Page
1. Executive Summary

2. Introduction
i.

Arena Country Club

ii.

Description of the Building

iii.

Existing Structural System

iv.

Existing Structural Condition


a) Desk Study

b) Field Investigation

3. Renovation & Upgrading Work


i.

Reason for renovation works

ii.

Design Consideration Stage

3
3

Owners Requirement

Statutory Requirements

Architectural Aspect

Structural Aspect

iii.

Foundation and Sub-Structural System

iv.

Super-Structural works

a) At 3th Storey

b) At 4th Storey

c) Roofing works

d) Internal Steel Staircase

4. Problems faced during the renovation work

5. References

6. Appendixes

7-10

ARENA Country Club | Renovation Work

Page |2

Executive Summary
The report presents the renovation & upgrading of 2-Storey Building with RC Roof Slab to the
4-Storey building. The report will be arrange in the order of inspection & findings, owners
requirement & authorities requirement, design & analysis, construction & problems solving.
The renovation and upgrading works involved strengthening works to the existing building,
Installation of new lift, upgrading of the existing fire safety system & upgrading the building to
comply current code of practice of relevant statutory authorities.

Introduction
i.

Arena Country Club


The Arena Country Club stands in close proximity to the Singapore Discovery Centre and
the SAFTI Military Institute at 511 Upper Jurong Road, Singapore. It occupies 28,755 sq.m.
that is poised to become an exciting hub brimming with endless activities for its members.

ii.

Description of the Building


The Arena Country Club consists of 3 main blocks with various facilities. The 2 storey main
block and left wing consist of restaurant, admin office, bowling centre ,function hall, lap
swimming pool, pub, children playground centre, kitchen and etc.
The 3 Storey right wing block consist of gymnasium, toilet, and sauna at 1st storey and
KTV rooms at second storey. (The report will be focused only for this block)
The 3 storey amenities block consists of fast food outlet, convenience store, toilet, pro shop
at 1st storey. There are indoor sport areas with multi-purpose courts, golf driving range deck,
office and etc at 2nd storey. The 3rd storey is storeroom and open sky driving range.
The single storey food court located the side of the amenities block.

iii.

Existing Structural System


The existing RC building is generally constructed with conventional RC structure up to
second storey including the Pad Footing, Beams, Columns & slabs forming the main
structural members of the building. Existing roofing system is the RC flat roof and serving
the Water Tank on top of it. Existing Columns & Beams goes up to the next level to capture
the future extension of roof and there is one bay of RC slab.

ARENA Country Club | Renovation Work

Page |3

iv.

Existing Structural Condition


a) Desk Study:
The available existing structural plans and details indicate the designed live load for the
1st and 2nd Floors are 5.0 kN/m2. Existing 1st Storey floor slab is designed as slab on
grade. Existing 2nd Storey slab is designed as two way RC slab. The footing and column
are designed not only for the existing 3-Storey Building but they are designed to capture
for future roof extension. All the Dead & Live loads are distributed through beams,
columns are sitting on the pad footing. The Design Strength of steel is fy =460N/mm2
and concrete is fc= 30N/mm2
b) Field Investigation:
Site investigation is carried out to verify the as built plans. The layout of structural
framing & sizes are tally with approved plan. There is no addition & alteration and no
sign of overloading is found. There is no sign of defect such as cracking, curling, joint
failure & water penetration is found on slab on grade. Existing beams and column are
structurally sound and no sign of structural distress or crack is found during the
inspection. Existing Roof slab is found to be no water seepage.

Renovation & Upgrading Work


i. Reason of Renovation Work
When it comes to stability and integrity of the existing building and its structural is
sound and stable. But owner decided to renovate to increase the serviceability and
upgrade the building to meet the statutory requirement such as Accessibility and Fire
safety requirement, etc.
ii. Design Consideration Stage
Owners Requirements
Owners the only and main concern is to increase serviceability with minimal cost.
ARENA Country Club | Renovation Work

Page |4

Statutory Requirements
The existing building and all new additional building works has to meet the
current statutory requirement such as Accessibility, Fire Safety Requirement.
Therefore, the building is required to upgrade the mechanical and electrical
system such as sprinkler system, dry riser, emergency light and alarm system, fire
hose reel and fire extinguishers according to the fire safety requirements.
And the building is required to be accessible especially for the wheel chair
users and persons with disabilities. As such, the minimum accessibility provisions
such as handicap carpark, accessible route, ramp, lift designated for wheel chair
users, water closet and bath facilities and signage etc.
Architectural Aspect
Architect has to concern about not only the owners requirement and request
but also the statutory requirements as stated above.
Structural Aspect
Engineer has to think of the design in such a way that all the requirement to
be complied with low cost. Moreover, new structural works and strengthening works
are required to meet the factors including effectiveness, constructability, durable,
cost-efficient and aesthetics.
iii. Foundation & Sub Structural System
The existing RC pad footings, which have been taking into consideration for future
extension, are able to withstand the current loading and future loading comes from
additional storey and new roof system. Two new RC pad footings are provided to support
the external steel staircase and new lift structures, which are supporting the overhead water
tank above. Allowable soil bearing capacity is 75 kN/m2. All load from overhead tank, steel
staircase and lift are transfer through the new RC Column. Please refer to the attached
drawing Appendix 1.
iv. Super Structural Work
a) At 3rd Storey
The design imposed load of existing 3rd Storey is 5.0kN/m2 and loading requirement has
met for the intended usage. Moreover, the inspection and structural analysis shown the
existing structural is in good condition thus the existing structure does not required to
do the strengthening for change of use.
ARENA Country Club | Renovation Work

Page |5

b) At 4th Storey
The design imposed load of 4th Storey Beam and one panel of slab does not met the
loading requirement of the change of use, therefore strengthening works to the existing
beams is required to withstand the future loading. Although there are many methods of
strengthening concrete beams, because of the fireproofing and aesthetics requirement,
enlarging the concrete section is the most suitable method. Active method of
strengthening is adopted as the current members are upgraded to resist both future (live
& superimposed) and existing (dead) loads. The strengthening works, involving prestressing and jacking current members to remove the existing stresses, will be carried
out as shown in the attached Drawing Appendix 2.
The 4th Storey slab will be supported by the 300x96x27.5x2.4x10.09 kg/m Lipped
Channel. The slab is designed as composite concrete slab with 0.75mm BMT Lysaght
Bondek II (yield strength 550 Mpa). The detail of the composite slab is as shown in the
attached Drawing Appendix 3. The properties of the Lysaght Bondek II are shown as
below.

c) Roofing Work
Roofing is separated into two portions, three perimeter side of the building except rear
elevation, are covered with clay tile roof. And the remaining portion including the
alongside of the rear elevation is covered by metal roof. Roof Truss are fixing to the
Stanchion which is fixed and supported by 4th Storey beam.
d) Internal Staircase
Internal staircase from 3rd to 4th Storey is designed as Steel Staircase. Please refer the
attached Appendix 3.
ARENA Country Club | Renovation Work

Page |6

Problem Facing during Renovation & Upgrading Work


i)

As the building is in irregular shape (Trapezoidal Shape), the columns located


alongside of Rear Elevation of the building become irregular shape like Trapezoidal.

ii)

As the result of limited space, the new lift and external steel staircase are allocated
along the existing handicap route, the new handicap ramp is provided by steel platform
which is turning alongside of the steel staircase and new lift core.

iii)

The design of the roof truss base on the two directional slopes which is roof pitch angle
and slope due to the irregular shape. So, the truss heights are varying according to the
slope. Please refer to the attached Appendix 4.

iv)

To prevent the buckling of the truss, engineer adopted the fly brace connection to
strength the roof truss from the purlin by bracing angle. Please refer to the attached
Appendix 3.

References
1. The Institution of Structural Engineers (2010), Appraisal of Existing Structures (3rd Ed.)
International HQ, 11 Upper Belgrave Street, London SW1X8BH.
2. Internal Concrete Repair Institute (Feb 2006), Technical Guidelines, Guideline
No.03742, Guide for selection of strengthening systems for concrete structures.
3166 S. River Road, Suite 132, Des Plaines, IL 60018.
3. Building & Construction Authority (2007), Accessibility Code 2007, 5 Maxwell Road
#16-00 Tower Block MND Complex, Singapore 069110.
4. BCA Academy of the Built Environment (2011), Structural Appraisal & Repair
(Lecture Notes).200 Braddell Road, Singapore 579700.
5. http://www.scdf.gov.sg/content/scdf_internet/en/buildingprofessionals/publications.html
6. http://bca.gov.sg/Publications/publications.html
7. http://www.bluescopesteelasia.com/bluescopesteel/country/singapore/lysaght/en/
8. http://www.arenaclub.com.sg/

ARENA Country Club | Renovation Work

S-ar putea să vă placă și