHf
Loads
450 x 225
1050 x 150 - 1050 x 150
10.21
G=10.02
3.09
Q=3.04
10.21
3.09
1.13
2.85
0.11
18.1
18.1
5.48
5.48
4.44
10.39
3.15
6.11
7.16
81.137
Shear
Force
(Env.)
-75.697
Moment
(Env.)
-169.238
Project: Guzape_Project
42.3
407.0
0.22
50.88
306.93
265.42
306.93
0.00
148.95
148.95
42.3
407.0
0.22
50.88
306.93
284.49
306.93
0.00
148.95
81.7
390.0
0.04
48.75
618.80
265.42
884.22
0.00
142.73
169.2
405.0
0.09
50.63
1233.77
172.86
1233.77
0.00
148.22
88.1
390.0
0.05
48.75
666.92
284.49
951.42
0.00
142.73
75.7
71.6
0.83
0.66
4.05
196.6
0.00
81.1
77.1
0.89
0.66
4.05
196.6
204.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
603.19
1256.64
3Y16
4Y20
603.19
1256.64
Guzape Project
BEAM DESIGN RESULTS
Axis: AG
Storey: 1
B1
L=7275mm
HxBw (mm)
Flange BfxHf
Loads
450 x 225
0 x 0 - 1050 x 150
0.11
G=5.2
Q=1.58
5.2
1.58
1.16
6.11
7.16
72.189
Shear
Force
(Env.)
-72.189
Moment
(Env.)
-139.358
Project: Guzape_Project
34.8
407.0
0.18
50.88
252.74
253.12
252.74
0.00
148.95
148.95
34.8
407.0
0.18
50.88
252.74
253.12
252.74
0.00
148.95
74.9
390.0
0.07
48.75
567.07
253.12
820.18
0.00
142.73
139.4
386.0
0.14
48.25
1065.95
130.83
1065.95
0.00
141.27
74.9
390.0
0.07
48.75
567.07
253.12
820.18
0.00
142.73
72.2
64.4
0.79
0.68
4.05
196.6
0.00
72.2
64.4
0.79
0.68
4.05
196.6
194.6
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
603.19
1344.60
3Y16
3Y20
2Y16
603.19
942.48
Guzape Project
BEAM DESIGN RESULTS
Axis: C
Storey: 1
B44
L=4575mm
HxBw (mm)
Flange BfxHf
450 x 225
650 x 150 - 650 x 150
12.44
12.44
3.77
3.77
G=4.14
Q=1.26
Loads
0.11
4.15
1.26
0.53
2.21
4.04
4.46
36.045
Shear
Force
(Env.)
-36.046
Moment
(Env.)
-50.646
Project: Guzape_Project
12.7
407.0
0.07
50.88
91.85
126.39
91.85
0.00
148.95
148.95
12.7
407.0
0.07
50.88
91.85
126.39
91.85
0.00
148.95
25.5
390.0
0.02
48.75
193.02
126.39
319.41
0.00
142.73
50.6
407.0
0.04
50.88
367.40
80.89
367.40
0.00
148.95
25.5
390.0
0.02
48.75
193.02
126.39
319.41
0.00
142.73
36.0
32.4
0.39
0.45
4.05
196.6
0.00
36.0
32.4
0.39
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: D
Storey: 1
B41
L=4237.6mm
HxBw (mm)
Flange BfxHf
B42
L=1612.5mm
450 x 225
390 x 150 - 0 x 0
450 x 225
140 x 150 - 140 x 150
9.37
2.84
6.87
2.08
G=2.23
1.9
Q=0.68
0.58
Loads
0.11
0.56
2.23
4.13
49.478
0.11
0.81
1.5
0.721
Shear
Force
(Env.)
-29.921
-34.835
29.224 25.398
Moment
(Env.)
-37.022
Project: Guzape_Project
9.3
407.0
0.05
50.88
67.14
122.14
67.14
0.00
148.95
25.5
390.0
0.05
48.75
192.85
122.14
268.57
0.00
142.73
148.95
29.2
407.0
0.15
50.88
212.00
173.49
212.00
0.00
148.95
25.4
407.0
0.13
50.88
184.24
104.91
184.24
0.00
148.95
13.4
407.0
0.07
50.88
96.85
81.08
177.94
0.00
148.95
2.6
407.0
0.01
50.88
18.59
35.76
54.34
0.00
148.95
37.0
407.0
0.07
50.88
268.57
113.24
268.57
0.00
148.95
1.9
390.0
0.00
48.75
14.24
173.49
187.73
0.00
142.73
142.73
148.95
142.73
49.5
42.1
0.54
0.45
4.05
196.6
29.9
22.0
0.33
0.45
4.05
196.6
34.8
24.0
0.38
0.45
4.05
196.6
0.00
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.1
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
10.2
10.2
0.11
0.45
4.05
196.6
Y10-250
0.0
Y10-250
--402.12
402.12
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: D
Storey: 1 (/ 2)
B43
L=2325.2mm
HxBw (mm)
Flange BfxHf
450 x 225
310 x 150 - 310 x 150
G=8.919.65 8.91
Q=2.7 2.93 2.7
Loads
0.11
2.21
23.787
Shear
Force
(Env.)
-23.787
Moment
(Env.)
-15.928
Project: Guzape_Project
4.0
407.0
0.02
50.88
28.89
83.40
28.89
0.00
148.95
148.95
4.0
407.0
0.02
50.88
28.89
83.40
28.89
0.00
148.95
8.9
390.0
0.01
48.75
67.58
83.40
115.55
0.00
142.73
15.9
407.0
0.02
50.88
115.55
47.20
115.55
0.00
148.95
8.9
390.0
0.01
48.75
67.58
83.40
115.55
0.00
142.73
23.8
15.8
0.26
0.45
4.05
196.6
0.00
23.8
15.8
0.26
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: F
Storey: 1
B35
L=1612.5mm
HxBw (mm)
Flange BfxHf
B36
L=3187.5mm
450 x 225
150 x 150 - 150 x 150
G=14.814.24
Q=4.49 4.32
Loads
14.25
4.32
0.11
14.67
4.44
7.38
2.24
0.81
1.5
B37
L=1387.5mm
450 x 225
310 x 150 - 310 x 150
70.26
0.11
14.67
13.86
4.44 4.2
1.59
2.21
450 x 225
120 x 150 - 120 x 150
6.87
6.31
6.31
2.08
1.91
1.91
5.75
1.74
5.75
1.74
3.08
0.11
0.69
1.28
Shear
Force
(Env.)
-25.205
-58.722
74.76 67.381
14.441 14.171
Moment
(Env.)
Project: Guzape_Project
-1.503
-7.146
9.3
407.0
0.05
50.88
67.10
120.08
187.18
0.00
0.00
0.1
407.0
0.00
50.88
0.45
120.08
0.45
0.00
0.00
43.1
407.0
0.22
50.88
312.70
204.08
516.79
0.00
148.95
148.95
34.2
34.2
0.37
0.52
4.05
205.2
0.00
74.8
407.0
0.39
78.02
558.00
246.36
558.00
0.00
148.95
67.4
407.0
0.35
69.70
498.51
205.90
498.51
0.00
148.95
23.1
407.0
0.12
50.88
167.75
152.03
319.79
0.00
148.95
14.4
407.0
0.07
50.88
104.76
123.96
167.75
0.00
148.95
142.73
142.73
7.1
407.0
0.01
50.88
51.84
152.03
51.84
0.00
148.95
70.3
57.2
0.77
0.52
4.05
196.6
58.7
50.7
0.64
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
0.0
Y10-250
603.19
603.19
6.2
407.0
0.03
50.88
44.73
56.60
101.33
0.00
148.95
0.4
407.0
0.00
50.88
2.65
21.50
24.15
0.00
148.95
3.3
390.0
0.00
48.75
24.89
123.96
51.84
0.00
142.73
142.73
1.5
407.0
0.00
50.88
10.60
56.60
11.24
0.00
148.95
1.5
390.0
0.00
48.75
11.24
21.50
11.24
0.00
142.73
35.4
21.3
0.39
0.52
4.05
196.6
25.2
13.6
0.28
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
14.2
407.0
0.07
50.88
102.80
88.38
102.80
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
6.1
6.1
0.07
0.52
4.05
196.6
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
3Y16
3Y16
3Y16
3Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: F
Storey: 1 ...
B38
L=2325.2mm
HxBw (mm)
Flange BfxHf
B39
L=3637.7mm
450 x 225
220 x 150 - 220 x 150
Loads
G=8.91
Q=2.7
10.4
3.15
1.01
1.31
0.11
10.4
10.12
10.12
10.12
3.15
3.073.07
3.07
10.12
3.07
2.16
1.48
L=1055.1mm
450 x 225
80 x 150 - 0 x 0
2.05
0.62
3.53
0.11
0.53
0.94
46.266
Shear
Force
(Env.)
B40
450 x 225
350 x 150 - 0 x 0
31.816
4.408
-11.351
-14.288
-57.593
30.65 33.635
8.186 4.23
Moment
(Env.)
Project: Guzape_Project
-0.749
-5.855
-22.383
1.5
407.0
0.01
50.88
10.62
50.10
59.99
0.00
148.95
8.3
407.0
0.04
50.88
59.99
94.82
154.81
0.00
148.95
4.2
390.0
0.01
48.75
32.02
50.10
42.47
0.00
142.73
5.9
407.0
0.01
50.88
42.47
94.82
42.47
0.00
148.95
14.3
6.3
0.16
0.52
4.05
196.6
0.00
30.7
407.0
0.16
50.88
222.35
162.22
222.35
0.00
148.95
33.6
407.0
0.17
50.88
244.00
201.94
244.00
0.00
148.95
0.2
407.0
0.00
50.88
1.39
101.10
102.49
0.00
148.95
8.2
407.0
0.04
50.88
59.38
111.56
59.38
0.00
148.95
142.73
0.7
390.0
0.00
48.75
5.07
201.94
162.37
0.00
142.73
22.4
407.0
0.03
50.88
162.37
101.10
162.37
0.00
148.95
46.3
30.6
0.51
0.52
4.05
196.6
57.6
42.1
0.63
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
603.19
603.19
1.3
407.0
0.01
50.88
9.23
25.06
30.69
0.00
148.95
0.2
407.0
0.00
50.88
1.35
15.46
9.23
0.00
148.95
9.8
390.0
0.02
48.75
74.12
111.56
162.37
0.00
142.73
142.73
0.7
407.0
0.00
50.88
5.42
25.06
5.67
0.00
148.95
0.7
390.0
0.00
48.75
5.67
15.46
5.67
0.00
142.73
31.8
24.5
0.35
0.52
4.05
196.6
11.4
4.1
0.12
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
4.2
407.0
0.02
50.88
30.69
39.80
30.69
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
4.4
4.4
0.05
0.52
4.05
196.6
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
3Y16
3Y16
3Y16
3Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: H
Storey: 1
B34
L=2732.7mm
HxBw (mm)
Flange BfxHf
450 x 225
370 x 150 - 0 x 0
G=4.98
Q=1.51
Loads
9.13
2.77
0.31
0.09
0.84
2.62
Shear
Force
(Env.)
-32.236
Moment
(Env.)
-21.33
Project: Guzape_Project
5.3
407.0
0.03
50.88
38.68
113.03
38.68
0.00
148.95
148.95
5.3
407.0
0.03
50.88
38.68
92.75
38.68
0.00
148.95
13.1
390.0
0.03
48.75
98.83
113.03
154.73
0.00
142.73
21.3
407.0
0.04
50.88
154.73
53.23
154.73
0.00
148.95
11.3
390.0
0.02
48.75
85.55
92.75
154.73
0.00
142.73
32.2
20.2
0.35
0.45
4.05
196.6
0.00
26.5
19.0
0.29
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: N
Storey: 1
B32
L=1387.5mm
HxBw (mm)
Flange BfxHf
B33
L=5962.9mm
450 x 225
120 x 150 - 120 x 150
G=5.75
Q=1.74
Loads
0.11
0.69
450 x 225
600 x 150 - 600 x 150
2.88
0.87
2.88
2.88
0.87
0.87
1.28
1.39
12.99
3.94
12.99
3.94
2.16
3.81
10.21 10.21
3.09 3.09
4.37 4.82
5.85
Shear
Force
(Env.)
-106.246
121.953 132.014
Moment
(Env.)
-85.346
Project: Guzape_Project
33.4
405.0
0.18
50.63
243.73
297.45
541.18
0.00
148.22
84.4
405.0
0.44
89.62
641.00
319.80
960.80
0.00
148.22
142.73
148.95
84.8
84.8
0.93
0.67
4.05
196.6
0.00
122.0
405.0
0.64
136.48
976.19
333.68
976.19
0.00
148.22
132.0
405.0
0.69
150.07
1073.38
372.54
1073.38
0.00
148.22
4.4
405.0
0.02
50.63
32.15
246.94
279.09
0.00
148.22
21.3
405.0
0.11
50.63
155.54
219.53
155.55
0.00
148.22
142.73
142.73
85.3
407.0
0.07
50.88
619.12
246.94
619.12
0.00
148.95
52.6
390.0
0.05
48.75
398.17
219.53
617.70
0.00
142.73
95.2
89.8
1.04
0.67
4.05
196.6
106.2
96.4
1.17
0.67
4.05
196.6
0.00
205.1
0.1
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
--1256.64
804.25
62.6
54.6
0.69
0.57
4.05
196.6
Y10-250
0.0
Y10-250
1256.64
804.25
1256.64
804.25
1256.64
804.25
4Y20
4Y20
4Y16
4Y16
1256.64
804.25
Guzape Project
BEAM DESIGN RESULTS
Axis: Q
Storey: 1
B30
L=3787.9mm
HxBw (mm)
Flange BfxHf
B31
L=299.6mm
450 x 225
370 x 150 - 370 x 150
G=4.55
4.55
Q=1.38
1.38
Loads
6.87
2.08
6.87
5.94 7.05
2.08
1.8 2.14
0.58
1.31
10.59
3.21
10.59
3.21
1.89
2.27
450 x 225
10 x 150 - 0 x 0
5.75
1.74
3.24
1.49
0.93
0.45
0.28
3.68
56.087
Shear
Force
(Env.)
0.19
UDL G=10.03 Q=0 kN/m
-14.717
-52.164
17.591
3.866
Moment
(Env.)
-51.686
Project: Guzape_Project
12.9
407.0
0.07
50.88
93.74
182.90
93.74
0.00
148.95
29.1
390.0
0.04
48.75
220.56
182.90
374.95
0.00
142.73
148.95
17.6
407.0
0.09
50.88
127.61
196.66
127.61
0.00
148.95
3.9
407.0
0.02
50.88
28.05
51.60
28.05
0.00
148.95
1.7
407.0
0.01
50.88
12.30
44.09
28.05
0.00
148.95
0.6
407.0
0.00
50.88
4.17
42.78
12.30
0.00
0.00
51.7
407.0
0.06
50.88
374.95
123.35
374.95
0.00
148.95
17.0
390.0
0.02
48.75
129.01
196.66
325.67
0.00
142.73
142.73
148.95
0.00
56.1
46.7
0.61
0.45
4.05
196.6
14.7
0.0
0.16
0.45
4.05
196.6
52.2
40.8
0.57
0.45
4.05
196.6
0.00
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
12.2
0.0
0.13
0.45
4.05
205.2
0.0
0.74 < 800.05 OK
402.12
402.12
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: R
Storey: 1
B27
L=5625mm
HxBw (mm)
Flange BfxHf
B28
L=3187.5mm
450 x 225
560 x 150 - 560 x 150
17.82
5.4
22.83
6.92
18.94
5.74
1.12
G=0.56
0.34
Q=0.17
Loads
1.8
2.81
3.6
B29
L=5062.4mm
450 x 225
310 x 150 - 310 x 150
5.51 0.11
112.017
9.65
2.92
9.65
2.92
1.09
1.59
450 x 225
0 x 0 - 500 x 150
5.02
1.52
2.06
0.17
0.05
3.04
0.92
3.04
0.92
3.08 0.11
0.69
5.06
36.793
33.677
Shear
Force
(Env.)
-51.255
-53.457
-80.03
96.98
79.767
38.322 42.045
Moment
(Env.)
15.245
-38.185
-117.335
Project: Guzape_Project
29.3
405.0
0.15
50.63
213.85
280.61
213.85
0.00
148.22
148.22
97.0
405.0
0.51
104.74
749.14
392.77
749.15
0.00
148.22
65.7
390.0
0.06
48.75
497.28
280.61
777.89
0.00
142.73
117.3
405.0
0.10
50.63
855.39
273.62
855.39
0.00
148.22
0.7
390.0
0.00
48.75
5.34
392.77
398.11
0.00
142.73
142.73
112.0
104.1
1.23
0.60
4.05
196.6
53.5
45.4
0.58
0.52
4.05
196.6
80.0
71.2
0.88
0.60
4.05
196.6
0.00
79.8
407.0
0.41
83.75
599.03
187.44
599.03
0.00
148.95
41.6
407.0
0.22
50.88
302.04
133.57
435.61
0.00
148.95
148.95
0.00
204.1
0.0
3.6
0.0
Y10-250
Y10-250
942.48
942.48
42.0
407.0
0.22
50.88
305.01
179.72
305.01
0.00
148.95
0.3
407.0
0.00
50.88
1.91
104.61
106.51
0.00
148.95
9.5
407.0
0.05
50.88
69.25
129.01
69.25
0.00
148.95
142.73
2.1
390.0
0.00
48.75
16.11
179.72
195.83
0.00
142.73
38.2
407.0
0.04
50.88
277.00
104.61
277.00
0.00
148.95
24.3
390.0
0.03
48.75
184.24
129.01
277.00
0.00
142.73
33.7
26.5
0.37
0.52
4.05
196.6
51.3
43.9
0.56
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
38.3
407.0
0.20
50.88
278.00
118.08
302.04
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
--942.48
942.48
603.19
603.19
36.8
27.6
0.40
0.52
4.05
196.6
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
603.19
603.19
3Y20
3Y16
3Y16
3Y20
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: S
Storey: 1
B25
L=3712.4mm
HxBw (mm)
Flange BfxHf
G=5.11
Q=1.55 3.62
1.1
Loads
B26
L=2663mm
450 x 225
0 x 0 - 360 x 150
0.11
1.14
450 x 225
0 x 0 - 250 x 150
3.62
1.1
1.44
2.87
3.6
38.47
0.11
3.62
1.1
3.62
1.1
0.84
1.82
2.55
Shear
Force
(Env.)
-26.159
-29.726
23.972
20.677
Moment
(Env.)
-7.539
-21.504
Project: Guzape_Project
5.4
407.0
0.03
50.88
39.00
91.72
39.00
0.00
148.95
0.1
407.0
0.00
50.88
0.67
80.62
81.29
0.00
148.95
24.0
407.0
0.12
50.88
173.90
134.89
173.90
0.00
148.95
13.8
390.0
0.03
48.75
104.46
91.72
156.00
0.00
142.73
21.5
407.0
0.04
50.88
156.00
80.62
156.00
0.00
148.95
26.2
18.8
0.29
0.45
4.05
196.6
0.00
20.7
407.0
0.11
50.88
150.00
104.23
150.00
0.00
148.95
2.9
407.0
0.02
50.88
21.27
66.97
88.25
0.00
148.95
1.9
407.0
0.01
50.88
13.67
51.77
21.27
0.00
148.95
0.8
390.0
0.00
48.75
6.40
134.89
141.29
0.00
142.73
142.73
7.5
407.0
0.02
50.88
54.69
66.97
54.69
0.00
148.95
5.5
390.0
0.01
48.75
42.00
51.77
54.69
0.00
142.73
38.5
31.1
0.42
0.45
4.05
196.6
29.7
22.5
0.32
0.45
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
14.8
7.5
0.16
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: T
Storey: 1
B24
L=2174.9mm
HxBw (mm)
Flange BfxHf
450 x 225
290 x 150 - 290 x 150
G=9.65
Q=2.92
Loads
0.11
1.09
2.06
21.656
Shear
Force
(Env.)
-21.656
Moment
(Env.)
-13.53
Project: Guzape_Project
3.4
407.0
0.02
50.88
24.54
75.93
24.54
0.00
148.95
148.95
3.4
407.0
0.02
50.88
24.54
75.93
24.54
0.00
148.95
7.7
390.0
0.01
48.75
57.95
75.93
98.15
0.00
142.73
13.5
407.0
0.02
50.88
98.15
42.49
98.15
0.00
148.95
7.7
390.0
0.01
48.75
57.95
75.93
98.15
0.00
142.73
21.7
13.7
0.24
0.45
4.05
196.6
0.00
21.7
13.7
0.24
0.45
4.05
196.6
205.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
402.12
402.12
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: U
Storey: 1
B21
L=4125mm
HxBw (mm)
Flange BfxHf
16.7 18.01
5.06 5.46
G=2.23
Q=0.68
Loads
0.11
0.56
2.03 2.29
Shear
Force
(Env.)
B22
L=1725.1mm
450 x 225
400 x 150 - 400 x 150
450 x 225
150 x 150 - 150 x 150
10.398.54
7.98 7.42
3.152.59
2.42 2.25
7.42
2.25
3.83
0.86
81.397
0.11
1.61
-44.085
-44.632
47.569
40.27
Moment
(Env.)
-50.765
Project: Guzape_Project
12.7
407.0
0.07
50.88
92.07
156.49
92.07
0.00
148.95
27.6
390.0
0.03
48.75
209.32
156.49
365.82
0.00
142.73
148.95
47.6
407.0
0.25
50.88
345.08
285.41
345.08
0.00
148.95
40.3
407.0
0.21
50.88
292.13
154.58
292.13
0.00
148.95
21.8
407.0
0.11
50.88
158.37
111.32
269.69
0.00
148.95
5.2
407.0
0.03
50.88
38.02
55.30
93.33
0.00
148.95
50.8
407.0
0.06
50.88
368.27
163.14
368.27
0.00
148.95
3.6
390.0
0.00
48.75
27.16
285.41
312.57
0.00
142.73
142.73
148.95
142.73
81.4
66.0
0.89
0.45
4.05
196.6
44.1
30.9
0.48
0.45
4.05
196.6
44.6
37.2
0.49
0.45
4.05
196.6
0.00
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
402.12
402.12
15.8
15.8
0.17
0.45
4.05
196.6
Y10-250
0.0
Y10-250
--402.12
402.12
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: U
Storey: 1 (/ 2)
B23
L=6375.4mm
HxBw (mm)
Flange BfxHf
Loads
450 x 225
920 x 150 - 0 x 0
0.11
G=2.97
Q=0.9
2.97
0.9
0.71
5.66
6.26
54.022
Shear
Force
(Env.)
-54.022
Moment
(Env.)
-88.926
Project: Guzape_Project
22.2
407.0
0.12
50.88
161.27
189.42
161.27
0.00
148.95
148.95
22.2
407.0
0.12
50.88
161.27
189.42
161.27
0.00
148.95
47.6
390.0
0.05
48.75
360.70
189.42
550.12
0.00
142.73
88.9
405.0
0.09
50.63
648.28
94.90
648.28
0.00
148.22
47.6
390.0
0.05
48.75
360.70
189.42
550.12
0.00
142.73
54.0
46.7
0.59
0.60
4.05
196.6
0.00
54.0
46.7
0.59
0.60
4.05
196.6
204.1
0.0
3.6
0.0
Y10-250
Y10-250
0.0
Y10-250
603.19
942.48
3Y16
3Y20
603.19
942.48
Guzape Project
BEAM DESIGN RESULTS
Axis: V
Storey: 1
B16
L=3374.9mm
HxBw (mm)
Flange BfxHf
Loads
B17
L=2700.1mm
450 x 225
330 x 150 - 0 x 0
0.11
B18
L=4462.4mm
450 x 225
250 x 150 - 0 x 0
G=4.36
Q=1.32
4.36
1.32
0.99
2.38
450 x 225
440 x 150 - 440 x 150
13.46
4.08
6.13
1.86
3.26 0.11
5.94
1.8
1.35
2.59 0.11
2.97
0.9
0.71
2.23
4.35
35.687
Shear
Force
(Env.)
25.313
-22.788
-23.872
-52.834
43.864
22.334 26.554
20.564 18.908
Moment
(Env.)
3.426
-18.225
-38.854
Project: Guzape_Project
4.6
407.0
0.02
50.88
33.05
83.70
33.05
0.00
148.95
0.1
407.0
0.00
50.88
0.58
76.30
76.88
0.00
148.95
20.6
407.0
0.11
50.88
149.18
125.13
149.18
0.00
148.95
11.6
390.0
0.03
48.75
87.88
83.70
132.21
0.00
142.73
18.2
407.0
0.04
50.88
132.21
76.30
132.21
0.00
148.95
0.9
390.0
0.00
48.75
6.92
125.13
132.05
0.00
142.73
142.73
35.7
28.4
0.39
0.45
4.05
196.6
22.8
15.5
0.25
0.45
4.05
196.6
23.9
16.6
0.26
0.45
4.05
196.6
0.00
18.9
407.0
0.10
50.88
137.17
79.90
137.17
0.00
148.95
8.1
407.0
0.04
50.88
58.78
50.92
109.70
0.00
148.95
148.95
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
402.12
402.12
26.6
407.0
0.14
50.88
192.63
185.25
192.63
0.00
148.95
0.1
407.0
0.00
50.88
0.71
129.23
129.95
0.00
148.95
43.9
407.0
0.23
50.88
318.20
218.40
318.20
0.00
148.95
142.73
9.5
390.0
0.01
48.75
72.21
185.25
257.47
0.00
142.73
38.9
407.0
0.04
50.88
281.86
129.23
281.86
0.00
148.95
0.7
390.0
0.00
48.75
5.57
218.40
223.97
0.00
142.73
25.3
18.1
0.28
0.45
4.05
196.6
52.8
44.7
0.58
0.45
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
22.3
407.0
0.12
50.88
162.02
88.76
162.02
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
--402.12
402.12
402.12
402.12
62.3
52.3
0.68
0.45
4.05
196.6
Y10-250
0.0
Y10-250
402.12
402.12
402.12
402.12
402.12
402.12
2Y16
2Y16
2Y16
2Y16
2Y16
2Y16
402.12
402.12
Guzape Project
BEAM DESIGN RESULTS
Axis: V
Storey: 1 ...
B19
L=3487.9mm
HxBw (mm)
Flange BfxHf
B20
L=1050.1mm
450 x 225
340 x 150 - 340 x 150
G=2.97
2.97
Q=0.9
0.9
8.35
2.53
8.36
2.53
1.2
1.8
Loads
10.67
3.23
2.27
450 x 225
90 x 150 - 0 x 0
4.64
1.41
3.49
0.94
Shear
Force
(Env.)
-39.121
-74.735
63.855 68.83
36.154
Moment
(Env.)
Project: Guzape_Project
3.982
-2.447
36.2
407.0
0.19
50.88
262.27
137.17
262.27
0.00
148.95
21.3
407.0
0.11
50.88
154.76
126.98
281.74
0.00
148.95
142.73
2.4
407.0
0.00
50.88
17.75
126.98
17.75
0.00
148.95
39.1
29.2
0.43
0.52
4.05
196.6
0.00
63.9
407.0
0.33
65.78
470.48
206.38
470.48
0.00
148.95
68.8
407.0
0.36
71.32
510.10
262.05
510.10
0.00
148.95
142.73
142.73
58.9
47.0
0.64
0.52
4.05
196.6
74.7
66.4
0.82
0.52
4.05
196.6
44.1
407.0
0.23
50.88
319.88
238.98
510.10
0.00
148.95
13.9
407.0
0.07
50.88
101.02
225.57
319.88
0.00
0.00
148.95
0.0
407.0
0.00
50.88
0.00
225.57
0.00
0.00
0.00
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
64.3
64.3
0.70
0.52
4.05
205.2
0.0
2.58 < 10.23 OK
603.19
603.19
603.19
603.19
603.19
603.19
3Y16
3Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Axis: X
Storey: 1
B13
L=1725.1mm
HxBw (mm)
Flange BfxHf
Loads
0.11
B14
L=2174.9mm
B15
450 x 225
150 x 150 - 150 x 150
450 x 225
200 x 150 - 200 x 150
G=7.43
Q=2.25
9.65
2.92
10.77
9.6510.21
3.26
2.92 3.09
1.09
2.06
0.86
1.61
0.11
L=3374.9mm
450 x 225
330 x 150 - 330 x 150
15.59
15.03
4.72
4.56
15.59
4.72
0.54
0.99
8.72
2.64
2.38
3.26
16.646
Shear
Force
(Env.)
-0.418
-15.198
-75.722
56.483 62.685
1.868
Moment
(Env.)
Project: Guzape_Project
-7.258
1.8
407.0
0.01
50.88
13.16
53.29
13.16
0.00
148.95
4.4
390.0
0.01
48.75
32.98
53.29
52.65
0.00
142.73
-18.202
148.95
1.9
407.0
0.01
50.88
13.55
58.37
13.55
0.00
148.95
3.6
407.0
0.02
50.88
26.46
56.30
82.76
0.00
148.95
7.3
407.0
0.02
50.88
52.65
32.70
52.65
0.00
148.95
4.0
390.0
0.01
48.75
30.08
58.37
52.65
0.00
142.73
2.6
390.0
0.01
48.75
19.76
56.30
19.76
0.00
142.73
16.6
8.7
0.18
0.52
4.05
196.6
16.1
16.1
0.18
0.52
4.05
196.6
15.2
7.2
0.17
0.52
4.05
196.6
0.00
27.9
407.0
0.14
50.88
202.56
139.00
341.56
0.00
148.95
148.95
0.00
205.1
0.0
3.6
0.0
Y10-250
Y10-250
603.19
603.19
62.7
407.0
0.33
64.49
461.23
265.51
461.23
0.00
148.95
8.4
407.0
0.04
50.88
60.97
152.62
213.60
0.00
148.95
4.6
407.0
0.02
50.88
33.01
90.06
60.97
0.00
148.95
142.73
142.73
18.2
407.0
0.02
50.88
132.04
152.62
132.04
0.00
148.95
12.5
390.0
0.02
48.75
94.69
90.06
132.04
0.00
142.73
57.1
42.0
0.62
0.52
4.05
196.6
75.7
58.2
0.83
0.52
4.05
196.6
0.00
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
56.5
407.0
0.29
57.70
412.66
200.17
412.66
0.00
148.95
Y10-250
205.1
0.0
3.6
0.0
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
25.7
17.6
0.28
0.52
4.05
196.6
Y10-250
0.0
Y10-250
603.19
603.19
603.19
603.19
3Y16
3Y16
3Y16
3Y16
3Y16
3Y16
603.19
603.19
Guzape Project
BEAM DESIGN RESULTS
Project: Guzape_Project
Guzape Project
COLUMN REINFORCEMENT DESIGN
C1
300
6Y16
C1
300
6Y16
C1
300
6Y16
C3
Project: Guzape_Project
225
225
4Y16
Guzape Project
COLUMN REINFORCEMENT DESIGN
C3
225
225
4Y16
C3
225
225
4Y16
C8
600
225
8Y16
C8
Project: Guzape_Project
600
225
8Y16
Guzape Project
COLUMN REINFORCEMENT DESIGN
C14
225
225
4Y16
C14
225
225
4Y16
C15
225
675
8Y16
C15
Project: Guzape_Project
225
675
8Y16
Guzape Project
COLUMN REINFORCEMENT DESIGN
C15
225
675
8Y16
C35
225
450
6Y16
C35
225
450
6Y16
C35
Project: Guzape_Project
225
450
6Y16
Guzape Project
COLUMN REINFORCEMENT DESIGN
C45
225
525
6Y16
C45
Project: Guzape_Project
225
525
6Y16