Project:WAREHOUSE
Owner:

Date:MARCH01,2016

taragtMlsrub ( SUMMARY QUOTATION )


lr

eQaHkargar

briyay

No

Name

Description

XaMg

Warehouse: 19mx30m

srub 1
R)ak;cMenj
srub

Total 1
Profit

TOTAL ( NOT INCLUDED VAT )

sMKal;
- tMlxagelIKWminKitbBalBneT.
- ral;sMParEdlminsitenAkgtaragxagelI KWCabnkrbs;mas;sMNg;.
Preparedby:YannSamphann,GM

kta brimaN tMlkta tMlsrub


Unit
m

Qlty

Unit Cost

570.00 $

115.15

Total Cost
$ 65,633.66
$ 65,633.66
$9,845.05
$75,478.71

Project:WAREHOUSE
Owner:

Date:MARCH01,2016

1-taragtMl ( QUOTATION )
lr

eQaHkargar

briyay

No

Name

Description

Kmeragsagsg;XaMg

sq.m

EpkRKwHsMNg;
kargarbukRKwH
kargarkat;k,alssrRKwH
kargarsMGatdI
CIkRKwHsMNg;
kargarbgab;f
ebtugRTnab;RKwH
kargareCIgtag nigkssr

kargarsrsEdk
kargarBum<
kargarcak;ebtug

Unit

Can;pal;dI
kargarEpkeRKOgbgM
kargarFwmRkv:at;

kargarsrsEdk
kargarBum<

Qlty

Unit Cost

Total Cost

Warehouse Project

I
A

kta brimaN tMlkta tMlsrub


570.00

Foundation
Piling work

48.00

$22.00

$1,056.00

Pile Head Cutting

Unit

8.00

$5.00

$40.00

Site Clearance

Unit

1.00

$500.00

$500.00

184.00

$5.00

$920.00

115.00

$19.00

$2,185.00

5.67

$50.00

$283.50

2.76

$600.00

$1,658.88

75.60

$15.00

$1,134.00

17.28

$68.00

$1,175.04

3.20

$600.00

$1,920.00

105.00

$15.00

$1,575.00

Excavation
Crushed Stone Compaction

4x6

Lean concrete
Footing and Stump Column
Rebar

SD390

Form Work
Concreting

C30 Cylinder strength at 28 days

Ground Floor
Structural Work
Ground Beam Work
Rebar
Form Work

SD390

kargarcak;ebtug
kargarsrsrebtug
kargarsrsEdk niglYscMNg
kargarBum<
kargarcak;ebtug
kargarFwmLaMgtU

kargarsrsEdk
kargarBum<
kargarcak;ebtug

kargarebtugbg;esrCan;pal;dI

kargarcak;ebtug
C

kargarlMGr

erob\d 20sRmab;CBaaMg
kargarbUk
kargarlabfaM
kargarbUkssr
kargarlabfaMsRmab;ssr
kargardMeLIgTVakBak;
kargardMeLIgkBak;bg c
TVarmUl
D

kargarCBaaMgnigdMbUl

kargardMeLIgeRKagEdksMrab;CbaaMg
kargardMeLIgsgsI
kargardMeLIgssrEdk

12.80

$68.00

$870.40

2.82

$600.00

$1,692.00

118.80

$15.00

$1,782.00

11.28

$68.00

$767.04

1.93

$600.00

$1,155.00

98.00

$15.00

$1,470.00

C30 Cylinder strength at 28 days

7.70

$68.00

$523.60

C 20 Cylinder

39.90

$50.00

$1,995.00

Interior and exterior

320.00

$10.00

$3,200.00

640.00

$3.00

$1,920.00

Unit

640.00

$3.00

$1,920.00

Plastering work for Column

66.00

$10.00

$660.00

Painting work for Column

66.00

$5.00

$330.00

Glass Door Installation

13.80

$45.00

$621.00

Glass Window Installation

28.80

$40.00

$1,152.00

sq.m

22.50

$40.00

$900.00

450.00

$15.00

$6,750.00

Concreting

C30 Cylinder strength at 28 days

Column Work
Rebar and Wire

SD390

Form Work
Concreting

C35 Cylinder strength at 28 days

Lintel Beam
Rebar

SD390

Form Work
Concreting

Ground Slab Work


Concreting

Decoration Work
Brick Work thk=200mm for Wall
Plastering Work
Painting Work

Roller Shutter Door

Jotun Paint

Without Monitor and thk=0.8mm

Wall and Roof Work


Girt Installation
Wall Zinc Panel Installation

thk = 0.45mm

450.00

$6.00

$2,700.00

Steel Column Installation

Hot-Rolled Section

kg

2,450.00

$1.40

$3,430.00

kargardMeLIgdMbUlEdk
kargarRbk;dMbUlsgsI
kargarRbk;dMbUlsgsIBnW

srub

Floor Tile Work in Terrace Floor

thk = 0.45mm

Roof Zinc Panel


Sky Light Installation

TOTAL

sMKal;
- tMlxagelIKWminKitbBalBneT.
- ral;sMParEdlminsitenAkgtaragxagelI KWCabnkrbs;mas;sMNg;.

684.00

$20.00

$13,680.00

684.00

$7.30

$4,993.20

unit

15.00

$45.00

$675.00
$65,633.66