RECENT DEVELOPMENTS IN
HIGH-SPEED TRACK
Coenraad Esveld
Presentation at CETRA 2010

www.esveld.com

ECS

CETRA 17-18 May 2010, Opatija, Croatia

Country

Network
length [km]

Scheduled trains

Test run speed record

Average speed of
fastest train

China

6,552

431 km/h (maglev)


350, 330, 300, 200-250 km/h
(conventional)

502 km/h (maglev)


394 km/h (conventional)

313 km/h

Japan

2,459

300, 275, 260 km/h (conventional)

581 km/h (maglev)


443 km/h (conventional)

256 km/h

France

1,700

320, 300, 280, 210 km/h

574 km/h

272 km/h

Germany

1,290

300, 280, 250, 230 km/h


(conventional)

550 km/h (maglev)


406 km/h (conventional)

226 km/h

Spain

1,272

300, 250 km/h

404 km/h

236 km/h

Italy

815

300, 260, 200 km/h

368 km/h

178 km/h

South Korea

412

300, 240 km/h

355 km/h

200 km/h

Taiwan

336

300, 240 km/h

315 km/h

245 km/h

Turkey

245

250 km/h

303 km/h

<140 km/h

Belgium

214

300, 250 km/h

347 km/h

237 km/h

United Kingdom

109

300 km/h, 225 km/h, 201 km/h

335 km/h

219 km/h

Netherlands

100

300, 250, 140/160 km/h

336.2 km/h

<140 km/h

Switzerland

79

250, 200 km/h

280 km/h

<140 km/h

www.esveld.com

ECS

www.esveld.com

CETRA 17-18 May 2010, Opatija, Croatia

HSL MAP EUROPE


2009

ECS

CETRA 17-18 May 2010, Opatija, Croatia

KTX TRACK WITH MONOBLOCK SLEEPERS

Seoul Pusan
412 km double track

www.esveld.com

ECS

CETRA 17-18 May 2010, Opatija, Croatia

BALLASTLESS TRACK
Pro

Reduced height;

No flying ballast particles;

High lateral resistance;

Low maintenance, hence higher availability;

Increased service life.

Contra

Investment costs.

www.esveld.com

ECS

CETRA 17-18 May 2010, Opatija, Croatia

SHINKANSEN TRACK TAIWAN


Route length 336 km

www.esveld.com

ECS

CETRA 17-18 May 2010, Opatija, Croatia

SHINKANSEN TRACK TAIWAN


Route length 336 km

www.esveld.com

ECS

CETRA 17-18 May 2010, Opatija, Croatia

RHEDA 2000 SLAB TRACK

www.esveld.com

RHEDA 2000 SLAB TRACK

ECS

www.esveld.com

CETRA 17-18 May 2010, Opatija, Croatia

Pad stiffness
< 35 kN/mm
9

ECS

CETRA 17-18 May 2010, Opatija, Croatia

BGEL PREFAB SLAB TRACK

www.esveld.com

10

ECS

CETRA 17-18 May 2010, Opatija, Croatia

EMBEDDED RAIL STRUCTURE


3 km test track near Best

www.esveld.com

11

ECS

CETRA 17-18 May 2010, Opatija, Croatia

HSL TRACK THE NETHERLANDS

www.esveld.com

12

ECS

www.esveld.com

CETRA 17-18 May 2010, Opatija, Croatia

13

ECS

CETRA 17-18 May 2010, Opatija, Croatia

ANALYSES FOR HIGH-SPEED TRACK

Longitudinal forces, especially at long bridges;

Static design;

Dynamics:
Wave propagation in soft soils;
Long wave vehicle track interaction;
Short wave wheel rail interaction;

www.esveld.com

14

ECS

CETRA 17-18 May 2010, Opatija, Croatia

CRITICAL TRAIN SPEED

CR CT =

On soft soils propagation of Rayleigh waves is a major issue;


Dutch solution: piled foundation (low viaduct).

www.esveld.com

15

ECS

CETRA 17-18 May 2010, Opatija, Croatia

Car body

Secondary suspension
Bogie

z Primary suspension
Rail pad

Wheelset

Sleeper

Hertzian spring

Ballast

4
Rail

Criteria: Passenger Comfort (carSubstructure


body acceleration) and
Wheel Rail Forces with associated stresses and deformations

www.esveld.com

16

ECS

CETRA 17-18 May 2010, Opatija, Croatia

Combined and NSTO (short waves) profile

10

Power Specral Density [mm2 s]

10

10

-2

10

-4

10

-6

10

-8

10

-1

10

10

10

10

10

Waveband [m]
www.esveld.com

17

ECS

CETRA 17-18 May 2010, Opatija, Croatia

Vertical rail level geometry (Combined)


12
10
8

Variation [mm]

6
4
2
0
-2
-4
-6
-8
-10

www.esveld.com

200

400
600
Distance [m]

800

1000
18

ECS

CETRA 17-18 May 2010, Opatija, Croatia

DYNAMICS ANALYSIS

Vertical car body accelerations (passenger comfort) <0.38 m/s2;

The track geometry used in the analyses should be adhered to during constructions
and maintenance;

Wheel Rail Forces: For =1 mm (0-25 m waveband) DAF95 <1.67, =1.5 mm


DAF95 < 2.0 according to Eurocode;

Substructure accelerations <5 m/s2

Track geometry has dominant influence!!!;

Rolling stock parameters, especially damping, important;

Track variants less important, except for pile distance.

www.esveld.com

19

ECS
Waveband

CETRA 17-18 May 2010, Opatija, Croatia

Level
Umax [mm]

[mm]

3 25 m

4.6058

1.0296

25 70 m

3.8831

1.3849

70 180 m

6.4151

2.7211

05m

2.3161

0.30047

0 10 m

4.4263

0.70446

0 150 m

7.4245

2.5974

Whole profile

10.5941

3.2093

www.esveld.com

20

ECS

CETRA 17-18 May 2010, Opatija, Croatia

WHEEL/RAIL CONTACT
CONFORMITY OF PROFILES

Equivalent conicity 0.025 - 0.15.

ROLLING CONTACT FATIGUE

Headchecks and squats are major


problems in Holland;

Main remedy is early grinding;

Special anti headcheck profiles.

www.esveld.com

21

ECS

CETRA 17-18 May 2010, Opatija, Croatia

HEADCHECKS

www.esveld.com

22

ECS

CETRA 17-18 May 2010, Opatija, Croatia

HEADCHECKS

www.esveld.com

23

ECS

CETRA 17-18 May 2010, Opatija, Croatia

SQUATS

www.esveld.com

24

ECS

CETRA 17-18 May 2010, Opatija, Croatia

SLAB TRACK DESIGN

Using a slab with reinforcement at the neutral line (e.g. Rheda


2000):
No bending stiffness thus massive soil improvements required.

Slab with reinforcement at top and bottom of the slab:


bending strength,
relatively high reinforcement ~1.5 % for B35;
only very limited soil improvements necessary.

Using bridge or bridge like structures as a substructure:


Restricted influence on the bending stresses in the track slab.

www.esveld.com

25

ECS

CETRA 17-18 May 2010, Opatija, Croatia

FORCE-BASED ASSESSMENT OF WELDS

www.esveld.com

26

ECS

CETRA 17-18 May 2010, Opatija, Croatia

RAILPROF MEASURING DEVICE

www.esveld.com

27

ECS

CETRA 17-18 May 2010, Opatija, Croatia

HSL SOUTH IN THE NETHERLANDS


Rheda 2000 total: 163 km single track

Amsterdam

Schiphol airport
Rotterdam

London
Brussels

Antwerp

Cologne

Paris

www.esveld.com

28

ECS

CETRA 17-18 May 2010, Opatija, Croatia

CONTRACT INFRASPEED

Public Private Partnership

Performance Based - Availability Payment

Verification and Validation in accordance with EN 50126

Functional Specification:

Availability (99%);
Bi-directional operation at full line speed;
Operational speed of 300 km/h;
Minimum operational Headway of 180 seconds;
Technical specification for interoperability.

www.esveld.com

29

ECS

CETRA 17-18 May 2010, Opatija, Croatia

PILED FOUNDATION HSL-SOUTH


Solution on Soft Soil

35 m
Rheda 2000 slab

www.esveld.com

Rail

35 m

Concrete supporting structure

30

ECS

CETRA 17-18 May 2010, Opatija, Croatia

GAP TESTS CARRIED OUT AT TU DELFT


Gap
Geotextile

Gap due to differential settlement

Gap due to rotation of the substructure

Largest gap according to calculations: 0.7 mm

Tests carried out at TU Delft: 0, 1 and 2.5 mm

Dynamic load 55 kN, 2 million load cycles

No damage at concrete interface, intermediate geotextile layer and slab

www.esveld.com

31

ECS

CETRA 17-18 May 2010, Opatija, Croatia

TEST SET UP AT TU DELFT

www.esveld.com

32

ECS

CETRA 17-18 May 2010, Opatija, Croatia

CONCLUSIONS

Both ballasted and non-ballasted track structures are suitable for HSL;
Availability and minimum life cycle cost are increasingly important;
therefore trend towards slab track;
Slab tracks are still far from optimal;
Dynamics plays a crucial role in track design:
tight standards for running surface and
sufficient resilience in the track components;
Wheel rail interface should be well designed and maintained;
Quality is a key factor in both construction and maintenance.

www.esveld.com

33