Proj: Godavari Sugar Mills Ltd.

Contract No: I 99004

CALCULATION
for
IBD TANK SIZING

04/20/2016
10:56:22

Calculation for IBD tank sizing:


Drain Water Pressure at tank inlet
Corresponding Satd. Water Temp.
Corresponding Sp. Enthalpy
Total Drain Qty in percentage of BMCR Steam
Generation (assumed)
BMCR Steam Generation
Total Drain Qty in kg/s of BMCR Steam Generation
Drain Qty from CBD Tank
CBD Tank O/L drain pr. at IBD tank inlet
CBD Tank O/L drain enthalpy. at IBD tank inlet
IBD Tank Operating Pressure
Corresponding Saturated Steam Enthalpy
Corresponding Saturated Water Enthalpy
Atmospheric Pr.
Flash Steam Temp
Flash Steam Percentage
Flash Steam Qty
Satd.Water qty in CBD Tank
Sp.Volume of the Satd. Water at Op. Pr.
Sp.Volume of the Flashed Steam
Volumetric Flow for the Flashed Steam
Maximum Allowable Steam Velocity
Minimum Cross-sectional Area of the tank reqd
Hence, minimum inside diameter reqd. for the tank
Tank Diameter provided
Tank Height (assumed)
Tank Volume for the Straight Portion
NWL (Normal Water Level)
Storage Capacity of Water upto NWL
Sp. Volume of the Condensate
Qty of condensate that can be stored upto NWL
Now, qty of the condensate at BMCR
Water Storage Capacity of the Tank

315152506.xlsx

1 of 1

72.5
bar(a)
288.2
Deg.C
#NAME? kJ/kg
1.0

36.111

kg/s

0.361

kg/s

Err:512
kg/s
bar(a)
2.5
535.3
kJ/kg
1.01325 bar(a)
Err:512
kJ/kg
Err:512
kJ/kg
1.01325 bar(a)
Err:512 Deg.C
#NAME?
%
Err:512
kg/s
Err:512
kg/s
Err:512
m3/kg
m3/kg
Err:512
m3/s
Err:512
1.0
m/s
Err:512
m2
Err:512
1.200
2.000
2.26
880
0.9953
Err:512
Err:512
Err:512
Err:512
= Err:512

m
m
m
m3
mm
m3
m3/kg
kg
kg/s
s
min

BKD