BAR BENDING SCHEDULE

TOWER TYPE
Name of the Work
Name of Agency
LOA No & Date

LA (220 KV EQIPMENT)
765/400/220 KV Sub-station Bhiwani
AREVA T & D INDIA LIMITED
C-14913-S019A-3/P-205/GI/CA-III/3187 dt. 25.02.2010

Drawing No

C/ENGG/STD/EQP/FDN/02

BHADANI QUANTITY SURVEYORS AND TRAINING PVT LTD. NEW DELHI -- WWW.BILLINGENGINEER.COM
Sl.
No.

Description

MAIN BOTTOM
Bothways B1

Dia
Spacing
(mm.) (mm.)

No.

Shape of the Bar


a

MAIN TOP Bothways


B2

Total
Length
(mtr.)

Unit
Weight

TOTAL
WEIGHT

Dia of Bars (in mm.)


8

10

12

16 20 25

10

250

14

0.15

1.4

0.15

1.70

23.80

0.617

14.68

0.00

14.68

0.00

0.00

0.00

0.00

10

250

14

0.15

1.4

0.15

1.70

23.80

0.617

14.68

0.00

14.68

0.00

0.00

0.00

0.00

1.970

15.76

0.888

13.99

0.00

0.00

13.99

0.00

0.00

0.00

VERTICAL

12

STIRRUPS

0.19

10

STIRRUPS

0.19

10

TOTAL STEEL

Length
(mtr.)

Length of Bar (in mm.)

0.3

1.67

0.416

0.416

0.416

0.416

0.16

1.824

18.24

0.395

7.20

7.20

0.00

0.00

0.00

0.00

0.00

0.302

0.302

0.302

0.302

0.16

1.368

13.68

0.395

5.40

5.40

0.00

0.00

0.00

0.00

0.00

55.97

12.61

29.37

13.99

0.00

0.00

0.00

PREPARED/SUBMITTED BY

APPROVED BY

AREVA T & D

POWERGRID

BAR BENDING SCHEDULE


TOWER TYPE
Name of the Work
Name of Agency
LOA No & Date

CB (220 KV EQIPMENT)
765/400/220 KV Sub-station Bhiwani
AREVA T & D INDIA LIMITED
C-14913-S019A-3/P-205/GI/CA-III/3187 dt. 25.02.2010

Drawing No

C/ENGG/STD/Bhi/EQP/FDN/03
BHADANI QUANTITY SURVEYORS AND TRAINING PVT LTD. NEW DELHI -- WWW.BILLINGENGINEER.COM

Sl.
No.

Description

Dia
Spacing
(mm.) (mm.)

MAIN BOTTOM op and


TBothways

10

250

18

MAIN BOTTOM op and


TBothways

10

250

16

VERTICAL

12

STIRRUPS

0.19

STIRRUPS

STIRRUPS

STIRRUPS

No.

Shape of the Bar


a

12

Length
(mtr.)

Length of Bar (in mm.)

Total
Length
(mtr.)

Unit
Weight

0.15

1.7

0.15

2.00

36.00

0.617

0.15

0.15

2.30

36.80

1.970

TOTAL
WEIGHT

Dia of Bars (in mm.)


8

10

12

16

20

25

22.21

0.00

22.21

0.00

0.00

0.00

0.00

0.617

22.71

0.00

22.71

0.00

0.00

0.00

0.00

23.64

0.888

20.99

0.00

0.00

20.99

0.00

0.00

0.00

0.3

1.67

10

0.916

0.616

0.916

0.616

0.16

3.224

32.24

0.395

12.73

12.73

0.00

0.00

0.00

0.00

0.00

0.19

10

0.464

0.616

0.464

0.616

0.16

2.320

23.20

0.395

9.16

9.16

0.00

0.00

0.00

0.00

0.00

0.19

10

0.080

0.616

0.080

0.776

7.76

0.395

3.07

3.07

0.00

0.00

0.00

0.00

0.00

0.19

10

0.080

0.916

0.080

1.076

10.76

0.395

4.25

4.25

0.00

0.00

0.00

0.00

0.00

TOTAL STEEL

95.12

29.21

44.92

20.99

0.00

0.00

PREPARED/SUBMITTED BY

APPROVED BY

AREVA T & D

POWERGRID

0.00

220 Equipment Reinforcement Detail

BHADANI QUANTITY SURVEYORS AND TRAINING PVT LTD. NEW DELHI -- WWW.BILLINGENGINEER
S.NO. Description
1
2
3
4
5
6
7
8

LA
ISO
CT
BPI
BPI(HL)
CVT
WT
CB

Types of
Foundation
F1
F5 and F5A
F2
F4
F4A
F3
F8
F6

No. of
Foun.
18
222
30
55
30
24
18
30
427

8
12.61
#REF!
#REF!
#REF!
15.31
#REF!
45.93
30.48

Dia Wise
10 12
29.37 13.99
#REF! #REF!
#REF! #REF!
#REF! #REF!
46.65 13.99
#REF! #REF!
29.62 105.92
44.92 20.99

16
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Unit Total

20% Extra

55.97
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00

Total Dia Wise


8
10
12
226.95
528.65
251.91
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
459.30
1399.50
419.70
#REF!
#REF!
#REF!
826.75
533.09
1906.57
914.35
1347.53
629.77
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

16
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Total
1007.50
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

NGENGINEER.COM

S-ar putea să vă placă și