Routine Checks

Turbine
April 11, 201

PMI Revision 00

Main Turbine

PHYSICAL INSPECTION

TURBINE BRG. INSPECTION

RETURN OIL LINE FLOW

STEAM LEAKAGE

LOCAL INSTRUMENTS

April 11, 201

PMI Revision 00

Turbine Auxiliaries
CONDENSATE SYSTEM
HOTWELL
STAND PIPES
AIR INGRESS
CONDENSER EXTRACTION PUMP
SEALING LINES
BEARINGS
COOLING SYSTEM
LP HEATERS
STAND PIPES
DRIP LINES

April 11, 201

PMI Revision 00

Turbine Auxiliaries
FEEDWATER SYSTEM

DEAERATOR

AIR VENTS
CHEMICAL DOZ. LINES
SAFTEY V/V (PASSING)
STEAM LEAKAGE

BOILER FEED PUMP

LUBE SYSTEM

MOP & FILTER , OIL TANK LEVEL


COOLER
HYD. COUPLING & WORKING OIL COOLERS
BALANCING LEAK OFF LINE
MECH. SEAL LEAKAGE

April 11, 201 ANY LEAKAGES


PMI Revision 00

Turbine Auxiliaries
OIL SYSTEM

MAIN OIL TANK

DUPLEX FILTER
COOLER
BASKET FILTER
VAPOUR EXTRACTOR FANS
CENTRIFUGE
TANK LEVEL(DIP STICK)

OIL PUMPS

GOVERNING RACKS

LPBP RACK

VALVE ROOM

MULSIFIER SYSTEM

April 11, 201

PMI Revision 00

Turbine Auxiliaries
VACUUM SYSTEM
VACUUM PUMP

SEALING ARRANGEMENT
SEAL WATER TANK & PUMP
VACUUM BREAKER VALVE
GLAND SEALING OF VACUUM V/V

COOLING WATER SYSTEM

EQUIPMENT COOLING WATER PUMP CHECKS

SUCTION STRAINERS

CONDENSER LINE INLET PR.AND DP

COOLERS STATUS

April 11, 201

PMI Revision 00

Turbine Auxiliaries
HIGH ENERGY DRAIN CHECKING
HP BYPASS SYSTEM

HPBP VALVES

OIL SUPPLY UNIT

April 11, 201

PMI Revision 00

OFFSITE
CHECKS
April 11, 201

PMI Revision 00

Compressor House

CHECK PLANT & INSTRUMENT AIR PRESSURE

AIR COMPRESSOR
LUBE OIL PR & TEMP.
COOLING WATER PR. & FLOW
AIR RECEIVER PRESSURE
MOISTURE TRAP WORKING
MOTOR CURRENT
LOADING UNLOADING SOL. WORKING.

AIR DRYING PLANT

ADSORBER CHANGE OVER

REGENERATION

HEATER & BLOWER


CYCLE TIME

April 11, 201

PMI Revision 00

Fuel Oil Pump House


HEAVY OIL SYSTEM

PRESSURING PUMPS

CHECK RUNNING PUMP PR. & PHYSICAL CONDITION


CHECK STANDBY PUMPS
ANY LEAKAGE

HEAT EXCHANGER

INLET & OUTLET PRESSURE


STEAM PRESSURE
OIL TEMP. AT HEATER OUTLET
CHARGING OF TRACING LINES
SAFTEY V/V FOR PASSING

April 11, 201

PMI Revision 00

10

Fuel Oil Pump House


PRESSSURE CONTROLLER
CHECK PR. SETTING & ACTUAL PR.
STATUS AUTO/MANUAL

DRAIN OIL TANK


CHECK FOR ANY OIL IN TANK
CHECK AVAILABILITY OF DRAIN OIL PUMP
CHECK AVAILABILITY OF DEWATERING PUMPS

STORAGE TANK AREA


OIL TANK LEVEL
TRACING LINES

April 11, 201

PMI Revision 00

11

Fuel Oil Pump House

LIGHT OIL SYSTEM

PRESSURING PUMPS

SUCTION FILTERS
DISCHAGE PR.
STANDBY PUMP

STORAGE TANKS

PRESSURE CONTROLLER

FIRE FIGHTING SYSTEM

HYDRANT SYSTEM
FOAM SYSTEM (3% PROFEIN BASED)

FOAM TANKS
HYDRO EJECTOR
April 11, 201

PMI Revision 00

12

Circulating Water Pump

CW PUMP
CHECK BRG. COOLING WATER FLOW
BRG. TEMP.
MOTOR CURRENT & WDG. TEMP.
VIBRATION READING
LUBE WATER PUMP

CW FOREBAY LEVEL

CHLORINATION OF FOREBAY

April 11, 201

PMI Revision 00

13

Raw Water Pump

MONITOR POND LEVEL

INTAKE CHANNEL

CHECK CHOKING OF TRASH RACK

FIRE FIGHTING PUMPS

HYDRANT PUMP
SPRINKLER PUMP

HYDRO PNEUMATIC SYSTEM

SOFTENING PUMPS

PRE TREATMENT DM PUMP

April 11, 201

PMI Revision 00