STANDARD MATERIAL CONSUMPTION F

(A)
SR. NO.
1

ITEMS IN PLINTH
Excavation in black
cotton soil

Compacted murum filling

Rubble soiling 23 cm (9) thick

UNIT PER
100 cft
1 cum
100 cft
1 cum
100 sft
1 sqm

(B)
SR. NO.

CONCRETE ITEMS

P.C.C. (1 : 4 : 8)

P.C.C. (1 : 3 : 6)

R.C.C. (1 : 2 : 4)

R.C.C. (1 : 1 : 3)

UNIT PER
100 cft
1 cum
100 cft
1 cum
100 cft
1 cum
100 cft
1 cum

(C)
SR. NO.
1
2

CONCRETE BLOCKS

UNIT PER

Solid cement concrete


block 30x15x20 cm
(12 x 6 x 8)
Solid cement concrete block 30x10x20 cm
x 8)

(12 x 4

35
35
50
50

Nos.
Nos.
Nos.
Nos.

(D)
SR. NO.

MASONRY ITEMS (excluding R.C.C. band

U.C.R. masonry
in C.M. 1:6

23 cm (9) B.B.M. in C.M. 1:6

15 cm (6) B.B.M. in C.M. 1:6

10 cm (4) B.B.M. in C.M. 1:4

15 cm (6) concrete block masonry

in C.M. 1:6

10 cm (4) concrete block masonry

in C.M. 1:4

UNIT PER
100 cft
1 cum
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm

(E)
SR. NO.

PLASTERING ITEMS

UNIT PER

Sanla finish plaster 12.5 mm () thick


a) In C.M. 1 : 4
1

b) In C.M. 1 : 5
c) In C.M. 1 : 6
Sanla finish plaster 20 mm () thick
a) In C.M. 1 : 4

b) In C.M. 1 : 5
c) In C.M. 1 : 6
Sanla faced plaster
Single coat 15 to 20 mm thick
a) In C.M. 1 : 4

b) In C.M. 1 : 5
c) In C.M. 1 : 6
Sanla faced plaster
Double coat 15 to 20 mm thick
a) In C.M. 1 : 4

b) In C.M. 1 : 5
c) In C.M. 1 : 6

100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm

(F)
SR. NO.
1
2
3

4
5

FLOORING & TILING


Mosaie tile flooring
(25 cm x 25 cm)
Mosaie tile flooring
(25 cm x 12.5 cm)
Stone flooring (marble, kotah, tandoor etc.
(45 cm x 60 cm uncut size)
(after cutting 40 cm x 55 cm)
Rough shahabad stone flooring
(45 cm x 60 cm uncut size)
(after cutting 40 cm x 55 cm)
Chequered tile flooring
(25 cm x 25 cm)

Crazy (Tukda) mosaic flooring

I.P.S. flooring

Glazed tile dado


(15 cm x 15 cm)

UNIT PER
100 cft
1 cum
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm
100 sft
1 sqm

(G)
SR. NO.
1

WATER PROOFING
Brickbat coba W/P
in W.C. bath, toilet etc.

UNIT PER
100 sft
1 sqm

2
3

Brickbat coba W/P


To terrace.
Glazed china mosaie (Kavadi) type W/P to terrace
(including brick bat coba)

100 sft
1 sqm
100 sft
1 sqm

CALCULATIONS OF SHUTTERING MATERIAL REQUIREMENT BY QUICK METHOD ESTIMATION

SR.

MATERIAL REQUIRED

UNIT

Plywood 12 m thick of
Size 2.44 x 1.22 m
(8-0 x 4-0)
Silver oak battern of
Size 75 mm x 40 mm

232 sqm

(3 x 1 )

232 sqm

Beam bottom planks

2500 sft

40 mm thick (1 )

232 sqm

2500 sft

2500 sft

3
Wooden props
2500 sft

a) For beams

232 sqm

2500 sft
b) For slab
232 sqm
5

Wooden batten for supporting


Slab plates
75 mm x 75 mm (3 x 3)
Steel plates of size
60 mm x 90 cm
(2-0 x 3-0)

2500 sft
232 sqm
2500 sft
232 sqm
2500 sft

Wire nails

232 sqm
8

2500 sft

Shuttering oil

232 sqm
9

M.S. clamps
(Shikanja)

2500 sft
232 sqm

MPTION OF STEEL IN KG PER SQM OR SFT OF WORK

SR. NO.

ITEMS

CONSUMPTION OF STEEL
on built-up area

Footing

0.55 kg/sqm

Columns up to plinth

2.15 kg/sqm

Tie beam

1.15 kg/sqm

Column (super structure)

4.80 kg/sqm

5
6

Slab
Beam

7.0 kg/sqm
7.5 kg/sqm

Chajja/loft/lintel

0.55 kg/sqm

Over head water tank

0.55 kg/sqm

TOTAL

24.25
kg/sqm

PROXIMATE QUANTITIES OF VARIOUS ITEMS PER SQ. M. / SQ. FT. OF BUILT-UP AREA.

APPROX. QTY.
PER
SR. NO.

ITEM

1
2
3

Excavation
R.C.C. below plinth
R.C.C. above plinth

SQ. M.
0.31 cum
0.046 cum
0.290 cum

Internal Masonry

0.7 sqm

External Masonry

0.9 sqm

Internal Plaster/Paint

3.2 sqm

7
8

External Plaster/Paint
Oil Paint

2.5 sqm
0.62 sqm

SQ. FT.

TERIAL CONSUMPTION FOR VARIOUS ITEMS

LOOSE SOIL
150 cft
1.5 cum

LOOSE MURUM

RUBBLE

150 cft
1.50 cum
90 cft
0.26 cum

CEMENT
9 bags
3.18 bags
12 bags
4.24 bags
17 bags
6.00 bags
22 bags
7.77 bags

CEMENT
11 bags
1 bags
1 bags
1 bags

CEMENT
4.50
1.60
2.50
0.27
1.50
0.16
1.00
0.11
1.00
0.11
1.00
0.11

bags
bags
bags
bags
bags
bags
bags
bags
bags
bags
bags
bags

CEMENT

SAND
60 cft
0.60 cum
60 cft
0.60 cum
60 cft
0.60 cum
60 cft
0.60 cum

SAND
3.75 cft
0.11 cum
3.75 cft
0.11 cum

SAND
40 cft
0.40 cum
20 cft
0.06 cum
15 cft
0.05 cum
8 cft
0.25 cum
11 cft
0.03 cum
8 cft
0.25 cum

SAND

METAL 25 mm METAL 20 mm
(1)
()
65 cft
20 cft
0.65 cum
0.20 cum
65 cft
20 cft
0.65 cum
0.20 cum
65 cft
0.65 cum
65 cft
0.65 cum

SHINGLE
2.50 cft
0.07 cum
2.50 cft
0.07 cum

RUBBLE

METAL 12
mm ()

20 cft
0.20 cum
20 cft
0.20 cum

METAL 12 mm
()
7.00 cft
0.20 cum
7.00 cft
0.20 cum

STONE
STONE
GRIT
DUST
5.50 cft
2.50 cft
0.16 cum
0.07 cum
5.50 cft
2.50 cft
0.16 cum
0.07 cum

BRICKS
23X10X7 cm

BRICKS
23X15X9
cm

BRICKS
23X10X7
cm

125 cft
1.25 cum
1000 Nos.
110 Nos.
400 Nos.
45 Nos.
475 Nos.
50 Nos.
145 Nos.
16 Nos.

SANLA
(30 Kg bag)

1.50 bags
0.16 bag
1.20 bags
0.13 bag
1.00 bags
0.11 bag
2.4 bags
0.26 bag
1.90 bags
0.21 bag
1.60 bags
0.17 bag

11.0 cft
0.03 cum
11.0 cft
0.03 cum
11.0 cft
0.03 cum
18 cft
0.06 cum
18 cft
0.06 cum
18 cft
0.06 cum

2.25 bags

17.0 cft

0.24 bag
1.8 bags
0.19 bag
1.5 bags
0.16 bag

0.05 cum
17.0 cft
0.05 cum
17.0 cft
0.05 cum

3.75 bags

28.0 cft

0.41 bag
3.0 bags
0.32 bag
2.5 bags
0.27 bag

0.09 cum
28.0 cft
0.09 cum
28.0 cft
0.09 cum

CEMENT

SAND

1.0 bags
1.11 bags
2.0 bags
0.65 bags

16 cft
0.05 cum
2 cft
0.01 cum

2.0 bags

0.60
0.07
0.60
0.07
0.60
0.07
0.60
0.07
0.60
0.07
0.60
0.07

bag
bag
bag
bag
bag
bag
bag
bag
bag
bag
bag
bag

LIME
(30 kg/bag)
2.0 bags
0.2 bags

150 Nos.
16 Nos.
125 Nos.
14 Nos.

WHITE
CEMENT
5 kg
0.55 kg
2 kg
0.65 kg

16 cft

43 Nos.

2 kg

0.22 bags

0.05 cum

5 Nos.

0.221 kg

0.75 bags

18 cft

0.08 bags
1.25 bags
0.13 bags
2.50 bags
0.27 bags
3.5 bags
0.38 bags
3.5 bags
0.38 bags

0.06 cum
16 cft
0.05 cum
16 cft
0.05 cum
16 cft
0.05 cum

CEMENT
6.0 bags
0.65 bags

2.0 bags
0.2
2.0
0.2
2.0
0.2

bags
bags
bags
bags
bags

TILES

40 Nos.
4 Nos.
150 Nos.
16 Nos.
required tukda
required tukda

420 Nos.
45 Nos.

SAND
30 cft
0.09 cum

BRICKBAT
30 cft
0.09 cum

LIME
(30 kg/bag)

2 kg
0.22 kg

KAVADI (in WHITE


kg)
CEMENT

4.0 bags
0.43 bags
5.0 bags
0.50 bags

30 cft
0.09 cum
45 cft
0.14 cum

30 cft
0.09 cum
30 cft
0.09 cum

1.20 bags
0.13 bag

K METHOD ESTIMATION FOR 232 sqm (2500 sft) OF SLAB AREA


MULTIPLYING
CONSTANT
BY THUMB
RULE

APPROXIMATE
QUANTITY OF
MATERIAL
REQUIRED

0.02

50 Nos. Sheets

0.22
50 sheets of
plywood x 65

50 Nos. Sheets
3250 rft

50 sheets of
plywood x
19.82
2500 sft x
0.24
232 sqm x
0.79
600 rft
beam bottom
x 0.5
183 rft
beam bottom
x 1.65
2500 sft x
0.16
232 sqm x
1.72

300 Nos.

2500 x 0.4

1000 rft

232 x 1.31

305 rm

2500 x 0.16

400 Nos.

232 x 1.72

400 Nos.

2500 x 0.020

50 kg

232 x 0.22

50 kg

2500 x 0.006

15 litres

232 x 0.065

15 litres

2500 x 0.08

200 Nos.

232 x 0.86

200 Nos.

NSUMPTION OF STEEL
on built-up area

990 rm
600 rft
183 rm

300 Nos.
400 Nos.
400 Nos.

125 kg
13.5 kg

25 kg
2.07 kg

0.05kg/sft
0.20kg/sft
0.10kg/sft
0.45kg/sft
0.65kg/sft
0.70kg/sft
0.05kg/sft
0.05kg/sft
2.25kg/sft

PROX. QTY.
PER

. M.

APPROX. QTY.
PER
SR. NO.

SQ. FT.
1.00 cft
0.15 cft
0.95 cft

ITEM
SQ. M.
9 Flooring
a) MM tile
b) skirting

SQ. FT.

0.75 sqm
0.82 rm

0.75 sft
0.25 rft

0.7 sft

c) W.C. / Bath

0.05 sqm

0.05 sft

0.9 sft

d) Dado

0.20 sqm

0.20 sft

3.2 sft

10 Waterproofing

0.30 sqm

0.30 sft

2.5 sft
0.62 sft

11 Door Frames
12 Windows

0.17 sqm
0.14 sqm

0.17 sft
0.14 sft

BRICKS
23X10X7
cm

145 Nos.
16 Nos.