Sunteți pe pagina 1din 135

Contractor name

Contractor Logo

CLIENT

PROJECT MANAGER

Project title.

DOCUMENT
DESCRIPTION:

MANIFOLD #XX
#XX RCC PIT,
PIT, BEAM AND
COLUMN DESIGN.

XXX
XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

XXX

Prepared

Checked

Reviewed

Approved

Issued for construction

B
A

Revised and resubmitted for approval


Issued for Clients Approval.

Rev.

Date

Revision Description

DOCUMENT NUMBER
Type

Discp

Job

Format

A4

PAGES

OF

117

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Record of Revisions
Rev.

Date

Revision Description

Issued for Clients Approval.

Revised and resubmitted for approval after incorporating clients comments.

Issued for construction.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 2 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

TABLE OF CONTENTS
Sr.

Description

No.

Page No.

Introduction

Scope

Manifold pit

1. Overall Geometry

2. Loads and load combinations

12

3. Column beam design.

35

4. Raft and wall design

79

5. Base pressure distribution.

107

6. BMD, SFD, AFD and Deflection Diagram,

109

7. Annexure
Annexure-A Staad-Pro Output.

116

Annexure-B Pump Drawings.

117

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 3 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

1) Introduction
This document is proposed to provide the description of method of carrying out the design and
detailing works for the proposed . civil/ structural works, to . Civil structural
engineering team for the following facilities.
a) ManifoldXX Pit RCC slab, walls, beam and column design.
2) Scope
This document describes the general requirements and various design parameters that shall be
considered and agreed between . team and client for the design of Civil / Structural
works of above listed item pertaining to the project. Loads due to Crane, Steel
platform and Pipe supports are arrived from Doc No .. Also Refer Annexure-1,2 and 3 of
that document for the input from others.
3)

Manifold pit.

1 Overall Geometry: Refer design basis Doc .

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 4 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Doc. No

9.5m

Job No:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 5 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Cross section (for Pipe rack design and dimensions refer Doc No. ..)

PlanPipe rack near White oil Manifold

PlanPipe rack near Black oil Manifold

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 6 of 135

Middle column

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 7 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Plan:
EL +13.00M FMD

EL +12.10M FMD RAIL TOP

6.5m

EL +11.50M
FMD

EL +5.00M FMD FGL

EL +2.60M FMD PIT FFL

Foundation system: For 1 degree of rotation settlement of soil is = tan (1o) x 500 = 8.72mm.
Pressure due to this settlement is = 20/175 = 8.72 / x hence x = 8.72 x175 / 20

x = 76.36 kN/sqm.

Further Pressure due rotation = M x 6 /b x d2 Hence M = (P x b x d2 )/6 = 12.72kN-m.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 8 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Foundation system is uniform soil spring of stillness (sub-grade modulus) of 20mm settlement at
175kN/sqm bearing pressure, Lateral stiffness is co-efficient of friction () x vertical stiffness = 8750 x
0.4 = 3500kN/m/m. Where () is as per soil investigation report of M/S Fugro for angle of repose of
( =2/3 x 1/tan ) Piperack footing consider 2m x2m footing with same soil stiffness = 8750 x 2 x 2 =
35000 kN/m/m. (Considered is 33.34% loss of contact for 3 x 3 m footing to get reduced size of 2 x
2m of footing.) Lateral stiffness is co-efficient of friction () x vertical stiffness = 35000 x 0.4 =
14000kN/m/m. (% loss of contact considered is 1/3 x 100 = 33.33%).
Rotational stiffness:

For 1 degree of rotation settlement of soil is = tan (1o) x 1000 = 17.45mm.


Pressure due to this settlement is = 20/175 = 17.45 / x hence x = 17.45 x175 / 20

x = 152.73

kN/sqm. Further Pressure due rotation = M x 6 /b x d2 Hence M = (P x b x d2)/6 = 203.64kNm/degree. Where P = 152.75 kN/sqm.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 9 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 10 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Bracket for middle column is modeled to only transfer the crane load to RC col. detailed analysis is
carried out in Doc No ...

Also single RC beam is modeled as their moments are

balancing each other only uniform dead load considered.


Member properties:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 11 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Only Property No 14 and 17 are used at crane extension bay, rest steel member are for pipe rack.

Wall 0.35 thk.

Middle Plates
0.5 thk.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 12 of 135

edge Plates
0.75 thk.

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

2 Load and load combinations: 1) Dead load: SELFWEIGHT Y -1, as per densities of
material, steel 78.50, and concrete 25.00 kN/cum respectively. Clients Manifold layout and
Piping information is Basis for design. Pipe rack loads refer Doc No. ...

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 13 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

2) Pump Load: Pump drawings are attached in Annexure-C, Pedestal height of 124 to 130mm is
required. The slab below pump is locally thickened to 1000 or 1500mm respectively as shown in
the table below. The pumps are not having dynamic load so overall weight of 3 times (min)
provided to that of Pumps weight. Staadpro. input is shown on next page.
White oil Manifold Pump details: (by Piping)

Black oil Manifold Pump details:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 14 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 15 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Pump load Notes:


Manifold Pumps are long lead Items and above details are available, so the detailing is done as
per criteria given below,
a. As the pumps are dynamically, balanced rotating equipment the foundation size will be
decided on the general guidelines of code using weight of foundation equal to 2.5 to 3
times of weight of pump. Actual loading will be updated when final data will be available
from mechanical department.
b. The pumps are proposed to be provided anti vibration bearing so that all the vibration will
be absorbed in anti-vibration pads.
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 16 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

c. Now in the detailing although the pump loads are considered on the raft slab physically the
pumps will be isolated from surrounding slab, so no transfer of loads will be due to pump
on manifold integral slab so the assumption is conservative.
3) Side wall load: Soil load: Refer design basis Doc No ..
Ph =

(1 sin )
soil h
(1 + sin )

where = is angle of repose of soil = 30o

P h = 0 . 334 2 h

P h = 0 . 667 h

Pipe Trunion loads (resting directly on Pedestal on bottom raft slab.) Refer Annexure A and C.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 17 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 18 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 19 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Plan-White Oil.

White oil Manifold- Pipe trunion loads:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 20 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Plan-Black Oil.
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 21 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 22 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Direct pipe supports: (refer Piping Document Number .)


Note:

All loads are applied at nearer to 1000 interval and dimensions are rounded to nearest
1000mm.

All Reactions are at pedestal bottom level, so no moment has been added due to shear.

Where Structural Pipe support Frame load and Direct pipe support loads are very close to
each other (less than 1000mm) the load is added on single node which will result in more
conservative and safer design.

Load transferred from Structural Pipe support Frame (at un-braced bays)
White oil Manifold Loads: Reaction summary taken from Doc No- .

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 23 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Overview:

Doc. No

Platforms

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 24 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Pipe supports

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Pipe frame support loads overview.


(Refer Doc .)
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 25 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

White oil Manifold

Contractor Logo

Contractor Name
Revision :
0

Date:

Black oil Manifold

Braced and un-braced support (Refer Doc No- ..)

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 26 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 27 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Braced bay Nodes: high reactions

Un-braced Nodes:
White Oil Manifold-Braced bay:
White Oil Manifold-Un-braced bay:
Black Oil Manifold-Braced bay:
Black Oil Manifold- Un-braced bay:
Shear force at Pedestal top is transferred at raft top equal to Mx and MZ as shown above.
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 28 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Access platform support braced and un-braced bays are considered to be in one group of un-braced
columns as the reactions are less compared to braced bays.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 29 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Platform reaction on crane column:

These loads include:


1. Platform reaction:
2. Stair Reaction:
3. Fire Monitor platform Reaction:
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 30 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Stair and fire monitor reaction is considered equal to platform reaction conservatively although they
light structures.
Raft Live load: 500 kN/sqm all over the slab:

Crane loads: Refer .

Two load locations are selected each at 6mc/c wheel-base one at centre of manifold and one near to
pipe-rack columns. Load of 40m crane applied on 30m span conservatively.
Lower value of crane wheel-base is considered to get more closer distribution of reactions and most
adverse condition (40m crane and 30m cranes are having 6.6m and 6m wheelbase respectively.
Moment due to crane reaction at corbel location is considered and applied at middle column.
In crane parking bay only unloaded weight of crane is considered:
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 31 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Live load of platform 600 wide at


middle rail beam = 0.6 x
0.5kN/sqm = 0.3 say 0.45 kN/m

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 32 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

At north end and at crane parking bay, a wheel load is considered to check column members.
Wind load: Wind load will act on pipe rack, Gantry girder and supporting beams/columns for wind load
on pipe rack refer .. pit wall and piping inside the pit no wind load is considered to be acting.

Refer BS 6399 Part -2,

Wind load on side beam and vertical column of 300 deep wide,
= 2 x 0.3 x 0.971 = 0.583 kN/m

Refer piping Drawing No .,


XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 33 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Largest pipe is 24in ~ 600mm so wind load for 5m span is = 0.6 x 1.2 x 0.971 x 5 = 3.5kN per 5 m
bay
Crane column wind load = 0.5 x 2 x 0.971 = 0.971kN/m.
Crane beam wind load = 0.6 x 2 x 0.971 = 1.16kN/m.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 34 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Wind load on crane supporting beam and columns is shown here for wind load on pipe rack refer
.

Seismic load: Seismic load will act on pipe rack, Gantry girder and supporting beams/columns. The
reaction of pipe support platform inclusive of wind/seismic loads are applied on base raft.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 35 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

UBC 97 Seismic load will be divided by 1.4 and multiplied by factor of 1.2 as per BS8110.
Loading combination: Loading combination shall be as per clause Doc No ..
Additionally following table from BS8110 part 1 is referred.
Notes:

Crane load is considered as imposed load factor is 1.6.

Piping load in manifold pit is considered as imposed load factor is 1.6.

Platform Loads in manifold pit are considered as imposed load factor is 1.6.

For Live load (General live load/Pipe loads etc)reduction of 50% is considered in EQ case.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 36 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Concrete design parameters:


Column effective lengths:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 37 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

ELY Minor axis effective length 1.5 times unsupported length.

ELZ Major axis effective length 2 times unsupported length.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 38 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Column beam Design: Crane supporting Beams

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 39 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Critical design for bending is for beam 11473.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 40 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Provide 5 Nos. T25 top main bars throughout 2450sqmm > 1808mm OK.
Provide 5 Nos. T20 top main bars throughout 1570sqmm > 628mm OK.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 41 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Area of stirrups of T8 dia. 2 Legged is 50.3 x 2 = 100.6 sqmm. Actual area provided is 113 x 5 =
565sqmm so stirrups spacing can be increased to 565/100 x 60 = 339mm c/c Provide T12-5L @
140c/c
T25- 5 Nos. Top

T20- 5 Nos

Design of TB2: Pipe rack Tie beam on Manifold side:


XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 42 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Force envelope (Bending and Shear)

Force envelope (Bending and Shear)


XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 43 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Moment at face of column 750 wide (P3) is = (917 0) x 1.625 / 2 + 11.4 = 745kNm

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 44 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Area per meter of beam of links = 50.3 x 2 x 7 = 704sqmm provided is 78.5x 2 x 5.55 = 871sqmm OK.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 45 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Crane Column Design:

load combinations for Min Fx, Max My and Min Mz are critical from the table above:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 46 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 47 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 48 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Crane column height above raft top is (lo) 9.5m (cantilever) 60b =60 x 0.5 =30m > 9.5m. Also 100 x
b x b/h = 100 x 0.5 x 0.5/0.75 = 33.34 > 9.2m hence column is not slender. (BS-8110 Part-1)

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 49 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 50 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 51 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 52 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 53 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Stress ratio for Crane column projection members (middle col. Bracket is not designed here):

Crane column footings outside Manifold Pit (for Crane parking Bay)
Column Node Numbers:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 54 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 55 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

*****
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 56 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 57 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 58 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 59 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Crane Parking Bay Bracket insert Plate design:

Per Insert plate 263kN ~ 60kips force.

Middle Column 2 IPs at top (in Tension)


XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 60 of 135

Side Columns 1 IP at top (in Tension)

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 61 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Crane column deflection check: (Un-factored operating load combinations only)

Vertical deflection:

North.
Vertical deflection Allowable as per BS 8110 = Span/600 = 1500/600=2.5mm ~ 3 (11-8mm)
Cantilever at South end. Ok.
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 62 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Vertical deflection Allowable as per BS 8110 = Span /600 = 4000/600=6.66mm > 6 (8-5mm) Next to
cantilever span from south side. Ok. Also in this case crane will be unloaded so it is conservative.

North.

Operating Load Deflection:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 63 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

North.

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Soil Load Deflection:

Lateral deflection Allowable as per BS 8110 = Span/600 = 9500/600=15.83mm > 11 (25-14mm)


Difference in Soil load and operating load. Crane erection will be after soil backfilling around manifold.
Design of pipe-rack column resting on Manifold slab:
All columns:
Pipe rack Unbraced columns Design:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 64 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 65 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 66 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 67 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Base plate design:

Moment y as shown above at top is not considered as it is generated due to shear force and does not
acts on base plate.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 68 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 69 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Resultant Shear = Sqroot ( Fy2 + Fz2) =31 kN

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 70 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 71 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 72 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 73 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 74 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 75 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Pipe Rack columns braced bays:

Combinations Max Fx, Min Fx and Min My are critical.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 76 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 77 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 78 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 79 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 80 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Column Design members

Base plate design nodes:

Base plate design members:

Base pate reaction: only top nodes of considered for base plate design.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 81 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 82 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 83 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Resultant Shear = Sqroot ( Fy2 + Fz2) =386.87 kN

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 84 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 85 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 86 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 87 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 88 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Anchor bolt design is done for total tensile force and shear: tension = 1368 x 1.2 = 1641 kN ~ 369
kips (seismic case combination 24) and shear 386 kN ~ 138.84 kips. Note that moment is negligible.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 89 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 90 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Design of Pedestals Inside of Pit:


Un-braced Nodes:
1. White Oil Manifold-Braced bay:
2. White Oil Manifold-Un-braced bay:
3. Black Oil Manifold-Braced bay:
4. Black Oil Manifold- Un-braced bay:
As the force is tensile force and Bolt is directly anchored in Raft slab pedestal is not designed. Only
anchor bolt is designed. For Pedestal only 0.4 % nominal steel is provided = 1440 Sqmm Provided is
8 Nos T 20 = 2512 Sqmm.
Anchor bolt design is done for factored force of 725 x 1.2 = 870 kN and shear resultant of 367 kN.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 91 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

4) Raft and wall Design: Base raft: Pump foundation will be left with construction joints:
Considerations:
1. Local stresses and forces (moments) are averaged between the highest of that plate to next
plate element highest stress/force adjacent to it. This is done because generally in finite
element analysis some local stress/force concentration is always there and shall be corrected.
2. Maximum Mx or My is combined with Mxy using Wood's Armer principle i.e.
Mx' = Mx + 0.7 x Mxy
Or My' = My + 0.7 x Mxy.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 92 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Contractor Logo

Contractor Name
Revision :
0

Doc. No

Date:

This is to account the twisting moment acting to at an angle to the orthogonal reinforcement
axis. Similar method is followed for two way slab corner where the cracking due to twisting
(torsion is in diagonal direction)
The angle of such moment is considered as 45 Degrees.
3. Crack width calculations are done as per BS 8007 provisions for un-factored load combination
including seismic and wind.
4. Strength design is done for all factored load combinations.
5. Sign convention for plate stresses and forces is as shown is sketches below, which is
obtained from staad-pro manual.
6. Local Z direction face moments are always +ve. (tension face) and shear force along local Z is
+ve.

[[

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 93 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

A. Side Wall Design


1. Strength Design. Wall Maximum force summary:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 94 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 95 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Shear forces:
Design is done for Maximum SQX (+ve- Wall inside face) and Minimum SQX (-ve-Wall outside face)

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 96 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Maximum SQX is average of forces of Plate 1789 and 1790

Contractor Logo

Contractor Name
Revision :
0

Date:

Minimum SQX is average of forces of Plate 1721 and 1651

Bending Moment:
Design is done for Maximum My (+ve - Wall inside face) and Minimum My (-ve-Wall outside face)

Maximum My is average of forces of Plate 1263 and 1343

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 97 of 135

Minimum SQX is average of forces of Plate 1048 and 1128

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 98 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 99 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Check for crack width: Wall Maximum force summary: (un-factored Loads)

Shear forces are not required for crack width check:


Bending Moment:
Check is done for Maximum My (+ve - Wall inside face) and Minimum My (-ve - Wall outside face)

Maximum My is average of forces of Plate 1044 and 1124

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 100 of 135

Minimum My is average of forces of Plate 61 and 141

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 101 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 102 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 103 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 104 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

B. Raft Slab Design:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 105 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

500 THK Plates

750 THK Plates

Plate thicknesses.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 106 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Stress contour for factored Loads: (shown for Load comb. 15)

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 107 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 108 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 109 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 110 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Design of 500 Thk Raft slab:


XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 111 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Maximum SQX is average of forces of Plate 6043 and 6143

Force Summary

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 112 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Minimum SQY is average of forces of Plate 6216 and 6146

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

These two plates are located exactly at the Pedestal locations. Shear force at 'd' will be outside the
element boundary, so average value is considered sketch below and values marked as *.

Pedestal
locations

Maximum Mx is average of forces of Plate 4321 and 4322

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 113 of 135

Minimum My is uniform in E-W direction so no average is taken.

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 114 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Crack width check: only moments are considered. (un-factored load summary)

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 115 of 135

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Force summary for crack width :

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 116 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 117 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 118 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Design of 750 Thk strips below piperack columns:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 119 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 120 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Crack width Check:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 121 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Check is done for Max My as it is highest moment at bottom and top and bottom same steel is
provided.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 122 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

5) Base pressure distribution:


All reactions are less than 175kN/sqm and are within the limit.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 123 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 124 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Two groups are identified of plates:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 125 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

6) BMD, SFD and AFD and deflection diagram.

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 126 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 127 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 128 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 129 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 130 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

Contractor Logo

Contractor Name
Revision :
0

Date:

Deflection Diagram:

The deflection visible is scaled up for better visibility: actual deflection is just in some mm.
XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc
Page 131 of 135

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

7) ANNEXURE

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 132 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

A. Staad pro Output

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 133 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

B. Pump Drawings:

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 134 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

Contractor Logo

MANIFOLD XX RCC
PIT, BEAM AND
COLUMN DESIGN.

Job No:

Doc. No

XX-X-XXXX-XX-XXXX-REV XX - Manifold #XX RCC design.doc


Page 135 of 135

Contractor Logo

Contractor Name
Revision :
0

Date:

S-ar putea să vă placă și