Sunteți pe pagina 1din 3

V3

p.p(2.4) (0.25) (o.45)=0.27


Al (4,11) (0.3) =1.233
Pt (4,11)(0.1)=0.411
Tb(1.8)(0.15)(2.4)= 0.648
Carga v
(4,11)(0.20)= 0.822
V4
p.p(2.40) (0.25) (o.45)=0.27
Al (1.91) (0.3) =0.573
Pt (1.91)(0.1)=0.191
Tb(1.8)(0.15)(2.4)= 0.648

Carga V
(1.91)(0.2)=0.382

C=2.5(tp/t) .. (I)
C=0.8/ ((t/ts) +1) . (II)
Igualamos (I) y (II) PARA HALLAR T
2.5(Tp) / T = 0.8 (Ts)/ T +1
1/T = 0.8(0.3) / ( T+1)
T+1/T =2.4
T+1=2.4T
1=1.4T
T=1/1.4
T=0.7

REEMPLAZAMOS T PARA HALLAR C

C= 2.5 ( 0.4)/ 0.7


C= 1.4

T=0.3
Tp= 0.3 Suelo tipo 1 limoso
C=1.4
R=8
A=229.12 m2 7.09 = 222.03
P=1130 tn

V=

( 0.4111.4 )
1.130=79.1
8

E= 77 Tn/ m2
A= 79.1/ 77 = 1.027 m2
Long necesaria= 1.027/ 0.15 = 6.84
Columnas
C esquineras= 0.3 * 0.3
C. exterior = 0.35*0.35
C. central= 0.4*0.4

S-ar putea să vă placă și