Documente Academic
Documente Profesional
Documente Cultură
A UTOMATIC
U NLOADING
S YSTEM
CLICK HERE TO CONTINUE
SLOP-P C.O.T.
VACUUM PUMPS
SEAL WATER TANK
CARGO TANK
SUCTION VALVE
NEXT SLIDE
2.
3.
4.
5.
6.
7.
NEXT SLIDE
NEXT SLIDE
>70%
SUCTION VALVE
SLIGHTLY OPEN
NEXT SLIDE
A U S - INITIAL START-UP
1. Increase DISCH. VLV loader
gradually to full open position
by turning the knob.
NEXT SLIDE
START DISCHARGING
D.V. CONTROLLED
BY LOADER
PUMP STARTED AT
MINIMUM SPEED
NEXT SLIDE
NEXT SLIDE
No. 1 VP
> 70%
< 50%
NEXT SLIDE
END OF DISCHARGE
AT THE END OF
DISCHARGING THE
SEPARATOR LEVEL
DROPS TO ABOUT
6% AND LASTS FOR
MORE THAN 3
MINUTES WHILST
BOTH VACUUM
PUMPS RUNNING
EXTRACTING THE
GAS FROM THE
SEPARATOR TRYING
TO FILL IT UP WITH
LIQUID
SEPARATOR
LEVEL
<6%
NEXT SLIDE