DOCUMENT SUBMISSION STATUS: AP

SEP.0511

FOR APPROVAL

REV

DATE

DESCRIPTION

OWNER

DRWN

CHKD

APPD

OWNERS CONSULTANT

POYRY ENERGY LTD

VIETNAM OIL AND GAS GROUP (PVN)


EPC CONTRACTOR

EPC CONTRACTORS CONSULTANT

VIETNAM MACHINERY INSTALLATION


CORPORATION (LILAMA)

& Co.FICHTNER GmbH & Co. KG

PROJECT TITLE

VUNG ANG 1 THERMAL POWER PLANT 2 x 600MW


CONTRACT No.

DRAWING TITLE

SMALL POWER AND LIGHTING SYSTEM


INSPECTION AND TEST PLAN
SUB-CONTRACTOR

DOCUMENT No.

FUNCTION

NAME

DRWN

N.V.TRUNG

SEP.0511

CHKD

L.V. HUY

SEP.0511

APPD

L.T.THANH

SEP.0511

E3 ITP 0002
VA1 LHT 00100 E E0

SIGN

SCALE
NONE

DATE

REV
A

REV.A

CONTENTS

I.

Inspection and test plan

II. Inspection and test form

VA1-LHT-00100-E-E0-ITP-0002

Page 2 of 11

REV.A

Explanation of Symbols
1. W
W in SUBCONTRACTOR Column means that SUBCONTRACTOR representative will witness the
test/inspection according to application from subcontractor.
W in LLM/FITCHNER: and PVN-POYRY column means that LLM/FITCHNER Engineer and PVNPOYRY (or third party) will witness the test/ inspection according to application (or notification) from
SUBCONTRACTOR.
2. I
I means Implementation of test/ inspection and reporting by SUBCONTRACTOR and ERECTION
SUBCONTRACTOR.
3. PW
PW means Partial witness. SUBCONTRACTOR will notify partial witness to LLM/FITCHNER
Engineer and PVN-POYRY with the information of starting date and expected period of the work. The
mentioned notification will be submitted to LLM/FITCHNER at lease 24 Hrs. prior to the starting date
of the work.
4. R
R in SUBCONTRACTOR column means Submission of inspection/ test record for review to
SUBCONTRACTOR by ERECTION SUBCONTRACTOR.
R in LLM/ FITCHNER and PVN-POYRY column means Submission of inspection / test record for
review to LLM/FITCHNER by SUBCONTRACTOR.

5. S
S in SUBCONTRACTOR column means Submission of inspection / test record for information to
SUBCONTRACTOR by ERECTION SUBCONTRACTOR.
S in LLM/FITCHNER and PVN-POYRY column means submission of inspection / test record for
information to LLM/FITCHNER and PVN/POYRY by SUBCONTRACTOR.

VA1-LHT-00100-E-E0-ITP-0002

Page 3 of 11

REV.A

I. INSPECTION AND TEST PLAN

No.
1

Item

Work Step

Inspection &
Test Item

Inspection Category
LLM/
Subcontractor
FITCHNER

Applicable
Code and
Standard

Erection
Subcontractor

As per drawing
As per drawing
As per drawing
As per drawing
As per drawing
As per drawing

I
I
I
I
I
I

W,S
W,S
W,S
W,S
W,S
W,S

PVNPOYRY

Remarks

W,S
W,S
W,S
W,S
W,S
W,S

W,S
W,S
W,S
W,S
W,S
W,S

Per delivery
Per delivery
Per delivery
Per delivery
Per delivery
Per delivery

1.1
1.2
1.3
1.4
1.5
1.6
2

Inspection
of
equipment delivery
on site
Lighting poles
Lighting fixtures
Electrical panels
Cables
Conduits
Accessories
Installation

2.1

Conduit

Construction works

E-ITP-001

As per drawing

W,S

W,S

W,S

Per area

2.1

Duct bank

Construction works

E-ITP-002

As per drawing

W,S

W,S

W,S

Per area

2.1

Electrical panel

Construction works

E-ITP-003

As per drawing

W,S

W,S

W,S

2.4

Lighting pole

Construction works

E-ITP-004

As per drawing

W,S

W,S

W,S

Per
equipment
Per area

2.5

Lighting fixture

Construction works

E-ITP-005

As per drawing

W,S

W,S

W,S

Per area

2.6

Cable pulling and


termination

Construction works

E-ITP-005

As per drawing

W,S

W,S

W,S

Per area

VA1-LHT-00100-E-E0-ITP-0002

On site Inspection
On site Inspection
On site Inspection
On site Inspection
On site Inspection
On site Inspection

Page 4 of 11

REV.A

II. INSPECTION AND TEST FORM

VA1 LHT 00100 E E0 - ITP 0002

Page 5 of 11

REV.A

VUNG ANG 1 THERMAL POWER PLANT 2X600W


INSPECTION CHECK LIST
FOR
CONDUIT INSTALLATION

TYPE OF CONDUIT

LOCATION :

SYSTEM DESCRIPTION. :

NO

DWG. NO. :

CHECK

ITEMS

RESULT

PROPER TYPE AND SIZE OF MATERIAL USED

VERIFICATION OF CONDUIT ROUTE

SUPPORTS

BRACKET WELDING

LOCK NUT & BUSHING

JUNCTION AND OUTLET BOX INSTALLATION

REMARK :

REMARKS

A : Accepted N/A : Not Applicable

SIGNATURE

DATE

CHECKED BY SUBCONTRACTOR :
VERIFIED BY LILAMA

ACCEPTED BY PVN

FORM NO. E-ITP-001

VA1 LHT 00100 E E0 - ITP 0002

Page 6 of 11

REV.A

VUNG ANG 1 THERMAL POWER PLANT 2X600W


INSPECTION CHECK LIST
FOR
DUCK BANK
Area / Location / Building :

DWG. No./ Rev. No :

Equipment Identification :

FCR. No :

NO

CHECK

ITEMS

VERIFICATION OF DUCT BANK ROUTE

PROPER TYPE AND SIZE

ARRANGEMENT

BURYING DEPTH

CONNECTION AND ENTRY TO MANHOLE

BACK FILLING

REMARK :

RESULT

REMARKS

A : Accepted N/A : Not Applicable

SIGNATURE

DATE

CHECKED BY SUBCONTRACTOR :
VERIFIED BY LILAMA

ACCEPTED BY PVN

FORM NO. E-ITP-002

VA1 LHT 00100 E E0 - ITP 0002

Page 7 of 11

REV.A

VUNG ANG 1 THERMAL POWER PLANT 2X600W


INSPECTION CHECK LIST
FOR
ELECTRICAL PANEL
Area / Location / Building :

DWG. No./ Rev. No :

From side designation (Equipment Identification) :

NO

CHECK

FCR. No :

ITEMS

RESULT

LOCATION / FOUNDTION / ANCHORING

SUPPORT

EQUIPMENT IDENTIFICATION AND LABELING.

PHYSICAL DAMAGE CHECK

CLEANLINESS

LEVELING AND ALIGNMENT

TOUCH-UP PAINTING

GROUNDING CONNECTION

REMARK :

REMARKS

A : Accepted N/A : Not Applicable

SIGNATURE

DATE

CHECKED BY SUBCONTRACTOR :
VERIFIED BY LILAMA

ACCEPTED BY PVN

FORM NO. E-ITP-003

VA1 LHT 00100 E E0 - ITP 0002

Page 8 of 11

REV.A

VUNG ANG 1 THERMAL POWER PLANT 2X600W


INSPECTION CHECK LIST
FOR
LIGHTING POLE
Area / Location / Building :

DWG. No./ Rev. No :

Equipment / devices description :

NO

CHECK

FCR. No :

ITEMS

LOCATION / FOUNDTION / ANCHORING

PHYSICAL DAMAGE CHECK

LEVELING AND ALIGNMENT

LIGHTING POLE INSTALLATION

GROUNDING CONNECTION

REMARK :

RESULT

REMARKS

A : Accepted N/A : Not Applicable

SIGNATURE

DATE

CHECKED BY SUBCONTRACTOR :
VERIFIED BY LILAMA

ACCEPTED BY PVN

FORM NO. E-ITP-004

VA1 LHT 00100 E E0 - ITP 0002

Page 9 of 11

REV.A

VUNG ANG 1 THERMAL POWER PLANT 2X600W


INSPECTION CHECK LIST
FOR
LIGHTING FIXTURE
Area / Location / Building :

DWG. No./ Rev. No :

Equipment / devices description :

NO

CHECK

FCR. No :

ITEMS

PROPER TYPE

LIGHTING FIXTURE INSTALLATION

LAMP INSTALLATION

TERMINAL TO TERMINAL WIRING

GROUNDING

SUPPORT INSTALLATION

REMARK :

RESULT

REMARKS

A : Accepted N/A : Not Applicable

SIGNATURE

DATE

CHECKED BY SUBCONTRACTOR :
VERIFIED BY LILAMA

ACCEPTED BY PVN

FORM NO. E-ITP-005

VA1 LHT 00100 E E0 - ITP 0002

Page 10 of 11

REV.A

UONG BI EXTENSION POWER PLANT


INSPECTION CHECK LIST
(POWER & CONTROL CABLE PULLING & TERMINATION)
FROM (PRIMARY SIDE)

TO(LOAD / SECONDARY)

CABLE I.D NO.CHECKED:

DRAWING NO :

NO.

CHECK ITEMS

RESULT

PROPER CABLE TYPE AND SIZE

CABLE IDENTIFICATION

VERIFICATION OF CABLE ROUTE

PHYSICAL DAMAGE CHECK

CABLE ARRANGEMENT

CABLE TERMINATION AND CABLE GROUNDING CONNECTION

REMARKS

REMARKS

A : Acceptable N/A : Not applicable

SIGNATURE

DATE

CHECKED BY SUBCONTRACTOR :
VERIFIED BY LILAMA

ACCEPTED BY PVN

FORM NO E-ITP-006

VA1 LHT 00100 E E0 - ITP 0002

Page 11 of 11