DESIGN PARAMETERS
Material
1. TUBE B.S. 1139
Outside Dia.
Thickness, t
Weight
Area
Yield Stress
Modulus of Elasticity

ATTACHMENT 1A
48.3 mm
3.2 mm
0.04 kN/m
2
453.00 mm
235 MPa
200000 MPa

2. MILD STEEL
Yield Stress
Modulus of Elasticity

250 MPa
200000 MPa

Design Loads
Dead loads (DL)
Concrete
Formwork
Live Load, LL

3
24.5 kN/m
2
0.5 kN/m
2
1.50 kN/m

SLAB SUPPORT
Slab Thickness =

Grid

Fs

Loading Condition, P = FS (DL + LL)


Dead load :
Concrete
Form
DL

1.8
[6'

0.3 m

=
=

0.3

24.5

x
X

1.1

=
=

Live load :
LL

2
7.35 kN/m
2
0.5 kN/m
2
7.85 kN/m

2
1.50 kN/m

Total Area Load :


Factor load, P =

1.1

7.85

1.50

2
10.29 kN/m

Check 6' (1.829m) Decking Beam


Point Load, P1, P2
P1 = 10.29
P2 = 10.29

x
x

0.548
0.548

1.3
1.3

=
=

7.33 kN
7.33 kN

1.3
4']

&

FO RM W O RK

Ref Drawing No.

S C A F F O L D IN G

CALCULATION
SHEET

L .L .C .

Project Name:

OMAN/8132/01

Sheet No.

Rev.

2 of 4

3
14/2/2007

Prepared by:

Date:

OCEC PACKAGE-4 CONVENTION HOTEL # 1


MZU
Client:

20\09\2015

Checked by:

BAHWAN BUILDING CONTRACTING

Date:

MZU

7.33 P1

20\09\2015

7.33

P1

245
R

M1

548

Reaction R
R=
7.33

548

0.50

548

2 Nos. of 12mm Dia. Round Bar

7.33

Member , M1

Tensile Capacity, Tc

M1 = 10.99

Joint A
tan 1
1

10.99 kN

245

M1 =

245
26.93

=
=

245/586
24.088

M1

Actual Stresses
Allowable Stresses

Ratio

548

Check 2 dia 12 Bar Capacity, Tc


Bar Area, As

2
As = 0.7854(12)2 x 2 =
226 mm
Tc = FyA =
56.55 kN

kN (T)
=

tan 2
2

0.4471

26.93 kN (T)

<

56.55 kN

=
=

245/586 =
24.088

..safe!

UDL = 24.07 kN
UDL =
40 kN
0.6017

Check 4' (1.22m) Infill Beam @


Span L =
1.3
m
Uniform Load, w
w = 10.29
0.488
w = 5.02 kN/m
Shear and Moment V, M
V = 0.5wL
V = 3.26
kN
2
M = 0.125wL
M = 1.06
kN-m

488

mm.o.c.

Spacing of infill beam

W=

5.02 kN/m

1.3

0.45

Ratio =0.48

&

FO RM W O RK

Ref Drawing No.

S C A F F O L D IN G

CALCULATION
SHEET

L .L .C .

Project Name:

OMAN/8132/01

Sheet No.

Rev.

3 of 4

3
14/2/2007

Prepared by:

Date:

OCEC PACKAGE-4 CONVENTION HOTEL # 1


MZU
Client:

20\09\2015

Checked by:

BAHWAN BUILDING CONTRACTING


Capacity, Vc, Mz
Properties of Infill beam
Area
Plastic Modulus, Z
Vc =
Mz =

0.4
250

MZU

2
621 mm
3
11919 mm

=
=

250
11919

621

Max. deflection =

5
384

Allowable deflection

Date:

=
=

62.1 kN
2.98 kN.m

5.02
200000
L /360

1300
4.84E+05
=

>
>

20\09\2015

3.26 kN
1.06 kN.m

3.6111 mm

mm4

483875

safe!
safe!

1.93 mm

>

1.93 mm safe!

Check Standard
Axial Load, P
P =
10.29

1.8

1.3

Tube Capacity, Pc
Fy =
235 Mpa
SIF =
E = 200000 Mpa
L=
1500 mm, Unbraced Length
C=

2 p2 E / Fy

1.1

129.61

r = 15.98 mm
2
A=
453 mm
L / r = 93.867
>

( 1 - (L/r)2/2C2) Fy*SIF
(5/3) + ( 3(L/r)/(8c) - (L/r)3/( 8c3)
Fa = 100.86 Mpa

Safe Length of Adjustable base jack =


1.3

q 38 x 4 Jack Capacity, Pc
Fy =
275 Mpa
E = 200000 Mpa
L=
300 mm, Adjusted Length
C=

2 p2 E / Fy

( 1 - (L/r)2/2C2) Fy
(5/3) + ( 3(L/r)/(8c) - (L/r)3/( 8c3)
Fa = 137.49 Mpa
Fa =

93.867
Pc = Fa A
Pc = 100.86
453
Pc = 45.69 kN
>
24.07 kN
45.69 kN
ATTACHMENT

Fa =

Check Adjustable Base Jack


Axial Load, P
P =
10.29
1.8

24.067 kN

>

300 mm

24.067 kN

r = 11.71 mm
A = 0.7854
36
kL / r = 51.238
119.82

safe!

k=
30
2

2.0
2
=
311 mm

51.238
Pc = Fa A
Pc = 137.49 311
Pc = 42.76 kN

>

24.07 kN

safe!

&

FO RM W O RK

Ref Drawing No.

S C A F F O L D IN G

CALCULATION
SHEET

L .L .C .

OMAN/8132/01

Sheet No.

Rev.

4 of 4

3
14/2/2007

Project Name:

Prepared by:

Date:

OCEC PACKAGE-4 CONVENTION HOTEL # 1


MZU
Client:

20\09\2015

Checked by:

BAHWAN BUILDING CONTRACTING

Date:

MZU

20\09\2015

Check Brace
Assume Horizontal Force :
Fh
=
0.05

5% of factored axial load


24.07
=
1.203 kN

1
1.5

Diagonal Force :
Fd
=
1.203345
Fd

1.50
1.8

Fd

1.8

1.8

provide bracing
Bracing must be in
a X & Z direction

1.57 kN

Checking Swivel Coupler


SCcap

Fh

ATTACHMENT

5.30 kN

>

1.57

kN

safe! Ratio =
p=

0.3

24.07

Fd =

1.57

Foundation - Recomandation
Loading
Vertical Load, p
Load From wind Pressure
Diagonal Force, Fb
Foundation Load, Fl

24.07

kN

1.566

kN

Fl =

25.1

25.1
150x150x6
Steel Plate
1.566
Fl

24.0669

+
1.50

Fl

25.06969 Kn

Soil Prssure, Ps

1.5

1.8

<
F1
Area

62.610 Kn

safe!

=
25.07
x
0.750

Ps

0.225

Ps

148.56 kN/m

Provide soil compaction @ least 300 kN/m Pressure

ADDITIONAL NOTES:
1. The contractor shall support unsupported beams and make-up areas with props.
2. Guardrail and toeboard on all access by contractor.
3. Temporary support must be sufficiently braced and/or butt tied and linked
while erection is in progress and stabilized prior to installation of reinforcements or any loadings.
4. Joints on standards are the responsibility of the contractor.
5. Contractor shall cover all slab openings with suitable materials.

Fl

6. Erection and dismantling by contractor.


7. DO NOT INSTALL ANY DEFECTIVE COMPONENTS OF DECKING AND SUPPORT.
8. Bridging across slab openings by contractor.
9. Protection fans and safety net by contractor.
10. Backpropping by contractor.

50x225x750
Sole Board

S-ar putea să vă placă și