Work Progress for 22.

10
Sr.No
1
2
3
4
5
6
7

Vaccum Pump PM

Work Progress for 23.10


Sr.No
1
2
3
4
5
6

Condensor

BFP 1A Mech

BFP 1B Mech

DMCW Pump A Mech

10

ACW Pump A Mech

11

Oil Vapour Exhauster Fan(OVF) A


Mech

12

Morshi MIDC Jackwell Pump

13

MCF Catridge filter Cleaning

14

DR-13

15

Vaccum Pump-B

Work Progress for 24.10


Sr.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14

HPH-6
OIL CENTRIFUGE
HPH-6
HPH-6 TO HPH-5 IMPLUSE LINE
HPH- 5
HPH-6
BFP 1C Mech
DMCW Pump B Mech
ACW Pump B Mech
Oil Vapour Exhauster Fan(OVF) B
Mech
GSC Exhauster Fan A Mech
CW pump 1- Mech
LTPRDS
LTPRDS

Work Progress for 25.10


Sr.No
1

LTPRDS

AS7

Dearator

MS-106

MAL- 11

MAL- 26

Deaerator

Deaerator

Vacccum pump
A&B

10

CEP 1A Mech

11

DMCW Pump C Mech

12

ACW Pump C Mech

13

CW pump 2- Mech

14

Bp-06

Work Progress for 26.10


1

CEP-A

MS line

Compressor

CW pump -1B

Vacuum Pump- 1B

SAFETY VALVE

Condensor

HGP

LT-PRDS

10

CEP 1B Mech

11

DMCW Booster Pump A Mech

12

Vaccum Pump B Mech

13

ACW System

14

Deareator

15

MAL- 26 MIV

Work Progress for 27.10

Main Oil Tank

Main oil tank

BFP- 1A, 1B, 1C

CW pump -1B

SAFETY VALVE

HGP

Gland Steam Condensor

GSC

GSC

10

CEP Discharge Header

11

DMCW Booster Pump B Mech

12
13

AC AOP 1A mech
AC AOP 1B mech

Work Progress for 28.10


1

A.C SEAL OIL PUMP- 1A

SOP 1A

LT PRDS

PRDS

BP 08

CD-27

AS-7

SAFETY VALVE

HGP

10

PHE 1 A Mech

11

PHE 1 B Mech

12

PHE 1 C Mech

13

HPBP Mech

14

Bearing Chamber Exhauster Fan A


Mech

15

Bearing Chamber Exhauster Fan B


Mech

16

GSC Exhauster Fan B Mech

17

DC EOP Mech

18

MOT

19

FRS

Work Progress for 29.10


1
2

DMCW Pump
MAL

DR-16

Turbine

Turbine Oil Cooler A

HPBypass

CRH

Air receiver tank

21 mtr

10

CD-25

11

FD-5A

12
13
14
15

RO-2 (DM plant)


MOT
HPSU Mech
LPSU Mech

16

AC JOP Mech

17

DC JOP Mech

18

MCF-1 (DM plant)

Work Progress for 30.10


1

A.C SEAL OIL PUMP- 1A

SOP 1A

Seal Oil system

JOP

Vaccum pump-1A

Turbine Bearing & Pedestial

Work Progress for 31.10


1

A.C SEAL OIL PUMP- 1A

SOP 1A

Seal Oil system

Seal Oil system

Turbine

Turbine

7
8

MB FFED Pump-B
N-pit Pump-A

Work Progress for 22.10.2013 (TMD)


Work Description
HPH- 6 Shell side safety valve bottom flange leakage
HTPRDS IMPLUSE LINE VALVE GLAND REPLACEMENT(ABOVE HPH-5)
HP TURBINE STEAM LEAKAGE FROM FIRST STAGE PRESSURE IMPLUSE LINE ROOT VALVE
WELDING LEAKAGE
LTPRDS BYPASS LINE DRAIN ELBOW LEAKAGE (UNIT-2 SIDE)
HPH-6 TO HPH-5 IMPLUSE LINE MANUAL ISOLATION VALVE NORMALIZATION(ONLINE)
COMPRESSOR COOLING WATER PUMP SOUND
Preventive maintenance

Work Progress for 23.10.2013 (TMD)


Work Description
HPH- 6 MCR SIDE MANHOLE GASKET REPLACEMENT
HPH-6 SHELL SIDE SAFETY VALVE BOTTOM FLANGE LEAKAGE
HP TURBINE STEAM LEAKAGE FROM FIRST STAGE PRESSURE IMPLUSE LINE ROOT VALVE
WELDING LEAKAGE
CEP DISCHARGE IMPLUSE LINE OF FLOW NOZZLE WELDING TO BE DONE(4.5 MTRS)
HTPRDS IMPLUSE LINE VALVE GLAND REPLACEMENT(ABOVE HPH-5)
Condensor flood test
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Breakdown maintenance
Preventive maintenance
EXTRA VALVE ERECTED

Vaccum pump to (PHE) plate heat exchanger cleaning.

Work Progress for 24.10.2013 (TMD)


Work Description
HPH-6 SHELL DRAIN VALVE REPLACEMENT(BOTH)
OIL CENTRIFUGE AIR TAPPING LINE EXTENSION
HPH-6 GAUGE GLASS LEAKAGE
HPH-6 TO HPH-5 IMPLUSE LINE MANUAL ISOLATION VALVE NORMALIZATION(ONLINE)
Leakage from drain line to HPH- 5
HPH-6 drip line isolating valve steam leakage
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
LTPRDS BYPASS LINE DRAIN ELBOW LEAKAGE (UNIT-2 SIDE)
HTPRDS IMPLUSE LINE VALVE GLAND REPLACEMENT(ABOVE HPH-5)

Work Progress for 25.10.2013 (TMD)


Work Description
LTPRDS BYPASS LINE DRAIN ELBOW LEAKAGE (UNIT-2 SIDE)
AS7 DRAIN LINE WELDING JOINT LEAKAGE 21 MTRS
DEARATOR LEVEL GAUGE UNION JOINT LEAKAGE(TOP)
MS 106 GLAND
Heavy passing
Heavy passing

Deaerator pegging line from CRH drain line leakage after isolation valve
Deaerator ex com line drn elbow weld lkg
Vaccum pump to (PHE) plate heat exchanger cleaning required as cooling is not affective
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Passing

Work Progress for 26.10.2013 (TMD)


CEP-A NRV PASSING
MS LINE ABOVE DMCW 2nd LINE BOTTOM VALVE GLAND LEAKAGE (BFP SIDE)
COMPRESSOR COOLING TOWER BASIN CLEANING
CW pump 1B rubber bellow damaged.
leakage from make up valve to seperator tank.
Safety valve passing
Condensor flood test
Hydrogen Purity improvement
LT-PRDS drain line leakage at 21 Mtr.
Preventive maintenance
Preventive maintenance
Preventive maintenance
ACW self cleaning strainer inlet/oulet valve passing

Deareator vent modification Work


Gland leakage

Work Progress for 27.10.2013 (TMD)

MOT AREA HOUSE KEEPING


MOT FILTER CLEANING
BFP-1A,B,C SUCTION STRAINER CLEANING
CW pump 1B rubber bellow damaged.
Safety valve passing
Hydrogen Purity improvement
GSC outlet valve drain line leakage at 4.5m
GSC outlet drain valve to be replace
GSC drain to LP flash tank line steam trap to be check
Sampling Collection line is extended upto zero metre
Preventive maintenance
Preventive maintenance
Preventive maintenance

Work Progress for 28.10.2013 (TMD)


SOP-A PRV oil leakage
SOP 1A NRV passing
LT PRDS drain and vents rerouting & final connection
PRDS SPRAY LINE SAMPLING PLINE MODIFICATIN AT 4.5 MTRS
Valve jam
Valve passing
Gland Leakage
Safety valve passing
Hydrogen Purity improvement
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance

Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance

FRS Flow nozzle impulse line valve replacement

Work Progress for 29.10.2013 (TMD)


DMCW Pump A inlet v/v inspection
MAL 47 jamming check
Drain rerouting
Pedestal no-2
DMCW outlet v/v inspection
Pressure gauge tapping dummy welding.
CRH drain line valve checking
Erection of air receiver tank
Drain and vent modification.
Handle Demage

Valve jam
Remove and cleaning of cartriage of RO-2
Removal of grating for housekeeping
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance
Preventive maintenance

Work Progress for 30.10.2013 (TMD)


SOP-A PRV oil leakage
SOP 1A NRV passing

Line modification work


Filter cleaning
Coupling & alignmnt
Throttle valve oil leakage from brg 4, 5 & 6

Work Progress for 31.10.2013 (TMD)


SOP-A PRV oil leakage
SOP 1A NRV passing

Line modification work


Filter cleaning -1B
Pedestal no-2

LP hood -Spray line 12 O'clock dummy done both side


Heating problem
Abnormal Sound Problem

PTW NO

Work Status

1462

Completed

1466

Completed

1468

Completed

1471

Completed

1469

Completed

1470

Completed

1460

Completed

PTW NO

Work Status

1473

Completed

1474

Completed

1475

Completed

1476

Completed

1466

Completed

1477

Completed

1488

Completed

1489

Completed

1494

Completed

1621

Completed

1614

Completed

NA

Completed

3499

Completed

**

Completed

1460

Completed

PTW NO

Work Status

1649

Completed

1650

Completed

1651

Completed

1652

Completed

1659

Completed

1666

Completed

1678

Completed

1684

Completed

1689

Completed

1685

Completed

1498

Completed

1500

Completed

1471

Completed

1466

Completed

PTW NO

Work Status

1471

Completed

1734

Completed

1736

Completed

1737

Completed

1834

Completed

1750

Completed

1751

Completed

1752

Completed

A- 1753
B- 1754

Completed

1807

Completed

1812

Completed

1759

Completed

1763

Completed

1847

Completed

1819

Completed

1820

Completed

1825

Completed

1766

Completed
Not Clear

1477

Completed

1840

Completed

1848

Completed

1851

Completed

1766

Completed

1773

Completed

302

Completed

1750

Completed

1901

Under Operation scope

1903

Completed

A-1796
B-1797
C-1798

Completed

Not Clear

1907

Completed

1911

Completed

No Permit

Completed

No Permit

Completed

1788

Completed

1791

Completed

1792

Completed

1918

Completed

1922

Completed
Completed

1907

Completed
Completed

1942

Completed

1734

Completed

Defect Not clear

1871/1889

Completed

1875

Completed

1876

Completed

1872

Completed

1878

Completed

1879

Completed

1880

Completed

1881

Completed

1884

Completed

1940

Completed

1939

Completed

1962

Completed

1951

Completed

1950

Completed

1941 & 1953

Completed

1954

Completed

2004

Completed

2003

Completed

1952

Completed

1955

Completed

1961

Mechanically ok.
jammed

Actuator

3499

Completed (Manual Permit)

2007

Completed

1943

Completed

1899

Completed

1945

Completed

1946

Completed

3509

Completed (Manual Permit)

1918

Completed

1922

Completed

2005

Completed

2009

Completed

1967

Completed

1968

Completed

1918

Completed

1922

Completed

2005

Completed

1970

Completed

1950

Completed

1969

Completed

3511

Completed

3511

Completed