Sunteți pe pagina 1din 6

A

TARGET:
%
MY HOURS

CANDIDATE: LEAL, Timothy Bret B.


PROJECT NAME
1.

DD

PERIOD COVERED
MM YEAR DD MM YEAR

576

30% 25%
1296 1072
144
112

15%
648
72

NO. OF
DAYS

1152 960

NO. OF
C

PANNY'S COMMERCIAL BUILDING


Baybay, southern Leyte
PREPARATION OF THE FINANCIAL FEASIBILITY STUDIES AND STUDY THE
LOCAL ORDINANCE
ARCHITECTURAL PLANNING & STRUCTURAL CONCEPTULIZATION

DEC

2009

11

22

JAN

2009

19

12

FEB

2010

15

2010

26

FEB

2010

10

MAR

2010

12

MAR

2010

10

15

MAR

2010

APR

2010

15

APR

2010

16

APR

2010

10

80

Maasin City, Southern Leyte

19

APR

2010

20

JUL

2010

ARCHITECTURAL PLANNING
EDITING FOR THE REVISIONS OF BILL OF MATERIALS, SPECIFICATIONS
AND BILL OF QUANTITIES
ARCHITECTURAL PLANNING

19

APR

2010

23

APR

2010

40

26

MAY

2010

JUN

2010

JUN

2010

13

JUN

2010

RELAYOUTING OF REVISED FURNITURE LAYOUT FOR GROUND FLOOR

14

JUN

2010

20

JUN

2010

21

JUN

2010

24

JUN

2010

25

JUN

2010

AUG

2010

30

240

AUG

2010

SEPT 2010

23

184

SEPT 2010

10

SEPT 2010

13

SEPT 2010

24

SEPT 2010

10

STUDIED AND RESEARCHED ON DESIGN AND LOCAL ORDINANCES

27

SEPT 2010

OCT

2010

TECHNICAL RESEARCH AND PRE-DESIGN MEETING WITH ENGINEERS

OCT

2010

OCT

2010

PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATIONS, BILL OF


MATERIALS & GENERAL CONDITIONS

11

OCT

2010

18

OCT

2010

PREPARATION OF INITIAL SET OF SCHEMES 1

19

OCT

2010

29

OCT

2010

72

ARCHITECTURAL DESIGN: PREPARATION OF SECOND SET OF SCHEMES

NOV

2010

NOV

2010

48

PREPARATION OF SITE MOVILIZATION & ON SITE TRAINING AND


MONITORING

NOV

2010

JAN

2011

46

EDITING OF ELECTRICAL AND SANITARY AND PLUMBING LAYOUT


EDITING OF THE REVISIONS FOR REFLECTED CEILING PLAN AND SITE
DEVELOPMENT PLAN
RELAYOUTING OF REVISED FURNITURE LAYOUT
EDITING FOR THE REVISIONS OF BILL OF MATERIALS, SPECIFICATIONS
AND BILL OF QUANTITIES
EDITING AND MAKING SHOP DRAWING REFLECTED CEILING PLAN

2.

3.

DEC

2009

21

23

JAN

2010

25

JAN

2010

15

FEB

152
80

120

LOURDES ARCADE

72
40

PANNY'S PRINCE MALL


Baybay, Southern Leyte
PREPARATION OF THE FINANCIAL FEASIBILITY STUDIES, TECHNICAL AND
ECONOMICAL SITUATION OF THE PROJ.
PREP. OF ARCH'L SCHEMES, FLR. PLN, ELEV'S, SCHED OF DOORS &
WINDOWS, SECTIONS AND FOUNDATION PLAN
EDITING THE REVISION OF FLR. PLN, ELEV'S, SCHED OF DOORS &
WINDOWS, SECTIONS AND FOUNDATION PLAN
PREPARATION OF PUMBING AND SANITARY LAYOUT AND REVISIONS
EDITING
PREPARATION OF CONTRACT DOCUMENTS, COST ESTIMATE, BOQ, GEN.
CONDITIONS AND OTHER CLERK WORKS

4.

80

BRIXTON WAREHOUSE
Brixton st., Pasig City

32
48

368

SOPHIA & MARGARET MODEL UNIT (MOCK UP)


Lacaster State,Alapan Cavite
PREPARING BILL OF MATERIALS, SPECIFICATIONS AND BILL OF
QUANTITIES

10

JAN

2011

28

JAN

2011

15

SITE SUPERVISION, PROJECT MONITORING

31

JAN

2011

11

FEB

2011

10

14

FEB

2011

25

FEB

2011

10

28

FEB

2011

25

MAR

2011

20

PREPARING THE FINAL BILLING

28

MAR

2011

APR

2011

PREPARING OF PERMIT FOR REMOVING OF TEMFACIL ON SITE SUBJECT


FOR DEMOLITION

APR

2011

APR

2011

EDITING THE BILL OF MATERIALS, SPECIFICATIONS AND BILL OF


QUANTITIES SUBJECT FOR VALUE ENGINEERING
SITE SUPERVISION, PROJECT MONITORING FINAL TOUCH OF MINOR
PARTS SUBJECT FOR TURN OVER

120
80
80
160
40
40

TSE RESIDENCE (RENOVATION)


Maasin City, Southern Leyte
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATIONS, BILL OF
MATERIALS & GENERAL CONDITIONS
TECHNICAL SUPPORT FOR THE FINANCIAL FEASIBILTY STUDY

11

APR

2011

22

APR

2011

10

25

APR

2011

20

MAY

2011

20

EDITING OF ELECTRICAL LAYOUT AND SHOPDRAWING

23

MAY

2011

10

JUN

2011

15

13

JUN

2011

17

JUN

2011

40

20

JUN

2011

JUL

2011

10

80

RELAYOUTING OF REVISED FURNITURE LAYOUT FOR GROUND FLOOR

JUL

2011

15

JUL

2011

10

EDITING OF PLUMBING AND SANITARY LAYOUT AND SHOPDRAWING

18

JUL

2011

AUG

2011

11

AUG

2011

26

AUG

2011

19

29

AUG

2011

15

SEPT 2011

14

16

SEPT 2011

22

SEPT 2011

23

SEPT 2011

OCT

2011

OCT

2011

OCT

2011

RELAYOUTING OF REVISED FURNITURE LAYOUT FOR GROUND FLOOR

12

OCT

2011

16

OCT

2011

EDITING OF ELECTRICAL LAYOUT AND SHOPDRAWING

19

OCT

2011

21

OCT

2011

24

OCT

2011

31

OCT

2011

48

NOV

2011

NOV

2011

48

10

NOV

2011

21

NOV

2011

10

24

NOV

2011

15

DEC

2011

16

16

DEC

2011

23

DEC

2011

27

DEC

2011

27

DEC

2011

29

DEC

2011

29

DEC

2011

JAN

2012

18

JAN

2012

13

104

EDITING THE BILL OF MATERIALS, SPECIFICATIONS AND BILL OF


QUANTITIES
EDITING THE BILL OF MATERIALS, BILL OF QUANTITIES SUBJECT FOR
VALUE ENGINEERING

80

LEN ENRILE RESIDENCE


Tagaytay city
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATIONS, BILL OF
MATERIALS & GENERAL CONDITIONS
TECHNICAL SUPPORT FOR THE FINANCIAL FEASIBILTY STUDY
EDITING THE BILL OF MATERIALS, SPECIFICATIONS AND BILL OF
QUANTITIES
EDITING OF SANITARY LAYOUT AND MAKING ISOMETRIC DIAGRAM FOR
PROPER INSTALLING AND LOCATION OF FITTINGS
EDITING THE BILL OF MATERIALS, BILL OF QUANTITIES SUBJECT FOR
BILLING

ARCHITECTURAL DESIGNING OF INTERIOR SCHEME SUBJECT FOR


PRESENTATION TO THE OWNER FOR APPROVAL
ARCHITECTURAL DESIGNING, EDITING OF REFLECTED CEILING PLAN
SUBJECT FOR CHANGES
RELAYOUTING OF REVISED FURNITURE LAYOUT FOR GROUND FLOOR
AND SECOND FLOOR SUBJECT TO FUNG SUI BY THE OWNER

152

40

40

LLAMAS RESIDENCE
BF Homes, Paraaque City
MEETING WITH THE OWNER AND STUDY THE LOCAL ORDINANCE
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATIONS, BILL OF
MATERIALS & GENERAL CONDITIONS
ARCHITECTURAL DESIGNING OF FIRST SCHEME SUBJECT FOR
PRESENTATION TO THE OWNER
ARCHITECTURAL DESIGNING OF FINAL SCHEME SUBJECT FOR
PRESENTATION TO THE OWNER'S APPROVAL
DRAFTING THE ARCHITECTURAL PLANS,ELEVATIONS,SECTION FOR
ARCHITECT'S CHECKING

48

PREPARATION OF CONTRACT DOCUMENTS, COST ESTIMATE, BOQ, GEN.


CONDITIONS AND OTHER CLERK WORKS
DRAFTING THE ELECTRICAL LAYOUT SUCH AS LIGHTING, POWER AND
CIRCUITING
RELAYOUTING OF REVISED FURNITURE LAYOUT FOR GROUND FLOOR
AND SECOND FLOOR
DRAFTING THE ARCHITECTURAL PLANS,ELEVATIONS,SECTION FOR
ARCHITECT'S CHECKING

19

JAN

2012

24

JAN

2012

25

JAN

2012

31

JAN

2012

FEB

2012

14

FEB

2012

10

15

FEB

2012

MAR

2012

14

32

112

1296 1072

648

384

384

384

10%
576
192

10%
480
96

10%
432
48

NO. OF HRS.
D

88
120

80

72

40

24

48

TOTAL

NO. OF
HRS.

3840
100%
4504
664

160
120

80
88

112

64

40
24

80

128

40
80

576

480

432

4504

S-ar putea să vă placă și