Sunteți pe pagina 1din 13
Structural Analysis Report 180-Ft. Monopole Prepared for: St. Charles Tower, Inc. #4 West Dr., Suite 110 Chesterfield, MO 63017 Clearwire #MO-STLS631C - Lindenwood 1785 John Weber Drive St. Charles, MO 63301 Calculations Prepared by: or Davinci Engineering, Inc. 2 © DaVinei Job #10241-1173 ~ Client Reference #2008-03-C Date: 3/18/2010 {6 rexonais Reviewing Engineer: Michael F. Plahovinsak, PLE, Davinci Engineering, Inc. Santa Maria, California 93456 Ph 805.922.5201 Fase -880.0402 -B9 PO Boe 66 “HOW. Main St Unionville Conte, OH 43077 Phy 6149974902 "Fane 61413-2887 sm dvinc-enziceringcom Page 2 of 5 382010 Project Summary: DaVinci Engineering, Inc. has completed a structural analysis of the existing monopole for the addition of Clearwire 125'- (6) Kathrein 840-10084 + (6) Motorola WAP450 + (2) Andrew VHILP2 Microwaves with associated cable feedlines The pole has been analyzed in accordance with the requirements of the International Building Code per IBC section 3108.4, and the recommendations of the Telecommunications Industry Association “Structural Standard for Steel Antenna Supporting Structures" ANSUTIA-222- This analysis may be considered a “Rigorous Structural Analysis” as defined in ANSV/TIA:222- G1s52, AAs indicated in the conclusions of this analysis, we have determined that the existing pole and foundation have suficien capacity to support the existing, reserved and proposed anteana loads a detailed herein. Based on the results of our analysis, structural magifcations are not equited at tis time, Source of Data: Rao Soares ob Number [Date Pole and Foundation Drawings Dane Engines ‘07235-1656 | 1002/09 ‘Geotechnical Report ‘Noble Engineering 2008-03-6 | 08725709 Structure Specifies: ‘© Manufacturer: TransAmerican Power Products ‘© Manufacturer File #:TP-8418 © Year Built: 2009 Davinci Engineering, Inc. £008 wwe denictensinceringsomm Page 3 ofS 3/18/2010 Analysis Criteria: Intemational Building Code (All Versions) Section 3108.4 Structural Standards for Steel Antenna Supporting Structures ANSUTIA-222-G ‘© Basie Wind Speed 90 mph (3-See Gust) f= Basic Wind Speed w/ I"Tee 40 mph G-See: ‘© Operational Wind Speed {60 mph (3-See Gust) ‘Sracture Cas Exposure Category | Topographic Categony | d= 10) c 1 Appurtenance Listing: Saws | Hes ‘Antenna Mounting ‘Owner os (1) 10 Whip Antenna Existing | 183 Prete sing | 18 TH Shively Labs 6810 6-Bay FM Antenna ees [Eta Flush Mounted 16) Kathrin 840-1084 w/ (6) Motorola WAPISO Proposed | 125° (2) Andrew VILP2 Microwave Clearwire Taro or Stai-Off Moun (1) 3° Diameter conduit flush mounted to the exterior of the pole tthe 150) elevation. All other tntenna lines assumed internally mounted, not exposed to the wind. Foundation Analysis: The existing monopole foundation design was analyzed in conjunction with site specific ‘geotechnical report. The existing foundation has sufficient capacity to support the pole with the proposed antenta configuration, Davinci Engineering, Inc. 2007 sew davinc-enginceringcomt Page 4 of 5 sisiz010 ‘Twist and Sway Critical Deflections and Radius of Curvature - Service Conclusion: DaVinci Engineering has completed a structural analysis of the existing monopole and foundation in aecordance with the project specitics outlined above, Our analysis indicates that the existing monopole and foundation is stressed to a maximum of 80% of its usable eapacity when considering the existing plus proposed loading. lease refer to the alached calculations for an itemized listing ofall member stress ratios. The existing pole is safe and adequate to support the preposed loads, and no structural reinforcing is required to support the above loading, If you have any questions about the contents of this structural report or require any additional information, please feel fee to contact our office Sincerely, DAVINCI ENGINEERING, INC, ALL hw Michael F. Plabovinsak, PE. mikeadarinc-eineri.com, Davinci Engineering, ine. £008 wendurinctentimecring som Page 5 of 5 siisn010 ‘Standard Conditions for Providing Structural Consulting ‘Services on Existing Struetures |. The following standard eoneitions ae a general overview of Key issues regarding the work product sippied hy DaVinci Engineering Ifthe existing conditions are not as represented in tis structural report or attached sketches, DaVinei Engineering should be contacted to evaluate the significance of the deviation and revise the structural assessment accordingly ‘The structural analysis has been performed assuming that the structure isin “like new" concltior. No allowance was made for excessive corrosion, damaged or miscing siuctural ‘members, lose bolts, ete, ITthere are any known deficiencies in the structure that potentially compromise structural integrity, DaVinci Engineering should be mad> aware of the deficiencies. IF DaVinei Engineering is aware ofa deficiency that exits ina structure atthe time of cur analysis, a general explanation ofthe structural concer due tothe deficieney will be ineluded in the structural report, but the deficiency will not be reflected in capacity caleulations. “The structural analysis provided by DaVinei Engineering is an assessment of the primary load caning capacity ofthe structure. DaVinci Engineering provides a limited seope of service in that we have not verified the capacity of every weld, plate, connection detail, ete. In mos eases, structural fabrication details are unknown atthe time of our analysis, and the detailed field measurement of this information is beyond the scape of our services, In instances where DaVinci Engineering has not performed connection capacity caleulations, i is assumed that existing manufactured connections develop the full capacity ofthe primary ‘members being connected. ‘The structural integrity of the existing foundation system ean only be verified if exact foundation sizes and sols conditions are known. DaVinei Engincering will ot accept any responsibilty for the adequacy of the existing foundations unless this sitespecifc data is supplied Miscellaneous items such as antenna mounts, coax supports, etc. have not been designed, detailed or specified as pat of our work, It is assumed that material of adequate size and steength will be purchased from a reputable component manufacturer. ‘The attached report and sketches are schematic in nature and should not be used to fabricate or purchase hardware and accessories to be attached tothe sucture. DaVinel Engineering recommends field measurement of the structure before fabricating oF purchasing new handwvare and accessories. DaVinei Engineering isnot responsible for proper fit and clearance of hardware And accessory items in the fel, ‘The strictural analysis has been performed considering minimum code requirements or recommendations. If altemate wind, ice, or deflection eriteri are to be eonsidered, then DaVinci Engincering shall be made aware of the alternate eriteia, Davinci Engineering, Ine L008 sewn davnc-ensncering. [DESIGNED APPURTENANCE LOADING een = | sera forenoon erreur TAZ22.6 Sard cai erenteatursom woes bascoetonds | Regen wn curteeracon cise ey \ Stee red we er ie feet) Woke [Pein Fnginering |= Ta Wonape- Dain wee nore Cre “Onssor [=o RISATower |” * 1010 180-R Monopole -DaVine #10241-1173 Vint Engineering Ine. | PO ra lke aa LUndenwood University MO-STLSE31C ‘0317 oaterio mama Cr On 77 Fa Desonedby ce sre St Chavis Towor ake P Tower Input Data i | ‘Theres pote section. “Tis towers designed wing the TIA222-G standard ‘The following design ean apply "Tawer is aed Sait Charles County, Missouri, 7 Basle windspeed of Omph. Expoure category Topographe Calegny | res Height 0.00 ‘Nomi thickes of 1.000 Tee thcknes iy ener to increase with gt Tee density of 36 pe. ‘And speed of 40 mph_is sed in combination with ice. “Temperature drop of 30°F. Deflection estes using» wind spesd of 60 mp ‘Anorline (Plea) anal was wed Prensres call teach section, Sires raioused in pole desig i Local ending seses du 1 cling fads, Feline suppors, end appurtenance mounts ae wot onside, Tapered Pole Section Geometry oe ea ee su a __ Tapered Pole Properties us Sie sien ee eater aver een ees oie RISATower 180-R Monopole - DaVinci #10241-1173 20f6 a et a Devine ene I Lindenvoat unversty MOSTLS6816 Tesi osnaa umount ESE eas ie St hares Toner aoe Feed Line/Linear Appurtenances - Entered As Area Ta? "5 ee wh ‘Cemne) ree tp to cnSGGmon cM tthe smote He Sb om (Genie) ace a Discrete Tower Loads Tae Fa — Tae ee Tae z 8 ’ Peeee ett a ‘Gare om is oom QpKatcstelOND WB Fontes 3m) 00m S00 i cos "fot a ae a Qpkatnsielensnwi Confuse 3m 9000500 ao os eres to a 3 RISATower ae aaa al soma Lnderwon! Uneaty HOSTESSIG “7 oso Pamemcie ase To er a nt on ag a ra [te = 4 ee Dishes > 2. ceo = = E =o coe : cc pike 2 men me ol ue es as ‘Load Combinations fue ee eat SE ies eae on a Dest indy Sse ra RISATower 1180-ft Monopole - DaVinci #10241-1173, 40t6 Vinci Engncering, nc | PRS fous eerie eee! Lindenwood University MO-STLS6S1C 110547 osteo naa Ce 977 ‘esared by co ssa ‘St. Chatles Tower ie P Maximum Member Forces _ SS SS See = an aa a ae eet ae i 8 ‘Maximum Tower Deflections - Service Wind ~ oie aad . 7 if =a "as a — RISATower 1804 Monopole - DaVinci #1024%-1173 506 pCHiUPESEOSCHEE tre [oe ine nine, Lindenwood University Mo-S816 r0s:17onte/10 Cm Come ona? FE eid by erred St Charles Tower Mike P Critical Deflections and Radius of Curvature - Service Wind Tan Critical Deflections and Radius of Curvature - Design Wind ra i —_ ae, 7 8S as Pole Desi im Se a Pole Bending Design Data 3 ton tw “pitt “a ny Fa RISATower 180s Monopole- Davin 1024-1173 5ot6 i Propet oy Secateurs Lindenwood Universty MO-STL6316 11:03:17 03/18/10 a a a rae ee = a a 4 ch teh “Riek 5 Sneha se Pole Shear Design Data eee ee t 6 rss! teswonwenoa 100 = i = ae Taos a 12 amemase) oom am aa a Lu 5435-1675 00m Gam om 02am Dg @ Ls 15-04) 0m Gash om orzo OS Section Capacity Table Same Bain Cap ata er Time Boek R Copay Fat parse 3 ta Monopde Caisson (Driled Per) Callin ee

S-ar putea să vă placă și