Logbook For Date: 19.11.2015

Shift:A

Planner Group: SMS1:SHIFT ELE (E)

Brigade:KESHF-A

Shift Incharge: SAJU THOMAS

Safety talk given to all at the shift beginningGeneral Jobs Done


PRODUCTION: 7 LADLES
GCP REPORTS:
GCP-1:1.2
82/68 46/44
GCP-2:8.2/0.2 69/65 49/47
GCP-3:---------S/D--------GCP-4: --------S/D---------

150
150

REMARKS:
1. THF-1 C/COOLING FAN PUT OFF AS PEDESTAL WAS BROKEN AS PER MECH.
2.FAD CR-2 UNDER P/M AT 11.30 & H/O AT 13.30HRS[SH LS RANA]
3.MAG CR-2 S/D GIVEN FOR HME AT 10.30 & FORM RETURNED AT 13.30.
INSPECTIONS:
1.DPH-1 & 2 WORKING NORMAL IN AUTO.
GENERAL JOBS:
1.MIX-2 S/DOOR N/W,ROPE OUT FROM DRUM,INFORMED MECH.08.00[HUMANLAL]
2.CANT CR-1 BR N/W,R/S CB WAS TRIPPED,MECH TRACK PROBLEM,INFORMED OPR.08.00[KISHOR]
3.T/CR-5 15/T N/W,C/WT L/S ARM WAS BROKEN,STEEL ROPE TIED,CRANE ALLOWED.L/S ASSEMBLY TO BE REPLACED.INFORMED G'SHIFT.08.30[LALSINGH/SH R KISHOR]--GSPS
4.MIX-1 MAGNET CABLE CUT,JOINTED & TESTED.12.00[NEOGI]
5.MIX CR-1 C/FAN N/W,CARBON BRUSHES REPLACED.11.00[NEOGI]
6.T/CR-7 M/H BOTH L/S C/WT REMOVED & PACKING PROVIDED IN BOTH L/S. FOR MECH ROPE CHANGING.09.30[MURTHY]
7.MLD YD CR-4 MAGNET N/W,H CONTACTOR FIXED UNIT BURNT,PT RELAY B/C DAMAGED,NEED REPLACEMENT,INFORMED G'SHIFT.09.30[NEOGI]--GSPS
8.MAG CR-4 MAGNET N/W,KNIFE SWITCH ONE POLE WAS BURNT,REPLACED.10.30[G'SHIFT]
9.STR CR-3 MAGNET CONNECTED FOR PIT CLEANING BETWEEN 10.30 TO 11.30[THAKUR]
12.THF-1 DOOR-6 PUSH BUTTON DEFECTIVE,REPLACED.12.00[HUMANLAL]
13.THF-1 DOOR-6 OVER HOIST,BRAKE LOOSE,INFORMED MECH.13.30[HUMANLAL/SELF]

Breakdown Notifications
-----------------------------------------------------------------------------------------------------------FL/EQUIPMENT
------------

Reason
------

TCR 5- 15T HOIST

NOT WORKING

Object Part
-----------

Damage
------

Activity
--------

STEEL ROPE TIED &


C/WT L/S ARM WAS CRANE ALLOWED
BROKEN & CAME
OUT.

Start/ End
Time
----------------

Persons
Deployed
---------------

Status
------

08:10:00
08:40:00

LALSINGH/RAJ
KISHOR

Completed

<------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------>

MAG YD CR 4- MAGNET

NOT WORKING

CLEANED & TESTED


B/C OF H WAS
CARBONISED

12:30:31
13:11:57

LALSINGH

Completed

<------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------>

MLD YD CR 6- HOIST

NOT WORKING

WIRE JOINTED
FINGER NO-5 WIRE
CUT FROM M/CONT.

Print Date:19.11.2015

Page 1 of 5

06:53:49
07:54:12

NEOGI

Completed

ERP-LOGBOOK
Logbook For Date: 19.11.2015

Shift:A

Planner Group: SMS1:SHIFT ELE (E)

Brigade:KESHF-A

Shift Incharge: SAJU THOMAS

Breakdown Notifications
-----------------------------------------------------------------------------------------------------------FL/EQUIPMENT
------------

Reason
------

Object Part
-----------

Damage
------

Activity
--------

Start/ End
Time
----------------

Persons
Deployed
---------------

Status
------

<------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------>

C/M 8- TROLLEY

NOT WORKING

2H CONTACTOR

CONTACTS WELDED

CONTACTS SEPERATED & 12:00:35


CLEANED
12:25:34

BALA

Completed

<------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------>

Electrical Shutdown Notifications


----------------------------------------------Fl/Equipment
-----------TWIN HEARTH FURNACE
ELECTRICAL

Description
----------

Form
----

Form no
-----------

S/D OF GCP 4 HT MOTOR

FORM EL-20

83664

Agency
-----T.T.S

Status
------

Activity
--------

In process BREAKER DRAWN OUT


DANGER BOARD DISPLAYED

Date/Time
Persons Deployed
-------------- ---------------16.10.2015
23:00:00

AS PER EL-16A 37087


FROM S/S

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF ALL ACTUATORS

FORM EL-16A

43961

SHOP
ELECTRICAL

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
20:02:58

HOMESINGH

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF CHIMNEY DAMPER

FORM EL-16A
FORM EL-20

43964
83684

SHOP
ELECTRICAL
GCP

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:54:19

DAYALU

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF ALL ACTUATORS

FORM EL-20

In process

17.11.2015
20:01:32

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF GCP DAMPER

FORM EL-20

83683

GCP

In process CONTROL AND POWER CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:59:06

GCP STAFF

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF ALL DOORS

FORM EL-16A
FORM EL-20

43959
83678

SHOP
ELECTRICAL
T.T.S

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:12:46

DAYALU

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF F/POINT

FORM EL-16A
FORM EL-20

43967
83680

SHOP
ELECTRICAL
T.T.S

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:43:58

DAYALU

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF CC FAN

FORM EL-16A
FORM EL-20

43965
83679

SHOP
ELECTRICAL
T.T.S

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:38:58

DAYALU

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF R/DAMPERS

FORM EL-16A
FORM EL-20

43963
83677

SHOP
ELECTRICAL
T.T.S

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:34:10

DAYALU

<------------------------------------------------------------------------------------------------------------------->

Print Date:19.11.2015

Page 2 of 5

ERP-LOGBOOK
Logbook For Date: 19.11.2015

Shift:A

Planner Group: SMS1:SHIFT ELE (E)

Brigade:KESHF-A

Shift Incharge: SAJU THOMAS

Electrical Shutdown Notifications


----------------------------------------------Fl/Equipment
-----------TWIN HEARTH FURNACE

Description
----------

Form
----

Form no
-----------

S/D OF HPPS

FORM EL-16A
FORM EL-20

43968
83676

Agency
-----SHOP
ELECTRICAL
T.T.S

Status
------

Activity
--------

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

Date/Time
Persons Deployed
-------------- ---------------17.11.2015
19:29:38

DAYALU

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF LANCES AND BURNERS

FORM EL-16A
FORM EL-20

43962
83675

SHOP
ELECTRICAL
T.T.S

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:22:42

DAYALU

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE

S/D OF TAPHOLE FAN

FORM EL-16A
FORM EL-20

43966
83681

SHOP
ELECTRICAL
T.T.S

In process POWER & CONTROL CBs


PUT OFF
DANGER BOARD DISPLAYED

17.11.2015
19:47:04

DAYALU

<------------------------------------------------------------------------------------------------------------------->
FERRO ALLOY CRANE 2

S/D FOR P/M

FORM EL-16A

43972

SHOP
ELECTRICAL

In process LINE BLOCK AND RED


FLAGS PUT UP BY MECH
REPAIR SECTION CB PUT
OFF
DANGER BOARD DISPLAYED

19.11.2015
12:00:10

[KISHOR]

<------------------------------------------------------------------------------------------------------------------->
MOULD YARD CRANE 6

S/D FOR P/M

FORM EL-16A
FORM-D

43969
12972

SHOP
ELECTRICAL
MECHANICAL

In process LINE BLOCK AND RED


FLAGS PUT UP BY MECH
REPAIR SECTION CB PUT
OFF
DANGER BOARD DISPLAYED
TROLLEY LINES SHORTED
AND EARTHED

18.11.2015
11:00:56

[HUMANLAL]

<------------------------------------------------------------------------------------------------------------------->
CHARGING MACHINES 5

S/D FOR P/M

FORM-D

12973

MECHANICAL

In process LINE BLOCK AND RED


FLAGS PUT UP BY MECH
COLLECTOR LIFTED AND
TIED

18.11.2015
11:33:24

[SURESH]

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE
ELECTRICAL

S/D OF THF 4 CROWN COOLING


FAN

FORM EL-20
FORM EL-16A

83663
10616

T.T.S
SHOP
ELECTRICAL

In process CONTROL AND POWER CBs


PUT OFF
DANGER BOARD DISPLAYED

16.10.2015
23:00:00

THAKUR

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE
ELECTRICAL

S/D OF THF 4 CHIMNEY DAMPER

FORM EL-20
FORM EL-16A

83665
10615

GCP
SHOP
ELECTRICAL

In process CONTROL AND POWER CBs


PUT OFF
DANGER BOARD DISPLAYED

16.10.2015
23:00:00

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE
ELECTRICAL

S/D OF THF 4 REVERSING


DAMPERs

FORM EL-20
FORM EL-16A

83660
10614

T.T.S
SHOP
ELECTRICAL

In process CONTROL AND POWER CBs


PUT OFF
DANGER BOARD DISPLAYED

16.10.2015
23:00:00

THAKUR

<------------------------------------------------------------------------------------------------------------------->
TWIN HEARTH FURNACE
ELECTRICAL

S/D OF THF 4 FETTLING POINTS

FORM EL-20
FORM EL-16A

83661
10618

T.T.S
SHOP
ELECTRICAL

In process CONTROL AND POWER CBs


PUT OFF
DANGER BOARD DISPLAYED

16.10.2015
23:00:00

THAKUR

<------------------------------------------------------------------------------------------------------------------->

Print Date:19.11.2015

Page 3 of 5

ERP-LOGBOOK
Logbook For Date: 19.11.2015

Shift:A

Planner Group: SMS1:SHIFT ELE (E)

Brigade:KESHF-A

Shift Incharge: SAJU THOMAS

Electrical Shutdown Notifications


----------------------------------------------Fl/Equipment
-----------TWIN HEARTH FURNACE
ELECTRICAL

Description
----------

Form
----

Form no
-----------

S/D OF THF 4 TAPHOLE FAN

FORM EL-20
FORM EL-16A

83662
10617

Agency
-----T.T.S
SHOP
ELECTRICAL

Status
------

Activity
--------

Date/Time
Persons Deployed
-------------- ----------------

In process CONTROL AND POWER CBs


PUT OFF
DANGER BOARD DISPLAYED

16.10.2015
23:00:00

THAKUR

<------------------------------------------------------------------------------------------------------------------->

Pending
-------------------------------------------------------------------------------------------------------------FL/EQUIPMENT
--------------

Reason

Object Part
-----------

MLD YD CR 5- BRIDGE

NOT WORKING

Damage
------

MOTOR

Task
--------

SINGLE PHASING IN
BF SIDE MOTOR

Start date
/ time

Persons
Deployed
---------------------------- -

Status
------

23.10.2015/
18:00:00

In process

NEOGI

<-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------->

MIX CR 2- 30T HOIST

NOT WORKING AT
HOISTING

-VE L/S WIRE WAS TO BE CHECKED


OPEN SOMEWHERE
FURTHER
CRANE WAS DOWN
WITH LOAD

18.11.2015/
13:00:00

HUMANLAL/BALA

In process

<-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------->

STR CR 4- BRIDGE

NOT WORKING

CONTACTOR

FIX UNIT OF " L" FAULT TO BE


IN MARODA/FOUNDRY RECTIFIED
SIDE
PANEL WAS
DEFECTIVE

02.11.2015/
18:00:00

BHANGU PRASAD

In process

<-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------->

MLD YD CR 6- TROLLEY

NOT WORKING

CONTACTOR

" P" WAS NOT


GETTING ON

FAULT TO BE
RECTIFIED

02.11.2015/
16:20:00

KR SAHU

In process

<-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------->

Measuring Parameters Recorded


Measuring Point
---------------

Position
--------

GCP 1- MOTOR(11664)

MOTOR CURRENT

GCP 1- MOTOR(11664)

Unit
----

Time
----

155.00

13:16:23

MOTOR CURRENT

155.00

11:06:02

GCP 1- MOTOR(11664)

MOTOR CURRENT

155.00

10:40:18

GCP 1- MOTOR(11664)

MOTOR CURRENT

155.00

09:29:03

GCP 1- MOTOR(11664)

MOTOR CURRENT

155.00

08:14:16

GCP 1- MOTOR(11664)

MOTOR CURRENT

155.00

07:00:00

GCP 1- MOTOR(11664)

MOTOR CURRENT

155.00

06:47:20

GCP 2- MOTOR(16200)

MOTOR CURRENT

150.00

13:14:33

GCP 2- MOTOR(16200)

MOTOR CURRENT

150.00

12:11:19

GCP 2- MOTOR(16200)

MOTOR CURRENT

150.00

11:17:57

Print Date:19.11.2015

Value
-----

Page 4 of 5

ERP-LOGBOOK
Logbook For Date: 19.11.2015

Shift:A

Planner Group: SMS1:SHIFT ELE (E)

Measuring Parameters Recorded


Measuring Point
---------------

Position
--------

GCP 2- MOTOR(16200)

MOTOR CURRENT

GCP 2- MOTOR(16200)

MOTOR CURRENT

GCP 2- MOTOR(16200)
GCP 2- MOTOR(16200)
GCP 2- MOTOR(16200)

Unit
----

Time
----

150.00

10:23:57

150.00

09:06:04

MOTOR CURRENT

150.00

08:31:42

MOTOR CURRENT

150.00

07:23:35

MOTOR CURRENT

150.00

06:14:19

Print Date:19.11.2015